HomeMy WebLinkAbout2020-04-02 Oxoboxo Mtg Min 34#16-063 Oxoboxo Lofts, Uncasville , CT MEETING MINUTES #34 PROJECT: Oxoboxo Lofts 42 Pink Row Uncasville, CT DATE: April 2, 2020 TIME: 10:00 a.m. LOCATION: Conf Call Present: Eric Kuczarski (EK) DP EKuczarski@DakotaPartners.net Frank Brachanow (FB) Dakota Partners (DP) FBrachanow@DakotaPartners.net Gifford Perry (GP) MC Gifford@MaggioreCos.com Peter Lentine (PL) MC Peter@MaggioreCos.com Eric Marsh (EM) MC Eric@Maggiore.Co Susan Odell (SO) Paul B. Bailey Architect (PBBA) SOdell@pbbarchitect.com Sam Kirby (SK) PBBA SKirby@pbbarchitect.com Frank Vacca (FV) BSC FVacca@BSCGroup.com Pat Callahan (PC) AZT PCallahan@aztecheng.com Dan Morrissey (DM) Morrissey Engineers (ME) daniel.morrissey@morrisseyengineers.com Minutes to: Paul Maggiore (PM) MC Paul@MaggioreCos.com Dave Mann (DM) Maggiore Construction (MC) Dave@MaggioreCos.com Karl Walsh DP KWalsh@DakotaPartners.net Marc Daigle DP MDaigle@DakotaPartners.net Roberto Arista (RA) DP RArista@DakotaPartners.net Evan Fink (EF) DP EFink@DakotaPartners.net Matt Abraham (MA) DP MAbraham@DakotaPartners.net Alycia Quintiliani DP aquintiliani@dakotapartners.net Bill Rundlett DP Brundlett@dakotapartners.net Kurt Prochorena (KP) BSC Group (BSC) KProchorena@BSCGroup.com Brandon Handfield (BH) Yantic River Consultants Brandon@yrc-ne.com Dean Azzam (DA) Aztech Engineers, Inc. (AZT) DAzzam@aztecheng.com Tim Carr (TC) Down To Earth Consulting (DTEC) Tim@DownToEarthConsulting.com James Sexton (JS) SHPO/NPS Consultant jmbjcs@hotmail.com CONSTRUCTION DATES: Dam Removal: Start Date: Oct 18, 2019 EST. End Date: Unknown Lofts Construction: Start Date: August 1, 2019 End Date: December 18, 2020 Responsible Party Priority Level 1.0 CONSTRUCTION SCHEDULE & PROGRESS 1.1 CONSTRUCTION SCHEDULE: 1.1.1 Status: 04/02 See Covid delays below. FB: Will have updated schedule in 10 days. EK: We had discussed putting lower buildings in service in the fall. GP: Concerned about MEP delays – equipment delivery, Eversource shut-down, etc. 1.1.2 Covid Delays: #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #34 04/02/2020 Page 2 of 8 04/02 GP: Carpenter framer may be stopping their work out of fear of the virus. We can’t make anyone work during this time, but we are trying to work around this by finding someone else. Heat pump delay – originally scheduled to arrive around now, but now first release is May 22, 2nd release is June 24 for a 7 week loss. Subject to change again. 1.2 CONSTRUCTION PROGRESS: 1.2.1 Status: 03/19 PL: Underway: Completing GWB in stair of Bldg B, hanging supports for MEP in lower bldgs, framing of load-bearing walls in C, installing ceilings in J H G, installing kitchens & bathrooms & ductwork in all lower bldgs, Roof demo on lower bldgs, water line installation from access road at RT 32, finishing electrical work in area north of Bldg J. Next week: Construction of stair in Bldg B, gyp-crete in A & B, Bldg D southeast corner rebuild (pending weather), piping for Bldg D Elec Rm, rotted exterior beam replacement on Bldg M, installation of metal deck at F lower level. 03/26 Not reviewed. 04/02 PL: COMPLETE: Bldg C wall framing, raised concrete platform in F, concrete floor of A/B connector, trenching under buildings for all underground, block around electrical piping in Elec Rm in H, elec lines outside of D for transformer, water pipes from Rt 32 to B Subbasement. UNDERWAY: Lower 5 building: Sheetrock/taping, painting, pulling electrical conductors to all panels, running HVAC lines through hangers. Wall framing in 2nd flr of E, transformer pad at D, rough framing for Bldg B Stair 2. NEXT: Framing A/B connector will start 1 week from Monday. 2.0 CONSTRUCTION TOPICS 2.1 SITE/CIVIL TOPICS: (BSC – Frank Vacca) 2.1.1 Site/Civil Submittals & RFI’s: 04/02 FV: No submittals or RFI’s outstanding. 2.1.2 Encroachment Permit for Guardrail on Route 32: 03/26 FV: Sent to Mayor who approved it. Sent to P&Z & Transit Authority at Mayor’s request. Have not heard back from either – will follow up. 04/02 FV: Have not heard back from P&Z or Transit Authority. Will keep trying. BSC/FV Medium 2.1.3 Bldg M basement access: 04/02 On hold until FMC is resolved. 2.1.4 CSK-10: 04/02 GP: Fabricator gave price of $25k to replicate a stair similar to the image that FV sent. FV: I can provide a comparison price. GP: I can also contact another vendor for comparison pricing. EK: Design is not the most important. Longevity & minimizing cost are more important. BSC/FV High 2.1.5 Roof Leaders: #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #34 04/02/2020 Page 3 of 8 04/02 FV: Issued revised CSK-12. CLOSED. 2.1.6 Water line installation at Bldg B west side: 04/02 FV: Issued draft CSK-13 for review showing landscape steps along the slope with sections of bituminous walk between them. It is longer than the previous stair, but it is not a full stair. They are set on top of a crushed stone layer – it is more of a landscape design. SO: Handrails on both sides of the stair treads will be required. GP: Location of water line without the retaining wall? FV: Shallow but can use anywhere from 2-8” of hard closed-cell foam insulation to protect it. FB: It is already covered. GP: Can we eliminate both retaining wall & insulation & handle it with grading? FV: Could shorten the retaining wall but not eliminate it completely. Will move the stairs to the southwest to get as shallow a slope over the pipe as possible. BSC/FV High 2.1.7 Transformer location at Bldgs B/D: 03/26 GP: Have drawing from Aschemun showing it in the correct location, but site/civil drawings don’t reflect this. FV: Will move from Bldg B to Bldg D on a CSK. 04/02 FV: Updated on latest set of plans. Conformed set includes CSK-1 thru CSK-11. CLOSED. 2.2 DEEP TOPICS: (Yantic River Consultants – Brandon Handfield) 2.2.1 FMC Application to DEEP: 03/19 EK: FMC was submitted last week. There is a 30 day public notice period next. Need list of work from MC that needs to occur in the floodway. I will set up a call w/BH for next Tuesday to review the list & see if anything can be released. SO: Add Courtyard access to the list. 03/26 EK: Call scheduled for tomorrow 04/02 Not reviewed. 2.2.2 Helical Pile Installation: 04/02 Completion of work remains outstanding until FMC is approved. 2.2.3 Grout Bag Submittal: 04/02 Completion of work remains outstanding until FMC is approved. 2.3 ENVIRONMENTAL REMEDIATION TOPICS: (Down To Earth – Tim Carr) 2.3.1 RAP Application to DEEP: 02/20 TC: Meeting last week w/DEEP went well. Have some followup with them but they have internal discussions to have & get back to us. EK: There is no official approval on the RAP – just have to respond to DEEP comments. We are in good shape on the RAP application – not holding up construction. 02/27 TC: Same. 03/05, 03/12, 03/19, 03/26, 04/02 Not reviewed. 2.3.2 Injection System: (related topic below: equipment in Bldg M Basement) 02/20 TC: Still on hold until after closing. Shouldn’t be doing remediation on someone else’s property. EK: Any weather- #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #34 04/02/2020 Page 4 of 8 driven dates? TC: Storing & mixing water-based solutions on the ground would require to hold off until after any threat of hard freeze. EK: May 1 start date? TC: Yes. Assume injection process will take 1 month, then monitor for 4 months. DEEP was helpful in being flexible with subsequent injections. After initial injection, the process runs through within 6 months. 