HomeMy WebLinkAboutSite PlanCD z
7 l _ 70,//7FF
7
y
r-----_
163
l
SCNLER
RD.
v yURC
NORWICH
82
A SUT1VIEW m
C0
RO-
354
RAYMOND
SCD COLCHEST ®<boxo gk(,
41
N tR 63
Aqp} 2 3 DR BEACH LA. - 7
D
1
Q RD I. 5 BIRCH PT.TRe
r-- BLUFF RD. - 5
CEDAR RD. - 3xabo COURT AV -4J® Z' EDKLA `i+
0 LAKE DR -I
SNORT R0. -E
CL ' LPRDR
OKp0-
08 1
O+orw, RD
a
fiJ 1a 5,9' e0t0
2 see,
Q R
K rI3 o
0 0FORSYTH51
17, sy 1 r-14
9 r OdKdo%
tq Z
s, 5ro s 2 J a to tl t 15
KEY MAP
5 15 SCALE AN fEET
ZONE* RA 120
EXISTING
Performed 10/31/89
LOT 25 MMP, 57 L015 Zf 5
PROPOSED
AREA= 1.14 Ac.
200 CONTOUR 200
I1-75" SAND & GRAVEL
BOULDER
68" GROUNDWATER
ABBREVIATIONS
AcuP wu 00mancoan MM M wMqHMEwrkam MIL
WPtT00( APPRmCWTE
0-24" TOPSOILt STONY CONFIRMATION
ummECICBI'TtAAIm Cww UP can vw rns zlAmm
OR wsmmumsWN
EASEMENT LINE
IS= XI
SOME 'COBBLES &
I Jtit' OR F/nytlfy+E] y y
BOULDERS (TOUGH
81 i
yy/+
i14N.
rW
C&x*
w CORMC:.W/ ow vI IM PC y /
w/
yW
Y{.IR.Tp1J411./i.
LN\1 {ir Ml7f{iMw
STONEWALL C.'ooC
r.9 HEAP OF STONES
C00
P
OR Cit>OT WAllt1UEM GFM
M•
GE a
POI" OF 11fRTT('JII. CURYATUITE
Clay
t:ErriEXtte
CaTRM= LIGHT " rower OouPtw
PM
vvr PONE OF VERTM ItTff=TM
pw IT WRIM ul ctwrCu? MUCAMe 1113k "S t oR Kilo umIIIcC" wff
temgtt INT atMolti
allverr Qo
ORDIP DIADOM
WATER
LIMIT
NE W
IINFORM COt"ETE PPE
DEEPTREE
TTEST PIT
PERCOLATION TEST
PFE ww CW OF WAYE
EL OR ELEV
am
ET.EMITpIt
IR
sSOLITH
POWER POLE
Esus- EASOA ff wr S#OME=
TD
Oc6m So. STOW SEM
M ir
ref
AND
TTRw
FIRM R DAP"
Suit WMARINir MMMLE
NEW E?IG1 w TFlF VICFTFOOTORnHW
0 G.G.
SPECFrAM
FF^
SPECS
CAS I
att>`.itilla
SWS1iOR
WATER GATE
WTFORO BMW Lt" COU w TEL TE PIMHPw" PWT
9-0 If
TTESTHYDWA"ILTP1{tUI
PITT
IE IIc Rr E1.EVlUIOH lw
UP TIPM
KELL
Iw
CATCH BASIN
FTEs cfooertc sTmSr
ROAD SIGN
vV OR VE"
OR IYDEORI" RM NLF
D'
UWR FEU
L POtI w MIT
14C LE? M- OF YUMC& CURY uu
R GATE
UTERilE7t TRWVAXVAXWUtknV" OUT gklnm
K9 e o TOE OF FlLL SLOPE F
WAXER SEFUCE VALVE
G GA.SLINE
ww lfftc WAM
LEGEND_
JOSEPH MERRITT & CO.
