HomeMy WebLinkAboutRFI 046 - Compiled Drawing Set-AztDistribution to:
OWNER X
ARCHITECT X
ENGINEER
13 Wheeling Ave
Woburn, MA 01801
781-935-6100
REQUEST FOR INFORMATION NO. 46
PROJECT:OXOBOXO LOFTS RFI #46
INITIATION DATE:01/17/20
FROM:Maggiore Construction Corporation DATE NEEDED:01/24/20
13 Wheeling Avenue
Woburn, MA 01801
REQUESTED BY:Gifford Perry
EMAIL: gifford@maggiorecos.com
TO:Paul B. Bailey Architect
110 Audubon Street
New Haven, CT 06510
ATTENTION:Susan Odell- email: susan@pbbarchitect.com
Frank Brachanow-Email Fbrachanow@dakotaPartners.net
Sam Kirby
SUBJECT:
REQUEST:Drawing ESK ABC-EL1.1 & 1.3 do not show any lighting in the stairwells.
Please clarify what light fixtures you want and the circuiting of them.
A-A1.11 does show them, please confirm locations and counts
Answered By:
Company:Date:
AB Connector lighting
33BUILDING D
BUILDING B
BUILDING C
BUILDING G
BUILDING A
UNIT A-1(2 BEDROOM)UNIT A-2(1 BEDROOM)
UNIT B-3(1 BEDROOM)TYPE 'A'
UNIT B-4(2 BEDROOM)
UNIT B-5(1 BEDROOM)
UNIT B-6(1 BEDROOM)
UNIT B-7(STUDIO)
UNIT A-2(2 BEDROOM)
B
BB
C
C
B
B
B
C
TPB3 -3
TPB3 -10
TPB3
TPB4
TPB5
E
BB
B
B B
C
C
TPB4 -10TPB4-3
B
B
B
C
TPB5 -10
C C
C
E
B
B B
TPB6 -10TPB6-3
C
E
B
B
B
TPB7C
TPB7 -10
TPB7 -3
C
E
TPB5 -3
TPB6
A
A
A
A
AAACC
C
C
C C C
C
C
E
E
E
B
B
B
B B B B B
BB
B
B B B
B
B
TPA1
TPA2
TPA3
TPA1 -3 TPA1 -10
TPA2 -3
TPA2 -10
TPA3 -3
TPA3 -10
XE
XE
XE
XE
XE
XE
EM
EM
EM
HPB1 -26
HPB1 -26
A
A
TYP B1 AND A1 CORRIDOR LTG
EM
XF
XF
XF
XF
XEHC
A
A
A
HPB1 -26
LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-EL1.1
ELECTRICAL
LIGHTING PLAN
BLDGS A-B-C
LEVEL 1
Dakota
Partners, Inc.
OXOBOXO
LOFTS
Checker
Author
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
7 Permit ReviewComments 08/05/2019
Revision 9 DATE 9
ESK ABC-EL1.1R1
ESK ABC-EL1.1R1 02/14/20209
UNIT B-8(1 BEDROOM)TYPE A
UNIT B-9(2 BEDROOM)
UNIT B-10(1 BEDROOM)
UNIT B-11(1 BEDROOM)
UNIT B-12(1 BEDROOM)
BUILDING B
BUILDING C
BUILDING A
BUILDING G
BUILDING D
C
C
C C
C
E
E
E
E TPB17TPB11TPB16
TPB13TPB8
TPB9
TPB10
TPB12
A
A
B
B
B
B
B B
B
B
BB
B
A
B
B B
B
BB
C
C
B
C
A
A
B
B
C
C
C
TPB12 -10
TPB11 -10TPB11-3
TPB10 -3
TPB10 -10
TPB9 -10TPB9-3
C
TPB8 -3
TPB8 -10
XE
XEC
EM
EM
HPB1 -27 HPB1 -25
CCC
C
EM
LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED
HPB1 -6
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-EL1.2
ELECTRICAL
LIGHTING PLAN
BLDGS A-B-C
LEVEL 2
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
Revision 9 DATE 9
ESK ABC-EL1.2R1
ESK ABC-EL1.2R1 02/14/20209
BUILDING G
BUILDING D
BUILDING B
BUILDING C
BUILDING A
UNIT A-4(1 BEDROOM)H.C.
