Loading...
HomeMy WebLinkAboutSite PlanW4 Z rTlRI 2W- r`po 0 PROVIDE BOULDER— PROPERTY LANDSCAPE WALL LINE PROPERTY LINE 4_1 -71 170 TPIN REC! UTILITY POLE 61. 19 154 PROPOSED -4- 00 166 UTILITIES IPIN 15 Ap'163A BENCHNLARK________' REC. .\ .0 : 2 164 IRON PIN152.6— ellEL=-153.70 TH#112 00i — 16*2 FOOTING 271,F-4"P\CDRAIN OUTLET (ASTMD17 P SET) 160 W LLkLLRADIUS 30'SHARED-- F41PVC 159 1\1, 1,500 GAL,/2COMP. DRIVEWAY DR 35) EASENIENT THtic,, SEPTIC TANK(SEE DETAh;. INV, IN -157.05 . N`V. OUT - 156,80 156 DRIVEWAYSHARED "SERVE PER SUBDIVISION MAP'--.--,-, N, D -BOX (SEE DETAIL), ARI A INV. IN -156.37 INV. OUT, - 156.20 TH I3 THl?Dvv15480LFOF36" MANTIS 536-8 16) YSECTIONS EXISTING GRADE @ SYSTEM - 155.9 BOTTOM OF SYSTEM - 155.20 INV. 4" DISTRIBUTION PIPE - 156.20 — SEE, DETAIL & REFER TO MANUFACTURERS i — -~- -' DESIGN & INSTALLATION GUIDELINES) PROVIDE A CONTINUOUS LINE OF SILT FENCE THROUGHOUT CONSTRUCTION SEE DETAIL) 08 IT - RD 160 LEGEND: AV— v— KNOCKOUT INLET ANDKNOCKOUT OUTLET OPENINGS Ca pL F.F. FIRST FLOOR EL. ELEVATION S.F. SQUARE FEET TYP, TYPICAL IPIN IRON PIN x153.4 EvISTING SPOT ELEVATION x158.5 PROPOSED SPOT ELEVATION 150 EXISTING CONTOURS 150 PROPOSED CONTOURS BUILDING SETBACY, LINE TH "B" - 011-711 TOPSOIL TEST HOLE IVEGE7ATIVE C0Vr'_'_R TOPSOIL CL S4N BACKFILL 9" 1 IN 18" ELJEN MANTIS 4" SDP WITH HOLES SPECIFIED SAND WITH 12 O'CLOCK 6 18" MINIMUM FROM48" BOTTOM OF UNIT TO SEASONAL HIGH WATER 6" MIN TA LE NOTE: VENTING REQUIRED WHEN MORE THAN 18" OF COVER AS JvIEASURED FROM THE TOP OF THE UNIT TO FINISHED GRADE MANTIS 536-8 INSTALLATION NOT TO SCALE CAST CONCRETE COVERS PLAN CAPACITIES AV— v— KNOCKOUT INLET ANDKNOCKOUT OUTLET OPENINGS Ca pL CAST CONCRETE COVERS PLAN CAPACITIES A B C 1250 GAL 611? 51" 48" 1500 GAL 6911 59" 5611 4 x 4 12.6/12,6 G.A. WIRE MESH 17 1/2" 6x 6 6/6 GA. WIAE MESH INLE VElfT ------ LIQUID LEVEL CONTINUOUS HOT ASPHALT SEAL 4" SCHED. #40 E -Z CROSS SECTION 1250/1500 GALLON 2 COI IPARTMENT NOT TO SCALE yurLET FILTER U DEVXCE rEST HOLE-DA'r] PERUNCAS HEALTH DISTRICT PER SUBDIVISION PLAN) TH#I 12 - 0%6" TOPSOIL 6"-19" BROWN FINE SANDY LOAM 19"-34" GREY LOAMY SAND 34"-72" WATER IvIOTTLING(&,19"' NO LEDGE RESTRICTIVE( 19 TH#I 13 - 0%4" TOPSOIL 4"-19" BROWN FINE SANDY LOAM 19"49" GREY LOAMY SAND 49"-100" NATER MOTTLING@191f, NO LEDGE, WATER@28" RESTRICTFVE@19't TI -141 14 - 0%4" TOPSOIL 411-2111 BROWN FINE SANDY LOAM 21 "42" GREY LOAMY SAND 42"-86" WATER MOTTLING@21f? , NO LEDGE, WATER@35" RESTRICTIVE@2111 TH#I 15 - 0"4" TOPSOIL 4"-36" BROWN FINE SANDY LOAM 36"-56" GREY LOAMY SAND 56%80" WATER MOTTLING@3 6 NO LEDGE, WATER@44 RESTRICTIVE@3611 2X2 5/8 16 GA. WIRE MESH 11/2" 7n t 4. cn cn 00 c Tcli T, STANDARD D -BOX WELBOW NOT TO SCALE - DESIGN NOTES: PERC TEST DATA L ALL CONSTRUCTION TO CONFORM TO STANDARDS OF THE CONNECTICUT PUBLIC HEALTH CODE AND TO THE SATISFACTION OF THE TOWN SANATAEkN. PER SUBDIVISION PLAN DEPTH - 18 1 THIS SYSTEM HAS NOT BEEN DESIGNED FOR THE USE OF LARGE TIME CAPACITY (+100 GALLONS), DISCHARGE TYPE BATHTUBS. RESIDENTIAL GARBAGE DISPOSALS ARE NOT ANTICIPATED FOR THIS DESIGN. IN THE 0 - 4" EVENT THAT SUCH AN INSTALLATION IS CONTEMPLATED FOR THE ' 5 - 5 1/2ft PROPOSED HOUSE, A LARGER SEPTIC TANK AND INCREASED LEACHING 10-8 FIELD CAPACITY WILL BE REQUIRED. 20 -101/8" 30 -12" LEACHING SYSTEM CONSTRUCTION NOTES: 40 -13 1/4 50-153/411 1. TOPSOIL TO BE STRIPPED OFF PRIOR TO FILLING. FILL MATERIAL BETWEEN AND BEYOND f? 60 - 17TRENCHES TO BE PERVIOUS, GOOD QUALITY AND CLEAN MEDIUM S ' AND (SELECT FILL) PLACED PERC RATE - 9 MINUTES PER INCH AND COMPACTED IN 6" LIFTS. SELECT FILL SHALL MEET THE FOLLOWING M[NLMl REQUIREMENTS: A. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN 3 INCHES, B, THE FILL SHALL NOT CONTAIN MORE MAN 45 PERCENT GRAVEL (GRAVEL IS BETWEEN NO. 4 & YSIEVES) NO MORE THAN 45 PERCENT OF THE MATERIAL CAN BE RETAINED ON THE NO. 4 SIEVE C, THE FILL LESS THE GRAVEL SHALL MEET THE FOLLOWING GRADATION CRITERIA: SIEVE SIZE: #4 #10 #40 #100 #200 PASSING: 100 70-100 **L0-50 0-20 0-5 ATT SIEVE PASSING: 100 70-100 10-75 0-5 0-2.5 DRY SIEVE PERCENT PASSING THE #40 SIEVE CAN BE INCREASED TO NO GREATER THAN 75% IF THE PERCENT PASSING THE 4100 SIEVE DOES NOT EXCEED 10% AND THE #200 SIEVE DOES NOT EXCEED 5%, 2, DOCUMENTATION OF TEST RESULTS ARE TO BE PROVIDED TO THE HEALTH DISTRICT. MLSS DATA BEDROOM HOUSE 3, FILL MATERIAL TO BE PLACED PRIOR TO TRENCH EXCAVATION. NO TRAFFIC OTHER THAN5 SLOPE - 6,7% TRACK -DRIVEN EQUIPMENT IS TO CROSS, DUMP, UNLOAD OR OTHERWISE COMPACT THE FILL AREA PER.C. RATE - 9 MINANCH AFTER TOPSOIL REMOVAL. FILL MATERIAL TO BE DUMPED AT THE EDGE OF THE STRIPPED AREA ANDRESTRICTIVELAYER - 27" SPREAD AND COMPACTED lATITITRACK-DRIVEN