Loading...
HomeMy WebLinkAbout2020-05-28 Oxoboxo Mtg Min 42#16-063 Oxoboxo Lofts, Uncasville , CT MEETING MINUTES #42 PROJECT: Oxoboxo Lofts 42 Pink Row Uncasville, CT DATE: May 28, 2020 TIME: 10:00 a.m. LOCATION: Conf Call Present: Eric Kuczarski (EK) DP EKuczarski@DakotaPartners.net Frank Brachanow (FB) Dakota Partners (DP) FBrachanow@DakotaPartners.net Gifford Perry (GP) MC Gifford@MaggioreCos.com Susan Odell (SO) Paul B. Bailey Architect (PBBA) SOdell@pbbarchitect.com Sam Kirby (SK) PBBA SKirby@pbbarchitect.com Frank Vacca (FV) BSC FVacca@BSCGroup.com Dan Morrissey (DM) Morrissey Engineers (ME) daniel.morrissey@morrisseyengineers.com Dave Mann (DM) Maggiore Construction (MC) Dave@MaggioreCos.com Pat Callahan (PC) AZT PCallahan@aztecheng.com Minutes to: Paul Maggiore (PM) MC Paul@MaggioreCos.com Karl Walsh DP KWalsh@DakotaPartners.net Marc Daigle DP MDaigle@DakotaPartners.net Roberto Arista (RA) DP RArista@DakotaPartners.net Evan Fink (EF) DP EFink@DakotaPartners.net Matt Abraham (MA) DP MAbraham@DakotaPartners.net Alycia Quintiliani DP aquintiliani@dakotapartners.net Bill Rundlett DP Brundlett@dakotapartners.net Kurt Prochorena (KP) BSC Group (BSC) KProchorena@BSCGroup.com Brandon Handfield(BH) Yantic River Consultants Brandon@yrc-ne.com Dean Azzam (DA) Aztech Engineers, Inc. (AZT) DAzzam@aztecheng.com Tim Carr (TC) Down To Earth Consulting (DTEC) Tim@DownToEarthConsulting.com Eric Marsh (EM) MC Eric@Maggiore.Co Peter Lentine (PL) MC Peter@MaggioreCos.com James Sexton (JS) SHPO/NPS Consultant jmbjcs@hotmail.com CONSTRUCTION DATES: Dam Removal: Start Date: Oct 18, 2019 EST. End Date: Unknown Lofts Construction: Start Date: August 1, 2019 End Date: December 29, 2020 Responsible Party Priority Level 1.0 CONSTRUCTION SCHEDULE & PROGRESS 1.1 CONSTRUCTION SCHEDULE: 1.1.1 Status: 04/30 EK: Work is slowing down significantly for month of May due to delay in DEEP approvals. If we don’t hear from DEEP in May, June could be slow as well. 05/07, 14 Not reviewed. 05/21, 28 EK: Schedule on hold. 1.1.2 Covid 19 Delays: #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #42 05/28/2020 Page 2 of 8 04/30 PL: Work is slowing down for other reasons, so nothing to report on Covid delays. 05/07, 14 Not reviewed. 05/21, 28 GP: Nothing yet. 1.2 CONSTRUCTION PROGRESS: 1.2.1 Status: 05/14 PL: Just Eric & Peter on site now. Doing extra work that we would normally sub out. COMPLETE: Level sill poured at east entrance to Bldg B. Gypcrete in Bldg B Level B & Bldg A Level 2. UNDERWAY: Repairing window & door coverings that were damaged due to wind over the weekend. 05/21 PL: UNDERWAY: Window covering repair continues. Gas lateral from Pink Row was cut off. Retaining wall btwn B & D underway. 05/28 PL on vacation this week. EM is on site daily. 2.0 CONSTRUCTION TOPICS 2.1 SITE/CIVIL TOPICS: (BSC – Frank Vacca) 2.1.1 Site/Civil Submittals & RFI’s: 05/28 GP: No submittals or RFI’s outstanding. Bldg M basement access: 05/07 FV: Sketches sent out this week for review. Will modify to include ramp, not stair, on courtyard side. Bulkhead will be modular block wall. Drain will go to swale. 05/14 FV: Finalizing CSK-16 today. OSHA approves a 12.5% ramp for maintenance use. 05/21 FV: Sent CSK-16. GP to price. Discussion: Add backflow valve on drain to daylite. CLOSED. BSC/FV High Ramp in lieu of steps between Bldg G & F: 05/14 FV: CSK-15 sent 5/11. EK: Asphalt or pavers around the chimney stack? GP: Pavers in narrow alley & asphalt around chimney is probably cost effective but it is out for pricing – will ask for least expensive options. 05/21 FV: CSK-15 R2 issued. CLOSED. 2.1.2 Swale & headwall: 05/07 GP: Status of headwall design? FV: It is on the drawings, but not official until DEEP approves FMC. Will submit these on an CSK to ease in tracking. 05/14 FV: Will create CSK-17 for Bldg J headwall & swale. 05/21 FV: Sent draft CSK-17. Will finalize after FMC approval. 