HomeMy WebLinkAboutRFI 046 - Compiled Drawing Set-AztDistribution to: OWNER X ARCHITECT X ENGINEER 13 Wheeling Ave Woburn, MA 01801 781-935-6100 REQUEST FOR INFORMATION NO. 46 PROJECT:OXOBOXO LOFTS RFI #46 INITIATION DATE:01/17/20 FROM:Maggiore Construction Corporation DATE NEEDED:01/24/20 13 Wheeling Avenue Woburn, MA 01801 REQUESTED BY:Gifford Perry EMAIL: gifford@maggiorecos.com TO:Paul B. Bailey Architect 110 Audubon Street New Haven, CT 06510 ATTENTION:Susan Odell- email: susan@pbbarchitect.com Frank Brachanow-Email Fbrachanow@dakotaPartners.net Sam Kirby SUBJECT: REQUEST:Drawing ESK ABC-EL1.1 & 1.3 do not show any lighting in the stairwells. Please clarify what light fixtures you want and the circuiting of them. A-A1.11 does show them, please confirm locations and counts Answered By: Company:Date: AB Connector lighting 33BUILDING D BUILDING B BUILDING C BUILDING G BUILDING A UNIT A-1(2 BEDROOM)UNIT A-2(1 BEDROOM) UNIT B-3(1 BEDROOM)TYPE 'A' UNIT B-4(2 BEDROOM) UNIT B-5(1 BEDROOM) UNIT B-6(1 BEDROOM) UNIT B-7(STUDIO) UNIT A-2(2 BEDROOM) B BB C C B B B C TPB3 -3 TPB3 -10 TPB3 TPB4 TPB5 E BB B B B C C TPB4 -10TPB4-3 B B B C TPB5 -10 C C C E B B B TPB6 -10TPB6-3 C E B B B TPB7C TPB7 -10 TPB7 -3 C E TPB5 -3 TPB6 A A A A AAACC C C C C C C C E E E B B B B B B B B BB B B B B B B TPA1 TPA2 TPA3 TPA1 -3 TPA1 -10 TPA2 -3 TPA2 -10 TPA3 -3 TPA3 -10 XE XE XE XE XE XE EM EM EM HPB1 -26 HPB1 -26 A A TYP B1 AND A1 CORRIDOR LTG EM XF XF XF XF XEHC A A A HPB1 -26 LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EL1.1 ELECTRICAL LIGHTING PLAN BLDGS A-B-C LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 7 Permit ReviewComments 08/05/2019 Revision 9 DATE 9 ESK ABC-EL1.1R1 ESK ABC-EL1.1R1 02/14/20209 UNIT B-8(1 BEDROOM)TYPE A UNIT B-9(2 BEDROOM) UNIT B-10(1 BEDROOM) UNIT B-11(1 BEDROOM) UNIT B-12(1 BEDROOM) BUILDING B BUILDING C BUILDING A BUILDING G BUILDING D C C C C C E E E E TPB17TPB11TPB16 TPB13TPB8 TPB9 TPB10 TPB12 A A B B B B B B B B BB B A B B B B BB C C B C A A B B C C C TPB12 -10 TPB11 -10TPB11-3 TPB10 -3 TPB10 -10 TPB9 -10TPB9-3 C TPB8 -3 TPB8 -10 XE XEC EM EM HPB1 -27 HPB1 -25 CCC C EM LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED HPB1 -6 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EL1.2 ELECTRICAL LIGHTING PLAN BLDGS A-B-C LEVEL 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date Revision 9 DATE 9 ESK ABC-EL1.2R1 ESK ABC-EL1.2R1 02/14/20209 BUILDING G BUILDING D BUILDING B BUILDING C BUILDING A UNIT A-4(1 BEDROOM)H.C. UNIT A-5(1 BEDROOM)UNIT A-6(2 BEDROOM)H.C. UNIT B-13(1 BEDROOM)TYPE A UNIT B-14(2 BEDROOM) UNIT B-15(1 BEDROOM) UNIT B-16(1 BEDROOM) UNIT B-17(1 BEDROOM) C BE B B B C TPB17 -10 TPB17 C C CE B B B TPB16 -10TPB16-3 TPB16 C B B B C TPB15 -10 C E TPB15 -3 TPB14 BB B B C C TPB14 -3E B TPB14 -10 B BB C C B C B B C TPB13 -3 TPB13 -10 TPB13 A A AAAAA A C C C C C C E E B B B B B B B BB B B B B TPA4 TPA6TPA5 C TPA4 -10 TPA4 -3 TPA5 -10 TPA5 -3 TPA6 -10 TPA6 -3 XEEM XEC XE EM EM HPB1 -28 HPB1 -28 CORRIROR LIGHTINGON THIS LEVEL A&B TO HPB1CIRCUIT 28 B C HEHC HPB1 -28 LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED A A A A HPB1 -6 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EL1.3 ELECTRICAL LIGHTING PLAN BLDGS A-B-C LEVEL 3 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 7 Permit ReviewComments 08/05/2019 Revision 9 DATE 9 ESK ABC-EL1.3R1 ESK ABC-EL1.3R1 02/14/20209 BUILDING D BUILDING G BUILDING B BUILDING C BUILDING A BUILDING F UNIT B-18(1 BEDROOM) UNIT B-19(2 BEDROOM) UNIT B-20(1 BEDROOM) UNIT B-21(1 BEDROOM) UNIT B-22(1 BEDROOM) ATTIC SPACE C BE B B B C TPB22-3TPB22 -10 TPB22 TPB21 C C C E B TPB21 -10TPB21-3 B B B TPB20 -10 C E TPB20 -3 E TPB19 BB B C C TPB19 -10TPB19-3 B BB C C B C B B C TPB18 -3 TPB18 -10 TPB18 TPB20 CB A A XEC XE EM EM HPB1 -28 LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED HPB1 -6 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EL1.4 ELECTRICAL LIGHTING PLAN BLDGS A-B-C LEVEL 4 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date Revision 9 DATE 9 ESK ABC-EL1.4R1 ESK ABC-EL1.4R1 02/14/20209 UNIT B-1(2 BEDROOM)TYPE A UNIT B-2(2 BEDROOM) UNIT C-3(2 BEDROOM)TYPE A UNIT C-4(2 BEDROOM)TYPE A ELEVATOR BUILDING B BUILDING CBUILDING A BUILDING G BUILDING D A A A A A C CC C C C C C B B B B B B B B B B B B B B B B B B B B B B B C TPC4 TPC4 -10 TPC4 -3 TPC3 C C TPC3 -10 TPC3 -3 TPC4 -10 TPB1 TPB2 TPB2 -3 TPB1 -3 TPB1 -10 XE XE XE XE XEC HPB1 -25TYP OF CORRIDOR LIGHTING ON BB XHCXHC B TPB2 -10 LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED HPB1 -6 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EL1.B ELECTRICAL LIGHTING PLAN BUILDINGS B-C LEVEL B Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 7 Permit ReviewComments 08/05/2019 Revision 9 DATE 9ESK ABC-EL1.BR1 ESK ABC-EL1.BR1 02/14/20209 UNIT C-1(2 BEDROOM) UNIT C-2(2 BEDROOM) STAIR 2 ELECTRICALMETER ROOM BOILER ROOMSPRINKLER ROOM BUILDING B BUILDING C BUILDING A (ABOVE) BUILDING D BUILDING G B TPC1 TPC2 E B B B B E B B B B B TPC4 C B TPC2 -10 TPC2 -3 TPC1 -3C C HPB1 -24 HPB1 -24 XE XE XE TPC1 -10 HPB1 -24 HPB1 -24 G G G GG G G G GGG G G G GG LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED HPB1 -6 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EL1.SB ELECTRICAL LIGHTING PLAN BUILDINGS B-C LEVEL SB Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date Revision 9 DATE 9ESK ABC-EL1.SBR1 ESK ABC-EL1.SBR1 02/14/20209 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT E3.2 ELECTRICAL PANELBOARD