Loading...
HomeMy WebLinkAboutSite PlanI 1777i MAC PK INN 531.85 OLD COLCHESTER ROAD REMOVE PAVED APRON AND ` PROVIDE BIT. CURB / RADIUS = 21.81 / DELTA = 68'57'58" MONUMENT ARC LENGTH = 26.25' -E - z 6 N62717" GE kit; aO GN ,pts MONUMENT (N®vRvG TH4 / o i TH 3 105 FOOTING rH / ,0106DRAIN PE t/J / .:. / 5 • - 526 i -'/ ,.- " ROCK 15LF-4"PVC , SDR35) I InKI UALITY CONTROL CERTIFICATION GROUP R VL D DTE PROJECT MANAGER PER WPREFERENCE SURVEY ENVIRONMENTAL FIRST FLOOR CIVIL o . STRUCTURAL SQUARE FEET ARCHITECTURAL EXISTING CONTOURS FILE 34591 7- ccC j j I b.Q P"4 • rl 00 EROSION AND SEDIMENT CONTROL PLAN o U (A1.) CLEARING, GRUBBING, AND GRADING OF THE PROPOSED LOT_ TO BE LIMITED TO + o AREAS ADJACENT TO THE PROPOSED HOUSE, DRIVEWAY, AND SEPTIC SYSTEM. v00 2.) DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED, q j v 3,) ALL TOPSOIL TO BE STOCKPILED- ON SITE AND PROTECTED WITH HAYBALES OR ° ,, ' 0 SILT FENCE. 4.) ALL `CU i AND FILL SLOPES ARE NOT TO EXCEED 3:1 SLOPES. O1 c*1 j I r 5.) PRIOR i0 SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF MONTVILLE, -d mlk' ISHALL BE NOTIFIED WHEN SEDIMENT CONTROL MEASURES ARE IN PLACE SO THAT THE 2 °1, oo INSPECTION CAN OCCUR. pa 00 6.) THE DE`IELOPER WILL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE o ooOF .ALL REC UIRED SEDIMENT CONTROL. MEASURES THROUGHOUT CONSTRUCTION. CONSTRUCTION ENTRANCE 7.) DUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH WATER, AND IF . NOT To SCALE NECESSARY THE APPLICATION OF CALCIUM CHLORIDE, 0 TEMPORARY-tEGETATN COVER PLANTING SCHEDULE Y®111® ` bA W Vi I MULCHES APPLICATION RATE NOTES SEEDING DATES: + aPER 1000 S.F. APRIL 1 JUNE 15 ol1 2X2 5/8 16 GA. WIRE MESH d I AUGUST 1 - SEPTEMBER 15 J ° , r'I I 1 1 2" STRAW/HAY 70-90 Lbs. FREE FROM WEEDS ath7ANDCOARSEMATTER I ..._ SEED MIXTURE: 15„ CPP I WOOD CHIPS 185-275 Ibs. FREE OF COARSE MATTER 45% RED . FESCUE 4 AIR DRIED, TREAT WITH 45% KENTUCKY BLUE GRASS CL := -: 121bs NITROGEN / TON 10% PERENNIAL RYE U 6951 TESTHOLE 'DATA W PER MAP REFERENCE v O+` TEST HOLE1 MONUMENT - 00 0„-10" TOPSOIL 10 16" SANDY SUBSOIL N 16"-78" GRAVEL2" NO LEDGE, _,O WATER, NO MOTTLING STANDARD D -BOX TEST HOLE NOT TO SCALE 0"-9" TOPSDIL 9"-15" SANDY SUBSOIL 15"-80" GRAVEL NO LEDGE, NO. WATER, NO MOTTLING 4" TEST HOLE 3 TOPSOIL 0"-10" TOPSOIL 10"-25"BRDWN MED SANDY .LOAM U 25,,-30„ SI;r Z SUITABLE FILL FILTER FABRIC00 2" 30"-84" GREY MED COMP SILTY SAND Q O w NO LEDGE, X10 WATER, MOTTLING C 30" LOT # 1 K 4,. PERFORATED o U PER MAP REFERENCE PIPE f TEST HOLE #4N , >, 0 -14 TOPSOIL o W n w 1" STONE 14"-28" BROWN MED SANDY LOAM w '® = z 28-34 SILT w . Q_ q v434 -84 GREY MED COMP SILTY SAND Q O O NO LEDGE, NO WATER, NO MOTTLING o. U w — TEENQH 11._1 ®_I CROSS S TION TEST HOLE 104 W 0- i NOT TO SCALE 0"-1 1 " TOPSOIL z 11 "-30" SUBSOIL CN 30"-80" GREY COMPACT SILTY SAND_ NO LEDGE, y0 WATER, _._MOTTLING @ q-4" .. TEST HOLE 105 I 0"-12" TOPSOIL FILTER II 