Loading...
HomeMy WebLinkAboutSite Planrye. \ WL13-2 m T7 rn X Z 440 \ \ \`\ \ m TP i I STOCKPILE 1.5"x1.5%42" STAKE DRIVEN ON DOWNSLOPE SIDE OF TRENCH EXTEND 8" OF SILTFENCE_ BELOW ANGLE STAKE 2' - 20' UPSLOPE 0SETSTAKE12" MINIMUM INTO GRADE Th, £ ti S. Mq STAKED HAYBALES MAY BE SUBSTITUTED TAkSFORSILTFENCE II SILT FENCE LOCATED 5-10' FROM TOE OF - I SLOPE = I I I II TI II E illh '' yl - Ill-I II_I II -1 I I I llE ll1 I. EXISTING BACKFILLED TRENCHSUBGRADE SILTFENCE 0 TOE OF SLOPE APPLICATION NOT TO SCALE STOCKPILE MANAGEMENT 1. Locate stockpiles so that natural drainage is not obstructed. 2. Maximize separation distances from wetlands, watercourses, drainage ways and steep slopes. 3. Divert runoff oway from stockpiles. 4. Install and maintain silt fence or hoybales around stockpile. 5. Stockpileside slopes shall not exceed 2H:1V. 6. Materials stockpiled for longer than 30 days shall be seeded and mulched immediately after formation. rrf 1-1 /4" PERCOLATION RATE I 4S -- PER MAP REFERENCE ET. --- / W "`' \D CLE.4W PROVIDE FOOTINt, PERC RATE 20 MINUTES INCH 1094 tr s ' 454.7PR(_MDE AND 1 a--- - A CANTtNt10U5 LINE-' ` SLAP REFERENCE 1 ,) SUBDIVISION PLAN ZONING DISTRICT WRP 160, R-80 AND R-120. PREPARED FOR OXIBY FARM, LLC, SEE-)ETAI -gip,}- = , .., : -.. FORSYTH ROAD, OLD COLCHESTER ROAD & OXOBOXO DAM ROAD, MONTVILLE, CONNECTICUT. CHANDLER, PALMER & KING ARCHITECTURE, ENGINEERING, AND SURVEYING. 110 BROADWAY NORWICH, CT 06360. 2 2„ 860-889-3397 FAX 860-886-7801 REVISED 09/06/00. p ' i , ,l / \ r- -9 \ 7r , --_ / / , STANDARD D-80 WITH ELBOW NOT TO SCALEPROVIDE50tfLF ; / / \ _ ; OF 4" SDR 35 457.0 DE SLEV E PROPOSED PERCOLATION RATE = 20 MINUTES/INCHG'EAN UNDER DF41E / W CAP / / / CLEARING UWITS 4 BEDROOM RESIDENCE„ REQUIRE; 900 SF OF LEACHING AREA j 4" PROVIDE 3 100 ) PROPOSED... i --, --' _ - (48 WIDE TRENCHES IN SERIESPR(l.E 1500 . TO GRADE ; raA l4GE i I -•€ i-. _- GAL. SEPTIC TANK EFFECTIVE LEACHING AREA = 900 SF TArdK 28 FT. }_ / TOPSOIL PROVIDE A 1500 GALLON 2 -COMPARTMENT TANK EXISTING DRAIN _ -- / M.L.S.S. REQUIRED = 14x1.5x2=42' M.L.S.S. PROVIDED = 100SUITABLEFILLF'ROMtOE 80f / // f.-- 9. I OP U. ii / / FILTER FABRIC °0 2" SEPTIC RESERVE AREA BASED ON, A 4' GALLERY DESIGN. OF 4-0 SCHX10ASTMD1785/ ' f R -o4PERFORATEDI DELTA= 16'01'50"C. PIPE y ? LENGHT=132,33 / \` j // i '•,> ' f o / o/ / o o P, REPME AREA OFPRIOEMED SY:iTEL AS FbLt OMIS RADIUS=47296 SNET CHORD=S36'53'50"E 131.90' #3324 -- , , / ` - 1.) REMOVE AND STOCKPILE TOPSOIL. APPROVED AGGREGATE 2.) PLACE SELECT FILL AS REQUIRED. 3.) EXCAVATE 4 WIDE TRENCHES ;AND PREPARE SURFACE. 