HomeMy WebLinkAbout05000-01 Misc MetalsSUBMITTAL
COVER SHEET
PROJECT:
SUBMITTAL NO.:
GENERIC NAME:
TRANSMITTAL INFORMATION
FROM:
CONTRACTOR:
TO:
ENGINEER’S ACTION (See Stamp)
Submitted for review and approval
Resubmitted for review and approval
Substitution involved - Substitution request attached
SUBMITTAL REVIEW
This review is only for general conformance with the design concept of the Project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittal during this review do not relieve contractor from compliance with the requirements of the plans and specifications. Approval of a specific item shall not be deemed approval of an assembly of which the item is a component. Contractor is responsible for the dimensions to be confirmed and correlated at the job-site; information that pertains solely to the fabrication process of the means, methods, techniques, sequences, and procedures of construction; coordination of his or her work with that of all other trades; and performing all work in a safe and satisfactory manner.
BSC Companies, Inc.
Reviewed By:
No Exceptions Taken
Approved as Noted
Revise & Resubmit
RejectedFurnish as Corrected
No action required
Not subject to review
See attached comments ( page(s))
Remarks:
CC:
SUBMITTAL DATE:
DATE RECEIVED: