HomeMy WebLinkAboutUncasville Mill FMC Amendment Memo Part A SHPO Bldg 2Uncasville Mill Design Change for FMC, Building 2 Condition of Approval: Design Change due to Flood Management Certificate (FMC) Review & Approval by the Connecticut Department of Energy and Environmental Protection (DEEP) “If, at any time prior to completion of the rehabilitation project, changes are contemplated to approved work, please use a Part 2 Amendment form to request approval.” Explanation of how the Project meets the Conditions of Approval Flood Vents Overview: Please see the attached Exhibit A, September 29, 2020 FMC Final Submission, page 1 Cover for a site plan with arrows showing the locations of the flood vents requested by the DEEP in its review of the FMC application. Building G Flood Vents: The DEEP, in its review of the FMC application, approved the flood vents in the south and west exterior walls of Building G. These flood vents were previously submitted to and approved by the SHPO and NPS in Amendment 1. Please see the attached Exhibit A, September 29, 2020 FMC Final Submission, page 6 ASK-006R3 for the floor plan and elevations showing these vents, and page 10 ASK-10R1 for the detail for the installation of these vents in the masonry walls. All vents installed in masonry walls will be painted to match the color of the masonry, per the condition of approval on Amendment 1.