X!rT, I e 1 Fr I (r1F
FOUNDATION DRAIN
115 - 2 SDR 35 0 0
ONE FOOT CONTOUR INTERVAL -
0 1111,
1
f(JAM ka
dicra j
Ur
j J
i
EXIST
HOUSE
ED AMIJNIn.C FPHINF
SMITH EXIST BIT DECK
DRIVE _-
6 DRAT N Ij,<
w - --
N
0<
C04
TEST PIT RESULTS
EXISTING
Performed 10/31/89
PROPOSED EXISTING
TP#3
PROPOSED
0-11" TOPSOIL
200 CONTOUR 200
I1-75" SAND & GRAVEL
BOULDER
68" GROUNDWATER
NO LEDGE NO LEDGE
PROPERTY LINE I= STEPS om
TP#6
0-24" TOPSOILt STONY CONFIRMATION
BLDG SETBACK
FILL MATERIAL FOR
TREE W/WIRE
HOUSE
49-80" SILTY SAND LOCATION
EASEMENT LINE
NO LEDGE NO LEDGE
IRON PIN/PIPE
SOME 'COBBLES & SOME COBBLES
BOULDERS (TOUGH
WATERCOURSE
DIGGING)
IMERESTONE PERFORMED 10/31/89
fix-Ngl Apo
STONEWALL C.'ooC
r.9 HEAP OF STONES
11
12102 12.25
M• TREELINE x121.69 SPOT GRADE X125.67
x—x x FENCE d
DEPTH (IN.)e 29
temgtt INT atMolti
PRESOAK (HRS.) 2
w WATER
LIMIT
NE W
DEEPTREE
TTEST PIT
PERCOLATION TEST
mw k"
dt WETLANDS
LEDGE POWER POLE
Gm ottei otkflll
f
HEDGE
rrlairn{r
cc SOILcs
PLACEMENT
M ir
ref
AND
tser 11111119111*
NIeM{
CONSTRUCTION
GUIDERAII
e sMit ,
FILTER BARRIER
0 G 0 G.G.
RETAINING WALL att>`.itilla 0 W.G. WATER GATE 0 W.G.
S-O-S— SAN. MANHOLE S-#-'S— 9-0 If
HYDRANT
STORM M91HOLE 0 WATER WELLW W
Tts- CATCH BASIN ROAD SIGN
PARKING SPACES RIPRAP
SILT FENCE nw taw tw tlew ars I I OVERHEAD POWER LINES
STAKED HAYBALES K9 e o TOE OF FlLL SLOPE F
a
r
G GA.SLINE G TOP OF CUT SLOPE
JOSEPH MERRITT & CO.
X!rT, I e 1 Fr I (r1F
FOUNDATION DRAIN
115 - 2 SDR 35 0 0
ONE FOOT CONTOUR INTERVAL -
0 1111,
1
f(JAM ka
dicra j
Ur
j J
i
EXIST
HOUSE
ED AMIJNIn.C FPHINF
SMITH EXIST BIT DECK
DRIVE _-
6 DRAT N Ij,<
w - --
N
0<
C04
TEST PIT RESULTS
Performed 10/31/89
FILTER FABRIC
TF'# 1 TP#2 TP#3
0-22" LOAMY GRAVEL 0-13" GRAVELLY 0-11" TOPSOIL
TOPSOIL
peat tN.m{Nit.
22-96" GRhVEL 13-72" GRAVEL I1-75" SAND & GRAVEL
NO GROUNDWATER 70" GROUNDWATER 68" GROUNDWATER
NO LEDGE NO LEDGE NO LEDGE
SOME COBBLES & SOME COBBLES
BOULDERS
TP#4 TP#5 TP#6
0-24" TOPSOILt STONY CONFIRMATION CONFIRMATION
FILL MATERIAL FOR FOR
24-49" SILTY LOAM HOUSE HOUSE
49-80" SILTY SAND LOCATION LOCATION
59" GROMDWATER 12" GROUNDWATER 48" MOTTLING
NO LEDGE NO LEDGE NO LEDGE
SOME 'COBBLES & SOME COBBLES
BOULDERS (TOUGH
DIGGING)
PERCOLATION TEST
PERFORMED 10/31/89
fix-Ngl Apo
TIME (MIN.) READING (IN.)
11147 8.5
11152 10.375
11
12102 12.25
I=
OM/twMlIn
12107 13.125
12212 14
I.AIIetN filter ft N It
12:17 14.625
12122 15
12127 13.3
DEPTH (IN.)e 29
temgtt INT atMolti
PRESOAK (HRS.) 2
edea/ N N the Ir{ntN.
PERC. RATE: 9.33
NM.
MIN./IN.)
A CONFIRMATORY DEEP TEST PIT SHALL BE C
10 CHECK FSR POSSIBLE MOTTLING. UNCAS
HEAL2jH DISTRICT SHALL BE NOTIFIED SO
THEY CAN OBSERVE THE HOLE BEFORE
THE START OF CONSTRUCTION
I E =391.4
I fol p{b oN ttaw{t 2.=1601e IM rift mttN
FILTER FABRIC
t to t so leafta tet
t• ` q
r
ItptIM N ead post.
peat tN.m{Nit.
4' OEPT-H Q3 ®® 0
rZCRI rtj Z3 065
g
It (ftllt111BN{
tD'
slowly o w tell eNE44. 4U0,11,15
lmit fix-NglApo
11
I=
OM/twMlIn
I.AIIetN filter ft N It 4.•tt fMl IM lhtetN oawl
Iris rift We" Mt temgtt INT atMolti
edea/ N N the Ir{ntN. NM.
mw k"
f
Gm ottei otkflll
f
rlrtttwrs' rrlairn{r
Li
PLACEMENT
M ir
ref
AND
tser 11111119111*
NIeM{
CONSTRUCTION OF A SYNTHETIC
e sMit ,
FILTER BARRIER
r
1
a
1 /
SWAMP ELEV WATER= 394.5+
APPROXI M;1TE LIMIT OF
501 REAR YARD
SETBACK
N/F
DABROSK I
25{SIDE YARD
1. THE STOCKPILING 3F BUILDING MATERIALS SHALL BE CONFINED TO THE AREA OF
DISTURBANCE. PROPOSED LEACHING SYSTEM AREA SHOULD NOT BE USED FOR TRAFFIC OR
PARKING AREAS. THE SEWAGE DISPOSAL SYSTEM AREA SHOULD BE STAGED TO
FOLLOW HOUSE SITE PREPARATION.
2. ALL EXISTING UTILITIES HAVE BEEN PLOTTED FROM THE BEST AVAILABLE DATA. THE
LOCATIONS ARE ONLY APPROXIMATE. CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL
EXISTING UTILITIES WITHIN WORK AREAS. NOTIFY EACH AFFECTED UTILITY COMPANY AND DIG
TEST PITS AS REQUIRED PRIOR TO COMMENCING CONSTRUCTION. CALL BEFORE YOU DIG
1-900-922-4455, 48 HOURS PRIOR TO STARTING EXCAVATION.
3. THE CONTRACTOR SHALL REVIEW AND CHECK ALL INFORMATION AND DATA SHOWN OR INDICATED ON
THE CONTRACT DOCUMENTS WITH RESPECT TO EXISTING UNDERGROUND FACILITIES. THE
CONTRACTOR SHALL GIVE THE OWNER WRITTEN NOTICE OF ALL CONFLICTS, ERRORS OR
DISCREPANCIES THAT HE HAS DISCOVERED IN THE CONTRACT DOCUMENTS AND THE WRITTEN
RESOLUTION THEREOF BY THE ENGINEER SHALL BE ACCEPTABLE TO THE CONTRACTOR.
4. SEE THE ARCHITECTURAL DRAWINGS FOR DETAILED FLOOR PLAN AND FOUNDATION LAYOUT,
5. ELECTRIC AND TELEPHONE SERVICES ARE TO BE INSTALLED BY THE UTILITY COMPANIES.
COORDINATE CONSTRUCTION ACTIVITIES WITH THE UTILITY COMPANIES AND THEIR CONTRACTORS.
S. SEPTIC SYSTEM IS DESIGNED FOR A 3 BEDROOM DWELLING WITH NO LARGE CAPACITY DISCHARGE
TYPE BATHTUBS WITH A CAPACITY OF GREATER THAN 99 GALLONS. IF SUCH TUB IS INSTALLED,
THE SEPTIC SYSTEM SHALL BE INCREASED ACCORDING TO THE CONNECTICUT PUBLIC HEALTH
CODE.
7. ALL COMPONENTS OF THE SANITARY AND WATER SUPPLY SYSTEMS SHALL BE CONSTRUCTED IN
ACCORDANCE WITH ALL APPLICABLE REGULATIONS OF THE CT. STATE DEPT, OF HEALTH.
A. THE HOUSE AND SYSTEM MUST BE STAKED BY THE ENGINEER/SURVEYOR
PRIOR TO THE START OF CONSTRUCTION.
SPACING
6X depth 01 ttruclurt, center 10 tenter
FILTER FABRIC
t• ` q
r
4' OEPT-H Q3 ®® 0
rZCRI rtj Z3 065
g
I" STONE
LFACHiNr r;Al I != RY
97 CLAP#93
5q
au0 ?
3s REIMO E
24121E NCE POST (TYP.)
Q)
x
1
x395.8
39 1 '
x a>,aa_ _ — 24' MAPLE
A
GRADE TO GRAIN `s/ _ _ - 50'rRONT YARD
TYP.) \ N _ _ SETBACK
398 REV.® SANITAF
REQUIRED LEACHING EFFECTIVE AREA: 495 S.F. (PERC. RATE: 9.33 11IN111N)
PROVIDED LEACHING EFFECTIVE AREA: 512 S.F.
PROVIDE I ROW OF CONCRETE GALLERIES, 7-41 X B' X 41 DEPTH SECTIONS
FOR PROPOSED THREE BEDROOM RESIDENTIAL DWELLING.
MAP REFERENCE: BOUNDARY AND TOPOGRAPHY TAKEN ICON A-2 SURVEY
ENTITLED 'TOPOGRAPHIC BOUNDARY .URVEY PREPARED FOR
EDMUND J. SMITH, JR. OLD C%CmSTER EXTENSION
DISTRIBUTION BOX MONTVILLE, CONNECTICUT PROPERTY OWNED PY: LOT 24
EDMUND k JOSEPUINE SMITH LOT 25 JOSEPl1 4 LAURA
IE = 395 95 (OUT 10 GALI.ER'Y
DANAO' DATED. 5112/89 BY R08EQT T. BOLTON, L.S.