Loading...
HomeMy WebLinkAboutSite Planm 1 t z r Q c CD 1 P6 i MONUMENT BENCHMARK IRON ROD ELEVATION = 361.57 MONUMENT W w o qq o INSTALL AND MAINTAIN A -J Q o CONTINUOUS LINE OF SILT FENCE THROUGHOUT CONSTRUCTION (SEE DETAIL) N QUALITY CONTROL CERTIFICATION GROUP REVIEWED DATE PROJECT MANAGER SURVEY ENVIRONMENTAL CIVIL STRUCTURAL ARCHITECTURAL MONUMENT O 0 11 WLF 1A MONUMENT DRILL HOLE NIF HENRIETTA M. BUSHNELL DRILL HOLE P.!: Z DRILL HOLE DRILL HOLE VL.10LG N64.00'31"E 175.00 50 25 0 50 NONE GRAPHIC SCALE IN FEET w 0 FIRST FLOOR ELEVATION SQUARE FEET EXISTING CONTOURS PROPOSED CONTOURS STONE WALL BUILDING SETBACK LINE PROPOSED RETAINING WALL PROPOSED SILT FENCE PROPOSED BURIED UTILITIES LIMITS OF INLAND WETLANDS INVERT ELEVATION TEST HOLE 4" TOPSOIL FILTER FABRIC SUITABLE FILL 1co 2" 4" PERFORATED o PIPE I N FitoTfocoQ APPROVED 03 AGGREGATE 4' --I TRENCU CROSS SECTION NOT TO SCALE 2x2 5/8 16 GA. 4" PVC ELBOWWIREMESH 1-1/2" 1-1/4, d-_ 41.4 A r CV i o 2" STANDARD D --BOX WITH ELBOW NOT TO SCALE e) _Yt I DRILL HOLE l 1 GRAOE - 0"-8" TOPSOIL QRpppSEO 8"-26" SUBSOIL 12"-29" SUBSOIL 26"-90" SANDY TILL PROVIDE , BANK RUN.' . GRAVEL 2141 NO WATER w FILTER FABRIC:: 0 oxU TESTHOLE #12 TESTHOLE X15 0"-13" TOPSOIL 0"-10" TOPSOIL 13"-37" SUBSOIL 10"-26" SUBSOIL 37"-84" SANDY TILL GRADE, NO LEDGE NO LEDGE NO WATER 12" ROCK 4 , CHIPS n o 2 TO 4 TON 4" PERFORATED BOULDERS PVC DRAIN PIPE FILL VOIDS 0 WITH s w Lr. SMALLER ROCKS L0 o N STONE RUAININQ WALL NOT TO SCALE 4" TOPSOIL FILTER FABRIC SUITABLE FILL 1co 2" 4" PERFORATED o PIPE I N FitoTfocoQ APPROVED 03 AGGREGATE 4' --I TRENCU CROSS SECTION NOT TO SCALE 2x2 5/8 16 GA. 4" PVC ELBOWWIREMESH 1-1/2" 1-1/4, d-_ 41.4 A r CV i o 2" STANDARD D --BOX WITH ELBOW NOT TO SCALE e) _Yt I DRILL HOLE l 1 FILTER 'I; 4" ROLLED PROCESSED GRAVEL FABRIC ANGLE 10' UP SLOPE 3" ROLLED 1/2" STONE - FOR STABILITY AND SELF CLEANING POST I A* OW 1 z = 12" COMPACTED GRAVEL SUBBASE COMPACTED Q GRAVEL DRIVE SURFACEBACKFILL NOT TO SCALE SILT FENCE NOT TO SCALE EROSION AND SEDIMENT CONTROL PLAN 1.) CLEARING, GRUBBING, AND GRADING OF THE PROPOSED LOT TO BE LIMITED TO AREAS ADJACENT TQ THE PROPOSED HOUSE, DRIVEWAY, AND SEPTIC SYSTEM. 2.) DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED. 3.) ALL TOPSOIL TO BE STOCKPILE ON SITE AND PROTECTED WITH HAYBALES OR SILT - FENCE. 4.) ALL CUT AND FILL SLOPES ARE NOT TO EXCEED 3:1 SLOPES. 5.) PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF MONTVILLE SHALL BE NOTIFIED WHEN SEDIMENT CONTROL MEASURES ARE IN PLACE SO THAT THE INSPECTION CAN OCCUR. 6.) THE CONTRACTOR WILL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL REQUIkED SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. 