HomeMy WebLinkAbout2020-05-14 Oxoboxo Mtg Min 40#16-063 Oxoboxo Lofts, Uncasville , CT MEETING MINUTES #40 PROJECT: Oxoboxo Lofts 42 Pink Row Uncasville, CT DATE: May 14, 2020 TIME: 10:00 a.m. LOCATION: Conf Call Present: Eric Kuczarski (EK) DP EKuczarski@DakotaPartners.net Frank Brachanow (FB) Dakota Partners (DP) FBrachanow@DakotaPartners.net Gifford Perry (GP) MC Gifford@MaggioreCos.com Peter Lentine (PL) MC Peter@MaggioreCos.com Susan Odell (SO) Paul B. Bailey Architect (PBBA) SOdell@pbbarchitect.com Sam Kirby (SK) PBBA SKirby@pbbarchitect.com Frank Vacca (FV) BSC FVacca@BSCGroup.com Dan Morrissey (DM) Morrissey Engineers (ME) daniel.morrissey@morrisseyengineers.com Dave Mann (DM) Maggiore Construction (MC) Dave@MaggioreCos.com Pat Callahan (PC) AZT PCallahan@aztecheng.com Minutes to: Paul Maggiore (PM) MC Paul@MaggioreCos.com Karl Walsh DP KWalsh@DakotaPartners.net Marc Daigle DP MDaigle@DakotaPartners.net Roberto Arista (RA) DP RArista@DakotaPartners.net Evan Fink (EF) DP EFink@DakotaPartners.net Matt Abraham (MA) DP MAbraham@DakotaPartners.net Alycia Quintiliani DP aquintiliani@dakotapartners.net Bill Rundlett DP Brundlett@dakotapartners.net Kurt Prochorena (KP) BSC Group (BSC) KProchorena@BSCGroup.com Brandon Handfield (BH) Yantic River Consultants Brandon@yrc-ne.com Dean Azzam (DA) Aztech Engineers, Inc. (AZT) DAzzam@aztecheng.com Tim Carr (TC) Down To Earth Consulting (DTEC) Tim@DownToEarthConsulting.com Eric Marsh (EM) MC Eric@Maggiore.Co James Sexton (JS) SHPO/NPS Consultant jmbjcs@hotmail.com CONSTRUCTION DATES: Dam Removal: Start Date: Oct 18, 2019 EST. End Date: Unknown Lofts Construction: Start Date: August 1, 2019 End Date: December 29, 2020 Responsible Party Priority Level 1.0 CONSTRUCTION SCHEDULE & PROGRESS 1.1 CONSTRUCTION SCHEDULE: 1.1.1 Status: 04/30 EK: Work is slowing down significantly for month of May due to delay in DEEP approvals. If we don’t hear from DEEP in May, June could be slow as well. 05/07, 14 Not reviewed. 1.1.2 Covid 19 Delays: #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #40 05/14/2020 Page 2 of 7 04/30 PL: Work is slowing down for other reasons, so nothing to report on Covid delays. 05/07, 14 Not reviewed. 1.2 CONSTRUCTION PROGRESS: 1.2.1 Status: 05/14 PL: Just Eric & Peter on site now. Doing extra work that we would normally sub out. COMPLETE: Level sill poured at east entrance to Bldg B. UNDERWAY: Repairing window & door coverings that were damaged due to wind over the weekend. 2.0 CONSTRUCTION TOPICS 2.1 SITE/CIVIL TOPICS: (BSC – Frank Vacca) 2.1.1 Site/Civil Submittals & RFI’s: 05/14 GP: No submittals or RFI’s outstanding 2.1.2 Bldg M basement access: 05/07 FV: Sketches sent out this week for review. Will modify to include ramp, not stair, on courtyard side. Bulkhead will be modular block wall. Drain will go to swale. 05/14 FV: Finalizing CSK-16 today. OSHA approves a 12.5% ramp for maintenance use. BSC/FV High 2.1.4 Ramp in lieu of steps between Bldg G & F: 05/14 FV: CSK-15 sent 5/11. EK: Asphalt or pavers around the chimney stack? GP: Pavers in narrow alley & asphalt around chimney is probably cost effective but it is out for pricing – will ask for least expensive options. 2.1.5 Swale & headwall: 05/07 GP: Status of headwall design? FV: It is on the drawings, but not official until DEEP approves FMC. Will submit these on an CSK to ease in tracking. 05/14 FV: Will create CSK-17 for Bldg J headwall & swale. BSC/FV High 2.1.5 Landscape, Signage & Pavement Marking Plans: 05/14 FV: Working on updating these drawings to reflect all design changes. BSC/FV High 2.2 DEEP TOPICS: (Yantic River Consultants – Brandon Handfield) 2.2.1 FMC Application to DEEP: 05/07 EK: Heard from DOH that something will be sent next Friday – waiting for that to gauge progress. 05/14 EK: Waiting for feedback on FMC submission tomorrow. 2.2.2 Helical Pile Installation: 05/14 Completion of work remains outstanding until FMC is approved. 