Loading...
HomeMy WebLinkAboutRFI 020-Bldg M basement equipment-AztDistribution to: OWNER X ARCHITECT X ENGINEER 13 Wheeling AveWoburn, MA 01801781-935-6100 REQUEST FOR INFORMATION NO. 20 PROJECT:OXOBOXO LOFTS RFI #20 INITIATION DATE:11/06/19 FROM:Maggiore Construction Corporation DATE NEEDED:11/15/19 13 Wheeling Avenue Woburn, MA 01801 REQUESTED BY:Gifford Perry EMAIL: gifford@maggiorecos.com TO:Paul B. Bailey Architect 110 Audubon Street New Haven, CT 06510 ATTENTION:Susan Odell- email: susan@pbbarchitect.com Frank Brachanow-Email Fbrachanow@dakotaPartners.net Sam Kirby SUBJECT: REQUEST:Design power circuits In the basement of Building M is an existing water purification equipment. If the injection wells don’t work, or get's delayed this equipment will have to stay. This equipment needs to say running continuously until it's no longer needed. A permanent electrical circuit should be designed into the switch gear and panels. Compressor 50 Amp 3-phase 208 volt Pump Control Panel 40 Amp 3-phase 208 volt Pump Control Power 1 20 amp 120 volt Pump Room Heaters 2 20 amp 1 phase 208 volt circuits Outside Vault 1 30 Amp 1-phase 208/120 volt Outside Vault Heater 1 30 amp 1-phase 208 volt Aztech's Response: At 12/10/19 Meeting it was determined that a 2" conduit with pull string would be routed from the Electrical Room (Meter Room) in H Wing to the area of Basement of M where the purification equipment is located, to wire in the future if required. Please let us know if anything further is required in this regard. Please provide details/designs for permanent power and provide design and specifications for an in-ground vault electrical heater to maintain pipes from freezing. There is a vault in the parking lot that all the water pipes go to. Existing residential baseboard heater is not adequate nor safe. Aztech Response: More info is required before addressing this issue. Are there drawings of this vault? What size More specific loaction of Vault in the Parking Lot? What type/use of piping? Answered By: Company:Date:12/13/2019 Building M basement remediation equipment DHA Aztech