Loading...
HomeMy WebLinkAbout2019-12-23 Oxoboxo Mtg Min 20#16-063 Oxoboxo Lofts, Uncasville , CT MEETING MINUTES #20 PROJECT: Oxoboxo Lofts 42 Pink Row Uncasville, CT DATE: December 24, 2019 TIME: 8:30 a.m. LOCATION: Job Site/Conf Call Present: Eric Kuczarski (EK) DP EKuczarski@DakotaPartners.net Frank Brachanow (FB) Dakota Partners (DP) FBrachanow@DakotaPartners.net Gifford Perry (GP) MC Gifford@MaggioreCos.com Peter Lentine (PL) MC Peter@MaggioreCos.com Susan Odell (SO) Paul B. Bailey Architect (PBBA) SOdell@pbbarchitect.com Frank Vacca (FV) BSC FVacca@BSCGroup.com Pat Callahan (PC) AZT PCallahan@aztecheng.com Dan Morrissey (DM) Morrissey Engineers (ME) daniel.morrissey@morrisseyengineers.com Minutes to: Paul Maggiore (PM) MC Paul@MaggioreCos.com Dave Mann (DM) Maggiore Construction (MC) Dave@MaggioreCos.com Karl Walsh DP KWalsh@DakotaPartners.net Marc Daigle DP MDaigle@DakotaPartners.net Roberto Arista (RA) DP RArista@DakotaPartners.net Evan Fink (EF) DP EFink@DakotaPartners.net Matt Abraham (MA) DP MAbraham@DakotaPartners.net Alycia Quintiliani DP aquintiliani@dakotapartners.net Bill Rundlett DP Brundlett@dakotapartners.net Kurt Prochorena (KP) BSC Group (BSC) KProchorena@BSCGroup.com Brandon Handfield (BH) Yantic River Consultants Brandon@yrc-ne.com Dean Azzam (DA) Aztech Engineers, Inc. (AZT) DAzzam@aztecheng.com Sam Kirby (SK) PBBA SKirby@pbbarchitect.com Tim Carr (TC) Down To Earth Consulting (DTEC) Tim@DownToEarthConsulting.com James Sexton (JS) SHPO/NPS Consultant jmbjcs@hotmail.com CONSTRUCTION DATES: Dam Removal: Start Date: Oct 18, 2019 EST. End Date: Unknown Lofts Construction: Start Date: August 1, 2019 End Date: December 18, 2020 Responsible Party Priority Level 1.0 CONSTRUCTION SCHEDULE & PROGRESS 1.1 CONSTRUCTION SCHEDULE: 1.1.1 Status: 12/24 Plumbing design, Bldg B floor, Bldg F structure, typical waterproofing detail issued. Field reports are being issued by DM as needed – next one will answer RFI 16 for existing site walls. All remaining overdue RFI’s & Submittals are almost caught up with exception of ones involving SHPO issues. Atypical waterproofing detail at Bldg C will be issued ASAP. Bldg F HVAC design will be issued by 12/31. All SHPO issues will be reviewed on site w/JS on Monday 12/30. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #20 12/24/2019 Page 2 of 8 1.2 CONSTRUCTION PROGRESS: 1.2.1 Status: 12/17, 12/24 Not reviewed. 2.0 CONSTRUCTION TOPICS 2.1 SITE/CIVIL TOPICS: 2.1.1 Site/Civil Submittals & RFI’s: 12/24 FV: CSK-02 issued, which finishes answer to RFI-27. Will issue lighting submittal by end of day Thursday. Will try to issue misc metal today. BSC/FV High 2.1.2 Encroachment Permit for Guardrail on Route 32: 12/24 FV: Mayor agreed w/shifting driveway over, as long as largest fire apparatus can access the site. Drawing in process – should be CSK-05 issued in the near future. Mayor also wants BSC to reach out to transit authority to make sure there is not an issue accessing the site. BSC/FV Medium 2.1.3 Coordination w/AZT: 12/24 Coordination ongoing. SO sent revised plumbing dwgs to FV today which show gas lines & ejector pumps. For gravity sewer line, FV to benchmark the top of arch under Bldg K. AZT & FV High 2.1.4 Concrete site walls: 12/24 FV: CSK-02 issued. CLOSED. 2.1.5 Site Lighting: 12/24 FV: In process of finishing modification of site lighting plan – will send to Sylvia who will run photometrics. Will also show schematic of connecting site lighting to panel in electrical room. Asked for pricing on industrial type fixtures for wall sconces – hope to have Thursday or Friday. BSC/FV High 2.1.6 Bldg B Basement Floor Level: 12/17 MC to verify floor level. Pending results, BSC to add area drain at exterior door. 12/24 PL: Will check floor level. MC/PL High 2.1.7 Bldg M basement access: 12/17 Discussion of FMC approval of Basement of Bldg M – our request to leave the basement open has not been approved – so BSC will wait to detail new entrances into Bldg M Basement. 12/24 On hold until FMC is resolved. 2.2 DEEP TOPICS: FMC, CONSENT ORDER, WORK AT RIVER (BSC & YANTIC RIVER CONSULTANTS – BRANDON HANDFIELD): 2.2.1 FMC Application to DEEP: 12/03, 12/10, 12/17 See consent order topic below. 12/24 FV: Trying to set up meeting in January to keep FMC going. 