80% chance of initial injection being successful. EK: Give me the exact cost of starting this before closing. 02/27 TC: Working on cost - meeting with vendor next Tuesday. Need Eversource contact to install insulating fleece on the wires because we will be within 10 feet of the wires. PL: Will send Eversource contact. 03/05, 03/12, 03/19, 03/26, 04/02 Not reviewed. DTE/TC High 2.3.3 SVE Equipment: 02/20 TC: Piping & wells are installed to Bldgs J,H & F. Finishing stub-ups to Bldg F today. Remaining: electrical supply for SVE blower & equipment installation after floor in Bldg F is installed. SK: Vents going through the living spaces of buildings? TC: No because we now have the crawl space to utilize. 02/27 TC: Adding stub-ups tomorrow. 03/05, 03/12, 03/19, 03/26, 04/02 Not reviewed. DTE/TC High 2.3.4 Remediation in Courtyard: 02/20 TC: Working on disposal of stockpile – we have approval for an alternate disposal location but waiting for final approval. EK: We would prefer to let stockpile remain until we can work in the flood plain again so there is only 1 mobilization. Approval of FMC is the key to this. PL: Parking is getting tight but we can wait for removal of stockpile. 02/27 TC: Same. 03/05, 03/12, 03/19, 03/26, 04/02 Not reviewed DTE/TC High 2.3.5 Equipment in M Basement: 02/20 TC: Equipment could be moved & stored while it is shut down during the injection process. It is an old system – should be scrapped. The problem is if we need to use it again, it would need to be reconnected. I will try to find a temporary system that could be used. The only thing of real value is the air compressor – it is new. EK: TC to review equipment & instruct on what is to be saved. 02/27 TC: Same. 03/05, 03/12, 03/19, 03/26, 04/02 Not reviewed. DTE/TC Medium 2.3.6 Excavating and storing soils during storm drainage installation: 02/27 GP: There is enough ash in the soil that we need to dig test pits – planning to dig them tomorrow. TC: Surface is changing from industrial paved surface to residential landscaped surface. FB: Under a paved surface, you need 2 feet of cover over the ash. Under a landscaped surface, you need 4 feet of cover over the ash. 03/05, 03/12, 03/19, 03/26, 04/02 Not reviewed. 2.4 STRUCTURAL TOPICS: (Morrissey Engineers – Dan Morrissey) 2.4.1 Structural Submittals & RFI’s: #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #34 04/02/2020 Page 5 of 8 04/02 DM: No outstanding submittals or RFI’s. 2.4.2 Bldg F Structural Steel: 04/02 Resolved. CLOSED. 2.4.3 Turnbuckles in Bldg A: 04/02 DM: Responded to this via email. CLOSED. 2.4.4 A/B Connector: 04/02 GP: No wood blocking showing in the metal stud walls. DM: We don’t require blocking, but we don’t object to it. If no blocking, they would need to screw through the metal into the joists that frame the landings. 2.4.5 Fire-rated sheathing at A/B Connector: 04/02 GP: Can we use DensGlass? DM/SO: Yes. 2.4.6 Bldg C Joists: 04/02 GP: Can we drill through joists for plumbing? DM: I will look for a product that can run through a 2x10. Not optimistic but I will try. ME/DM High 2.5 MEP TOPICS: (Aztech Engineers – Pat Callahan) 2.5.1 MEP Submittals & RFI’s: 04/02 PL: No outstanding submittals or RFI’s. 2.5.2 Laundry Room Redesign: 04/02 PL: Printing sheets for review right now – will send ASAP. AZT/PC/DA Highest 2.5.3 Site Lighting: 03/26 PL: DA sent this week. DA sent options for photocells or time clocks. EK: Will run this by the property manager. 