2.2.3 Grout Bag Submittal: 05/14 Completion of work remains outstanding until FMC is approved. 2.3 ENVIRONMENTAL REMEDIATION TOPICS: (Down To Earth – Tim Carr) #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #40 05/14/2020 Page 3 of 7 2.3.1 RAP Application to DEEP: 05/14 Not reviewed. 2.3.2 Injection System: (related topic below: equipment in Bldg M Basement) 05/14 Not reviewed. 2.3.3 SVE Equipment: 05/14 Not reviewed. 2.3.4 Remediation in Courtyard: 05/14 EK: Working w/TC to remove contaminated soils. 2.3.5 Equipment in M Basement: 05/14 Will need to be removed to facilitate courtyard access. 2.3.6 Urban fill/ash areas: 05/14 EK: Working w/TC on this. 2.3.7 Use of fill south of Bldg M: 05/07 PL: BO was on site yesterday & was concerned w/our use of this fill – he thought it was contaminated. Gave him Tim Carr’s #. 05/14 EK: Per conversation w/TC, DEEP will want us to test the existing fill. 2.4 STRUCTURAL TOPICS: (Morrissey Engineers – Dan Morrissey) 2.4.1 Structural Submittals & RFI’s: 05/14 GP: No structural RFI’s or submittals outstanding. 2.4.2 Cooling Tower Relocation: 04/30 DM: Working with PC on this. The sump tank needs a seal under it per manufacturer. EK: Keep it as simple as possible. GP: Least expensive for the sump would be to pour a 4” housekeeping pad. It is not on manufacturer’s list of recommended options. DEF asked the manufacturer & they didn’t really answer the question. EK: If there is any risk, let me know – Owner needs to make that decision. PC, you should be involved also in getting this answer. PC: Whatever the solution is, it won’t be higher than 6”, so we can proceed with locating the tower. 05/07 Not yet ready for structural design. 05/14 DM: Need height to be set because that drives the foundation design. SK: Will send today. ME/DM High 2.4.3 Bldg F lintel: 04/30 PL: Sent photo to DM of door opening on east side. It is a 8’-6” opening, has failing brick above, was “repaired” with railroad ties. Similar to Bldg H to Bldg K opening. DM: The solution for the H to K opening should work here also. 05/07 PC: Need this design. SO: Will follow up w/DM. 05/14 DM: Sent sketches this week. CLOSED. 2.5 MEP TOPICS: (Aztech Engineers – Pat Callahan) 2.5.1 MEP Submittals & RFI’s: 05/07 GP: RFI 61 returned. Site lighting submittal returned – needs Architect’s review. PC: Working on RFI 64 today. 05/14 PC: Finalizing RFI’s 61 & 64. AZT/DA/PC High #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #40 05/14/2020 Page 4 of 7 2.5.2 Relocation of Cooling Tower: 04/30 PC: Work underway. Clearances in alleyway will work, leave 3 feet min. between chiller & retaining wall. Stair will be in the clearance but can still maneuver around it. Working w/DEF to obtain field measurements so we can finalize it. Have to review layout inside Bldg F – need to keep pump & filter above flood line. 05/07 PC: Reviewing now w/DEF. Bottom of tower will be 5’-9” above grade & 4’ above Bldg F window sill. EK/SO: Cut the window sill down if it helps. EK: Timeline? PC: Will confirm w/DEF. 05/14 PC: Finalizing w/SK. Then goes to DM. AZT/PC Highest 2.5.3 Add Annunciator Panel in Bldg B entrance: 04/30 PL: Will add annunciator to Bldg B lobby. SK: Will do interior elevations to ensure that mailboxes & annunciator will fit. 05/07 PC: Will finalize w/ Fire Marshal. 05/14 PC: SK sent sketch – finalizing. AZT/PBBA High 2.5.4 Heat Distribution inside Units: 05/07 PC: Sent sketches. Option 1 is the lower cost option. Option 2 is the premium option. GP: Sent out for pricing. 05/14 GP: Pricing underway. 2.5.5 Exterior outlets: 04/30 SO: Need at least 6 exterior outlets by code for the 6 units that have entry doors directly to the exterior. EK followed with add’l exterior outlet requests via email. AZT to show on a dwg. PC: Will need convenience outlet for the cooling tower which should already be on the dwgs. SK: Look at lighting also. PC: Will check if there is a light on the tower. 