HomeMy WebLinkAboutRFI 035 - Stair 2 - Building B - answered by ME and PBA 200115Distribution to:
OWNER X
ARCHITECT X
ENGINEER
13 Wheeling Ave
Woburn, MA 01801
781-935-6100
REQUEST FOR INFORMATION NO. 35
PROJECT:OXOBOXO LOFTS RFI #35
INITIATION DATE:12/27/19
FROM:Maggiore Construction Corporation DATE NEEDED:12/30/19
13 Wheeling Avenue
Woburn, MA 01801
REQUESTED BY:Gifford Perry
EMAIL: gifford@maggiorecos.com
TO:Paul B. Bailey Architect
110 Audubon Street
New Haven, CT 06510
ATTENTION:Susan Odell- email: susan@pbbarchitect.com
Frank Brachanow-Email Fbrachanow@dakotaPartners.net
Sam Kirby
SUBJECT:
REQUEST: Given: The rated stair shaft continues to Grid L2.L on the SB level
Given: The rated stair shaft continues only to Grid L2.M on the upper levels
Given: The long side wall of the stair the 6" stud is continuous to the floor of the SB level
Given: At the B Level, drawing B-A1.2, the 6" stud of the W3 wall type sits on the
floor framing to carry the weight of the 6" wall framing.
Given: The stair well has a 1 hour rating??
Given: The floor framing at the B Level is an F22 which has a 1 hour rating
Question: How does the wall finish to the floor at terminus of the W3 wall at the F22 Floor
Answered By:
Company: Date:
Building B Stair 2 Shaft Rating/Construction
The W3 wall at the North end of Building B Stair 2 terminates at a CFMF beam just below the
basement heavy-timber floor system. See attached structural notes (1/15/20 email) and attached
architectural sketches ASK45A-D.
Sam Kirby
Paul Bailey Architect January 15, 2020
From:Elizabeth Michel
To:Sam Kirby; daniel.morrissey@morrisseyengineers.com
Cc:Susan Odell
Subject:Re: Oxoboxo Building B Stair 2 (RFI 35)
Date:Wednesday, January 15, 2020 11:34:05 AM
Sam,
The north wall should be supported on a built-up CFMF beam within the wall, supported by
CFMF built-up posts.
On the east side:
At the upper floors, the decking is running n/s. The CFMF submittal shows the deckinginterrupting the wall and sitting on a deflection track, which is acceptable.
At floor level 1, there will be a short length of unsupported deck between the first joist andedge of existing decking. This can be supported on the CFMF wall. The deflection tracks at
level B and level 1 should be replaced with a rigid connection to support this small area.
Please let me know if you have any questions or comments.
Thanks, Beth
Elizabeth A. Michel P.E.Morrissey Engineering, LLC58 Essex Street, Deep River, CT 06417cell 860-208-8954
On 1/15/2020 10:11 AM, Sam Kirby wrote:
Dan and Beth,
Here is more information regarding the Building B Stair 2 shaft.
Thanks,
Sam Kirby
skirby@pbbarchitect.com
Paul B. Bailey Architect
110 Audubon Street
New Haven, CT 06510
Ph: 203-776-8888
Fax: 203-772-1365
From: Sam Kirby
Sent: Tuesday, January 14, 2020 2:03 PM
To: 'Daniel Morrissey' <daniel.morrissey@morrisseyengineers.com>; 'Elizabeth Michel'
<elizabeth.michel@morrisseyengineers.com>
STAIR B
(LEVEL SB)
1
ASK-045B 1
ASK-045C
NEW 2-HOUR RATED
CEILING BELOW
EXISTING TIMBER
FRAMED FLOOR.
NEW WOOD FRAMED
STAIR LANDING.
NEW WOOD FRAMED
STAIR LANDING.
NEW COLUMN
SUPPORTING CUT
WOOD TIMBER
NEW COLUMN
SUPPORTING NEW
STAIR LANDING
Date
Drawn by
Scale
REF:
3/8" = 1'-0"
1/15/2020 1:13:17 PM
OXOBOXO LOFTS
42 Pink Row Uncasville, CT 06382 ASK-045A
12/30/2019
BUILDING B STAIR 2 -PLAN AT LEVEL SB
Author
RFI35
3/8" = 1'-0"ASK-045A
1 BLDG B PARTIAL CEILING PLAN - LEVEL SB
L2.M
CORRIDOR FURRING
RATED WALL
STAIR 2
LEVEL 1 FLOOR (2-4 SIM.)
LEVEL B FLOOR
HEAVY TIMBER
FLOOR TO REMAIN
HEAVY TIMBER
FRAMING TO REMAIN
NEW UNRATED FLOOR
TO FLOOR PARTITION
NEW RATED
SHAFTWALLEXTENDING
FROM BASEMENT FLOOR
TO ROOF DECK
NEW C.F.M.F. BEAM
SUPPORTING SHAFT WALL AND
SUPPORTED ON C.F.M.F. BUILT
UP POSTS (SEE ATTACHED
STRUCTURAL NOTES)
NEW EXPANSION
TOP TRACK
NEW FIRE-RATED
HORIZONTAL ASSEMBLY
W3
W3
W3
Date
Drawn by
Scale
REF:
1 1/2" = 1'-0"
1/15/2020 1:14:15 PM
OXOBOXO LOFTS
42 Pink Row Uncasville, CT 06382 ASK-045B
12/30/2019
BUILDING B STAIR 2 -N-S SECTION
SK
RFI 035
APARTMENT FURRING
RATED WALL
STAIR 2
LEVEL 2 thru 4
LEVEL B and 1
HEAVY TIMBER
FLOOR TO REMAIN
HEAVY TIMBER
FRAMING TO REMAIN
NEW UNRATED FLOOR
TO FLOOR PARTITION
NEW RATED
SHAFTWALLEXTENDING
FROM BASEMENT FLOOR
TO ROOF DECK
NEW EXPANSION
TOP TRACK
NEW RIGID
CONNECTION TOP
TRACK (SEE ATTACHED
STRUCTURAL NOTES)
W3
W3
W3
Date
Drawn by
Scale
REF:
1 1/2" = 1'-0"
1/15/2020 1:15:22 PM
OXOBOXO LOFTS
42 Pink Row Uncasville, CT 06382 ASK-045C
12/30/2019
BUILDING B STAIR 2 -E-W SECTION
Author
RFI35
OXOBOXO LOFTS ASK 45D - RATED HORIZONTAL ASSEMBLY 01/15/2020REFERENCE: SHEET R.6 FLOOR AND CEILING TYPES, RFI 395