7.) DUST CONS ROL WILL BE ACCOMPLISHED BY SPRAYING WITH WATER, AND IF NECESSARY THE APPLICATION OF CALCIUM CHLORIDE. TEMPORARY MEATIVE COVER LAUNG SCHEDULE MULCHES APPLICATION RATE NOTES SEEDING DATES: PER 1000 S.F. APRIL 1 - JUNE 15 AUGUST 1 - SEPTEMBER 15 STRAW/HAY 70-90 Ibs. FREE FROM WEEDS AND COARSE MATTER SEED MIXTURE: WOOD CHIPS 185-275 lbs. FREE OF COARSE MATTER 45% RED ' FESCUE AIR DRIED, TREAT WITH 45% KENTUCKY BLUE GRASS 1.21bs NITROGEN / TON 10% PERENNIAL RYE 1 / PLAN CAPACITIES A B C 1250 GAL 61" 51" 48" 1500 GAL 69" 59 56" PROVIDE RISERS TO WITHIN 4 x 4 12.6/12.6 12" OF FINISHED GRADE GA. WIRE MESH WIRE MESH GA AT INLET AND OUTLET PROVIDE OUTLET 24" FILTER POLYLOK PL -122 INLET 3 VENT OUTLET LIQUID LEVEL ' CONTINUOUS HOT b 4" OUTLET ASPHALT SEAL BAFFLE.\ M 4" SCHED. #40 v INLET BAFFLE P60' GASa. DEFLECTOR CROSS SECTION 1250/1500 CALLON 2 COMPARTMENT SEPTIQ TANK NOT TO SCALE SELECT FILL MATERIAL SELECT FILL MATERIAL" AND "SELECT BACKFILL MATERIAL", PLACED WITHIN AND ADJACENT TO PROPOSED LEACHING AREAS SHALL BE COMPRISED OF CLEAN SAND AND GRAVEL, FREE FROM ORGANIC (MATTER AND FOREIGN SUBSTANCES. THE FILL MATERIAL SHALL MEET THE FOLLOWING REQUIREMENTS UNLESS OTHERWISE APPROVED BY A PROFESSIONAL ENGINEER FOR USE WITHIN THE LEACHING AREA: 1. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN 3". 2. UP TO 45% OF THE DRY WEIGHT OF THE REPRESENTATIVE SAMPLE MAY BE RETAINED ON THE #4 SIEVE (THTS- IS THE GRAVEL PORTION OF THE SAMPLE). 3. THE MATERIAL THAT PASSES THE #4 SIEVE IS THEN REWEIGHED AND THE SIEVE ANALYSIS STARTED. 4. THE REMAINING SAMPLE SHALL MEET THE FOLLOWING GRADATION CRITERIA: SIEVE SIZE PERCENT PASSING 4 100% 10 70%-100% 40 10%-50% (SEE NOTE BELOW) 100 0%-20% 200 0%-5% NOTE: PERCENT PASSING THE #40 SIEVE- CAN BE INCREASED TO NO GREATER THAN 75% IF THE PERCENT PASSING THE #100 SIEVE DOES NOT EXCEED 107o AND THE #200 SIEVE DOES NOT EXCEED 5%. THE RESPONSIBILITY FOR THE PREPARATION OF THE LEACHING AREA UTILIZING "SELECT MATERIAL" IS THAT OF THE LICENSED INSTALLER. THE INSTALLER SHALL TAKE THE NECESSARY STEPS TO PROTECT THE UNDERLYING NATURALLY OCCURRING SOILS FROM OVERCOMPACTION AND SILTATION ONCE EXPOSED. TESTHOLE 114 KNOCKOUT INLET AND OUTLET OPENINGS 0"-8" TOPSOIL 0"-12" TOPSOIL 8"-26" SUBSOIL 12"-29" SUBSOIL 26"-90" SANDY TILL 29"-76" SANDY TILL NO LEDGE NO LEDGE 2141 NO WATER win MR 0 oxU TESTHOLE #12 TESTHOLE X15 0"-13" TOPSOIL 0"-10" TOPSOIL 13"-37" SUBSOIL 10"-26" SUBSOIL 37"-84" SANDY TILL 26"-96" SANDY TILL NO LEDGE NO LEDGE NO WATER NO WATER MOTTLING @ 37" MOTTLING @ 26" n o TESTHOL 1 a 0"-8" TOPSOIL o... cN 8"-26" SUBSOIL 0 26"-95" SAA '1,40 ' 7-8_U E SOIL s w Lr. NO LEDGE L0 o N NO WATER O7 MOTTLING @ 26" Ld z PERCOLATION RAZE FILTER 'I; 4" ROLLED PROCESSED GRAVEL FABRIC ANGLE 10' UP SLOPE 3" ROLLED 1/2" STONE - FOR STABILITY AND SELF CLEANING POST I A* OW 1 z = 12" COMPACTED GRAVEL SUBBASE COMPACTED Q GRAVEL DRIVE SURFACEBACKFILL NOT TO SCALE SILT FENCE NOT TO SCALE EROSION AND SEDIMENT CONTROL PLAN 1.) CLEARING, GRUBBING, AND GRADING OF THE PROPOSED LOT TO BE LIMITED TO AREAS ADJACENT TQ THE PROPOSED HOUSE, DRIVEWAY, AND SEPTIC SYSTEM. 