05/28 FV: On hold until FMC approval. BSC/FV High 2.1.3 Landscape, Signage & Pavement Marking Plans: 05/14 FV: Working on updating these drawings to reflect all design changes. 05/21, 28 FV: Same. BSC/FV High 2.1.4 Dam Removal: 05/28 FV: Dam removal schedule to start July 1. EK: We heard that there are DEEP comments on qualifications of dam removal contractor but don’t have anything official now. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #42 05/28/2020 Page 3 of 8 2.2 DEEP TOPICS: (Yantic River Consultants – Brandon Handfield) 2.2.1 FMC Application to DEEP: 05/07 EK: Heard from DOH that something will be sent next Friday – waiting for that to gauge progress. 05/14 EK: Waiting for feedback on FMC submission tomorrow. 05/21 EK: Received preliminary comments - will receive final comments within a week or so. 05/28 EK: Received email from DOH. Still waiting on letter of insufficiency from DEEP. Have call w/DOH & CHFA tomorrow to review & receive more clarity. 2.2.2 Helical Pile Installation: 05/28 Completion of work remains outstanding until FMC is approved. 2.2.3 Grout Bag Submittal: 05/28 Completion of work remains outstanding until FMC is approved. 2.3 ENVIRONMENTAL REMEDIATION TOPICS: (Down To Earth – Tim Carr) 2.3.1 RAP Application to DEEP: 05/28 Not reviewed. 2.3.2 Injection System: (related topic below: equipment in Bldg M Basement) 05/28 Not reviewed. 2.3.3 SVE Equipment: 05/28 Not reviewed. 2.3.4 Remediation in Courtyard: 05/14 EK: Working w/TC to remove contaminated soils. 05/21, 28 Not reviewed. 2.3.5 Equipment in M Basement: 05/14 Will need to be removed to facilitate courtyard access. 05/21, 28 Not reviewed. 2.3.6 Urban fill/ash areas: 05/14 EK: Working w/TC on this. 05/21 EK: TC thinks we can obtain approval to fill 2’ instead of 4’. Still working on this. 05/28 EK: 2.3.7 Use of fill south of Bldg M: 05/14 EK: Per conversation w/TC, DEEP will want us to test the existing fill. 05/21, 28 Not reviewed. 2.4 STRUCTURAL TOPICS: (Morrissey Engineers – Dan Morrissey) 2.4.1 Structural Submittals & RFI’s: 05/28 GP: No structural RFI’s or submittals outstanding. 2.4.2 Cooling Tower Relocation: 05/21 DM: Sketch sent this week. Discussion revealed changes needed. DM: will update sketch. 05/28 DM: Revised sketch sent. CLOSED. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #42 05/28/2020 Page 4 of 8 2.5 MEP TOPICS: (Aztech Engineers – Pat Callahan) 2.5.1 MEP Submittals & RFI’s: 05/28 GP: No submittals or RFIs outstanding. 2.5.2 Relocation of Cooling Tower: 05/21 GP: Need confirmation that pipe sizing from cooling tower to equipment is not changing. Need CAD file from Arch & Mech so DEF can work on it. 05/28 GP: Cad file received & pipe size question answered. Pricing underway. CLOSED HERE, MOVED TO CONSTRUCTION. 2.5.3 Heat Distribution inside Units: 05/21 GP: Sent unit pricing out this morning. Everyone should review, including me. FB to work on total cost. 05/28 GP/FB reviewed. FB: How many units can be adjusted? SO: Will provide # of units. EK: Review this w/HET also. PBBA/SO High 2.5.4 Exterior outlets: 05/14 PC: Underway. Coordinating w/any add’l interior outlets needed. 05/21 PC: Same. Will include exterior sconces in the revised dwgs. 05/28 PC: Same. AZT/DA High RFI 61: 05/21 PC: RFI 61 returned. GP: FM wants standpipe in Bldg B Stair 2. PC: Riser is already showing in that stair – sprinkler sub should be able to work with that & convert it to a standpipe riser in shop dwgs. 05/28 SK to issue sketch showing clearances at stair landings. 2.5.5 Hose Bibs: 05/14 EK: add hose bibs near all major entrances. SK to sketch & send to EK for review. 05/21 PC: Waiting on EK’s approval of suggested locations. 05/28 EK: Same. DP/EK High 2.6 ARCHITECTURAL TOPICS: (Paul Bailey Architect – Sam Kirby) 2.6.1 Architectural Submittals & RFI’s: 05/21 GP: Door frames/hardware outstanding. 05/28 GP: Same. PBBA/SK High Code Mod for outlets on short walls: 04/30 SO: Don’t need mod, there is language in the code for foyers and corridors. Showing these areas in all units on floor plans so I can review w/BO. 05/07 SO: Will send to Dave today. 