Loading...
HomeMy WebLinkAboutSite Planrrt�rHi-C� HKtr� �J� t-"KVI—'VJtu J.i � ! tNl �J � VL�C1`�VS: 1. REMOVE AND STOCKPILE TOPSOIL. 2. PLACE BANK RUN GRAVEL (LESS THAN 5% FINES) PLACED IN 6" LIFTS AND COMPACTED TO 95% DENSITY. 3 EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE. 4. FILL TRENCHES WITH 1 WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH, AND FILL_ TO 2" OVER TOP. ,OF PIPE. 5.- PLACE A 4' WIDE STRIP, `OF ICON—'MOVEN - FILTER FABRIC ON ,TOP OF THE ENTIRE LENGTH Or THE.:SYSTEIM), AND BACKFILL WITH NATIVE MATERIAL. 6. REPLACE TOPSOIL, SEED., MULCH. DESIGN DATA: A 3.. BEDROOM RESIDENCE REQUIRE 5 SQ.FT. 71 E FENCK Cr a x ,✓- r f=a`� N iT TO SCAl F t, - v v KNOC''OUT INLET AND OUTLET OPENINGS RIBS INSID°— j 0i+ rrt�rHi-C� HKtr� �J� t-"KVI—'VJtu J.i � ! tNl �J � VL�C1`�VS: 1. REMOVE AND STOCKPILE TOPSOIL. 2. PLACE BANK RUN GRAVEL (LESS THAN 5% FINES) PLACED IN 6" LIFTS AND COMPACTED TO 95% DENSITY. 3 EXCAVATE 4' WIDE TRENCHES AND PREPARE SURFACE. 4. FILL TRENCHES WITH 1 WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH, AND FILL_ TO 2" OVER TOP. ,OF PIPE. 5.- PLACE A 4' WIDE STRIP, `OF ICON—'MOVEN - FILTER FABRIC ON ,TOP OF THE ENTIRE LENGTH Or THE.:SYSTEIM), AND BACKFILL WITH NATIVE MATERIAL. 6. REPLACE TOPSOIL, SEED., MULCH. DESIGN DATA: A 3.. BEDROOM RESIDENCE REQUIRE 5 SQ.FT. 71 E FENCK Cr a x ,✓- r f=a`� N iT TO SCAl F t,