2.) DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED. 3.) ALL TOPSOIL TO BE STOCKPILE ON SITE AND PROTECTED WITH HAYBALES OR SILT - FENCE. 4.) ALL CUT AND FILL SLOPES ARE NOT TO EXCEED 3:1 SLOPES. 5.) PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF MONTVILLE SHALL BE NOTIFIED WHEN SEDIMENT CONTROL MEASURES ARE IN PLACE SO THAT THE INSPECTION CAN OCCUR. 6.) THE CONTRACTOR WILL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL REQUIkED SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. 7.) DUST CONS ROL WILL BE ACCOMPLISHED BY SPRAYING WITH WATER, AND IF NECESSARY THE APPLICATION OF CALCIUM CHLORIDE. TEMPORARY MEATIVE COVER LAUNG SCHEDULE MULCHES APPLICATION RATE NOTES SEEDING DATES: PER 1000 S.F. APRIL 1 - JUNE 15 AUGUST 1 - SEPTEMBER 15 STRAW/HAY 70-90 Ibs. FREE FROM WEEDS AND COARSE MATTER SEED MIXTURE: WOOD CHIPS 185-275 lbs. FREE OF COARSE MATTER 45% RED ' FESCUE AIR DRIED, TREAT WITH 45% KENTUCKY BLUE GRASS 1.21bs NITROGEN / TON 10% PERENNIAL RYE 1 / PLAN CAPACITIES A B C 1250 GAL 61" 51" 48" 1500 GAL 69" 59 56" PROVIDE RISERS TO WITHIN 4 x 4 12.6/12.6 12" OF FINISHED GRADE GA. WIRE MESH WIRE MESH GA AT INLET AND OUTLET PROVIDE OUTLET 24" FILTER POLYLOK PL -122 INLET 3 VENT OUTLET LIQUID LEVEL ' CONTINUOUS HOT b 4" OUTLET ASPHALT SEAL BAFFLE.\ M 4" SCHED. #40 v INLET BAFFLE P60' GASa. DEFLECTOR CROSS SECTION 1250/1500 CALLON 2 COMPARTMENT SEPTIQ TANK NOT TO SCALE SELECT FILL MATERIAL SELECT FILL MATERIAL" AND "SELECT BACKFILL MATERIAL", PLACED WITHIN AND ADJACENT TO PROPOSED LEACHING AREAS SHALL BE COMPRISED OF CLEAN SAND AND GRAVEL, FREE FROM ORGANIC (MATTER AND FOREIGN SUBSTANCES. THE FILL MATERIAL SHALL MEET THE FOLLOWING REQUIREMENTS UNLESS OTHERWISE APPROVED BY A PROFESSIONAL ENGINEER FOR USE WITHIN THE LEACHING AREA: 1. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN 3". 2. UP TO 45% OF THE DRY WEIGHT OF THE REPRESENTATIVE SAMPLE MAY BE RETAINED ON THE #4 SIEVE (THTS- IS THE GRAVEL PORTION OF THE SAMPLE). 3. THE MATERIAL THAT PASSES THE #4 SIEVE IS THEN REWEIGHED AND THE SIEVE ANALYSIS STARTED. 4. THE REMAINING SAMPLE SHALL MEET THE FOLLOWING GRADATION CRITERIA: SIEVE SIZE PERCENT PASSING 4 100% 10 70%-100% 40 10%-50% (SEE NOTE BELOW) 100 0%-20% 200 0%-5% NOTE: PERCENT PASSING THE #40 SIEVE- CAN BE INCREASED TO NO GREATER THAN 75% IF THE PERCENT PASSING THE #100 SIEVE DOES NOT EXCEED 107o AND THE #200 SIEVE DOES NOT EXCEED 5%. THE RESPONSIBILITY FOR THE PREPARATION OF THE LEACHING AREA UTILIZING "SELECT MATERIAL" IS THAT OF THE LICENSED INSTALLER. THE INSTALLER