* .LEGEND
PROPERTY LINE
STREET PROPERTY LINE
BUILDING SETBACK LINE
EXISTING CONTOUR
PROPOSED SPOT GRADE
EXISTING SPOT GRADE
SILT FENCE
PROPOSED CONTOUR
TEST HOLE
PERC TEST
UNDERGROUND UTILITIES
EDGE OF PROPOSED CLEARING
---
EROSION & SEDIMENTATION CONTROL NARRATIVE
THE PROJECT SITE CONSISTS OF AN EXISTING LOT ON APPROXIMATELY 9.3 ACRES OF LAND.
THE SITE IS LOCATED ON THE NORTHEAST SHORE OF OXOBOXO LAKE AT THE END OF
OAKLAND DRIVE. THE SITE WILL HAVE A PRIVATE WELL AND ON SITE SEPTIC SYSTEM.
ANTICIPATED PROJECT COMMENCEMENT IS ESTIMATED TO BE SPRING 2013. HOUSE
CONSTRUCTION IS ANTICIPATED THROUGH LATE 2013, AND IS ESTIMATED TO TAKE 6 - 9
MONTHS FROM THE ISSUANCE OF BUILDING PERMITS. WHILE IT IS DIFFICULT TO ACCURATELY
ANTICIPATE ALL CONSTRUCTION ACTIVITIES THAT MAY AFFECT SEQUENCING OF CONSTRUCTION
WORK, THE FOLLOWING MAJOR ACTIVITIES ARE INTENDED TO -BE SEQUENCED AS FOLLOWS:
CONSTRUCTION SEQUENCE
1. PRE -CONSTRUCTION MEETING
NO WORK IS TO BE BEGUN PRIOR TO AUTHORIZATION BY THE TOWN ZONING OFFICIAL.
2. LOT DEVELOPMENT -
A. EXISTING RUNOFF AND DRAINAGE PATTERNS WILL NOT BE SIGNIFICANTLY CHANGED.
THE PROJECT DOES REQUIRE CONVERTING AN EXISTING STONE CROSSING THROUGH AN
INTERMITTENT WATERCOURSE TO A FORMAL CULVERT CROSSING. AS THE CROSSING WILL BE
THE ONLY MEANS OF ACCESS FOR RESIDENCES OF THE STRUCTURE AS WELL AS
EMERGENCY SERVICES A PROPOSED BOX CULVERT HAS BEEN PROPOSED.
3. LIMITS OF CLEARING -
LIMITS OF GENERAL CLEARING SHALL BE LIMITED TO THAT DEPICTED ON THE APPROVED
PLAN. CLEARING OF TREES AND OTHER VEGETATION MAY BEGIN, ONLY IF THERE IS NO
GRUBBING OR STUMPING ACTIVITIES INVOLVED. THESE ACTIVITIES WILL BE ALLOWED ONLY
AFTER THE COMPLETION OF INSTALLATION OF EROSION CONTROL BARRIERS.
4. INSTALLATION OF E & S CONTROLS - INCLUDING
A. INSTALLATION OF SILT FENCE
B. NO CONSTRUCTION ACTIVITY SHALL BEGIN WITHOUT PROPER INSTALLATION OF
APPROPRIATE
E & S MEASURES AND APPROVAL BY THE TOWN. TOWN STAFF SHALL BE NOTIFIED
48 HOURS PRIOR TO ANY ACTIVITY.
5. STUMP AND TOPSOIL REMOVAL -
REMOVE STUMPS, STRIP AND STOCKPILE TOPSOIL AND SEED WITH TEMPORARY SEED MIX.
NO ONSITE BURYING OF STUMPS 'MLL BE ALLOWED WITHOUT PRIOR APPROVAL OF THE
ZONING ENFORCEMENT OFFICER.
6. ANY REQUIRED SEDIMENTATION CONTROLS FOR STOCKPILED AREAS SHALL BE IN PLACE
PRIOR
TO PLACEMENT OF MATERIAL. STOCKPILING OF MATERIAL TO BE WITHIN LOCATIONS TO BE
APPROVED BY TOWN STAFF. NO STOCKPILES SHALL BE ALLOWED WITHIN 100' FEET OF
WETLANDS. SEEDING AND MULCHING OF STOCKPILES SHALL TAKE PLACE WITHIN 15 DAYS.
7. FINISH LOAM AND SEED -
UPON COMPLETION OF SITE GRADING, FINISH LOAMING AND SEEDING OF ALL DISTURBED
AREAS. FINAL STABILIZATION OF DISTURBED AND GRADED AREAS SHALL BE FINISHED
WITH LOAM AND SEED. LOAM (TOPSOIL AND SUBSOIL) SHALL BE PLACED AT A MINIMUM
DEPTH OF 4". A FERTILIZER MIX SHALL BE PROVIDED AS FOLLOWS:
FERTILIZER MAY BE APPLIED AT A RATE OF 7.5 LB. PER 1,000 S.F. OF 10-10-10 OR
NATURAL (MANURE) FERTILIZERS MAY BE SUBSTITUTED WITH LIME APPLIED AT A RATE OF
180 LBS. PER 1,000 S.F. (4 TONS PER ACRE, OR AS SUGGESTED AFTER SOIL TESTING).
THE RECOMMEND SEEDING DATES ARE BETWEEN APRIL 15 THROUGH JUNE 15 AND AUG.
15 THROUGH OCT. 15. SEED MIXES MAY VARY WITHIN THE SITE, BUT IN GENERAL WILL
CONFORM TO THE FOLLOWING MIXTURES:
PERMANENT VEGETATIVE COVER
GENERAL: DISTURBED AREAS SHALL BE SEEDED WITH .45 LB PER 1,000 S.F. (20 LB. PER
AC.) OF CREEPING RED OR TALL FESCUE, .05 LB. PER 1,000 S.F. (2 LB. PER AC.) OF
REDTOP, AND .20 LB. PER 1,000 S.F. (8 LB. PER AC.) OF BIRDSFOOT TREFOIL WITH
INNOCULENT OR AN APPROVED EQUAL SUBSTITUTE.
TEMPORARY VEGETATIVE COVER -
THE RECOMMENDED SEEDING DATES FOR TEMPORARY COVER ARE FROM MAR. 1 THOUGH
JUNE 15 AND AUG .1 THROUGH OCT. 15 AND SHALL CONSIST OF 1.0 LB. PER 1.000 S.F.
OF ANNUAL RYEGRASS.
IN THE EVENT THAT COVER IS REQUIRED FOR STOCKPILES OR FINISHED AREAS OUTSIDE
OF NORMAL SEEDING DATES, STRAW MULCHING SHALL BE APPLIED AT THE RATE OF 90
LB. PER 1,000 S.F.. OTHER MULCH MATERIALS USED SHALL BE APPROVED AND APPLIED
AT THE RECOMMEND RATES OF THE CONNECTICUT GUIDELINES FOR SOIL EROSION AND
SEDIMENT CONTROL MANUAL.
MULCH/EROSION BLANKETS: DISTURBED AREAS SHALL BE MULCHED AFTER LOAMING AND
SEEDING. MULCH SHALL CONSIST OF .STRAW OR HAY AT THE RATE OF 90 LB. PER 1,000
S.F.. MULCH SHALL BE ANCHORED WHEN DEEMED NECESSARY BY THE TOWN ZONING
OFFICER. ANCHORING METHODS SHALL CONSIST OF MULCH NETTING OR ASPHALT SPRAY.
SLOPES OF 3h; 1V OR GREATER SHALL BE PROTECTED WITH NORTH AMERICAN GREEN
EROSION CONTROL BLANKETS 75 OR EQUAL.
SEED BED; SEEDBED PREPARATION WILL CONFORM TO THE STANDARDS RECOMMENDED
BY THE CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENTATION CONTROL
MANUAL (REV. 2002). HYDROSEEDING WILL BE PERMITTED ONLY ON SLOPES THAT ARE
NO STEEPER THAN 2' HORIZONTALLY TO 1' VERTICALLY. WHERE HYDROSEEDING IS USED
TO THE ABOVE SEEDING RATES SHALL BE INCREASED BY 1OX
ALL SEEDED AREAS SHALL BE MAINTAINED AND RESEEDED IF NECESSARY UNTIL
SUFFICIENT STANDS OF GRASS ARE ESTABLISHED.