VEHICLES, STOCKPILING IS TO TAKE PLACE UPGRADIENT OF M,L,S,,S. REQUIRED - 28 x 2.25 x 1.0 75.6' M.S.S. PROVIDED - 80' THE LEACHING AREA, THE AREA DOWN GRADIENT OF THE LEACHING AREA IS NOT TO BE DISTURBED. L 5 BEDROOM HOUSE REQUIRES 742.5 S.F. OF EFFECTIVE LEACHING AREA USE 8OLF 4(16) - 51 LONG lvlANTIS 5' )6-8 UNITS 80x11= 880 S.F.) USE 1,500 GAL. 2 COWARTMBNT SEPTIC TANK W/ OUTLET FILTER DEVICE SEPTIC SYSTEM CONSTRUCTION NOTES: 1. CONSTRUCTION SEQUENCE, A. STRIP & STOCKPILE TOPSOIL FROM LEACHING AREA, B. EXCAVATE 42" WIDE TRENCHES AND P4PARE SURFACE. C. PLACE MANTIS UNITS IN TRENCH, REFER TO MANUFACTURERS DESIGN AND INSTALLATION GUIDELINES FOR INSTALLATION, D. LOAM, FINE GRADE TO FINISHED GRADE AND SEED. PROTECT DISTURBED AREAS WITH EROSION CONTROLS UNTIL FIRST MOWING, 2, THE PIPE BETWEEN THE HOUSE AND SEPTIC TANK SHALL BE 4 IN, EXTRA HEAVY CAST IRON, DUCTILE IRON OR EXTRA STRENGTH PVC ASTM D1785 SCHD 40 OR APPROVED EQUAL. 3, ALL DISTRIBUTION PIPE IS TO BE ASTM D3034 SDR 35 (4"PVC) OR APPROVED EQUAL UNLESS NOTED. 4, SEPTIC TANK SHALL BE SET LEVEL ON A MR41MUM OF 6" OF PROCESSED GRAVEL OR BROKEN STONE ON COMPACTED SUBGRADE. 5. THERE ARE NO APPARENT WELLS OR SEPTIC FIELDS WITHIN 75' OF THE PROPOSED WELL AND SEPTIC SYSTEM AS SHOWN ON THIS PLAN. 6. THE BOTTOM OF THE LEACHING GALLERIES SHALL BE SET A MAXIMUM OF 9" INTO EXISTING GRADE, 7. THE LOCATION AND ELEVATION OF THE PROPOSED SEPTIC SYSTEM SHALL BE STAKED IN THE FIELD BY A LICENSED LAND SURVEYOR. FILTER NOTES: FABRIC---, ANGLE 10- UP SLOPE 1, TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING POST FOR STABILITY AND STANDARDS. SELF CLEANING 2. PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT. COMPACTED 3, BASE FOR LEVELS: PER REFERENCE MAP, BACKFILL 4. PROPERTY IS LOCATED IN THE TOWN OF MONTVILLE ZONING DISTRICT R-80. 5. THERE ARE NO WELLS LOCATED WITHIN 75'OFTHE PROPOSED SEPTIC SYSTEM SILT FENCE LOCATED ON ABUTTING PROPERTIES. NOT TO SCALE 6. A BENCHMAJK IS TO BE PLACED WITHIN 50' OF THE PROPOSED HOUSE & SEPTIC SYSTEM AT THE TIME OF CONSTRUCTION, 7, IF BLASTING IS NECESSARY A PRE -BLAST SURVEY SHALL BE REQUIRED PRIOR TO THE START OF CONSTRUCTION. REFERENU MAP: SUBDIVISION PLAN PREPARED FOR ELIZABETH PATRICIA SHEEHAN MASSAPEAG ROAD, MONTVILLE, CONNECTICUT, SCALES AS NOTED REVISED TO 12/27/07, PREPARED BY CME ASSOCIATES, INC. PROJECT NO. 13-025 SEPTIC