2.2.2 Consent Order: 12/24 EK: Consultants are preparing reports on work that was done last week to remove fill in the river & Attorney is contacting DEEP for direction. 2.2.3 Helical Pile Installation: #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #20 12/24/2019 Page 3 of 8 11/26 FV: How much work remains? GP: 2 days for helical piles, 1 or 2 weeks for grout bags. Helical pile contractor has asked when they can come back. Do we know? FV: We do not know. 12/03, 12/10, 12/17, 12/24 Not reviewed. 2.2.4 Grout Bag Submittal: 12/03 SO: Reviewed BH’s comments w/GP & Susan Weglein. GP: We will resubmit the submittal. 12/10, 12/17, 12/24 Not reviewed. MC/GP Medium 2.3 ENVIRONMENTAL REMEDIATION TOPICS (DOWN TO EARTH – TIM CARR): 2.3.1 Environmental Submittals & RFI’s: 12/24 Not reviewed. 2.3.2 RAP Application to DEEP: 12/10 TC: Testing of buildings is almost complete. Data package available but no formal submittal to the state. Will submit mid- January. 1 sample in Bldg D has to be re-taken, scheduled for tomorrow. 12/17 TC: Sample in Bldg D taken last week. Might need to do indoor air sampling in Bldgs H & J based on conversation w/DEEP yesterday. Talked to DEEP yesterday – meeting to be scheduled in January about the RAP & the path forward. 12/24 Not reviewed. 2.3.3 Injection System: (related topic below: equipment in Bldg M Basement) 11/05 TC: Still on hold. Winter will dictate the work – have to pump 40k gallons of water into the ground. (Extended discussion of where the water might come from) RA: Work on hold until Dakota owns the property. TC: Process & results of injection takes about 1 year. 11/12, 11/19, 11/26, 12/03 Not reviewed. 12/10, 12/17 TC: Still on hold. 12/24 Not reviewed. 2.3.4 Abandoned Brownfield Application to DEEP: 10/25 TC: Working on DEEP sign-off, then DECD has to sign off. Need approval before closing since we can’t get into that program after purchase. FB: Anything we need to do? TC: Nothing for construction – this is more legal. Had a call yesterday w/RA & Attorney so process is moving forward. 11/01, 11/05, 11/12, 11/19, 11/26, 12/03,12/10 Not reviewed. 12/10, 12/17 TC: Status uncertain. 12/24 Not reviewed. 2.3.5 SVE Equipment: 12/10 TC: Installed 4 soil vapor extraction wells last week. The new SVE equipment (soil vapor extraction pump & controls) will be brought in on a 4’x4’x6’ skid rig. Proposed to go in the southeast corner of F. SK: That is where we show it. Be aware that there is a raised floor in that area. TC: Ok. 12/17 TC: Will submit description of sound-proofing needed. SO: We don’t need sound-proofing inside Bldg F – it is all mechanical space now. 12/24 Not reviewed. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #20 12/24/2019 Page 4 of 8 2.3.6 Remediation in Courtyard: 12/10 TC: Removed 30 tons of soil from courtyard, took 15 samples, 1 exceeded. Tentatively scheduled to return tomorrow pending weather. 12/17 TC: Did not excavate because it is in the floodway. Stockpile is outside the floodway, working on permits for disposal. 12/24 Not reviewed 2.3.7 Equipment in M Basement: 12/24 Not reviewed. 2.3.8 Contaminated soils under removed oil tank: 12/10 TC: Contaminated still removal tentatively scheduled for tomorrow. FB: Scope? TC: We will excavate to 2 foot depth but depth of actual contamination is somewhat unknown. Will test soil that remains. 12/17 TC: Excavated area last week. 12/24 Not reviewed. 2.3.9 Haz-Mat Removal Reports: 12/10 TC: Need copies of all hazardous material removal reports - Bill of ladens – for haz mat work done inside the buildings. GP: Ok, will send. 12/17 GP: Underway - asked the subs for these. 12/24 Not reviewed. MC/GP Medium 2.3 STRUCTURAL TOPICS: 2.3.1 Structural Submittals & RFI’s: 12/10 DM: Reviewing record set of cold-formed metal framing- will complete tomorrow. RFI-25 answered. RFI-31 sketch for Bldg D will be issued today. Need info from PBA to answer Bldg B portion of RFI-31 – will issue sketch on Bldg B tomorrow. 12/17 DM: Still need answer from PBA for RFI 31. 12/24 DM: RFI-31 answered. RFI-32 will be answered today. Will send misc metal submittal ASAP. RFI-16 on site walls – will issue field report of site review. 2.3.2 Bldg B: Floors, Various column issues: 12/17 DM: Will issue all sketches Wednesday or Thursday 12/24 Issued. CLOSED. 