THIS DRAWING IS THE PROPERTY OF THE L.L.C. THIS PLAN AND
REPRODUCTIONS, ADDITIONS OR REVISIONS OF THIS PLAN ARE
NOT VALID WITHOUT THE EMBOSSED SEAL AND SIGNATURE OR
BLUE COLORED STAMPED SEAL AND SIGNATURE OF THE LAND
SURVEYOR OR ENGINEER WHO PREPARED THIS PLAN.
-72
2B
WF
3C
:•
WF
WF
87 0
....... ..:.
A
. .. T R
....... ......
.s.. � IE TO EXISTING 67 CONTOUR
I:. `'• IS NOT DEPICTED ON THE
PLAN
CL BROOK
AND Jll�
/ 1 SECTION \ WF
/ 1 A- A C
W
5
/ SIDE SLOPES SHALL BE
/ ARMORED WITH 8"-9" dso:'' ....................
%
RIP RAP WF XJ. C
PROPOSED 2'X4'X20' BOX
WF I
CULVERT TO REPLACE
7r t EXISTING STONE CROSSING
\ -®.-
75
��
65
DATUM ELEV
60.00
-� APPROXIMATE AREA OF CLEARING
655 Sq Ft
e
-4. BM NAIL
IN 3' OAK
ASSUMED ELEV.=69.10
PROPOSED 2'X4'X20' BOX
CULVERT TO REPLACE
EXISTING STONE CROSSING
SLOPE = 0.05 \
OUTLET SET AT
ELEVATION = 63.0
UNDGERGROUND
UTILITIES
PROFILE A- A
SIDE SLOPES SHALL BE
ARMORED WITH 8"-9" dao
RIP RAP AND SHALL NOT
EXCEED A 1:1 SLOPE.
PROPOSED
GRADE
. �'P��e.v--� �..--.-.�'t _�.3_ .✓.__i .cart__-- _--
���" EXISTING STONE -
CROSSING -
CL BROOK
INLET SET AT
ELEVATION = 64.0
VERT; /" =5' HORZ: 1 " = 10'
VAN
70
65
m
/ 1 CUBIC YARD BOULDERS•
OR WOOD GUARD RAIL TO / � � � ��••"' �`` ���• � � ,--
/ BE PLACED ALONG EDGE
/ OF CROSSING Lo �.�'� � � :.:. �::..... _... ®-- � --- -� .. ®...�- -�_-. EXI NG
.............. ,. SC '~'�STI GRA E
/............ .................
X 0'..APPROXIMATE AREA OF CLE G
...
..
/ �.-- ----_ 1,300 Sq Ft.-
.. 1
A
GAP o / o \ -
/ SIDE SLOPES SHALL BE
WF ARMORED WITH 8"-9" dso i-- •� " l ` -- -_ ,-- __
/ RIP RAP
WOOD STAKE
WF
OUT FALL TO BE CONSTRUCTED o ° 9C
AT THE OUTLET OF THE BOX
CULVERT 8"-9" dso RIP RAP
SHALL BE USED :' /
/ 1 i /
TOTAL AREA OF WETLANDS TO BE DISTURBED = ±1,100 S.F. 1 '
f / TOTAL VOLUME OF PROPOSED FILL IN WETLANDS = ±56 C.Y. :.
/ TOTAL AREA OF RIP -RAP FILL IN WETLANDS = ± 9 1
/ 27 S.F. INSTALL S i WF 1
/ TOTAL VOLUME OF PROPOSED RIP -RAP IN WETLANDS = ±26C.Y. SILT FENCE ,. 10C
WF
t \ 4
WF
` , 3
1 l
rn ,
STAPLES
-SILT FABRIC TO EXTEND
6"BELOW GROUND LEVEL
FLOW
EXCAVATE 6"x 6" TRENCH TO
COVER FABRIC AND
. COMPACT BACKFILL
6)l
Uis ;
1
SILT FENCE DETAIL
NOT TO SCALE
PRIOR TO CONSTRUCTION 1 1
(TYP.) 1 1
1 1
... 1 1
1 1 1
1 1 1
WF 1 1
11C ( I
1 1
/ 1 1
/ / 1
�o zo �
WF �
12C PROPOSED WETLANDS CROSSING
PREPARED FOR
KEITH MILLER
ON PROPERTY OF
KAREN M. PILVELIS
85 OAKLAND DRIVE
OAKDALE, CONNECTICUT
SCALE: 1" = 10'
SHEET 2
OF 2
DATE: OCTOBER 3, 2012 JOB NO. 12-034