SYSTEM DESIGN PLAN DRAWN BY: R.A.D. PREPARED FOR DATE: 4/28/13 SCALE: 111=30' RTT DEVELOPMENT SHEET 10F I REVISIONS MASSAPEAG ROAD MONTVILLE, CONNECTICUT 411, C ONO h 0;0! LOT #001-OF50.6 T.0 M LIEF, THIS MAP IS SUBSTANTIALLY CORRECT At- E1} IS NOT VALID WITHOUT A LIVE SIGNATURE 0 THE SURVEYOR I-MUON. ADVANCED SURVEYS, LLC. N 30 15 0 30 162River.Road Preston CT. 06365 w E Phone & Fax (860) 859-1280 SRICHARDA. DESCHAMPS L.S. 070019 DATE GRAPHIC SCALE IN FEET EROSION AND SEDIMENT CONTROL PLAN: PER UNICAS HEALTH DISTRICT 4/30/22013 1. CLEARING, GRUBBING, AND GRADING OF THE PROPOSED SITE TO BE LIMITED TO AREAS ADJACENT TO THE PROPOSED HOUSE TH "A" - 011-61f TOPSOIL AND SEPTIC SYSTEM. 2. DISTURBED AREAS TO BE LOAMED, SEEDED, AND MULCHED. 6"-23" BROWN FINE SANDY LOAM 3. ALL TOPSOIL TO BE STOCKPILED ON SITE AND PROTECTED 23"-72" GREY COMPACT, MOTTLED WITH HAYBALES OR SILT FENCE. MOTTLING@28", NO LEDGE, NO WATER 4. ALL CUT AND FILL SLOPES ARE NOT TO EXCEED 3:1 SLOPES. RESTRICTIVE@2811 5. PRIOR TO SITE DISTURBANCE, THE REPRESENTATIVE OF THE TOWN OF MONTVILLE SHALL BE NOTIFIED WHEN SEDIMENT CONTROL MEASURES ARE IN PLACE SO THAT THE INSPECTION TH "B" - 011-711 TOPSOIL CAN OCCUR. 711-35" BROWN FINE SANDY LOAM 6. THE CONTRACTOR WILL BE RESPONSIBLE FORTHE INSTALLATION 35"-72" GREY COMPACT, MOTTLED AND MAINTENANCE OF ALL REQUIRED SEDIMENT CONTROL MEASURES THROUGHOUT CONSTRUCTION. MOTTLING@27, NO LEDGE, NO WATER 7. DUST CONTROL WILL BE ACCOMPLISHED BY SPRAYING WITH RESTRICTIVE@2827 WATER, AND IF NECESSARY THE APPLICATION OF CALCIUM CHLORIDE. TH "C" - 011-611 TOP$OEL TEMPORARY VEGETATIVE COVER: 6"-24" BROWN FINE SANDY LOAM 24"-54" GREY COMPACT, MOTTLED MULCHES APPLICATION RATE NOTES PER 1000 S.F. MOTTLING@27tt, ROCK@541', NO WATER REST-PJCTIVE@2711 STRAW/HAY 70-90 tbs. FREE FROM WEEDS AND COARSE MATTER TH "Dtv - 0ff-71f TOP$OIL 7-30" BROWN FINE SANDY LOAM WOOD CHIPS 185-275 tbs. FREE OF COARSE MATTER AIR DRIED, TREAT WITH 30"-75" GREY COMPACT, MOTTLED PLANTING SCHEDULE: 12lbs NITROGEN / TON MOTTLING@2711, NO LEDGE, NO WATER RESTRICTIVE@27?y SEEDING DATES: APRIL 1-._-T-- JUNE 15 AUGUST I SEPTEMBER 15 SEED MIXTURE: 45% RED FESCUE 45% KENTUCKY BLUE GRASS 10% PERENNIAL RYE DESIGN NOTES: PERC TEST DATA L ALL CONSTRUCTION TO CONFORM TO STANDARDS OF THE CONNECTICUT PUBLIC HEALTH CODE AND TO THE SATISFACTION OF THE TOWN SANATAEkN. PER