2.3.3 SKS for support for water heater tanks in Bldg H: 12/17 DM: Issued. SO: Missed them, will find & forward to GP. 12/24 Issued. CLOSED. 2.3.4 Bldg B floor deflection: 12/17 DM: Need confirmation on construction method. Answer: High point of floors will be top of sleepers. DM: Will issue sketch this week. 12/24 DM: SKS issued. CLOSED. 2.3.5 Bridge over raceway behind Bldg B: 12/24 DM indicated that a prefab bridge would be least expensive option. 2.3.6 Bldg C Revisions to Structural Dwgs: 12/24: SO: PBA will send updated Revit model to ME next week so ME can update structural drawings. 2.3.7 Beam support at elevator shaft Bldg B: 12/24 BO requested more detail. DM: Issued sketches. CLOSED. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #20 12/24/2019 Page 5 of 8 2.3.8 Hatchway in floor 4 of Bldg B, North Tower: 12/24 DM: Will handle structural support of opening w/sleepers. 2.3.9 MEP running in J & H corridors at brick arches: 12/24 PL: Arches are too low to run MEP below them – need to cut hole in brick wall above. DM: Can be covered with lintel schedule previously issued. Needs to be minimum of 16” above arch. 2.4 MEP TOPICS: 2.4.1 MEP Submittals & RFI’s: 12/24 PC: Light fixtures & media boxes returned. On schedule to return RFI 30 & 33 & submittals for panel boards/load centers, water source heat pumps, fire protection materials & products, revised switch gear & Bldg D elec rm layout. GP: Question 1 on RFI 33 is open, but question 2 was answered by ASI-05. AZT Highest 2.4.2 Ejector Pit Redesign/Elimination: 12/24 Ejector pit shown on new plumbing dwgs. Location reviewed & communicated to FV. Alarm panel for pump will be in the Elec Rm of Bldg H. No vault needed – buried in pit on crushed stone. FV needs invert for pipe exiting the building. Jason of DEF provided to PC. 2.4.3 Egress from Electrical Rooms: 12/17 PC: DA reviewed, thinks some equipment needs to be relocated to achieve required clearances. SO: Electrician indicated this morning that he is re-working layout based on these comments & will issue new submittal. 12/24 PC: Submittal received & will be reviewed. AZT/DA High 2.4.4 Smoke detectors in Corridors: 12/24 Smoke detectors are shown in some corridors – BO questioned if they are required. GP: sent email to DA yesterday with this question. AZT/DA High 2.4.5 Generator Submittal: 12/24 GP: Submittal was returned, but design is incomplete. Will resubmit for final design (to include site lighting) after 12/31 deadline for electrical updates. 2.4.6 Electrical Outlets on exterior walls: 12/24 PL: Can we run exposed from side walls? FB: Yes. 2.4.7 Supply & return water source loop: 12/24 Jason: Currently shown as dead ending – please review if they should be looped. PL: Ok. 2.4.8 Updated Mechanical Schedules: 12/24 PC: Will issue by 12/27. 2.4.9 Dates on PSK’s: 12/24 GP: Please add issuance dates to the PSK’s. PC: Will do. 2.5 ARCHITECTURAL TOPICS: 2.5.1 Architectural Submittals & RFI’s: 12/24 SO: RFI 10: will measure window on Bldg F today. RFI 19: Will ask FM about sprinklers today. All other RFI’s have been returned. Submittals: Misc Metals & lighting fixtures outstanding, will return misc metals as soon as all reviews are collected. Light fixtures have to be sent to SHPO after all reviews are in. Window PBA Highest #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #20 12/24/2019 Page 6 of 8 shop dwgs have been reviewed & in communication w/Graham rep for options to better match existing windows. 2.5.2 Updated package of drawings for permit: 12/24 SO: Mtg w/BO after this mtg. 2.5.3 Flood Vents: 12/24 SO: Issued. CLOSED. 2.5.4 Existing Connections between B & D and D & E: 12/24 SO: Dwgs will be issued next week. PBA Medium 2.5.5 Insulation & Waterproofing where Bldg K crosses the stream: 12/24 SO: ASK issued. CLOSED. 2.5.6 Below grade waterproofing at A, B, C, D, F: 12/24 SO: Typical waterproofing detail issued. Bldg C detail to follow next week. PBA Highest 2.5.7 Mason’s mortar samples: 12/10 Reviewed mason’s samples. Sample on M: color is good, needs more washing to reveal more aggregate. Established 7 areas of brick color to submit to SHPO. Need to verify if there are 7 corresponding areas of mortar color (probably fewer). Mason should prep samples for all mortar colors. 12/17 Not reviewed. 