HomeMy WebLinkAboutRFI 035 - Stair 2 - Building B - answered by ME and PBA 200115Distribution to: OWNER X ARCHITECT X ENGINEER 13 Wheeling Ave Woburn, MA 01801 781-935-6100 REQUEST FOR INFORMATION NO. 35 PROJECT:OXOBOXO LOFTS RFI #35 INITIATION DATE:12/27/19 FROM:Maggiore Construction Corporation DATE NEEDED:12/30/19 13 Wheeling Avenue Woburn, MA 01801 REQUESTED BY:Gifford Perry EMAIL: gifford@maggiorecos.com TO:Paul B. Bailey Architect 110 Audubon Street New Haven, CT 06510 ATTENTION:Susan Odell- email: susan@pbbarchitect.com Frank Brachanow-Email Fbrachanow@dakotaPartners.net Sam Kirby SUBJECT: REQUEST: Given: The rated stair shaft continues to Grid L2.L on the SB level Given: The rated stair shaft continues only to Grid L2.M on the upper levels Given: The long side wall of the stair the 6" stud is continuous to the floor of the SB level Given: At the B Level, drawing B-A1.2, the 6" stud of the W3 wall type sits on the floor framing to carry the weight of the 6" wall framing. Given: The stair well has a 1 hour rating?? Given: The floor framing at the B Level is an F22 which has a 1 hour rating Question: How does the wall finish to the floor at terminus of the W3 wall at the F22 Floor Answered By: Company: Date: Building B Stair 2 Shaft Rating/Construction The W3 wall at the North end of Building B Stair 2 terminates at a CFMF beam just below the basement heavy-timber floor system. See attached structural notes (1/15/20 email) and attached architectural sketches ASK45A-D. Sam Kirby Paul Bailey Architect January 15, 2020 From:Elizabeth Michel To:Sam Kirby; daniel.morrissey@morrisseyengineers.com Cc:Susan Odell Subject:Re: Oxoboxo Building B Stair 2 (RFI 35) Date:Wednesday, January 15, 2020 11:34:05 AM Sam, The north wall should be supported on a built-up CFMF beam within the wall, supported by CFMF built-up posts. On the east side: At the upper floors, the decking is running n/s. The CFMF submittal shows the deckinginterrupting the wall and sitting on a deflection track, which is acceptable. At floor level 1, there will be a short length of unsupported deck between the first joist andedge of existing decking. This can be supported on the CFMF wall. The deflection tracks at level B and level 1 should be replaced with a rigid connection to support this small area. Please let me know if you have any questions or comments. Thanks, Beth Elizabeth A. Michel P.E.Morrissey Engineering, LLC58 Essex Street, Deep River, CT 06417cell 860-208-8954 On 1/15/2020 10:11 AM, Sam Kirby wrote: Dan and Beth, Here is more information regarding the Building B Stair 2 shaft. Thanks, Sam Kirby skirby@pbbarchitect.com Paul B. Bailey Architect 110 Audubon Street New Haven, CT 06510 Ph: 203-776-8888 Fax: 203-772-1365 From: Sam Kirby Sent: Tuesday, January 14, 2020 2:03 PM To: 'Daniel Morrissey' <daniel.morrissey@morrisseyengineers.com>; 'Elizabeth Michel' <elizabeth.michel@morrisseyengineers.com> STAIR B (LEVEL SB) 1 ASK-045B 1 ASK-045C NEW 2-HOUR RATED CEILING BELOW EXISTING TIMBER FRAMED FLOOR. NEW WOOD FRAMED STAIR LANDING. NEW WOOD FRAMED STAIR LANDING. NEW COLUMN SUPPORTING CUT WOOD TIMBER NEW COLUMN SUPPORTING NEW STAIR LANDING Date Drawn by Scale REF: 3/8" = 1'-0" 1/15/2020 1:13:17 PM OXOBOXO LOFTS 42 Pink Row Uncasville, CT 06382 ASK-045A 12/30/2019 BUILDING B STAIR 2 -PLAN AT LEVEL SB Author RFI35 3/8" = 1'-0"ASK-045A 1 BLDG B PARTIAL CEILING PLAN - LEVEL SB L2.M CORRIDOR FURRING RATED WALL STAIR 2 LEVEL 1 FLOOR (2-4 SIM.) LEVEL B FLOOR HEAVY TIMBER FLOOR TO REMAIN HEAVY TIMBER FRAMING TO REMAIN NEW UNRATED FLOOR TO FLOOR PARTITION NEW RATED SHAFTWALLEXTENDING FROM BASEMENT FLOOR TO ROOF DECK NEW C.F.M.F. BEAM SUPPORTING SHAFT WALL AND SUPPORTED ON C.F.M.F. BUILT UP POSTS (SEE ATTACHED STRUCTURAL NOTES) NEW EXPANSION TOP TRACK NEW FIRE-RATED HORIZONTAL ASSEMBLY W3 W3 W3 Date Drawn by Scale REF: 1 1/2" = 1'-0" 1/15/2020 1:14:15 PM OXOBOXO LOFTS 42 Pink Row Uncasville, CT 06382 ASK-045B 12/30/2019 BUILDING B STAIR 2 -N-S SECTION SK RFI 035 APARTMENT FURRING RATED WALL STAIR 2 LEVEL 2 thru 4 LEVEL B and 1 HEAVY TIMBER FLOOR TO REMAIN HEAVY TIMBER FRAMING TO REMAIN NEW UNRATED FLOOR TO FLOOR PARTITION NEW RATED SHAFTWALLEXTENDING FROM BASEMENT FLOOR TO ROOF DECK NEW EXPANSION TOP TRACK NEW RIGID CONNECTION TOP TRACK (SEE ATTACHED STRUCTURAL NOTES) W3 W3 W3 Date Drawn by Scale REF: 1 1/2" = 1'-0" 1/15/2020 1:15:22 PM OXOBOXO LOFTS 42 Pink Row Uncasville, CT 06382 ASK-045C 12/30/2019 BUILDING B STAIR 2 -E-W SECTION Author RFI35 OXOBOXO LOFTS ASK 45D - RATED HORIZONTAL ASSEMBLY 01/15/2020REFERENCE: SHEET R.6 FLOOR AND CEILING TYPES, RFI 395