SUBDIVISION PLAN DEPTH - 18 1 THIS SYSTEM HAS NOT BEEN DESIGNED FOR THE USE OF LARGE TIME CAPACITY (+100 GALLONS), DISCHARGE TYPE BATHTUBS. RESIDENTIAL GARBAGE DISPOSALS ARE NOT ANTICIPATED FOR THIS DESIGN. IN THE 0 - 4" EVENT THAT SUCH AN INSTALLATION IS CONTEMPLATED FOR THE ' 5 - 5 1/2ft PROPOSED HOUSE, A LARGER SEPTIC TANK AND INCREASED LEACHING 10-8 FIELD CAPACITY WILL BE REQUIRED. 20 -101/8" 30 -12" LEACHING SYSTEM CONSTRUCTION NOTES: 40 -13 1/4 50-153/411 1. TOPSOIL TO BE STRIPPED OFF PRIOR TO FILLING. FILL MATERIAL BETWEEN AND BEYOND f? 60 - 17TRENCHES TO BE PERVIOUS, GOOD QUALITY AND CLEAN MEDIUM S ' AND (SELECT FILL) PLACED PERC RATE - 9 MINUTES PER INCH AND COMPACTED IN 6" LIFTS. SELECT FILL SHALL MEET THE FOLLOWING M[NLMl REQUIREMENTS: A. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN 3 INCHES, B, THE FILL SHALL NOT CONTAIN MORE MAN 45 PERCENT GRAVEL (GRAVEL IS BETWEEN NO. 4 & YSIEVES) NO MORE THAN 45 PERCENT OF THE MATERIAL CAN BE RETAINED ON THE NO. 4 SIEVE C, THE FILL LESS THE GRAVEL SHALL MEET THE FOLLOWING GRADATION CRITERIA: SIEVE SIZE: #4 #10 #40 #100 #200 PASSING: 100 70-100 **L0-50 0-20 0-5 ATT SIEVE PASSING: 100 70-100 10-75 0-5 0-2.5 DRY SIEVE PERCENT PASSING THE #40 SIEVE CAN BE INCREASED TO NO GREATER THAN 75% IF THE PERCENT PASSING THE 4100 SIEVE DOES NOT EXCEED 10% AND THE #200 SIEVE DOES NOT EXCEED 5%, 2, DOCUMENTATION OF TEST RESULTS ARE TO BE PROVIDED TO THE HEALTH DISTRICT. MLSS DATA BEDROOM HOUSE 3, FILL MATERIAL TO BE PLACED PRIOR TO TRENCH EXCAVATION. NO TRAFFIC OTHER THAN5 SLOPE - 6,7% TRACK -DRIVEN EQUIPMENT IS TO CROSS, DUMP, UNLOAD OR OTHERWISE COMPACT THE FILL AREA PER.C. RATE - 9 MINANCH AFTER TOPSOIL REMOVAL. FILL MATERIAL TO BE DUMPED AT THE EDGE OF THE STRIPPED AREA ANDRESTRICTIVELAYER - 27" SPREAD AND COMPACTED lATITITRACK-DRIVEN VEHICLES, STOCKPILING IS TO TAKE PLACE UPGRADIENT OF M,L,S,,S. REQUIRED - 28 x 2.25 x 1.0 75.6' M.S.S. PROVIDED - 80' THE LEACHING AREA, THE AREA DOWN GRADIENT OF THE LEACHING AREA IS NOT TO BE DISTURBED. L 5 BEDROOM HOUSE REQUIRES 742.5 S.F. OF EFFECTIVE LEACHING AREA USE 8OLF 4(16) - 51 LONG lvlANTIS 5' )6-8 UNITS 80x11= 880 S.F.) USE 1,500 GAL. 2 COWARTMBNT SEPTIC TANK W/ OUTLET FILTER DEVICE SEPTIC SYSTEM CONSTRUCTION NOTES: 1. CONSTRUCTION SEQUENCE, A. STRIP & STOCKPILE TOPSOIL FROM LEACHING AREA, B. EXCAVATE 42" WIDE