12"-45" SUBSOILFABRICANGLE10• UP SLOPE FOR STABILITY AND 45"-84" GREY SILTY SAND POST I SELF CLEANING NO LEDGE, VO WATER, MOTTLING @ 45" oo TEST HOLE 106 IRON PIN \\\ \ 1 0"_9" TOPSOIL a 9" L27" SUESOI COMPACTED 27"-80" 0 27-80 GREY SILTY SAND BACKFILLLi NO LEDGE, NO WATER, MOTTLING @ 31 SILT FENCE MAP REFERENCE NOT TO SCALE RESUBDIVISION PLAN PREPARED FOR RTT DEVELOPMENT, INC., FORSYTH ROAD. & OLD COLCHESTER ROAD, MONTVILLE, CONNECTICUT, BY CME/CPK DESIGN GROUP, NORWICH, CONNECTICUT, DATED: 03/07/2002 WITH REVISIONS TO 06/14/2002, 10,-6., DESIGN DATA KNOCKOUT INLET AND OUTLET OPENINGS PERCOLATION RATE = 7.33 MINUTES/INCH o .4 BEDROOM RESIDENCE REQUIRES 660 SF OF LEACHING AREA I N W pp C] 1 N (n 0 z cn m WLF FG O OT #1/ PER WPREFERENCE LE END FF FIRST FLOOR ELEV ELEVATION S. F. SQUARE FEET 524 - EXISTING CONTOURS 524 PROPOSED CONTOURS BUILDING SETBACK LINE STONE WALL EXISTING TREE LINE PROVIDE A ° 250 GALLON 2 -COMPARTMENT TANK TEST. HOLE 524.0 INVERT ELEVATION i 7- ccC j j I b.Q P"4 • rl 00 EROSION AND SEDIMENT CONTROL PLAN o U (A1.) CLEARING, GRUBBING, AND GRADING OF THE PROPOSED LOT_ TO BE LIMITED TO + o AREAS ADJACENT TO THE PROPOSED HOUSE, DRIVEWAY, AND SEPTIC SYSTEM. v00 2.) DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED, q j v 3,) ALL TOPSOIL TO BE STOCKPILED- ON SITE AND PROTECTED WITH HAYBALES OR ° ,, ' 0 SILT FENCE. 4.) ALL `CU i AND FILL SLOPES ARE NOT TO EXCEED 3:1 SLOPES. O1 c*1 j I r 5.) PRIOR i0 SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF MONTVILLE, -d mlk' ISHALL BE NOTIFIED WHEN SEDIMENT CONTROL MEASURES ARE IN PLACE SO THAT THE 2 °1, oo INSPECTION CAN OCCUR. pa 00 6.) THE DE`IELOPER WILL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE o ooOF .ALL REC UIRED SEDIMENT CONTROL. MEASURES THROUGHOUT CONSTRUCTION. CONSTRUCTION ENTRANCE 7.) DUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH WATER, AND IF . NOT To SCALE NECESSARY THE APPLICATION OF CALCIUM CHLORIDE, 0 TEMPORARY-tEGETATN COVER PLANTING SCHEDULE Y®111® ` bA W Vi I MULCHES APPLICATION RATE NOTES SEEDING DATES: + aPER 1000 S.F. APRIL 1 JUNE 15 ol1 2X2 5/8 16 GA. WIRE MESH d I AUGUST 1 - SEPTEMBER 15 J ° , r'I I 1 1 2" STRAW/HAY 70-90 Lbs. FREE FROM WEEDS ath7ANDCOARSEMATTER I ..._ SEED MIXTURE: 15„ CPP I WOOD CHIPS 185-275 Ibs. FREE OF COARSE MATTER 45% RED . FESCUE 4 AIR DRIED, TREAT WITH 45% KENTUCKY BLUE GRASS CL := -: 121bs NITROGEN / TON 10% PERENNIAL RYE U 6951 TESTHOLE 'DATA W PER MAP REFERENCE v O+` TEST HOLE1 MONUMENT - 00 0„-10" TOPSOIL 10 16" SANDY SUBSOIL N 16"-78" GRAVEL2" NO LEDGE, _,O WATER, NO MOTTLING STANDARD D -BOX TEST HOLE NOT TO SCALE 0"-9" TOPSDIL 9"-15" SANDY SUBSOIL 15"-80" GRAVEL NO LEDGE, NO. WATER, NO MOTTLING 4" TEST HOLE 3 TOPSOIL 0"-10" TOPSOIL 10"-25"BRDWN MED SANDY .LOAM U 25,,-30„ SI;r Z SUITABLE FILL FILTER FABRIC00 2" 30"-84" GREY MED COMP SILTY SAND Q O w NO LEDGE, X10 WATER, MOTTLING C 30" LOT # 1 K 4,. PERFORATED o U PER MAP REFERENCE PIPE f