SHALL TAKE THE NECESSARY STEPS TO PROTECT THE UNDERLYING NATURALLY OCCURRING SOILS FROM OVERCOMPACTION AND SILTATION ONCE EXPOSED. TESTHOLE 114 TESTHOLE #12 0"-8" TOPSOIL 0"-12" TOPSOIL 8"-26" SUBSOIL 12"-29" SUBSOIL 26"-90" SANDY TILL 29"-76" SANDY TILL NO LEDGE NO LEDGE WATER @ 88" NO WATER MOTTLING @ 26" MOTTLING @ 29" 0 oxU TESTHOLE #12 TESTHOLE X15 0"-13" TOPSOIL 0"-10" TOPSOIL 13"-37" SUBSOIL 10"-26" SUBSOIL 37"-84" SANDY TILL 26"-96" SANDY TILL NO LEDGE NO LEDGE NO WATER NO WATER MOTTLING @ 37" MOTTLING @ 26" n o TESTHOL 1 a 0"-8" TOPSOIL o... cN 8"-26" SUBSOIL 0 26"-95" SAA '1,40 ' 7-8_U E SOIL s w Lr. NO LEDGE L0 o N NO WATER O7 MOTTLING @ 26" Ld z PERCOLATION RAZE Q Y PER MAP REFERENCE I Ir I- 111 = .zn PRESOAK @ 11:25 12:59 7-1 /2„ 1:09 14-3/4" 1:19 17-1 '2" P. 1:29 18 3 1:39 19" : , , J 1:49 20" CRY 10 MINUTE'S / INCH M 13EFERENCE SUBDIVISION PLATO, STONY BROOK ACRES, PREPARED FOR WILLIAM M. HRACYK & ANNE M. DANIEWICZ, SALEM TURNPIKE (RTE #82), CHERRY LANE & NOBLE HILL ROAD, MONTVILLE:, CONNECTICUT, BY CHANDLER, PALMER & KING DATED APRIL 24, 1997 REVISED TO 08/11/98. DES( N D ,i'A PERCOLATION RATE = 10 MINUTES/INCH 4 BEDROOrA RESIDENCE REQUIRES 660 SF OF LEACHING AREA PROVIDE (}} 1 lo, (48" WIDE) TRENCHES IN SERIES EFFECTIVE LEACHING AREA = 660 SF PROVIDE A,1250 GALLON 2 -COMPARTMENT TANK M.L.S.S. RI;QUIRED = 28 x 2.0 x 1.2 = 67.2 M.L,S.S, PROVIDED = 110' EPARE ,REA QE PROPOSED SYSTEM AS FOLLQW 1.) REPROVE AND STOCKPILE TOPSOIL. 2.) PLACE BANK RUN GRAVEL (LESS THAN 5% FINES) PLACED IN 6" LIFTS AND COMPACTED TO 95% DENSITY. 3.) EXCAVj\TE 4' WIDE TRENCHES AND PREPARE SURFACE. 4.) FILL TRENCHE'S WITH 1 " WASHED STONE TO HEIGHT OF PIPE INVERTS PLACE PIPE IN TRENCH, AND FILL TO 2" OVER TOP OF PIPE. 5,) CAP E0S OF PIPES. 6.) PLACE'A 4' 'WIDE S -T -RIP OF NON -WOVEN FILTER FABRIC ON TOP OF THE ENTIRE LENGTH OF THE SYSTEM), AND BACKFILL WITH NATIVE MATERIAL. 7.) REPLA;E TOPSOIL, SEED & MULCH, dfOiES 1.) TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING STANDARDS. 2:) BASE FOR LEVELS: SUBDIVISION MAP. 3.) PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SUR't; EYOR LICENSED IN THE STATE OF CONNECTICUT, 4.) LOT AREA = 8.87± ACRES 5.) BENCi1MARK TO BE SET IN AREA OF SEPTIC SYSTEM AT TIME OF CONSTRU.TION. 6.) ADDITIONAL TEST HOLES ARE TO BE DUG ON THE SOUTH SIDE OF THE SYSTEM AND IN THE RESERVE AREA PRIOR TO THE START OF CONSTRUCTION. m + c tv i cb0 aI, Ccao X 1.J hLLC CIL I o co o s 0 0a O E m 0 Q u m z 4 z Q. it 0 U LLI o W cr w F 0 z Q W Ld cn w z LL LLJ 0 oxU W Q LL 0 W Z M z V) j LLJ Q F- ZwV U w o m CLC:)® o Ln 0 n o a o... cN 0 0 s w Lr. I m z 4 z Q. it 0 U LLI o W cr w F 0 z Q aQLij o Ln M cr_ a M o... cN I Iii z w z 1 L0 o N QO O7 Ld z z Q Y J LL Y O M O W o o U O O v Ld DATE: 07/14/2005 SCALE, 1 " = 50' SHEET 1 OF 1