HomeMy WebLinkAboutZBA Request Linesavid
rd'ck
O l 1 G
60 VO, , Dnll dole (Set)
6G
N7 ^ n/
Dnll Hole (Set)
Zoning Requirements
M.,.........,.,,.. I
NODnllhole (Set F , •. ,
0 ne 1-9 Pro 0 U30SSFtperYLine
Thames P\", Trda!)
Ebbjflow
l
x H
This survey and map has been prepared in accordance with
5ect10n5 20-300b- I through 20-300b-20 of the Kegulation5 of
Connecticut State Agencies- Minimum 5tandard5 for Surveys and
Maps in the State of Connecticut" as endorsed by the Connecticut
Association of Land Surveyors, Inc. It 15 a CIa55 A-2 Property
Survey.
The Duilding5 and Improvements on this parcel predate the
e5tabli5hment of Zoning.
ri
MA`s 2 0 ?010
THIS MAP AND SURVEY
CONFORMS TO A CLASS A-2
SURVEY AND IS SUBSTANTIALLY + '
CORRECT TO THE BEST OF MY ,; d
AND23t
David A. Yung, Professional Engineer andLandSljc eyor < y 4.•
NOT VALID WITHOUT LIVE STAMP # 51GNATURE)
I Inch = 0 Feed
0 40 80 120
Graphic Scalep
David A. Kin , 1 L5
r'" En Ineerin 5urve Inq
f
GOldColchester Road- J
Quaker Hill, Gt 0375
Phone (8G0) 848-0485
DPAWN BY: D.A.K. DATE: f 11ay 12, 2010
rvle, Cha pa6jne, Froperty
Sihowin(ZDA e uert LinesKNOWLEDGE
23 M,355areaq?point RoadI5/ 1 I / I O Modifiedas er NN DAK'
NO. DATE DESCRIPTION BY I
Vin ca 5vl I l e , CTREVISIONS
5HEET NUMBER
OF
t-\ih7r
F\ , _1 '''iris G