UNIT A-5(1 BEDROOM)UNIT A-6(2 BEDROOM)H.C.
UNIT B-13(1 BEDROOM)TYPE A
UNIT B-14(2 BEDROOM)
UNIT B-15(1 BEDROOM)
UNIT B-16(1 BEDROOM)
UNIT B-17(1 BEDROOM)
C BE
B B
B
C
TPB17 -10
TPB17
C C
CE
B
B B
TPB16 -10TPB16-3
TPB16
C
B
B
B
C
TPB15 -10
C
E TPB15 -3
TPB14
BB
B
B
C
C
TPB14 -3E
B
TPB14 -10
B
BB
C
C
B
C
B
B
C
TPB13 -3
TPB13 -10 TPB13
A
A
AAAAA
A
C
C C
C
C C
E
E
B
B B
B
B B B
BB
B B
B
B
TPA4 TPA6TPA5
C
TPA4 -10
TPA4 -3 TPA5 -10
TPA5 -3 TPA6 -10
TPA6 -3
XEEM
XEC
XE
EM
EM
HPB1 -28
HPB1 -28
CORRIROR LIGHTINGON THIS LEVEL A&B TO HPB1CIRCUIT 28 B
C
HEHC
HPB1 -28
LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED
A
A
A
A
HPB1 -6
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-EL1.3
ELECTRICAL
LIGHTING PLAN
BLDGS A-B-C
LEVEL 3
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
7 Permit ReviewComments 08/05/2019
Revision 9 DATE 9
ESK ABC-EL1.3R1
ESK ABC-EL1.3R1 02/14/20209
BUILDING D
BUILDING G
BUILDING B
BUILDING C
BUILDING A
BUILDING F
UNIT B-18(1 BEDROOM)
UNIT B-19(2 BEDROOM)
UNIT B-20(1 BEDROOM)
UNIT B-21(1 BEDROOM)
UNIT B-22(1 BEDROOM)
ATTIC SPACE
C BE
B B
B
C TPB22-3TPB22 -10
TPB22
TPB21
C C
C
E
B
TPB21 -10TPB21-3
B
B
B
TPB20 -10
C
E TPB20 -3
E
TPB19
BB
B
C
C
TPB19 -10TPB19-3
B
BB
C
C
B
C
B
B
C
TPB18 -3
TPB18 -10
TPB18
TPB20
CB
A
A
XEC
XE
EM
EM
HPB1 -28
LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED
HPB1 -6
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-EL1.4
ELECTRICAL
LIGHTING PLAN
BLDGS A-B-C
LEVEL 4
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
Revision 9 DATE 9
ESK ABC-EL1.4R1
ESK ABC-EL1.4R1 02/14/20209
UNIT B-1(2 BEDROOM)TYPE A
UNIT B-2(2 BEDROOM)
UNIT C-3(2 BEDROOM)TYPE A
UNIT C-4(2 BEDROOM)TYPE A
ELEVATOR
BUILDING B
BUILDING CBUILDING A
BUILDING G
BUILDING D
A
A
A
A
A
C
CC
C
C
C
C
C
B
B
B
B
B B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
C
TPC4
TPC4 -10
TPC4 -3
TPC3
C
C
TPC3 -10
TPC3 -3
TPC4 -10
TPB1
TPB2
TPB2 -3
TPB1 -3
TPB1 -10
XE
XE
XE
XE
XEC
HPB1 -25TYP OF CORRIDOR LIGHTING ON BB
XHCXHC
B
TPB2 -10
LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED
HPB1 -6
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-EL1.B
ELECTRICAL
LIGHTING PLAN
BUILDINGS B-C
LEVEL B
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
7 Permit ReviewComments 08/05/2019
Revision 9 DATE 9ESK ABC-EL1.BR1
ESK ABC-EL1.BR1
02/14/20209
UNIT C-1(2 BEDROOM)
UNIT C-2(2 BEDROOM)
STAIR 2
ELECTRICALMETER ROOM
BOILER ROOMSPRINKLER ROOM
BUILDING B BUILDING C
BUILDING A
(ABOVE)
BUILDING D
BUILDING G
B
TPC1
TPC2
E B
B
B B
E
B
B
B
B
B
TPC4
C
B
TPC2 -10
TPC2 -3
TPC1 -3C
C
HPB1 -24
HPB1 -24
XE
XE
XE
TPC1 -10
HPB1 -24
HPB1 -24
G G G
GG
G
G
G
GGG
G G G
GG
LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED
HPB1 -6
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-EL1.SB
ELECTRICAL
LIGHTING PLAN
BUILDINGS B-C
LEVEL SB
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
Revision 9 DATE 9ESK ABC-EL1.SBR1
ESK ABC-EL1.SBR1
02/14/20209
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
E3.2
ELECTRICAL
PANELBOARD
SCHEDULES
Dakota
Partners, Inc.