05/14 SO: Sent to Dave on Monday. Will add Bldg K to this since the add’l outlets have not been installed in K. 05/21 SO: Sent Bldg K to Dave. CLOSED. 2.6.2 Lighting fixtures at top floors of Bldgs A & B/RCP’s: 05/21 SO: Need to review installation of a track light on a strut w/EF. 05/28 SO: sent to EF, haven’t heard back. PBBA/SO High 2.6.3 MEP in corridors of Bldgs A & B: PBBA/SK High #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #42 05/28/2020 Page 5 of 8 03/19 SO: Will review if anything can move to crawl space in Bldg A. Bldg B Basement underway. Need to review all other Bldg B corridors. 03/26, 04/02,09,16,23,30, 05/07,14, 21, 28 SK: Same. Bldg F Cooling Tower Enclosure: 05/21 SK sent Cad file to GP. CLOSED. 2.6.4 Postal & Package Delivery: 04/30 PBBA to issue sketch showing revised package room & adding door to Community Room. PBBA to review for # of boxes & layout & provide interior elevations. 05/07 SK: Same. Will show annunciator panel in Bldg B lobby in these dwgs. 05/14 SK: Sent draft sketch of Bldg B lobby. SO to review. 05/21 PBBA to select models for post boxes for Bldgs B & H. Finalizing details of package delivery access remains outstanding. 05/28 SK: Sent sketches for both Bldgs B and H. PBBA/SK High 2.6.5 Exterior Trim Color: 05/14 SO: Sent gutter colors, which sets eave/rake trim colors. Dark green for lower bldgs. & light gray (to match granite) for upper bldgs. Will use this to develop colors for windows, doors, etc. 05/21 SO: Same. 05/28 SO: 2.6.6 Door Schedule/Hardware: 04/30 SK: Will include electronic strikes in hardware submittal. Doors that are egress only: outside trim includes a key cylinder. SO: no key cylinder on the egress door from Bldg B subbasement due to clearance issues. EK: Keep key cylinders on the other egress doors. 05/07 SK: Review underway, should return today. 05/14 SK: Waiting on EK to confirm access control. 05/21 EK: Will set up call w/Steve from Safer Places & SO. SO: Will send markups of Security plans to all. 05/28 EK: Had call w/Steve. Could not interpret the hand markup, asked the Electrician’s sub to update their proposal PBBA/SK/SO High Trim on Bldg B Eave: 05/07 GP: Do we replace existing rotten crown mold with flat stock? SO: Will review on site tomorrow. 05/14 SO: Upper profile can be replaced w/flat stock since the gutter will cover it, but will need to replicate the lower profile. MC to save a piece of the existing trim so we can replicate the profile. 05/21 SO: MC will save pieces of both trim profiles. CLOSED. 2.6.7 A/B Connector Dim’s: 05/07 SO: Per phone w/PL, need height of top plate off level 4 floor & horizontal dim to locate ridge of lower roof of AB connector. 05/14 SK: North side plate should be low enough so the roof of the A/B connector does not collide w/roof of Bldg A but this is causing issues w/ window head height on south side. SO: Could reduce the size of the south window. Will send photos from site visit to SK. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #42 05/28/2020 Page 6 of 8 05/21 SK: Dim’s sent. Window updates to follow. 05/28 SK: Same. Convenience set of dwgs: 05/07 FB: status? SO: Will compile today & send to EK. Will put on Egnyte in folder identified as convenience set, not official. 05/14 SO: Will review w/SK re: which ASK’s have been issued. 05/21 SO: Issued. CLOSED. 2.6.8 Add Annunciator Panel in Bldg B entrance: 04/30 PL: Will add annunciator to Bldg B lobby. SK: Will do interior elevations to ensure that mailboxes & annunciator will fit. 05/07 PC: Will finalize w/ Fire Marshal. 05/14 PC: SK sent sketch – finalizing. 05/21 GP: Arch dwg will suffice. SK: ASK-111 will be sent, showing interior elev’s of Bldg B Lobby. 