Loading...
HomeMy WebLinkAbout14210-01-0 - elevator shop drawings oxoboxo lofts - reviewed by PBA and Aztech - SHEETS 10-12 correctedConfirm total wallthicknessConfirm Stainless Steel#4 Entrance Doors andFramesYES. - PBA 8/13/19CONTRACTOR: PLEASE TAKE NOTE. - PBA 8/13/197-5/8" CMU Wall 1/2" interstitial space 2-1/4" furred GWB wall TOTAL: 9-3/8"ELEVATOR CONTRACTOR AND GENERAL CONTRACTOR: VERIFY ALL CONDITIONS AND DIMENSIONS IN FIELD PRIOR TO FABRICATION AND INSTALLATION. NOTIFY ARCHITECT OF ANY DISCREPANCIES.Paul B. BaileyX8/13/19Sam KirbyTOTAL: 10-3/8"PBA 10/4/19 Confirm total wallthicknessConfirm Stainless Steel#4 Entrance Doors andFramesYES. - PBA 8/13/19CONTRACTOR: PLEASE TAKE NOTE. - PBA 8/13/197-5/8" CMU Wall 1/2" interstitial space 2-1/4" furred GWB wall TOTAL: 9-3/8"Paul B. BaileyELEVATOR CONTRACTOR AND GENERAL CONTRACTOR: VERIFY ALL CONDITIONS AND DIMENSIONS IN FIELD PRIOR TO FABRICATION AND INSTALLATION. NOTIFY ARCHITECT OF ANY DISCREPANCIES.X8/13/19Sam KirbyTOTAL: 10-3/8"PBA 10/4/19 Confirm total wallthicknessConfirm Stainless Steel#4 Entrance Doors andFrames* Top floor wall needs to be completely left open prior to installation of elevator* Top floor wall thickness needs to be a minimum of 8 1/2" which shall include2 layers of sheetrockYES. - PBA 8/13/19CONTRACTOR: PLEASE TAKE NOTE. - PBA 8/13/19CONTRACTOR: PLEASE TAKE NOTE. - PBA 8/13/197-5/8" CMU Wall 1/2" interstitial space 2-1/4" furred GWB wall TOTAL: 9-3/8"ELEVATOR CONTRACTOR AND GENERAL CONTRACTOR: VERIFY ALL CONDITIONS AND DIMENSIONS IN FIELD PRIOR TO FABRICATION AND INSTALLATION. NOTIFY ARCHITECT OF ANY DISCREPANCIES.Paul B. BaileyX8/13/19Sam KirbyTOTAL: 10-3/8"PBA 10/4/19