TEST HOLE #4N , >, 0 -14 TOPSOIL o W n w 1" STONE 14"-28" BROWN MED SANDY LOAM w '® = z 28-34 SILT w . Q_ q v434 -84 GREY MED COMP SILTY SAND Q O O NO LEDGE, NO WATER, NO MOTTLING o. U w — TEENQH 11._1 ®_I CROSS S TION TEST HOLE 104 W 0- i NOT TO SCALE 0"-1 1 " TOPSOIL z 11 "-30" SUBSOIL CN 30"-80" GREY COMPACT SILTY SAND_ NO LEDGE, y0 WATER, _._MOTTLING @ q-4" .. TEST HOLE 105 I 0"-12" TOPSOIL FILTER II 12"-45" SUBSOILFABRICANGLE10• UP SLOPE FOR STABILITY AND 45"-84" GREY SILTY SAND POST I SELF CLEANING NO LEDGE, VO WATER, MOTTLING @ 45" oo TEST HOLE 106 IRON PIN \\\ \ 1 0"_9" TOPSOIL a 9" L27" SUESOI COMPACTED 27"-80" 0 27-80 GREY SILTY SAND BACKFILLLi NO LEDGE, NO WATER, MOTTLING @ 31 SILT FENCE MAP REFERENCE NOT TO SCALE RESUBDIVISION PLAN PREPARED FOR RTT DEVELOPMENT, INC., FORSYTH ROAD. & OLD COLCHESTER ROAD, MONTVILLE, CONNECTICUT, BY CME/CPK DESIGN GROUP, NORWICH, CONNECTICUT, DATED: 03/07/2002 WITH REVISIONS TO 06/14/2002, 10,-6., DESIGN DATA KNOCKOUT INLET AND OUTLET OPENINGS PERCOLATION RATE = 7.33 MINUTES/INCH o .4 BEDROOM RESIDENCE REQUIRES 660 SF OF LEACHING AREA I N W pp C] 1 N (n 0 z cn m WLF FG O z PROVIDE (2) 110 (48 WIDE) TRENCHES, CONNECT ENDS O w EFFECTIVE LEACHING AREA = 690 SF Q PROVIDE A ° 250 GALLON 2 -COMPARTMENT TANK M,L.S,S. RECUIRED = 42 x 2 x 1,2 = 101' M.L.S.S. PROVIDED = 110' CAST CONCRETE covERs PREPARE AREA OF PROPOSED SYSTEM AS FOLLQWS PL4N 1.) REMOVE AND STOCKPILE TOPSOIL. 2.) PLACE SANK RUN GRAVEL (LESS THAN 5% FINES) PLACED IN 6" LIFTS AND CAPACITIES A B C COMPACTED TO 95% DENSITY, 1250 GAL 61" 51" 48" 3.) EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE. 1500 GAL 69" 59" 56" 4.) FILL TRENCHES WITH 1" WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE PIPE 1N TRENCH, AND FILL TO 2" OVER TOP OF PIPE, PROVIDE RISERS TO WITHIN 5.) CAP ENLS OF PIPES. 12" OF FINISHED GRADE 6,) PLACE A 4' WIDE STRIP OF NON -WOVEN FILTER FABRIC ON TOP OF THEATINLETANDOUTLET 4 X 4 12.6/12.6 6X6 6/6 GA. ENTIRE LENGTH OF THE SYSTEM), AND BACKFILL WITH NATIVE MATERIAL. GA. WIRE MESH WIRE MESH PROVIDE 7.) REPLACE TOPSOIL, SEED & MULCH. OUTLET 24" FILTER POLYLOK INLET j PL -122 NOTES 3 VENT-_ OUTLET LIQUID LEVEE z 1.) TOPOGRAPHIC INFORMATION, ON THIS PLAN COMPLIES WITH T-2 MAPPING Q CONTINUOUS HOT D 4" OUTLET BAFFLE STANDARDS, m ASPHALT SEAL 2.) BASE FCR LEVELS: SUBDIVISION MAP. 4" SCHEID 4 Q 3.) PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY Aso• V, LAND SURVE`( DEFLECTOTORORLICENSEDINTHESTATEOFCONNECTICUT, Q 4.) LOT AREN = 1.48f ACRES 5.) BENCHMtIRK TO BE SET IN AREA SEPTIC SYSTEM AT TIME OFCROSSSECTIONOF CONSTRUCTION. 1250/1500 GALLON z O w Q o o U i w z z Q Q Q w oQ CL 0 w C) ci Q z cn o z O W o ILL, a o O Q F- 3 Q L'-- w DO 03NN NOV) O m N 5 N O o z 00 J z s w LL__ D 0 U O O O n QLLJ CD L) cl O w 6_ z oDCD00UU N 2 COMPARTMENT DATE.: 06/18/2W-': SEPTICTANK 20 10 o Zo NOT TO SCALE SCALE; 1 " = 20'/ GRAPHIC SCALE IN FEET i SHEET., 1 O F ' w i