HomeMy WebLinkAbout334400-01-0 Catch Basins etc - Site Submittals #2SUBMITTAL
COVER SHEET
PROJECT:
SUBMITTAL NO.:
GENERIC NAME:
TRANSMITTAL INFORMATION
FROM:
CONTRACTOR:
TO:
ENGINEER’S ACTION (See Stamp)
Submitted for review and approval
Resubmitted for review and approval
Substitution involved - Substitution request attached
SUBMITTAL REVIEW
This review is only for general conformance with the design concept of the Project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittal during this review do not relieve contractor from compliance with the requirements of the plans and specifications. Approval of a specific item shall not be deemed approval of an assembly of which the item is a component. Contractor is responsible for the dimensions to be confirmed and correlated at the job-site; information that pertains solely to the fabrication process of the means, methods, techniques, sequences, and procedures of construction; coordination of his or her work with that of all other trades; and performing all work in a safe and satisfactory manner.
BSC Companies, Inc.
Reviewed By:
No Exceptions Taken
Approved as Noted
Revise & Resubmit
RejectedFurnish as Corrected
No action required
Not subject to review
See attached comments ( page(s))
Remarks:
CC:
SUBMITTAL DATE:
DATE RECEIVED:
MAGGIORE CONSTRUCTION CORP.
13 Wheeling Avenue, Woburn, MA 01801 Phone 781.935.6100 FAX 781.933.8044
SUBMITTAL ACTION SHEET
Oxoboxo Lofts
40 Pink Row
Uncasville, CT
General Contractor:Architect:
Maggiore Construction Corp.Paul B Bailey Architects
13 Wheeling Ave.110 Audubon Street
Woburn, MA 01801 New Haven, CT 06510
Job No.: 1214 Job No.: 16-063
Prepared By:Maggiore Construction Corp.
Form of Submittal:
Samples Cut Sheets Schedule Shop Drawings Other
Description:Manhole,
Catch basin
Yard drains
Wing walls
Light pole base
Bollards
HD manhole frame & covers
Manufacturer:Arrow Concrete Products
United Concrete Products
Campbell Foundry
Other/Notes:
Received By MCC:10/24/2019 Received By Owner:
Reviewed:Comments:
Approved Approved as Noted
Rejected Revise and Re-submit
Compliance Equal Submitted For Approval
By: Gifford Perry - Senior Project Manager Approved By:
Date:10/28/2019 Date:
Date:No.
Attention:
Project Name:
From:
Schumack@schumackconstruction.com
We are sending you: For Approval For your Use As Requested
Sent Via:
Mail to:
Fax:
Email:
Signed:
Letter of Transmittal
An Affirmative Action - Equal Opportunity Employer
Providing Equal Opportunities for Minorities/Females/Veterans/Individuals with Disabilities
Susan Weglein, Operations Manager
To :
gifford@maggiore.co
Maggiore Construction Corporation
13 Wheeling Avenue
Woburn, MA 01801
gifford@maggiore.co
Gifford Perry
Oxoboxo Lofts 42 Pink Row, Montville
Project #:
DescriptionSpecifications
Susan Weglein, Operations Manager
Schumack Engineered Construction
An Update
Comments:
Precast Concrete Structures
Manhole
Conversion Slab - CB to MH Opening
Standard Catch Basin Components Yard Drain with Base & Riser (2' x 2')End Wall w/Wing Walls Custom Wing Wall for 30" Pipe
Custom Wing Wall for 36" Pipe
Light Pole Base (18" Diameter)Precast Bollards HD Manhole Frame & Cover - Frame & Grate
21 Pages