05/07 SO: will send EK’s sketch to AZT today. PC: DA is working on the code-required outlets & waiting on the sketch. Also adding light at the new cooling tower location. 05/14 PC: Underway w/DA. Coordinating w/any add’l interior outlets needed. PBBA/SO & AZT/DA High 2.5.6 RFI 61: 05/07 Fire protection contractor to meet with Fire Code Official to review design. FB/EK: Pat should be in this meeting. FB to take the lead on this meeting. 05/14 PC: Finalizing this. DP/FB & AZT/PC High 2.5.7 Hose Bibs: 05/14 EK: add hose bibs near all major entrances. SK to sketch & send to EK for review. PBBA/SK High 2.6 ARCHITECTURAL TOPICS: (Paul Bailey Architect – Sam Kirby) 2.6.1 Architectural Submittals & RFI’s: 05/07 GP: Gutters, tapered roof insulation, door frames/hardware outstanding. SK: Hope to return door frames/hardware today. Tapered insulation next. SO: I will finish gutters today & site lighting. 05/14 GP: Door frames/hardware outstanding. PBBA/SK/SO High 2.6.2 Code Mod for outlets on short walls: 04/30 SO: Don’t need mod, there is language in the code for foyers and corridors. Showing these areas in all units on floor plans so I can review w/BO. PBBA/SO High #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #40 05/14/2020 Page 5 of 7 05/07 SO: Will send to Dave today. 05/14 SO: Sent to Dave on Monday. Will add Bldg K to this since the add’l outlets have not been installed in K. 2.6.3 Lighting fixtures at top floors of Bldgs A & B/RCP’s: 04/16 SO: Will be reviewing RCP’s on site tomorrow. 04/23 EK: Review w/EF. 04/30, 05/07, 05/14 SO: Same. PBBA/SO High 2.6.4 MEP in corridors of Bldgs A & B: 03/19 SO: Will review if anything can move to crawl space in Bldg A. Bldg B Basement underway. Need to review all other Bldg B corridors. 03/26, 04/02, 04/09, 04/16, 04/23, 04/30, 05/07, 05/14 SK: Same. PBBA/SK High 2.6.5 Paint Color Schedule: 05/14 SO: Sent color & height for black in corridors, & color to highlight the structural elements in Bldg H Lobby to GP. CLOSED. 2.6.6 Bldg F Cooling Tower Enclosure: 05/07 SK: Waiting for final location of cooling tower. Then will provide flashing details for Bldg F roof, bricked-up windows, schematic layout for cooling tower support. 05/14 SK: Will finalize & send to DM. PBBA/SK High 2.6.7 Postal & Package Delivery: 04/30 PBBA to issue sketch showing revised package room & adding door to Community Room. PBBA to review for # of boxes & layout & provide interior elevations. 05/07 SK: Same. Will show annunciator panel in Bldg B lobby in these dwgs. 05/14 SK: Sent draft sketch of Bldg B lobby. SO to review. PBBA/SK High 2.6.8 Gutter Color: 04/30 SO: Working on exterior trim colors w/PBB. PBB likes the green that is on the lower buildings Will send selections to EK for approval. EK: Want to include window colors in this so we have the complete picture. Want all bldgs. Included. 05/07 SO: Will review w/Paul Bailey today. 05/14 SO: Sent gutter colors, which sets eave/rake trim colors. Dark green for lower bldgs. & light gray (to match granite) for upper bldgs. Will use this to develop colors for windows, doors, etc. 2.6.9 Door Schedule/Hardware: 04/30 SK: Will include electronic strikes in hardware submittal. Doors that are egress only: outside trim includes a key cylinder. SO: no key cylinder on the egress door from Bldg B subbasement due to clearance issues. EK: Keep key cylinders on the other egress doors. 05/07 SK: Review underway, should return today. 05/14 SK: Waiting on EK to confirm access control. PBBA/SK High 2.6.10 Trim on Bldg B Eave: 05/07 GP: Do we replace existing rotten crown mold with flat stock? SO: Will review on site tomorrow. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #40 05/14/2020 Page 6 of 7 05/14 SO: Upper profile can be replaced w/flat stock since the gutter will cover it, but will need to replicate the lower profile. MC to save a piece of the existing trim so we can replicate the profile. 