4.) FILL TRENCHES WITH APPROVED AGGREGATE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH AND FILLVU / ' i l TO 2 OVER TOP OF PIPE. CHTENCROSS SINECTO 5.) CAP ENDS OF PIPES. NOT TO SCALE 6.) PLACE A 4' WIDE STRIP OF h'ON-WOVEN FILTER FABRIC ON. TOP OF THE ENTIRE LENGTH OF THE SYSTEM, AND BACKFILL WITH NATIVE MATERIAL. PROPOSEDIIYE11. / f / r-- / i 7.) REPLACE TOPSOIL, SEED & MULCH. BURIED i rru rrIES -- RADIUS / / o. DELTA=03'38'49" i- \ / aha' LENGHT=150, 65' / j / / RADIUS=2366,76' - -- L # 44/ 002 / / CHORD S2T03 30 E 150,62 AREA ,;- -4.57 ± ,AC ES / X (19 9,222--C SF) R LM(TS of BUIL.D114G ENVELOP KNOCKOUT INLET AND OUTLET OPENINGS EROSION AND SEDIMENT CONTROL PLAN p DR. CORRECT A C GROUP REVIEWED A PROJECT MANAGER SURVEY 1 o aE O osoxo r N UtPEtPOINT Lak4 00 p> PLAN FILE 3510® l• C 2.) DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED. CLQ G 00 c C 3.) ALL TOPSOIL TO BE STOCKPILED ON SITE AND PROTECTED WITH HAYBALES OR CAPACITIES A B C 0C m FIRST FLOOR SILT FENCE. 1250 GAL61" 51" 4$" ELEV ELEVATION 4.) ALL CUT AND FILL SLOPES ARE NOT TO EXCEED 3:1 SLOPES. r.. 00 0 5.) PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF_: MONTVILLE r SF SQUARE FEET oo LSITE PROVIDE RISERS To WITHIN o EXISTING CONTOURS AlesQ INSPECTION CAN OCCUR. 4 x 4 12.6/12.6 6 x 6 6/6 GA. 12" of FINISHED GRADE GA. WIRE MESH AT INLET AND OUTLET 460- 6.} THE CONTRACTOR WILL BE RESPONSIBLE FOR .THE INSTALLATION AND MAINTENANCE WIRE MESH L___J-- x460 PROPOSED CONTOURS LUo5 .o OF ALL REQUIRED SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. PROVIDE OUTLET FILTER y 1tE010N B eT ozQ 24 POLYLOK PL -122 STONE WALL C NECESSARY THE APPLICATION OF CALCIUM CHLORIDE. INLET f 3 VENT------ EXISTING TREELINE i ? J M7,f oy0 P ouYLEr vcnwW 0 R cVOMO MrM LIQUID LEVEL BUILDING SETBACK LINE o Foo PROPOSED SILT FENCE f ELIEF, THIS MAP IS SUBSTANTIALLY PER 1000 S.F. APRIL 1 -JUNE 15 SCHED. 404INLETBAFFLE 1 PROPOSED LIMITS OF CLEARING REON, AUGUST 1 - SEPTEMBER 15 STRAW/HAY 70-90 lbs. FREE FROM WEEDS so• GAs DEFLECTOR PROPOSED BURIED UTILITIES ORK ROAD c MARYLAND RD. ROAD f !/ AND COARSE MATTER LOCATION MAP SCALE 1 -1000 LIMITS OF INLAND WETLANDS rrf 1-1 /4" PERCOLATION RATE I 4S -- PER MAP REFERENCE ET. --- / W "`' \D CLE.4W PROVIDE FOOTINt, PERC RATE 20 MINUTES INCH 1094 tr s ' 454.7PR(_MDE AND 1 a--- - A CANTtNt10U5 LINE-' ` SLAP REFERENCE 1 ,) SUBDIVISION PLAN ZONING DISTRICT WRP 160, R-80 AND R-120. PREPARED FOR OXIBY FARM, LLC, SEE-)ETAI -gip,}- = , .., : -.. FORSYTH ROAD, OLD COLCHESTER ROAD & OXOBOXO DAM ROAD, MONTVILLE, CONNECTICUT. CHANDLER, PALMER & KING ARCHITECTURE, ENGINEERING, AND SURVEYING. 110 BROADWAY NORWICH, CT 06360. 