TRENCHES AND P4PARE SURFACE. C. PLACE MANTIS UNITS IN TRENCH, REFER TO MANUFACTURERS DESIGN AND INSTALLATION GUIDELINES FOR INSTALLATION, D. LOAM, FINE GRADE TO FINISHED GRADE AND SEED. PROTECT DISTURBED AREAS WITH EROSION CONTROLS UNTIL FIRST MOWING, 2, THE PIPE BETWEEN THE HOUSE AND SEPTIC TANK SHALL BE 4 IN, EXTRA HEAVY CAST IRON, DUCTILE IRON OR EXTRA STRENGTH PVC ASTM D1785 SCHD 40 OR APPROVED EQUAL. 3, ALL DISTRIBUTION PIPE IS TO BE ASTM D3034 SDR 35 (4"PVC) OR APPROVED EQUAL UNLESS NOTED. 4, SEPTIC TANK SHALL BE SET LEVEL ON A MR41MUM OF 6" OF PROCESSED GRAVEL OR BROKEN STONE ON COMPACTED SUBGRADE. 5. THERE ARE NO APPARENT WELLS OR SEPTIC FIELDS WITHIN 75' OF THE PROPOSED WELL AND SEPTIC SYSTEM AS SHOWN ON THIS PLAN. 6. THE BOTTOM OF THE LEACHING GALLERIES SHALL BE SET A MAXIMUM OF 9" INTO EXISTING GRADE, 7. THE LOCATION AND ELEVATION OF THE PROPOSED SEPTIC SYSTEM SHALL BE STAKED IN THE FIELD BY A LICENSED LAND SURVEYOR. FILTER NOTES: FABRIC---, ANGLE 10- UP SLOPE 1, TOPOGRAPHIC INFORMATION ON THIS PLAN COMPLIES WITH T-2 MAPPING POST FOR STABILITY AND STANDARDS. SELF CLEANING 2. PROPOSED HOUSE AND SEPTIC SYSTEM TO BE STAKED IN THE FIELD BY A LAND SURVEYOR LICENSED IN THE STATE OF CONNECTICUT. COMPACTED 3, BASE FOR LEVELS: PER REFERENCE MAP, BACKFILL 4. PROPERTY IS LOCATED IN THE TOWN OF MONTVILLE ZONING DISTRICT R-80. 5. THERE ARE NO WELLS LOCATED WITHIN 75'OFTHE PROPOSED SEPTIC SYSTEM SILT FENCE LOCATED ON ABUTTING PROPERTIES. NOT TO SCALE 6. A BENCHMAJK IS TO BE PLACED WITHIN 50' OF THE PROPOSED HOUSE & SEPTIC SYSTEM AT THE TIME OF CONSTRUCTION, 7, IF BLASTING IS NECESSARY A PRE -BLAST SURVEY SHALL BE REQUIRED PRIOR TO THE START OF CONSTRUCTION. REFERENU MAP: SUBDIVISION PLAN PREPARED FOR ELIZABETH PATRICIA SHEEHAN MASSAPEAG ROAD, MONTVILLE, CONNECTICUT, SCALES AS NOTED REVISED TO 12/27/07, PREPARED BY CME ASSOCIATES, INC. PROJECT NO. 13-025 SEPTIC SYSTEM DESIGN PLAN DRAWN BY: R.A.D. PREPARED FOR DATE: 4/28/13 SCALE: 111=30' RTT DEVELOPMENT SHEET 10F I REVISIONS MASSAPEAG ROAD MONTVILLE, CONNECTICUT 411, C ONO h 0;0! LOT #001-OF50.6 T.0 M LIEF, THIS MAP IS SUBSTANTIALLY CORRECT At- E1} IS NOT VALID WITHOUT A LIVE SIGNATURE 0 THE SURVEYOR I-MUON. ADVANCED SURVEYS, LLC. N 30 15 0 30 162River.Road Preston CT. 06365 w E Phone & Fax (860) 859-1280 SRICHARDA. DESCHAMPS L.S. 070019 DATE GRAPHIC SCALE IN FEET