HomeMy WebLinkAbout012 - Valve Box - ANSUBMITTAL COVER SHEET PROJECT: SUBMITTAL NO.: GENERIC NAME: TRANSMITTAL INFORMATION FROM: CONTRACTOR: TO: ENGINEER’S ACTION (See Stamp) Submitted for review and approval Resubmitted for review and approval Substitution involved - Substitution request attached SUBMITTAL REVIEW This review is only for general conformance with the design concept of the Project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittal during this review do not relieve contractor from compliance with the requirements of the plans and specifications. Approval of a specific item shall not be deemed approval of an assembly of which the item is a component. Contractor is responsible for the dimensions to be confirmed and correlated at the job-site; information that pertains solely to the fabrication process of the means, methods, techniques, sequences, and procedures of construction; coordination of his or her work with that of all other trades; and performing all work in a safe and satisfactory manner. BSC Companies, Inc. Reviewed By: No Exceptions Taken Approved as Noted Revise & Resubmit RejectedFurnish as Corrected No action required Not subject to review See attached comments ( page(s)) Remarks: CC: SUBMITTAL DATE: DATE RECEIVED: MAGGIORE CONSTRUCTION CORP. 13 Wheeling Avenue, Woburn, MA 01801 Phone 781.935.6100 FAX 781.933.8044 SUBMITTAL ACTION SHEET Oxoboxo Lofts 40 Pink Row Uncasville, CT General Contractor:Architect: Maggiore Construction Corp.Paul B Bailey Architects 13 Wheeling Ave.110 Audubon Street Woburn, MA 01801 New Haven, CT 06510 Job No.: 1529 Job No.: 16-063 Prepared By:Maggiore Construction Corp. Form of Submittal: Samples Cut Sheets Schedule Shop Drawings Other Description:Fire Hydrant, pipe and fittings Mechanical Joints Megalug Field Lok 350 Red Gasket Marking Tape Tyton Joint Ductile Pipe Gate Valves by Mueller Valve Bvox Manufacturer:Mueller, Tyler Union Products,Ebava Iron, Omega Marking Co., Tyton, Other/Notes:ADS is being submited as an alternate to RCP. Received By MCC:12/30/2019 Received By Owner: Reviewed:Comments: Approved Approved as Noted Rejected Revise and Re-submit Compliance Equal Submitted For Approval By: Gifford Perry - Senior Project Manager Approved By: Date:12/31/2019 Date: