Loading...
HomeMy WebLinkAbout2020-01-07 Oxoboxo Mtg Min 22#16-063 Oxoboxo Lofts, Uncasville , CT MEETING MINUTES #22 PROJECT: Oxoboxo Lofts 42 Pink Row Uncasville, CT DATE: January 7, 2020 TIME: 10:00 a.m. LOCATION: Job Site/Conf Call Present: Eric Kuczarski (EK) DP EKuczarski@DakotaPartners.net Frank Brachanow (FB) Dakota Partners (DP) FBrachanow@DakotaPartners.net Gifford Perry (GP) MC Gifford@MaggioreCos.com Peter Lentine (PL) MC Peter@MaggioreCos.com Susan Odell (SO) Paul B. Bailey Architect (PBBA) SOdell@pbbarchitect.com Frank Vacca (FV) BSC FVacca@BSCGroup.com Pat Callahan (PC) AZT PCallahan@aztecheng.com Dan Morrissey (DM) Morrissey Engineers (ME) daniel.morrissey@morrisseyengineers.com Minutes to: Paul Maggiore (PM) MC Paul@MaggioreCos.com Dave Mann (DM) Maggiore Construction (MC) Dave@MaggioreCos.com Karl Walsh DP KWalsh@DakotaPartners.net Marc Daigle DP MDaigle@DakotaPartners.net Roberto Arista (RA) DP RArista@DakotaPartners.net Evan Fink (EF) DP EFink@DakotaPartners.net Matt Abraham (MA) DP MAbraham@DakotaPartners.net Alycia Quintiliani DP aquintiliani@dakotapartners.net Bill Rundlett DP Brundlett@dakotapartners.net Kurt Prochorena (KP) BSC Group (BSC) KProchorena@BSCGroup.com Brandon Handfield (BH) Yantic River Consultants Brandon@yrc-ne.com Dean Azzam (DA) Aztech Engineers, Inc. (AZT) DAzzam@aztecheng.com Sam Kirby (SK) PBBA SKirby@pbbarchitect.com Tim Carr (TC) Down To Earth Consulting (DTEC) Tim@DownToEarthConsulting.com James Sexton (JS) SHPO/NPS Consultant jmbjcs@hotmail.com CONSTRUCTION DATES: Dam Removal: Start Date: Oct 18, 2019 EST. End Date: Unknown Lofts Construction: Start Date: August 1, 2019 End Date: December 18, 2020 Responsible Party Priority Level 1.0 CONSTRUCTION SCHEDULE & PROGRESS 1.1 CONSTRUCTION SCHEDULE: 1.1.1 Status: 01/07 Not reviewed. 1.2 CONSTRUCTION PROGRESS: 1.2.1 Status: 01/07 Not reviewed. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #22 01/07/2020 Page 2 of 8 2.0 CONSTRUCTION TOPICS 2.1 SITE/CIVIL TOPICS: 2.1.1 Site/Civil Submittals & RFI’s: 12/31 No outstanding RFI’s. Submittals for Sitework items is due Jan 15. BSC/FV High 2.1.2 Encroachment Permit for Guardrail on Route 32: 12/24 FV: Mayor agreed w/shifting driveway over, as long as largest fire apparatus can access the site. Drawing in process – should be CSK-05 issued in the near future. Mayor also wants BSC to reach out to transit authority to make sure there is not an issue accessing the site. 12/31 FV: Moving forward on meetings w/transit authority. 01/07 FV: Received size of largest apparatus from FM today – readjusting the entrance so it will receive this equipement. BSC/FV Medium 2.1.3 Coordination w/AZT: 01/07 FV: CSK-04 issued showing gas lines & sewer lines. CLOSED. 2.1.4 Site Lighting: 01/07 FV: Sylvia needs direction for photometric plan - will provide. Photometric will include all light poles, bollards at C,D,A, and wall packs elsewhere. Added 2 poles at HC ramp & site stair near HC ramp. Will finalize CSK-03 when photometrics are returned. BSC/FV High 2.1.5 Bldg B Basement Floor Level: 12/31 FV: Working on revised drainage plan to pick up gutters/leaders. Will issue after Bldg B Basement is confirmed. PL: Will do that today. 01/07 Bldg B basement floor is 1.5” above the elevation on the grading plan. FV: Will update grading plan & show on CSK-05. BSC/FV High 2.1.6 Bldg M basement access: 12/17 Discussion of FMC approval of Basement of Bldg M – our request to leave the basement open has not been approved – so BSC will wait to detail new entrances into Bldg M Basement. 12/24, 12/31 On hold until FMC is resolved. 2.1.7 Bridge over Raceway: 01/07 FV: Forwarding contact info to GP for pre-fabricated bridge – we think steel truss pre-fab bridge will be least expensive. BSC/FV Medium 2.1.8 Site Walls: 01/07 FV: Will remove site walls that DM indicated are unsafe, and will show sloped grade in those locations. Site walk to review walls followed this meeting. FV to document. BSC/FV High 2.2 DEEP TOPICS: FMC, CONSENT ORDER, WORK AT RIVER (BSC & YANTIC RIVER CONSULTANTS – BRANDON HANDFIELD): 2.2.1 FMC Application to DEEP: 12/24 FV: Trying to set up meeting in January to keep FMC going. 12/31, 01/07 FV: No word on a meeting with DEEP yet. 2.2.2 Consent Order: 12/24 EK: Consultants are preparing reports on work that was done last week to remove fill in the river & Attorney is contacting DEEP for direction. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #22 01/07/2020 Page 3 of 8 12/31 EK: Still wrapping up paperwork for work at waterway. Will ask for meeting after that is wrapped up. 01/07 EK: DEEP wants to do site inspection. 2.2.3 Helical Pile Installation: 11/26 FV: How much work remains? GP: 2 days for helical piles, 1 or 2 weeks for grout bags. Helical pile contractor has asked when they can come back. Do we know? FV: We do not know. 12/03, 12/10, 12/17, 12/24, 12/31, 01/07 Not reviewed. 2.2.4 Grout Bag Submittal: 12/03 SO: Reviewed BH’s comments w/GP & Susan Weglein. GP: We will resubmit the submittal. 12/10, 12/17, 12/24, 12/31, 01/07 Not reviewed. MC/GP Medium 2.3 ENVIRONMENTAL REMEDIATION TOPICS (DOWN TO EARTH – TIM CARR): 2.3.1 Environmental Submittals & RFI’s: 12/24, 12/31, 01/07 Not reviewed. 2.3.2 RAP Application to DEEP: 12/17 TC: Sample in Bldg D taken last week. Might need to do indoor air sampling in Bldgs H & J based on conversation w/DEEP yesterday. Talked to DEEP yesterday – meeting to be scheduled in January about the RAP & the path forward. 12/24, 12/31, 01/07 Not reviewed. 2.3.3 Injection System: (related topic below: equipment in Bldg M Basement) 11/05 TC: Still on hold. Winter will dictate the work – have to pump 40k gallons of water into the ground. (Extended discussion of where the water might come from) RA: Work on hold until Dakota owns the property. TC: Process & results of injection takes about 1 year. 11/12, 11/19, 11/26, 12/03 Not reviewed. 12/10, 12/17 TC: Still on hold. 12/24, 12/31, 01/07 Not reviewed. 2.3.4 Abandoned Brownfield Application to DEEP: 10/25 TC: Working on DEEP sign-off, then DECD has to sign off. Need approval before closing since we can’t get into that program after purchase. FB: Anything we need to do? TC: Nothing for construction – this is more legal. Had a call yesterday w/RA & Attorney so process is moving forward. 11/01, 11/05, 11/12, 11/19, 11/26, 12/03,12/10 Not reviewed. 12/10, 12/17 TC: Status uncertain. 12/24, 12/31, 01/07 Not reviewed. 2.3.5 SVE Equipment: 12/24, 12/31, 01/07 Not reviewed. 2.3.6 Remediation in Courtyard: 12/17 TC: Did not excavate further because courtyard is in the floodway. Stockpile is outside the floodway, working on permits for disposal. 12/24, 12/31, 01/07 Not reviewed DTE/TC Medium 2.3.7 Equipment in M Basement: 12/24, 12/31, 01/07 Not reviewed. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #22 01/07/2020 Page 4 of 8 2.3.8 Contaminated soils under removed oil tank: 12/17 TC: Excavated area last week. 12/24, 12/31, 01/07 Not reviewed. 2.3.9 Haz-Mat Removal Reports: 12/10 TC: Need copies of all hazardous material removal reports - Bill of ladens – for haz mat work done inside the buildings. GP: Ok, will send. 12/17 GP: Underway - asked the subs for these. 12/24, 12/31, 01/07 Not reviewed. MC/GP Medium 2.3 STRUCTURAL TOPICS: 2.3.1 Structural Submittals & RFI’s: 01/07 RFI’s 32, 35 & 39 answered w/SKS’s 40-57. No RFI’s outstanding. Submittal for stair framing is due Jan. 16. ME/DM High 2.3.2 Bldg C Revisions to Structural Dwgs: 12/24: SO: PBA will send updated Revit model to ME next week so ME can update structural drawings. 12/31 SO: PBA sent updated Revit model to ME. 01/07 ME issued SKS-46. CLOSED. 2.3.3 Hatchway in floor 4 of Bldg B, North Tower: 12/24 DM: Will handle structural support of opening w/sleepers. 12/31 Not reviewed. 01/07 Issued in SKS 40-45. CLOSED. 2.3.4 New Issues from 12/24 Site Meeting: 12/31 DM waiting on feedback from MC before he can move forward. PL sent photos to DM but not sure they are enough. 01/07 Issued addressed in latest round of SKS’s. CLOSED. 2.3.5 Bldg B South Stair: 12/31 BO commented that wall supporting roof (inset wall at Level 4) needs support inside the south stair tower. DM to issue sketch. 01/07 Issued in SKS’s 40-45, 49. CLOSED. 2.3.6 Special Inspections: 12/31 Materials Testing issued 1st report, which needs to be reviewed by DM before going to BO. (See also topic below under Construction Topics) 01/07 DM: General review – nothing jumped out. Will review item by item & issue a report. ME/DM High 2.3.7 Header for clearance required in crawl space in Bldgs G, H, J: 01/07 DM: Will run #’s & provide size of header for BO’s requested clearance in crawl space. ME/DM High 2.3.8 B/D & D/E Connector: 01/07 DM to review architectural sketches & review condition of existing framing on site today, & provide framing dwgs as needed. ME/DM High 2.3.9 New topics per today’s site walk: 01/07 New issues: masonry in Bldg H & new issues in Bldg B. ME/DM High 2.4 MEP TOPICS: 2.4.1 MEP Submittals & RFI’s: 01/07 PC: Outstanding submittals are Panel Boards & Load Centers & Revised Switch Gear & Bldg D Elec Rm Layout are AZT Highest #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #22 01/07/2020 Page 5 of 8 overdue. DA to return by end of week. SO: Will return formal answers on RFI’s 30 & 33. GP to supply color chart for grilles on unit heat pumps for Architect’s selection. GP requested typed versions of comments. 2.4.2 Ejector Pit Redesign/Elimination: 01/07 PC: Updated plans show ejector pit. Inverts sent to FV. CLOSED. 2.4.3 Egress from Electrical Rooms: 12/31 PC: Submittal for revised Bldg D layout is due 1/6. 01/07 PC: Will check w/DA re: status of this submittal. AZT/DA High 2.4.5 Generator Submittal: 12/24 GP: Submittal was returned, but design is incomplete. Will resubmit for final design (to include site lighting) after 12/31 deadline for electrical updates. 12/31 Not reviewed. 01/07 DA to confirm if site lighting needs to be on the generator. MC AZT/DA High High 2.4.6 Electrical Outlets on exterior walls: 12/24 PL: Can we run exposed from side walls? FB: Yes. 12/31 PL: SO was to review outlet locations on exterior walls. 01/07 SO reviewed mock-up during site walk-thru. All mockups approved. Discussion of Kitchen Exhaust Fans, Closet Lights, etc. was held. GP will document. MC/GP High 2.4.7 Supply & return water source loop: 01/07 PL: Updated on 12/31 MP plans to show looped. CLOSED. 2.4.8 Updated Mechanical Schedules: 12/31 PC: Issued mark-up showing changes to schedules. Final version will be in updated dwgs. 01/07 PC: Updated schedules are on the 12/31 drawings. CLOSED. AZT/PC High 2.4.9 Dates on PSK’s: 01/07 Issued with dates. CLOSED. 