2.6.11 A/B Connector Dim’s: 05/07 SO: Per phone w/PL, need height of top plate off level 4 floor & horizontal dim to locate ridge of lower roof of AB connector. 05/14 SK: North side plate should be low enough so the roof of the A/B connector does not collide w/roof of Bldg A but this is causing issues w/ window head height on south side. SO: Could reduce the size of the south window. Will send photos from site visit to SK. PBBA/SK High 2.6.12 Convenience set of dwgs: 05/07 FB: status? SO: Will compile today & send to EK. Will put on Egnyte in folder identified as convenience set, not official. 05/14 SO: Will review w/SK re: which ASK’s have been issued. PBBA/SO High 2.7 SHPO/NPS APPROVALS: (Paul Bailey Architect – Susan Odell) 2.7.1 SHPO/NPS: Existing wood flooring in Bldgs A & B: 04/16 SHPO sent amendment approval on 4/13. 04/23 Not reviewed. 04/30, 05/07, 05/14 No change. 2.7.2 SHPO/NPS Approval of Roofing Details 04/30 EK: SHPO approved roofing details. 05/07 SO: Had to print paper copies for NPS. Will check w/JS to confirm that it was sent. 05/14 SO: JS sent to NPS. PBBA/SO High 2.7.3 SHPO/NPS Windows: 05/07 SO: Working on answering comments from SHPO on window package “A”. 05/14 SO: Comment responses underway. Will issue by end of week. PBBA/SO Highest 2.7.4 SHPO/NPS Lighting Fixtures: 05/14 SO: JS is sending to SHPO today. 2.7.5 SHPO/NPS Masonry: 03/19 SO: After windows, will package the photos of the mortar samples for Bldgs D, E, G, H, J, K, L, M & send to Historic Consultants for review. Samples underway by Mason for Bldgs A,B,C,F. 03/26 SO: Bldg G mortar sample approved. 04/02, 09, 16, 23, 30, 05/07, 14 SO: Will assemble this package after the ones listed above. 2.7.6 SHPO/NPS Signage: 04/30, 05/07, 14 SO: Will assemble this package after the ones listed above. 2.7.7 SHPO/NPS Design Changes: 04/09 SO: Will assemble these 2 packages after the ones listed above. 2 packages are Bldg E Vestibule & changing windows to doors. 04/16, 23 Not reviewed. 04/30 EK: Add cooling tower relocation to list of design changes. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #40 05/14/2020 Page 7 of 7 Conference calls will be held weekly on Thursdays at 10:00 am. Job site meetings will be held weekly on Thursdays at 1:00 pm. Next up is a conference call at 10:00 am on May 21, 2020. Recorded by Susan Odell, AIA, CPHC, Senior Project Architect, Paul B. Bailey Architect, LLC These minutes are meant to convey & record the general content of the meeting, but do not represent a verbatim recording. Please promptly respond to the Architect with any comments or questions. 05/07, 14 SO: Will assemble this package after the ones listed above. 2.8 OWNER TOPICS: 2.8.1 Transformers/Eversource Coordination/Electric Meter location: 05/14 EK: Have to pay one of the fees – the project is considered to be 2 separate buildings w/Eversource. Easement is with the surveyor – will follow up w/him. GP: Will ask Gerry to submit a work order. DP/EK High 2.8.2 Meeting on Security: 05/07 EK: Gave approval to wire for future additions. GP: We still need to review access control – fob or key & on which doors. Look at change estimate & confirm which parts that we are going forward with. SK: This affects the door hardware submittal. Will hold on returning submittal until confirmation from EK is received. 05/14 EK: Will talk to security consultant & confirm access control. DP/EK PBBA/SK High 2.9 CONSTRUCTION TOPICS: 3.0 CHANGE ORDERS 3.1 Status: 05/07 EK, GP, SO reviewed earlier this week. GP: Several outstanding, waiting for DP to approve. GP/FB to review. 05/14 GP: Several CE’s outstanding, need to review w/FB. MC/GP & DP/FB High 4.0 REQUISITIONS 4.1 Status: 05/14 EK: Don’t think I have seen an April req. GP: Will track it down.