04/02 EK: Same. DP/EK High 2.5.4 Ducts in Bldg B Basement Level: 03/12 SO: Clg height at beams is 7’-1”. We need to review all ductwork in that level. PC: Send a redline plan to me & I will review. SO: Will do. 03/19, 03/26 SO: Same. 04/02 PL: Will send ASAP. PBBA/SO High 2.5.5 J/M Connector: 03/19 GP: Need full MEP drawings. SO: These are on hold until we resolve where the courtyard access will occur. 03/26 PL: Layouts started, need Revit model. SO: We have a call tomorrow for work in the floodway; hopefully we will have an answer on courtyard access soon. 04/02 PL: Mechanical & lighting work is done, just waiting to see if doors to courtyard will be in this area. EK: Need sketches to evaluate options for courtyard access. PBBA/SK High 2.6 ARCHITECTURAL TOPICS: (Paul Bailey Architect – Sam Kirby) 2.6.1 Architectural Submittals & RFI’s: 04/02 SK: No submittals or RFI’s outstanding. 2.6.2 Updates to all drawings to reflect design changes: 04/02 SO: RCP’s are underway. PBBA/SO/SK High 2.6.3 Outlets on short walls: 04/02 SK: Code mod was sent to BO this week. CLOSED. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #34 04/02/2020 Page 6 of 8 2.6.4 Lighting fixtures at top floors of Bldgs A & B: 02/13 GP: Some fixtures will be very high – should they change to pendants? SO: Perimeter fixtures can remain as surface mounted; fixtures in center should be pendants. Will update RCP’s. 02/20, 02/27, 03/05, 03/12 SO: Same. 03/19, 03/26, 04/02 SO: Will be answered on revised RCP’s. PBBA/SO/SK High 2.6.5 MEP in corridors of Bldgs A & B: 03/19 SO: Will review if anything can move to crawl space in Bldg A. Bldg B Basement underway. Need to review all other Bldg B corridors. 03/26, 04/02 SK: Same. PBBA/SK High 2.6.6 Fireproofing of Bldg B Basement Floor: 03/19 SO: We will provide a rating to spray fireproof the steel. 03/26, 04/02 SK: Same. PBBA/SK High 2.6.7 Paint Color Schedule: 03/26 GP: Received. It calls for epoxy paint which is not in the specs. SO: Ignore the epoxy paint direction – use what is in the spec. 04/02 GP: Need to keep the upper corridor walls white behind the mechanical runs. Have mockup in Bldg M to review. SO: Will go to site today to review. GP: Pick up draw-downs in the trailer when you are here. PBBA/SO High 2.6.8 Bldg F Cooling Tower Enclosure: 04/02 SK: Finishing up the details PBBA/SK High 2.7 SHPO/NPS APPROVALS: (Paul Bailey Architect – Susan Odell) 2.7.1 SHPO/NPS: Existing wood flooring in Bldgs A & B: 03/19 SO: JS sent the package to SHPO. Will ask JS for exact date so we can track the 30 days. 03/26 SO: JS reports that SHPO received this amendment on March 12. So we are targeting April 12 for SHPO approval & May 12 for NPS approval. 04/02 SO: Same. 2.7.2 SHPO/NPS Approval of Roofing Details 04/02 SO: JS is sending today or tomorrow to SHPO. EK: MC is released for roofing per latest ASK-75 series and updated roof plans. 2.7.3 SHPO/NPS Windows: 03/19 SO: Window details reviewed by Historic Consultants this week – have 1 comment on the drawings to complete by end of day today – will send revised package out & we can review when we review the roofing details. 03/26 SO: Will update description by end of day. Will send mull detail that JS said was problematic to Toby Wharton for review. 