OXOBOXO
LOFTS
Checker
Author
11/01/2016
16066.01
Notes:
Total Est. Demand:75 A
Receptacle 14352 VA 100.00%14352 VA Total Conn.:74 A
Other 5400 VA 100.00%5400 VA Total Est. Demand:27011 VA
Motor 3274 VA 108.08%3539 VA Total Conn. Load:26746 VA
Lighting - Dwelling Unit 2848 VA 100.00%2848 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps:120 A 98 A 25 A
Total Load:13192 VA 10557 VA 3001 VA
41 42
39 40
37 38
35 Lighting - Dwelling Unit 20 A 1 448 VA 36
33 Other 20 A 1 540 VA 529 VA ------34
31 Lighting - Dwelling Unit 20 A 1 448 VA 529 VA 2 20 A Motor 32
29 Motor 20 A 1 0 VA 0 VA 1 20 A Power 30
27 Motor 20 A 1 550 VA 529 VA ------28
25 Security Head End Rack 20 A 1 360 VA 529 VA 2 20 A Motor 26
23 Lighting - Dwelling Unit 20 A 1 0 VA 0 VA 1 20 A Security Head End Rack 24
21 Lighting 20 A 1 0 VA 0 VA 1 20 A Lighting 22
19 ------529 VA 832 VA 1 20 A Lighting 20
17 SEWAGE EJECTOR PUMP 20 A 2 0 VA 0 VA 1 20 A Other 18
15 Lighting 20 A 1 224 VA 1080...1 20 A CORRIDOR RECEPTACLES 16
13 Spare 20 A 1 0 VA 540 VA 1 20 A CORRIDOR RECEPTACLES 14
11 CORRIDOR RECEPTACLES 20 A 1 0 VA 0 VA 1 20 A CORRIDOR RECEPTACLES 12
9 WASHER 20 A 1 0 VA 0 VA 1 20 A CORRIDOR RECEPTACLES 10
7 ------2392...0 VA 1 20 A WASHER 8
5 DRYER 30 A 2 2392...180 VA 1 20 A WASHER 6
3 ------2392...2392...------4
1 DRYER 30 A 2 2392...2392...2 30 A DRYER 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure:MCB Rating:100 AMounting:Recessed Wires:4 Mains Rating:225 A
Supply From:HPB Phases:3 Mains Type:MCB
Location:Volts:120/208 Wye A.I.C. Rating:
Branch Panel:HPH1
Notes:
Receptacle 15072 VA 65.00%9797 VA Total Est. Demand:327 A
Other 15120 VA 100.00%15120 VA Total Conn.:336 A
Motor 73479 VA 104.59%76854 VA Total Est. Demand:117830 VA
Lighting - Exterior 350 VA 125.00%438 VA Total Conn. Load:121208 VA
Lighting - Dwelling Unit 5518 VA 70.34%3881 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps:377 A 354 A 295 A
Total Load:44315 VA 41496 VA 35400 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 ------1233...24
21 ------1233...500 VA 1 20 A Power 22
19 EUH-1 30 A 3 1233...1000...1 20 A Power 20
17 ------987 VA 1000...1 20 A Power 18
15 ------987 VA 3300...------16
13 Motor 20 A 3 987 VA 3300...------14
11 ------1773...3300...3 80 A ELEVATOR 1 12
9 ------1723...1055...------10
7 HPFA 225 A 3 1954...1319...2 100 A HPH1 8
5 ------4627...3519...------6
3 ------3403...4283...2 100 A HPE 4
1 HPB1A 225 A 3 4888...180 VA 1 20 A Security Head End Rack 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure:Type 1 MCB Rating:400 A
Mounting:Surface Wires:4 Mains Rating:400 A
Supply From:Phases:3 Mains Type:
Location:Volts:120/208 Wye A.I.C. Rating:
Branch Panel:HPB
Notes:
Total Est. Demand:38 A
Receptacle 720 VA 100.00%720 VA Total Conn.:36 A
