HomeMy WebLinkAboutSite Planrrt�rHi-C� HKtr� �J� t-"KVI—'VJtu J.i � ! tNl �J � VL�C1`�VS:
1. REMOVE AND STOCKPILE TOPSOIL.
2. PLACE BANK RUN GRAVEL (LESS THAN 5% FINES) PLACED IN
6" LIFTS AND COMPACTED TO 95% DENSITY.
3 EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE.
4. FILL TRENCHES WITH 1 WASHED STONE TO HEIGHT OF PIPE INVERTS
PLACE PIPE IN TRENCH, AND FILL_ TO 2" OVER TOP. ,OF PIPE.
5.- PLACE A 4' WIDE STRIP, `OF ICON—'MOVEN - FILTER FABRIC ON ,TOP OF
THE ENTIRE LENGTH Or THE.:SYSTEIM), AND BACKFILL WITH
NATIVE MATERIAL.
6. REPLACE TOPSOIL, SEED., MULCH.
DESIGN DATA:
A 3.. BEDROOM RESIDENCE REQUIRE 5 SQ.FT.
71 E
FENCK
Cr
a x ,✓-
r
f=a`� N iT TO SCAl F
t,
- v v
KNOC''OUT INLET AND
OUTLET OPENINGS
RIBS INSID°—
j
0i+
rrt�rHi-C� HKtr� �J� t-"KVI—'VJtu J.i � ! tNl �J � VL�C1`�VS:
1. REMOVE AND STOCKPILE TOPSOIL.
2. PLACE BANK RUN GRAVEL (LESS THAN 5% FINES) PLACED IN
6" LIFTS AND COMPACTED TO 95% DENSITY.
3 EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE.
4. FILL TRENCHES WITH 1 WASHED STONE TO HEIGHT OF PIPE INVERTS
PLACE PIPE IN TRENCH, AND FILL_ TO 2" OVER TOP. ,OF PIPE.
5.- PLACE A 4' WIDE STRIP, `OF ICON—'MOVEN - FILTER FABRIC ON ,TOP OF
THE ENTIRE LENGTH Or THE.:SYSTEIM), AND BACKFILL WITH
NATIVE MATERIAL.
6. REPLACE TOPSOIL, SEED., MULCH.
DESIGN DATA:
A 3.. BEDROOM RESIDENCE REQUIRE 5 SQ.FT.
71 E
FENCK
Cr
a x ,✓-
r
f=a`� N iT TO SCAl F
t,