12/24 New samples reviewed on site. SO will review w/Historic Consultant at Monday mtg. 2.5.8 Existing windows in M and F: 12/24 SO: Measured Bldg F transom windows on site today. – will be drafted in the next 2 weeks. Details for windows in Bldg M sent to Graham rep to see what they can match – waiting for response. PBA High 2.5.9 Gutters: 11/19 SO: We show gutters on all buildings but they go to splash blocks, not to underground drainage system. Could be cost savings to eliminate them in areas, such as courtyard. We would keep them where drainage is a problem, such as around Bldg C. EK: Please review where elimination is possible. 11/26, 12/03, 12/10, 12/17, 12/24 SO: Same PBA Low 2.5.10 Bldg B “Attic” triangle: 12/24 SO: ASK issued. CLOSED. 2.5.11 Crawl space below Bldg G, H, J: 12/24 PL: BO asked for wider passage – will modify 1 row of studs to accommodate. SO: Will also issue ASK showing 30”x36” insulated access hatches, with lock on the panel in the corridor. GP: Provide spec also. SO: Will do. PBA High 2.5.12 Updates to all drawings to reflect design changes: 12/24 SO: We are reviewing & updating all drawings to reflect design changes. RCP’s will be updated after revised electric dwgs are issued. Dwg list sheets will be issued ASAP – review revealed some corrections needed. Dimensions in corridors of Bldgs A, B & K will be checked & corrected as needed. 2.5.13 Meeting w/Postmaster: 12/24 SO: Postponing this meeting until other items are caught up. 2.6 SHPO APPROVALS #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #20 12/24/2019 Page 7 of 8 2.6.1 NPS Approval of Roofing Details: 12/24 SO: Will measure roof metal edge today, then revise details & review w/JS at Monday’s mtg. 2.6.2 Typical details to represent SHPO conditions: 12/24 SO: Window clearance ASK issued. Will issue MEP obstruction of view of historic structural elements ASAP. 2.6.3 Existing wood flooring in Bldgs A & B: 12/24 GP: We have a sketch - can we proceed w/leveling floors in Bldg B? EK: No, decision is pending Monday’s meeting w/JS. 2.6.4 Windows: 12/24 SO: Windows for Bldgs G, H, J, K, M pending Graham rep’s review of options from Graham to better match existing window. Windows for Bldgs A, B, C, D, E, F: received info from JS, will review info before Monday & review best direction to proceed at Monday’s mtg. 2.6.5 Signage: 12/24 SO: Reviewing signage dwgs for updates needed as a result of design changes & FM requests. After updates are made, will review signage w/ EF for “industrial look” requested by SHPO. 2.7 CONSTRUCTION TOPICS: 2.7.1 Pricing for raising floors in Bldgs G, H & J above 500 year flood: 12/17 SO: Reviewed w/BO after mtg who referred the sprinkler issue to the FM. SO to meet w/FM to resolve. 12/24 SO: Mtg w/FM today. PBA/SO Highest 2.7.2 Transformers/Eversource Coordination/Electric Meter location: 11/26 GP: Sent contact info to FB. Electrician has been calling Eversource daily w/no response on receiving revised site layout. 12/03 GP: Same. FB: Have not called yet. 12/10 GP: Eversource returned Electrician’s call at the end of last week & indicated that they are just starting to look at our project. 12/17, 12/24 Not reviewed. 2.7.3 Telephone/Cable lines: 12/24 EK: Connected w/Atlantic Broadband. They will be calling FB to set up a meeting. Have call into Frontier but have not received return call. GP: Need to make sure the media box will be acceptable to the providers. DP/FB High 2.7.4 Mechanical Work on Hold Until BO reviews Addendum 8: 12/10 GP: Mechanical can’t move forward until BO gives approval. SO: I will check in w/BO today for new meeting date which was to follow their review – our tentative meeting date has passed. 12/24 Not reviewed. 3.0 CHANGE ORDERS 3.1 Status: 12/24 Change orders signed. 4.0 REQUISITIONS 4.1 Status: 12/24 Not reviewed. #16-063 Oxoboxo Lofts, Uncasville, CT Meeting Minutes #20 12/24/2019 Page 8 of 8 Alternating job site meetings/conference calls will be held weekly. Next up is a conference call at 10:00 am on December 31, 2019. Recorded by Susan Odell, AIA, CPHC, Senior Project Architect, Paul B. Bailey Architect, LLC These minutes are meant to convey & record the general content of the meeting, but do not represent a verbatim recording. Please promptly respond to the Architect with any comments or questions.