HomeMy WebLinkAboutRFI 007 - Helical Pile work - answered by PBA - 190913Distribution to:
OWNER X
ARCHITECT X
ENGINEER
13 Wheeling Ave
Woburn, MA 01801
781-935-6100
REQUEST FOR INFORMATION NO. 7
PROJECT:OXOBOXO LOFTS RFI #7
INITIATION DATE:09/11/19
FROM:Maggiore Construction Corporation DATE NEEDED:09/20/19
13 Wheeling Avenue
Woburn, MA 01801
REQUESTED BY:Gifford Perry
EMAIL: gifford@maggiorecos.com
TO:Paul B. Bailey Architect
110 Audubon Street
New Haven, CT 06510
ATTENTION:Susan Odell- email: susan@pbbarchitect.com
Frank Brachanow-Email Fbrachanow@dakotaPartners.net
SUBJECT:
REQUEST:
1)Yantic River Consultants wrote a scour report about the helical pile installation and associated work.
Should you contact them about us starting the helical piles October 1st?I will notify Dan Morrissey, Brandon Hatfield & Frank Vacca.
Should they or someone else witness the installation and observe?Dan Morrissey should comment on the need for observation.
Should the grout bags after placement be covered with riprap?
This is time sensitive and needs quick turn around, pile work is scheduled to start
October 1, 2019
Answered By:
Company: Date:9/12/2019
Helical Pile work
Susan Odell
Paul B. Bailey Architect LLC
Riprap was eliminated from the design based
on scour report recommendation.
Structural drawing S3.3 refers to civil drawings for backfill of grout
bags, but cannot find information
Riprap backfill was eliminated from the
design based on scour report
recommendation.