2 2„ 860-889-3397 FAX 860-886-7801 REVISED 09/06/00. p ' i , ,l / \ r- -9 \ 7r , --_ / / , STANDARD D-80 WITH ELBOW NOT TO SCALEPROVIDE50tfLF ; / / \ _ ; OF 4" SDR 35 457.0 DE SLEV E PROPOSED PERCOLATION RATE = 20 MINUTES/INCHG'EAN UNDER DF41E / W CAP / / / CLEARING UWITS 4 BEDROOM RESIDENCE„ REQUIRE; 900 SF OF LEACHING AREA j 4" PROVIDE 3 100 ) PROPOSED... i --, --' _ - (48 WIDE TRENCHES IN SERIESPR(l.E 1500 . TO GRADE ; raA l4GE i I -•€ i-. _- GAL. SEPTIC TANK EFFECTIVE LEACHING AREA = 900 SF TArdK 28 FT. }_ / TOPSOIL PROVIDE A 1500 GALLON 2 -COMPARTMENT TANK EXISTING DRAIN _ -- / M.L.S.S. REQUIRED = 14x1.5x2=42' M.L.S.S. PROVIDED = 100SUITABLEFILLF'ROMtOE 80f / // f.-- 9. I OP U. ii / / FILTER FABRIC °0 2" SEPTIC RESERVE AREA BASED ON, A 4' GALLERY DESIGN. OF 4-0 SCHX10ASTMD1785/ ' f R -o4PERFORATEDI DELTA= 16'01'50"C. PIPE y ? LENGHT=132,33 / \` j // i '•,> ' f o / o/ / o o P, REPME AREA OF PRIOEMEDSY:iTEL AS FbLt OMIS RADIUS=47296 SNET CHORD=S36'53'50"E 131.90' #3324 -- , , / ` - 1.) REMOVE AND STOCKPILE TOPSOIL. APPROVED AGGREGATE 2.) PLACE SELECT FILL AS REQUIRED. 3.) EXCAVATE 4 WIDE TRENCHES ;AND PREPARE SURFACE. 4.) FILL TRENCHES WITH APPROVED AGGREGATE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH AND FILLVU / ' i l TO 2 OVER TOP OF PIPE. CHTENCROSS SINECTO 5.) CAP ENDS OF PIPES. NOT TO SCALE 6.) PLACE A 4' WIDE STRIP OF h'ON-WOVEN FILTER FABRIC ON. TOP OF THE ENTIRE LENGTH OF THE SYSTEM, AND BACKFILL WITH NATIVE MATERIAL. PROPOSEDIIYE11. / f / r-- / i 7.) REPLACE TOPSOIL, SEED & MULCH. BURIED i rru rrIES -- RADIUS / / o. DELTA=03'38'49" i- \ / aha' LENGHT=150, 65' / j / / RADIUS=2366,76' - -- L # 44/ 002 / / CHORD S2T03 30 E 150,62 AREA ,;- -4.57 ± ,AC ES / X (19 9,222--C SF) R LM(TS of BUIL.D114G ENVELOP 1.) TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING STANDARDS. 2.) BASE FOR LEVELS: SUBDIVISION MAP. 3.) PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT. 4.) LOT AREA = 4.57f ACRES 5 ) BENCHMARK TO BE SET IN ARRA OF SEPTIC SYSTEM AT TIME OF CONSTRUCTION KNOCKOUT INLET AND OUTLET OPENINGS EROSION AND SEDIMENT CONTROL PLAN TCS MY KNOWLEI QUALITY CONTROL CERTIFICATION CORRECT A C GROUP REVIEWED A PROJECT MANAGER SURVEY 1 RICHAR H. ST OUS ENVIRONMENTAL r CIVIL J J STRUCTURAL ARCHITECTURAL PLAN FILE 3510® 1.) TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING STANDARDS. 2.) BASE FOR LEVELS: SUBDIVISION MAP. 3.) PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT. 4.) LOT AREA = 4.57f ACRES 5 ) BENCHMARK TO BE SET IN ARRA OF SEPTIC SYSTEM AT TIME OF CONSTRUCTION KNOCKOUT INLET AND OUTLET OPENINGS EROSION AND SEDIMENT CONTROL PLAN CAST CONCRETE COVERS 1.) CLEARING, GRUBBING, AND GRADING OF THE PROPOSED LOT TO BE LIMITED TO n' PLAN 1 EGM 1.) TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING STANDARDS. 