Loading...
HomeMy WebLinkAboutRFI 008 - Grout for Helical Piles- response from MEDistribution to: OWNER X ARCHITECT X ENGINEER 13 Wheeling Ave Woburn, MA 01801 781-935-6100 REQUEST FOR INFORMATION NO. 8 PROJECT:OXOBOXO LOFTS RFI #8 INITIATION DATE:09/20/19 FROM:Maggiore Construction Corporation DATE NEEDED:09/23/19 13 Wheeling Avenue Woburn, MA 01801 REQUESTED BY:Gifford Perry EMAIL: gifford@maggiorecos.com TO:Paul B. Bailey Architect 110 Audubon Street New Haven, CT 06510 ATTENTION:Susan Odell- email: susan@pbbarchitect.com Frank Brachanow-Email Fbrachanow@dakotaPartners.net SUBJECT: REQUEST: 1. Size and Layout of Grout Bags a: Need grout bag size. We can get any size as shown on the Submittal (Attached Table with sizes) b: Not clear on the layout & placement position of the grout bags. Are they to be positioned between the helical piles and under the building completely? c: Will we be pumping grout around them to fill in any voids? 2. Direction from structural engineer for the area adjacent to the Bridge that is supported by large rocks/blocks. (See attached picture) This is time sensitive and needs quick turn around, pile work is scheduled to start October 1, 2019 Answered By: Company: Date: Grout bag work at Helical Piles PROJECT: TO: TITLE: DATE: JOB: STARTED: COMPLETED: REQUIRED: REQUEST FOR INFORMATION No. Schumack Engineered Construction Corp. 93A Glenwood Road Clinton, CT 06413 860-669-7115 1 Fax: Phone: 860-669-4032 Helical Pile & Grout bag Placement OXOBOXO Oxoboxo Lofts Attn: Gifford Perry Maggiore Construction Corporation 13 Wheeling Avenue Woburn, MA 01801 Phone:781-935-6100 09/19/2019 09/19/2019 40 Phase I - OxoboxoCONTRACT/PO: REQUEST: After our meeting in the field with Peter of Maggiore, James of Soiltesting Inc & Nick/Sue/Jim with Schumack we will need information and direction from the structural engineer for the Installation of the Helical piles and the Grout Bags as outlined below. 1. Size and Layout of Grout Bags a: We can get any size as shown on the Submittal (Attached Table with sizes) b: Not clear on the layout & placement position of the grout bags. Are they to be positioned between the helical piles and under the building completely? Scheduling Impact:Monetary Impact: c: Will we be pumping grout around them to fill in any voids? 2. Direction from structural engineer for the area adjacent to the Bridge that is supported by large rocks/blocks ANSWER: Date: Signed: Requested By:Schumack Engineered Construction Corp. Susan H Weglein 09/19/2019 Page 1 of 1 Susan Weglein Note: Values shown are typical and will vary with weight of concrete and field conditions. The ordering of fabric forms should be done in advance of the start of the project, to allow time for the preparation, submittal and approval of layout and shop drawings. Project plans and specifications should be submitted to Geostar’s technical support department. Trained tech- nicians translate the site plans, grades, elevations, contours and con- struction details into CAD systems where they develop cost-effective take-offs and fabric-formed concrete armor unit layout drawings, tai- lored to the project’s design requirements. This design technique and CAD layout verification procedure will assure accurate dimensioning and quantity material takeoffs. The forms are over-dimensioned, in both length and width, to make allowance for form contraction as they are filled with fine aggregate concrete. Contraction factors are a function of site conditions and fin- ished armor unit dimensions. The definition of “contraction factor” is the length or width of fabric form required divided by the correspond- ing length or width of the area to be covered by the concrete armor Page 34 tinUromrAfohtgneL/htdiWdnassenkcihTdelliFothtgneL/htdiWmroFcirbaFdellifnU-0.21elbaT tinUromrAfohtgneL/htdiWdnassenkcihTdelliFothtgneL/htdiWmroFcirbaFdellifnU-0.21elbaT tinUromrAfohtgneL/htdiWdnassenkcihTdelliFothtgneL/htdiWmroFcirbaFdellifnU-0.21elbaT tinUromrAfohtgneL/htdiWdnassenkcihTdelliFothtgneL/htdiWmroFcirbaFdellifnU-0.21elbaT tinUromrAfohtgneL/htdiWdnassenkcihTdelliFothtgneL/htdiWmroFcirbaFdellifnU-0.21elbaT delliF delliFdelliFdelliF delliF ssenkcihT ssenkcihTssenkcihTssenkcihT ssenkcihT smroFcirbaFdellifnUfohtgneL/htdiW smroFcirbaFdellifnUfohtgneL/htdiW smroFcirbaFdellifnUfohtgneL/htdiW smroFcirbaFdellifnUfohtgneL/htdiW smroFcirbaFdellifnUfohtgneL/htdiW sehcni sehcnisehcnisehcni sehcni 42 03 63 24 84 45 06 66 27 87 48 09 69 201 801 411 021 sehcnI-smroFcirbaFdelliFfohtgneL/htdiW sehcnI-smroFcirbaFdelliFfohtgneL/htdiW sehcnI-smroFcirbaFdelliFfohtgneL/htdiW sehcnI-smroFcirbaFdelliFfohtgneL/htdiW sehcnI-smroFcirbaFdelliFfohtgneL/htdiW 66666 12 72 33 93 54 15 75 36 96 57 18 78 39 99 501 111 711 99999 91 52 13 73 34 94 55 16 76 37 97 58 19 79 301 901 511 2121212121 71 32 92 53 14 74 35 95 56 17 77 38 98 59 101 701 311 5151515151 12 72 33 93 54 15 75 36 96 57 18 78 39 99 501 111 8181818181 62 23 83 44 05 65 26 86 47 08 68 29 89 401 011 1212121212 03 63 24 84 45 06 66 27 87 48 09 69 201 801 4242424242 43 04 64 25 85 46 07 67 28 88 49 001 601 7272727272 93 54 15 75 36 96 57 18 78 39 99 501 0303030303 34 94 55 16 76 37 97 58 19 79 301 3333333333 74 35 95 56 17 77 38 98 59 101 6363636363 15 75 36 96 57 18 78 39 99 9393939393 65 26 86 47 08 68 29 89 2424242424 06 66 27 87 48 09 69 5454545454 46 07 67 28 88 49 8484848484 96 57 18 78 39 Synthetex