2.4.10 Circuits for Heat Pumps & Condensate Pumps: 01/07 Electrician needs to know if heat pumps & condensate pumps need separate circuits. Electrician recommends adding a circuit, but will cost more. PC to clarify what is required. AZT/PC High 2.5 ARCHITECTURAL TOPICS: 2.5.1 Architectural Submittals & RFI’s: 01/07 RFI’s 35 & 39 need architectural answers. Submittals are as caught up as they can be – lighting & windows need SHPO approval. PBBA Highest 2.5.2 Existing Connections between B & D and D & E: 01/07 Dwgs issued. Structural needs to review. 2.5.3 Below grade waterproofing at A, B, C, D, F: 01/07 PBBA needs to revise details for Bldg C & coordinate w/BSC for drain. PBBA Highest 2.5.4 Mason’s mortar samples: 12/31 SO: Reviewed what needs to be submitted to SHPO w/JS yesterday - new item includes smokestack. Reviewed all mortar samples w/Mason today. Mason will continue to prep samples & will send some out for specialized color matching. SO will prep list of mortar samples to be submitted to SHPO so we can track progress. PBBA/SO High #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #22 01/07/2020 Page 6 of 8 01/07 PL: Mason is expecting mortar samples back by Friday. 2.5.5 Existing windows in M and F: 12/31 SO: All existing windows have been measured & drawn. Topic moved to SHPO. CLOSED. 2.5.6 Gutters: 01/07 Owner has reviewed. Owner requested PBBA to compare existing gutter locations to proposed – should keep gutters where gutters previously existed. PBBA High 2.5.7 Updates to all drawings to reflect design changes: 01/07 RCP’s next. Drawing list sheets to be updated weekly. PBBA High 2.5.8 Meeting w/Postmaster: 01/07 FB: Should have this meeting soon – phone company was asking if units will have addresses. 2.4.4 Smoke detectors in Corridors: 12/31 SO to send inquiry (RFI-38)& answer to BO & FM. PBBA High 2.5.5 Ceiling Paint Color: 01/07 EK: Review ceiling colors w/EF – currently all ceilings are white. PBBA/SO High 2.5.6 Interior Masonry Repairs: 01/07 SO provided direction on interior masonry repairs during walk-thru. GP to document & distribute. MC/GP High 2.5.7 Meeting on Security: 01/07 Electrician requested that coordination meeting be scheduled sooner than was done at CC. GP: Security submittal was issued yesterday. DP High 2.5.8 Flood Vent Color: 01/07 Discussion re: flood vent manufacturers. SmartVent has a monopoly on the business right now, so decision made to stay with SmartVent even though price is very high. PBBA to provide custom color for vents to MC. PBBA High 2.6 SHPO APPROVALS 2.6.1 NPS Approval of Roofing Details: 12/24 SO: Will measure roof metal edge today, then revise details & review w/JS at Monday’s mtg. 12/31 SO: Measurement of roof edge showed max 1” gain at rakes only. Reviewed how to proceed w/JS yesterday – we will show a continuous taper of the insulation from the edge of the roof to the ridge. 01/07 Not reviewed. 2.6.2 Typical details to represent SHPO conditions: 12/31 SO: Both ASK’s were reviewed w/JS yesterday. Window clearance is fine to send, but MEP obstruction needs further info/review. Will review in the field w/MC today for Bldg J & revise sketch. Lively discussion held about options for where the MEP would go if it can’t go in the corridors. SO to check if any MEP’s can go through units without needing add’l fire protection. 01/07 SO & GP reviewed details of how MEP will run through all corridors in Bldgs G, H, J, K & M with sub’s during walk-thru. GP to document discussion. Sub’s to prep drawings showing their locations. SO: Sketch revision is the same. Need to also look at Bldg B corridors which will likely be problematic. MC/GP PBBA High High #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #22 01/07/2020 Page 7 of 8 2.6.3 Existing wood flooring in Bldgs A & B: 12/31 SO: Reviewed w/JS yesterday. We will submit to not reuse existing floors since they are so out of level. We will include locations of floor patches on the drawings so this can be a backup if needed. PBA to send all info to JS by Jan 6; JS to submit to SHPO by Jan 10. 