05/28 SK: Sketch sent. CLOSED. PBBA/SK High 2.6.9 Bldg B Level 4 Corridor/Unit B-22: 05/21 SO: BO requested that we eliminate the dead-end space at the north end of Bldg B Level 4 corridor by adding that space to the unit next to it. Will require updated architectural, MEP dwgs. 05/28 SK: Underway. PBBA/SK AZT/PC High 2.7 SHPO/NPS APPROVALS: (Paul Bailey Architect – Susan Odell) SHPO/NPS: Existing wood flooring in Bldgs A & B: 05/21 SO: Received approval from NPS on 5/14. CLOSED. 2.7.1 SHPO/NPS Approval of Roofing Details 05/14 SO: JS sent to NPS on 5/12. 05/21 SO: Tracking NPS review to be complete by 6/12. 05/28 SO: 2.7.2 SHPO/NPS Windows: 05/21 SO: SHPO comment responses sent to JS, AR for review. EK: Will follow up with them. SO: My next step will be the 2nd window submission. EK: Correct. 05/28 SO: Will send final updated comment responses to JS. PBBA/SO Highest 2.7.3 SHPO/NPS Lighting Fixtures: 05/21 SO: JS sent to SHPO on 5/19. Tracking SHPO review by 6/19. EK: Will ask AR about risk factor for ordering light fixtures. 05/28 SO: Same. DP/EK High 2.7.4 SHPO/NPS Masonry: 03/19 SO: After windows, will package the photos of the mortar samples for Bldgs D, E, G, H, J, K, L, M & send to Historic Consultants for review. Samples underway by Mason for Bldgs A,B,C,F. 03/26 SO: Bldg G mortar sample approved. 04/02, 09, 16, 23, 30, 05/07, 14, 21, 28 SO: Will assemble this package after the ones listed above. 2.7.5 SHPO/NPS Signage: 04/30, 05/07, 14, 21, 28 SO: Will assemble this package after the ones listed above. 2.7.6 SHPO/NPS Design Changes: #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #42 05/28/2020 Page 7 of 8 04/09 SO: Will assemble these 2 packages after the ones listed above. 2 packages are Bldg E Vestibule & changing windows to doors. 04/16, 23 Not reviewed. 04/30 EK: Add cooling tower relocation to list of design changes. 05/07, 14, 21, 28 SO: Will assemble this package after the ones listed above. 2.8 OWNER TOPICS: 2.8.1 Transformers/Eversource Coordination/Electric Meter location: 05/14 EK: Have to pay one of the fees – the project is considered to be 2 separate buildings w/Eversource. Easement is with the surveyor – will follow up w/him. GP: Will ask Gerry to submit a work order. 05/21 EK: Surveyor package is with the surveyor who will let me know tomorrow when the survey will go out. Will go to the Attorney next. 05/28 EK: Followed up w/surveyor yesterday, have not heard back. DP/EK High 2.8.2 Meeting on Security: 05/07 EK: Gave approval to wire for future additions. GP: We still need to review access control – fob or key & on which doors. Look at change estimate & confirm which parts that we are going forward with. SK: This affects the door hardware submittal. Will hold on returning submittal until confirmation from EK is received. 05/14 EK: Will talk to security consultant & confirm access control. 05/21 EK: Will set up conf call w/Steve at Safer Places. 05/28 EK: DP/EK High 2.9 CONSTRUCTION TOPICS: 2.9.1 Relocation of Cooling Tower: 05/28 GP: Cad file received & pipe size question answered. Pricing underway. 3.0 CHANGE ORDERS 3.1 Status: 05/07 EK, GP, SO reviewed earlier this week. GP: Several outstanding, waiting for DP to approve. GP/FB to review. 05/14 GP: Several CE’s outstanding, need to review w/FB. 05/21 GP: Reviewing w/FB today. 05/28 GP: MC/GP & DP/FB High 4.0 REQUISITIONS 4.1 Status: 05/14 EK: Don’t think I have seen an April req. GP: Will track it down. 05/21 SO: April req shows framing at 99% but Bldg B is not framed out. FB: 99% is carpentry. Metal framing is with GWB on the req which is 46%. SO: Ok, then req is fine. 05/28 GP: #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #42 05/28/2020 Page 8 of 8 Conference calls will be held weekly on Thursdays at 10:00 am. Job site meetings will be held weekly on Thursdays at 1:00 pm. Next up is a conference call at 10:00 am on June 4, 2020. Recorded by Susan Odell, AIA, CPHC, Senior Project Architect, Paul B. Bailey Architect, LLC These minutes are meant to convey & record the general content of the meeting, but do not represent a verbatim recording. Please promptly respond to the Architect with any comments or questions.