SCHEDULES Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 Notes: Total Est. Demand:75 A Receptacle 14352 VA 100.00%14352 VA Total Conn.:74 A Other 5400 VA 100.00%5400 VA Total Est. Demand:27011 VA Motor 3274 VA 108.08%3539 VA Total Conn. Load:26746 VA Lighting - Dwelling Unit 2848 VA 100.00%2848 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:120 A 98 A 25 A Total Load:13192 VA 10557 VA 3001 VA 41 42 39 40 37 38 35 Lighting - Dwelling Unit 20 A 1 448 VA 36 33 Other 20 A 1 540 VA 529 VA ------34 31 Lighting - Dwelling Unit 20 A 1 448 VA 529 VA 2 20 A Motor 32 29 Motor 20 A 1 0 VA 0 VA 1 20 A Power 30 27 Motor 20 A 1 550 VA 529 VA ------28 25 Security Head End Rack 20 A 1 360 VA 529 VA 2 20 A Motor 26 23 Lighting - Dwelling Unit 20 A 1 0 VA 0 VA 1 20 A Security Head End Rack 24 21 Lighting 20 A 1 0 VA 0 VA 1 20 A Lighting 22 19 ------529 VA 832 VA 1 20 A Lighting 20 17 SEWAGE EJECTOR PUMP 20 A 2 0 VA 0 VA 1 20 A Other 18 15 Lighting 20 A 1 224 VA 1080...1 20 A CORRIDOR RECEPTACLES 16 13 Spare 20 A 1 0 VA 540 VA 1 20 A CORRIDOR RECEPTACLES 14 11 CORRIDOR RECEPTACLES 20 A 1 0 VA 0 VA 1 20 A CORRIDOR RECEPTACLES 12 9 WASHER 20 A 1 0 VA 0 VA 1 20 A CORRIDOR RECEPTACLES 10 7 ------2392...0 VA 1 20 A WASHER 8 5 DRYER 30 A 2 2392...180 VA 1 20 A WASHER 6 3 ------2392...2392...------4 1 DRYER 30 A 2 2392...2392...2 30 A DRYER 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:MCB Rating:100 AMounting:Recessed Wires:4 Mains Rating:225 A Supply From:HPB Phases:3 Mains Type:MCB Location:Volts:120/208 Wye A.I.C. Rating: Branch Panel:HPH1 Notes: Receptacle 15072 VA 65.00%9797 VA Total Est. Demand:327 A Other 15120 VA 100.00%15120 VA Total Conn.:336 A Motor 73479 VA 104.59%76854 VA Total Est. Demand:117830 VA Lighting - Exterior 350 VA 125.00%438 VA Total Conn. Load:121208 VA Lighting - Dwelling Unit 5518 VA 70.34%3881 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:377 A 354 A 295 A Total Load:44315 VA 41496 VA 35400 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 ------1233...24 21 ------1233...500 VA 1 20 A Power 22 19 EUH-1 30 A 3 1233...1000...1 20 A Power 20 17 ------987 VA 1000...1 20 A Power 18 15 ------987 VA 3300...------16 13 Motor 20 A 3 987 VA 3300...------14 11 ------1773...3300...3 80 A ELEVATOR 1 12 9 ------1723...1055...------10 7 HPFA 225 A 3 1954...1319...2 100 A HPH1 8 5 ------4627...3519...------6 3 ------3403...4283...2 100 A HPE 4 1 HPB1A 225 A 3 4888...180 VA 1 20 A Security Head End Rack 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:Type 1 MCB Rating:400 A Mounting:Surface Wires:4 Mains Rating:400 A Supply From:Phases:3 Mains Type: Location:Volts:120/208 Wye A.I.C. Rating: Branch Panel:HPB Notes: Total Est. Demand:38 A Receptacle 720 VA 100.00%720 VA Total Conn.:36 A Other 4500 VA 100.00%4500 VA Total Est. Demand:13800 VA Motor 4791 VA 118.44%5674 VA Total Conn. Load:12918 VA Lighting - Dwelling Unit 1920 VA 100.00%1920 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:42 A 28 A 40 A Total Load:4888 VA 3403 VA 4627 VA 41 42 39 40 37 38 35 36 33 Other 20 A 1 540 VA 50 VA 1 20 A Motor 34 31 Power 20 A 1 550 VA 1767...