01/07 SO: Sent documentation to JS yesterday. On target to submit to SHPO by end of the week. 2.6.4 Windows: 12/31 SO: Reviewed w/JS, who indicated that Bldgs A, B, C, D should have 6/6 DH’s (except for clerestory windows at Bldg B, 4th floor) and that Bldg E should have 2/2 DH’s. Bldg F should have matching 12/12 DH’s & clerestory windows per dwgs of existing windows. We should pursue aluminum clad wood windows in all of these bldgs. Windows for Bldgs G, H, J, K, L, M should proceed in metal with the request to make the lower portion operable as the reason to use metal. 01/07 Conf call with S&L (window sub) held yesterday. S&L to follow up w/SO. 2.6.5 Signage: 12/31 SO: Reviewed signage w/JS yesterday. EK selected an industrial look for the signage (white background, black letters, sans serif font) and confirmed w/signage supplier that a tin look can be achieved. EK indicated to send the site sign to EF for review. FM requested signage that identifies each building – EK & JS agreed that the temporary signage that MC did is fine as a model for the permanent solution. 01/07 Not reviewed. 2.7 CONSTRUCTION TOPICS: 2.7.1 Transformers/Eversource Coordination/Electric Meter location: 12/10 GP: Eversource returned Electrician’s call at the end of last week & indicated that they are just starting to look at our project. 12/17, 12/24 Not reviewed. 12/31 GP: Eversource is on vacation – no update. 01/07 Not reviewed. 2.7.2 Telephone/Cable lines: 12/31 EK: Using both services – Atlantic Broadband and Frontier. Will keep trying to connect with Frontier. FB will follow up w/Atlantic Broadband. GP: We should have meeting with Electrician on site soon. 01/07 FB met w/Frontier Rep on site this morning. DP/FB High 2.7.3 Mechanical Work on Hold Until BO reviews Addendum 8: 12/31 SO: Spoke w/Dave Jensen today about Mech. His only issue is where the exhaust for the boilers in Bldg B will exit – it has to be 10 feet away from any operable opening. Will look at relocating it to the east side of the building. GP: Have they issued permit to the subs? PL, follow up w/Jason. PL: Will do. 01/07 Not reviewed. MC/PL High 2.7.4 Material Testing: #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #22 01/07/2020 Page 8 of 8 12/31 PL: Inspector from Materials Testing was on site & was not happy that we don’t have drawings documenting all conditions that exist in the field. Report reflects this. FB: Report from Materials Testing sent to DM for review. Do not send to BO until DM reviews & comments. 01/07 DM: General review – nothing jumped out. Will review item by item & issue a report. ME/DM High 2.7.5 Division #’s on Submittal Cover Pages: 01/07 GP to provide CSI division #’s on the submittal cover pages moving forward. MC/GP High 2.7.7 Updated set of drawings: 01/07 PBBA to update set of drawings weekly, with a refreshed set on Monday mornings, including drawing list sheets. PBBA High 3.0 CHANGE ORDERS 3.1 Status: 01/07 New set of re-organized change orders signed. 4.0 REQUISITIONS 4.1 Status: 01/07 Not reviewed. Job site meetings will be held weekly on Thursdays at 10:00 am, starting Jan. 16. Next up is a job site meeting at 10:00 am on January 16, 2020. Recorded by Susan Odell, AIA, CPHC, Senior Project Architect, Paul B. Bailey Architect, LLC These minutes are meant to convey & record the general content of the meeting, but do not represent a verbatim recording. Please promptly respond to the Architect with any comments or questions.