Loading...
HomeMy WebLinkAboutRFI 023 - Floor systems Addendum 8 - answered by PBA 191220Distribution to: OWNER X ARCHITECT X ENGINEER 13 Wheeling Ave Woburn, MA 01801 781-935-6100 REQUEST FOR INFORMATION NO. 23 PROJECT:OXOBOXO LOFTS RFI #23 INITIATION DATE:11/14/2019 FROM:Maggiore Construction Corporation DATE NEEDED:11/14/19 13 Wheeling Avenue Woburn, MA 01801 REQUESTED BY:Gifford Perry EMAIL: gifford@maggiorecos.com TO:Paul B. Bailey Architect 110 Audubon Street New Haven, CT 06510 ATTENTION:Susan Odell- email: susan@pbbarchitect.com Frank Brachanow-Email Fbrachanow@dakotaPartners.net Sam Kirby SUBJECT: REQUEST:A quick review appears that floor system F35 is not detailed or spelled out. We are working in M building now with wood framing over existing floor. Does the cavity between old and new get insulated? Does building J,H,J get insulated underneath the floor? Please detail these different conditions. There is no gypcrete in these buildings and floor system details needs to be modified to reflect this. Aka F31 Please update R.6 drawing to reflect different floor systems This is time sensitive Answered By: Company: Date: Addendum 8 Yes. Yes. See ASK-027 attached. Correct. (there is no Gypcrete at Buildings G,H,J,K,L,M). See ASK-027 attached. Sam Kirby Paul Bailey Architect 12/20/19