REQUEST FOR INFORMATION NO. 23
PROJECT:OXOBOXO LOFTS RFI #23
INITIATION DATE:11/14/2019
FROM:Maggiore Construction Corporation DATE NEEDED:11/14/19
13 Wheeling Avenue
Woburn, MA 01801
REQUESTED BY:Gifford Perry
EMAIL: gifford@maggiorecos.com
TO:Paul B. Bailey Architect
110 Audubon Street
New Haven, CT 06510
ATTENTION:Susan Odell- email: susan@pbbarchitect.com
Frank Brachanow-Email Fbrachanow@dakotaPartners.net
Sam Kirby
SUBJECT:
REQUEST:A quick review appears that floor system F35 is not detailed or spelled out.
We are working in M building now with wood framing over existing floor.
Does the cavity between old and new get insulated?
Does building J,H,J get insulated underneath the floor?
Please detail these different conditions.
There is no gypcrete in these buildings and floor system details needs to be
modified to reflect this. Aka F31
Please update R.6 drawing to reflect different floor systems
This is time sensitive
Answered By:
Company: Date:
Addendum 8
Yes.
Yes.
See ASK-027 attached.
Correct. (there is no Gypcrete at Buildings G,H,J,K,L,M).
See ASK-027 attached.
Sam Kirby
Paul Bailey Architect 12/20/19