Other 4500 VA 100.00%4500 VA Total Est. Demand:13800 VA
Motor 4791 VA 118.44%5674 VA Total Conn. Load:12918 VA
Lighting - Dwelling Unit 1920 VA 100.00%1920 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps:42 A 28 A 40 A
Total Load:4888 VA 3403 VA 4627 VA
41 42
39 40
37 38
35 36
33 Other 20 A 1 540 VA 50 VA 1 20 A Motor 34
31 Power 20 A 1 550 VA 1767...------32
29 ERV2 20 A 1 50 VA 1767...2 30 A HP-4 30
27 Lighting 20 A 1 160 VA 480 VA 1 20 A Lighting 28
25 Lighting 20 A 1 200 VA 416 VA 1 20 A Lighting 26
23 ------529 VA 538 VA 1 20 A Lighting 24
21 Motor 20 A 2 529 VA 50 VA 1 20 A Motor 22
19 LEVLEL 3 CORRIDOR RECEPTACLES 20 A 1 540 VA 360 VA 1 20 A LEVEL 4 CORRIDOR RECEPTACLES 20
17 LEVEL 1 CORRIDOR RECEPTACLES 20 A 1 540 VA 360 VA 1 20 A LEVEL 2 CORRIDOR RECEPTACLES 18
15 ------90 VA 90 VA ------16
13 DRYER 50 A 2 90 VA 90 VA 2 50 A DRYER 14
11 ------90 VA 90 VA ------12
9 DRYER 50 A 2 90 VA 90 VA 2 50 A DRYER 10
7 8
5 WASHER 20 A 1 500 VA 192 VA 1 20 A Lighting Stairwell 6
3 MAINTENANCE RECEPTACLES 20 A 1 720 VA 540 VA 1 20 A B CORRIDOR RECEPTACLES 4
1 BOILER ROOM RECEPTACLE 20 A 1 360 VA 540 VA 1 20 A SB RECEPTACLES 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure:Type 1 MCB Rating:225 A
Mounting:Surface Wires:4 Mains Rating:225 A
Supply From:HPB Phases:3 Mains Type:
Location:Volts:120/208 Wye A.I.C. Rating:
Branch Panel:HPB1
Notes:
Total Est. Demand:161 A
Other 1260 VA 100.00%1260 VA Total Conn.:151 A
Motor 50438 VA 106.69%53813 VA Total Est. Demand:57976 VA
Lighting - Exterior 350 VA 125.00%438 VA Total Conn. Load:54518 VA
Lighting - Dwelling Unit 512 VA 100.00%512 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps:163 A 144 A 148 A
Total Load:19541 VA 17239 VA 17739 VA
41 42
39 40
37 38
35 36
33 34
31 BOILERS 20 A 1 1000...350 VA 1 20 A Lighting - Exterior 32
29 CHEMICAL TREATMENT SYSTEM 20 A 1 500 VA 250 VA ------30
27 Security Head End Rack 20 A 1 0 VA 250 VA 2 60 A SVE EQUIPMENT 28
25 BLDG F LIGHTING 20 A 1 512 VA 987 VA ------26
23 ------529 VA 987 VA ------24
21 HP9 30 A 2 529 VA 987 VA 3 20 A CT-1 22
19 RECEPTACLES 20 A 1 540 VA 720 VA 1 20 A RECEPTACLES 20
17 ------2250...2250...------18
15 ------2250...2250...------16
13 P5 50 A 3 2250...2250...3 50 A P6 14
11 ------987 VA 987 VA ------12
9 ------987 VA 987 VA ------10
7 P3 20 A 3 987 VA 987 VA 3 20 A P4 8
5 ------4500...4500...------6
3 ------4500...4500...------4
1 P1 (VFD)80 A 3 4500...4500...3 80 A P2 (VFD)2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure:Type 1 MCB Rating:225 AMounting:Surface Wires:4 Mains Rating:225 A
Supply From:HPB Phases:3 Mains Type:
Location:ELEVATOR C-3 Volts:120/208 Wye A.I.C. Rating:
Branch Panel:HPF
No.Description Date
Revision 9 DATE 9
ESK E3.2R1
ESK E3.2R1 02/14/20209