2.) BASE FOR LEVELS: SUBDIVISION MAP. 3.) PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT. 4.) LOT AREA = 4.57f ACRES 5 ) BENCHMARK TO BE SET IN ARRA OF SEPTIC SYSTEM AT TIME OF CONSTRUCTION a] 1500 GAL 69" 59" 56" 1- Z UJ F - j O U CL O Ljj a" W l7 LLJ W (..,) U LCL z Ld d p w o m = w o Q Z a Q U Ld LJ C14 X oQU W z a W q ao o a z 7 M cn Lo CIA Ln m a rx N O F_ ci o o J z w w 0 0 < w w w m o o v U LL DATE:. 08/30/2006 SCALE: 1" = 3O! SHEET 1 OF 1 EROSION AND SEDIMENT CONTROL PLAN CAST CONCRETE COVERS 1.) CLEARING, GRUBBING, AND GRADING OF THE PROPOSED LOT TO BE LIMITED TO AREAS ADJACENT TO THE PROPOSED HOUSE, DRIVEWAY, AND SEPTIC SYSTEM. PLAN 1 EGM 2.) DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED. 3.) ALL TOPSOIL TO BE STOCKPILED ON SITE AND PROTECTED WITH HAYBALES OR CAPACITIES A B C FF FIRST FLOOR SILT FENCE. 1250 GAL61" 51" 4$" ELEV ELEVATION 4.) ALL CUT AND FILL SLOPES ARE NOT TO EXCEED 3:1 SLOPES. 5.) PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF_: MONTVILLE SF SQUARE FEET SHALL BE NOTIFIED WHEN SEDIMENT CONTROL MEASURES ARE IN PLACE SO THAT THE PROVIDE RISERS To WITHIN EXISTING CONTOURS INSPECTION CAN OCCUR. 4 x 4 12.6/12.6 6 x 6 6/6 GA. 12" of FINISHED GRADE GA. WIRE MESH AT INLET AND OUTLET 460- 6.} THE CONTRACTOR WILL BE RESPONSIBLE FOR .THE INSTALLATION AND MAINTENANCE WIRE MESH L___J-- x460 PROPOSED CONTOURS OF ALL REQUIRED SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. PROVIDE OUTLET FILTER l 7.) DUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH WATE=R, AND IF 24 POLYLOK PL -122 STONE WALL NECESSARY THE APPLICATION OF CALCIUM CHLORIDE. INLET f 3 VENT------ EXISTING TREELINE i ? J M7,f ouYLEr I LIQUID LEVEL BUILDING SETBACK LINE MULCHES APPLICATION RATE NOTES SEEDING DATES: a CONTINUOUS HOT P. 4" OUT m ASPHALT SEAL PROPOSED SILT FENCE f ELIEF, THIS MAP IS SUBSTANTIALLY PER 1000 S.F. APRIL 1 -JUNE 15 SCHED. 404INLETBAFFLE 1 PROPOSED LIMITS OF CLEARING REON, AUGUST 1 - SEPTEMBER 15 STRAW/HAY 70-90 lbs. FREE FROM WEEDS so• GAs DEFLECTOR PROPOSED BURIED UTILITIES f !/ AND COARSE MATTER e WLF# LIMITS OF INLAND WETLANDS P.E. 19679 DdE SEED MIXTURE: WOOD CHIPS 185-275 lbs. FREE OF COARSE MATTER 45% RED FESCUE CROSS SECTION 458 INVERT ELEVATION AIR DRIED, TREAT WITH 45% KENTUCKY BLUE GRASS 30 15 0 3012lbsNITROGEN / TON 10% PERENNIAL RYE 12501500 GALLQN THS TEST HOLE ARTMEN2COMPT SEPTIC TANK GRAPHIC SCALE IN FEET NOT TO SCALE a] 1500 GAL 69" 59" 56" 1- Z UJ F - j O U CL O Ljj a" W l7 LLJ W (..,) U LCL z Ld d p w o m = w o Q Z a Q U Ld LJ C14 X oQU W z a W q ao o a z 7 M cn Lo CIA Ln m a rx N O F_ ci o o J z w w 0 0 < w w w m o o v U LL DATE:. 08/30/2006 SCALE: 1" = 3O! SHEET 1 OF 1 SCALE: 1" = 3O! SHEET 1 OF 11