Loading...
HomeMy WebLinkAboutRFI 049 - Bldg F filtration equipment drain - AZTDistribution to: OWNER X ARCHITECT X ENGINEER 13 Wheeling Ave Woburn, MA 01801 781-935-6100 REQUEST FOR INFORMATION NO. 49 PROJECT:OXOBOXO LOFTS RFI #49 INITIATION DATE:02/11/20 FROM:Maggiore Construction Corporation DATE NEEDED:02/18/20 13 Wheeling Avenue Woburn, MA 01801 REQUESTED BY:Gifford Perry EMAIL: gifford@maggiorecos.com TO:Paul B. Bailey Architect 110 Audubon Street New Haven, CT 06510 ATTENTION:Susan Odell- email: susan@pbbarchitect.com Frank Brachanow-Email Fbrachanow@dakotaPartners.net Sam Kirby SUBJECT: REQUEST:The filtration equipment needs a drain for it's flushing of water. Please detail where you want that to go. A floor drain will not be able to handle the flow, could a floor sink be an option ? We are also adding a small ejector pump in the building for the single floor drain that's not in the raised platform Response:See corresponding filtration system flushing equipment detail markup from Cooling Tower mfr. rep. and updated PSK F-PB1.1R1 for Building F drainage Answered By: Company: Date:2/19/2020 Building F Patrick M. Callahan Aztech Engineers, Inc.