04/02 SO: Separating out the windows that don’t need a condition assessment attached to them & sending to JS for submission to SHPO. Starting condition assessment on remaining windows. PBBA/SO Highest 2.7.4 SHPO/NPS Lighting Fixtures: PBBA/SO High #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #34 04/02/2020 Page 7 of 8 03/19 SO: Cut sheets assembled, just need the fixture at the exterior doors, then will send all cut sheets, lighting schedule & plans to Historic Consultants for review. 03/26 SO: Have approval from Historic Consultants on new fixture – will package all together & send for a final review. 04/02 SO: Same. 2.7.5 SHPO/NPS Masonry: 03/19 SO: After windows, will package the photos of the mortar samples for Bldgs D, E, G, H, J, K, L, M & send to Historic Consultants for review. Samples underway by Mason for Bldgs A,B,C,F. 03/26 SO: Bldg G mortar sample approved. 04/02 SO: Same. PBBA/SO High 2.7.6 SHPO/NPS Signage: 04/02 SO: Will assemble this package after the ones listed above. 2.7.7 SHPO/NPS Design Changes: 04/02 SO: Will assemble these 2 packages after the ones listed above. 2 packages are Bldg E Vestibule & changing windows to doors. 2.8 OWNER TOPICS: 2.8.1 Transformers/Eversource Coordination/Electric Meter location: 04/02 GP: Gerry said that all easement paperwork is sitting on Joe Cassata’s desk. PL: Joe Cassata said that office was pretty much shut down & they are not allowed in. Asked him if they would provide power without the easement finalized. He said probably not. EK: I will call Joe to find out who I need to mail the paperwork to to keep this moving? Joe’s cell: 860-447-5746 DP/EK High 2.8.2 Meeting w/Postmaster: 03/26 EK: Emailed Postmaster to resolve, waiting to hear back. Will try for conf call early next week. 04/02 EK: Haven’t heard back from Postmaster. Will try again. SO/EK High 2.8.3 Meeting on Security: 03/19 EK: Electrical sub to circulate plan mark-up for confirm by team. Electrical sub to price requested items in a Tier 1 and Tier 2 format. 03/26 GP: Elec sub should have pricing in the next week. 04/02 GP: Haven’t received anything. Will review w/Gerry after the mtg. MC/GP High 2.8.5 Site Sign: 04/02 EK: On hold for now. 2.9 CONSTRUCTION TOPICS: 2.9.1 Window sills: 03/12 GP: Approx $3k to remove existing layer of mortar. 03/19 GP: Will send photos of sills to FB to review for approval. 03/26 GP: Will show to EK on site today. 04/02 EK: Reviewed on site. GP: Lets get the windows installed & then look at a wood sill. EK: Ok. CLOSED. 2.9.2 Sewer Lateral out of Bldg M: 03/19 GP: Just sent instruction to DEF to camera the sewer line. 03/26 GP: Camera work is happening Monday at 7 am. PL: Camera will tell us whether we need to add a house trap. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #34 04/02/2020 Page 8 of 8 04/02 GP: Camera was done but reached a block that it could not get past. Will review options. 2.9.3 Electrical Installation: 03/26 PL: Because of depth of manhole, Eversource wanted the pole supported. Need to follow up w/Elec Sub. 04/02 GP: Happening this week. CLOSED. 2.9.4 Blower Door Test: 04/02 GP: Scheduled for April 13. EK: Testing should happen in 1 day but will need 2 days following that to formulate direction to construction. 3.0 CHANGE ORDERS 3.1 Status: 04/02 Not reviewed. 4.0 REQUISITIONS 4.1 Status: 04/02 Not reviewed. Conference calls will be held weekly on Thursdays at 10:00 am. Job site meetings will be held weekly on Thursdays at 1:00 pm. Next up is a conference call at 10:00 am on April 9, 2020. Recorded by Susan Odell, AIA, CPHC, Senior Project Architect, Paul B. Bailey Architect, LLC These minutes are meant to convey & record the general content of the meeting, but do not represent a verbatim recording. Please promptly respond to the Architect with any comments or questions.