------32 29 ERV2 20 A 1 50 VA 1767...2 30 A HP-4 30 27 Lighting 20 A 1 160 VA 480 VA 1 20 A Lighting 28 25 Lighting 20 A 1 200 VA 416 VA 1 20 A Lighting 26 23 ------529 VA 538 VA 1 20 A Lighting 24 21 Motor 20 A 2 529 VA 50 VA 1 20 A Motor 22 19 LEVLEL 3 CORRIDOR RECEPTACLES 20 A 1 540 VA 360 VA 1 20 A LEVEL 4 CORRIDOR RECEPTACLES 20 17 LEVEL 1 CORRIDOR RECEPTACLES 20 A 1 540 VA 360 VA 1 20 A LEVEL 2 CORRIDOR RECEPTACLES 18 15 ------90 VA 90 VA ------16 13 DRYER 50 A 2 90 VA 90 VA 2 50 A DRYER 14 11 ------90 VA 90 VA ------12 9 DRYER 50 A 2 90 VA 90 VA 2 50 A DRYER 10 7 8 5 WASHER 20 A 1 500 VA 192 VA 1 20 A Lighting Stairwell 6 3 MAINTENANCE RECEPTACLES 20 A 1 720 VA 540 VA 1 20 A B CORRIDOR RECEPTACLES 4 1 BOILER ROOM RECEPTACLE 20 A 1 360 VA 540 VA 1 20 A SB RECEPTACLES 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:Type 1 MCB Rating:225 A Mounting:Surface Wires:4 Mains Rating:225 A Supply From:HPB Phases:3 Mains Type: Location:Volts:120/208 Wye A.I.C. Rating: Branch Panel:HPB1 Notes: Total Est. Demand:161 A Other 1260 VA 100.00%1260 VA Total Conn.:151 A Motor 50438 VA 106.69%53813 VA Total Est. Demand:57976 VA Lighting - Exterior 350 VA 125.00%438 VA Total Conn. Load:54518 VA Lighting - Dwelling Unit 512 VA 100.00%512 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:163 A 144 A 148 A Total Load:19541 VA 17239 VA 17739 VA 41 42 39 40 37 38 35 36 33 34 31 BOILERS 20 A 1 1000...350 VA 1 20 A Lighting - Exterior 32 29 CHEMICAL TREATMENT SYSTEM 20 A 1 500 VA 250 VA ------30 27 Security Head End Rack 20 A 1 0 VA 250 VA 2 60 A SVE EQUIPMENT 28 25 BLDG F LIGHTING 20 A 1 512 VA 987 VA ------26 23 ------529 VA 987 VA ------24 21 HP9 30 A 2 529 VA 987 VA 3 20 A CT-1 22 19 RECEPTACLES 20 A 1 540 VA 720 VA 1 20 A RECEPTACLES 20 17 ------2250...2250...------18 15 ------2250...2250...------16 13 P5 50 A 3 2250...2250...3 50 A P6 14 11 ------987 VA 987 VA ------12 9 ------987 VA 987 VA ------10 7 P3 20 A 3 987 VA 987 VA 3 20 A P4 8 5 ------4500...4500...------6 3 ------4500...4500...------4 1 P1 (VFD)80 A 3 4500...4500...3 80 A P2 (VFD)2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:Type 1 MCB Rating:225 AMounting:Surface Wires:4 Mains Rating:225 A Supply From:HPB Phases:3 Mains Type: Location:ELEVATOR C-3 Volts:120/208 Wye A.I.C. Rating: Branch Panel:HPF No.Description Date Revision 9 DATE 9 ESK E3.2R1 ESK E3.2R1 02/14/20209