HomeMy WebLinkAbout012 - Valve Box - ANSUBMITTAL
COVER SHEET
PROJECT:
SUBMITTAL NO.:
GENERIC NAME:
TRANSMITTAL INFORMATION
FROM:
CONTRACTOR:
TO:
ENGINEER’S ACTION (See Stamp)
Submitted for review and approval
Resubmitted for review and approval
Substitution involved - Substitution request attached
SUBMITTAL REVIEW
This review is only for general conformance with the design concept of the Project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittal during this review do not relieve contractor from compliance with the requirements of the plans and specifications. Approval of a specific item shall not be deemed approval of an assembly of which the item is a component. Contractor is responsible for the dimensions to be confirmed and correlated at the job-site; information that pertains solely to the fabrication process of the means, methods, techniques, sequences, and procedures of construction; coordination of his or her work with that of all other trades; and performing all work in a safe and satisfactory manner.
BSC Companies, Inc.
Reviewed By:
No Exceptions Taken
Approved as Noted
Revise & Resubmit
RejectedFurnish as Corrected
No action required
Not subject to review
See attached comments ( page(s))
Remarks:
CC:
SUBMITTAL DATE:
DATE RECEIVED:
MAGGIORE CONSTRUCTION CORP.
13 Wheeling Avenue, Woburn, MA 01801 Phone 781.935.6100 FAX 781.933.8044
SUBMITTAL ACTION SHEET
Oxoboxo Lofts
40 Pink Row
Uncasville, CT
General Contractor:Architect:
Maggiore Construction Corp.Paul B Bailey Architects
13 Wheeling Ave.110 Audubon Street
Woburn, MA 01801 New Haven, CT 06510
Job No.: 1529 Job No.: 16-063
Prepared By:Maggiore Construction Corp.
Form of Submittal:
Samples Cut Sheets Schedule Shop Drawings Other
Description:Fire Hydrant, pipe and fittings
Mechanical Joints
Megalug
Field Lok 350 Red Gasket
Marking Tape
Tyton Joint Ductile Pipe
Gate Valves by Mueller
Valve Bvox
Manufacturer:Mueller, Tyler Union Products,Ebava Iron,
Omega Marking Co., Tyton,
Other/Notes:ADS is being submited as an alternate to RCP.
Received By MCC:12/30/2019 Received By Owner:
Reviewed:Comments:
Approved Approved as Noted
Rejected Revise and Re-submit
Compliance Equal Submitted For Approval
By: Gifford Perry - Senior Project Manager Approved By:
Date:12/31/2019 Date: