HomeMy WebLinkAbout2019-08-16 Oxoboxo Lofts - Addendum 7 - additional items
Information contained in this document is proprietary and confidential and may not be disseminated to any party other than the
intended recipient without the written consent of Paul B. Bailey Architect, LLC.
ADDENDUM 7 appended
Issue Date: August 16, 2019
Oxoboxo Lofts
42 Pink Row, Uncasville, CT
General Information:
This Addendum shall become a part of the Contract and the Contractor shall be bound thereby.
Changes to the Drawings and Specifications Following the Final Construction Documents dated
10/12/2018.
This appends Addendum 7 with the missing items:
1. ComCheck.
2. Smoke detector locations.
This Addendum includes the following RFI, drawings and specs:
1. Res/ComCheck forms
2. Architectural drawing sheets:
A‐A1.11 BUILDING A – REFLECTED CEILING PLANS
B‐A1.12 BUILDING B – REFLECTED CEILING PLANS
B‐A1.13 BUILDING B – REFLECTED CEILING PLANS
B‐A1.14 BUILDING B – REFLECTED CEILING PLANS
B‐A1.15 BUILDING B – REFLECTED CEILING PLANS
B‐A1.16 BUILDING B – REFLECTED CEILING PLANS
C‐A1.11 BUILDING C – REFLECTED CEILING PLANS
D‐A1.11 BUILDING D – REFLECTED CEILING PLANS
E‐A1.11 BUILDING E – REFLECTED CEILING PLANS
G‐A1.11 BUILDING G – REFLECTED CEILING PLANS
G‐A1.12 BUILDING G – REFLECTED CEILING PLANS
HJ‐A1.11 BUILDING H – REFLECTED CEILING PLANS
HJ‐A1.12 BUILDING J – REFLECTED CEILING PLANS
HJ‐A1.13 BUILDING J – REFLECTED CEILING PLANS
K‐A1.11 BUILDING A – REFLECTED CEILING PLANS
M‐A1.11 BUILDING A – REFLECTED CEILING PLANS
M‐A1.12 BUILDING A – REFLECTED CEILING PLANS
M‐A1.13 BUILDING A – REFLECTED CEILING PLANS
END OF ADDENDUM 7 appended
P A U L B. B A I L E Y
• A R C H I T E C T •
LLC
1 1 0 A U D U B O N S T R E E T
N E W H A V E N , C O N N E C T I C U T 0 6 5 1 0
P H: 2 0 3 7 7 6 8 8 8 8 F A X: 2 0 3 7 7 2 1 3 6 5
August 16, 2019
Vernon D. Vesey II, Building Official
Town of Montville Building Department 310 Norwich-New London Turnpike
Uncasville, CT 06382
Dear Vern,
This letter addresses the areas of the Oxoboxo Lofts project at 42 Pink Row, Uncasville, that fail the ResCheck or ComCheck. Per IECC Section C501.6 Historic Buildings – “No provisions of this code
relating to the construction, repair, alteration, restoration and movement of structures, and change of occupancy shall be mandatory for historic buildings provided a report has been submitted to the code official and signed by a registered design professional…demonstrating that compliance with that
provisions would threaten, degrade or destroy the historic form, fabric or function of the building.”
This letter serves as the report described above. The building envelopes of all buildings in the Oxoboxo
Lofts project fail to meet IECC standards due to the fact that the Secretary of the Interior’s Standards for Rehabilitating Historic Buildings state “A property will be…given a new use that requires minimal
change to its distinctive materials, features, spaces and spatial relationships.” The State Historic
Preservation Office (SHPO) and the National Park Service (NPS) interpret this to mean that an interior face of an exterior wall shall have the same level of finish that it had in the original use. The original use
of this property is factory, and as such the interior faces of the exterior walls never had a finished (i.e.
plaster) surface – the 3-wythe brick exterior walls remained exposed brick on the interior sides. Further, the existing slab-on-grade floors are expected by the SHPO and NPS to remain, and therefore there is no
opportunity to replace them & install insulation under the slab. The roofs of factory buildings traditionally
did not have insulation which gave them a very thin profile, and the SHPO and NPS expect this thin profile to remain. There are a handful of original windows that remain, and the SHPO and NPS expect
them to be repaired or replaced in kind – single pane wood framed windows. For the windows that have already been replaced, we are allowed to install double pane windows, but this energy savings measure by itself is not enough to overcome the above stated deficiencies.
Sincerely,
Susan B. Odell, AIA, CPHC® Senior Project Architect, Paul B. Bailey Architect, LLC
REScheck Software Version 4.6.5
Compliance Certificate
Project Oxoboxo Lofts Building A
Energy Code:2015 IECC
Location:New London, Connecticut
Construction Type:Multi-family
Project Type:Alteration
Orientation:Bldg. faces 0 deg. from North
Climate Zone:5 (5951 HDD)
Permit Date:
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Permit Number:
Compliance: Fails using prescriptive requirements for alteration projects
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1: Cathedral Ceiling
Exemption: Framing cavity filled with insulation
---------------
Wall 1: Solid Concrete or Masonry:No Insulation
Orientation: Front
1,750 0.333 478
Window 3: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
273 0.270 74
Door 1: Solid
Orientation: Unspecified
43 0.500 22
Wall 2: Solid Concrete or Masonry:No Insulation
Orientation: Right side
1,178 0.333 348
Window 2: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
84 0.270 23
Door 2: Solid
Orientation: Unspecified
48 0.500 24
Wall 3: Solid Concrete or Masonry:No Insulation
Orientation: Back
1,850 0.333 504
Window 1: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
336 0.270 91
Floor 1: Slab-On-Grade:Unheated
Insulation depth: 0.0'
206 0.0 1.042 215
Project Title: Oxoboxo Lofts Building A
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg A ResCheck.rck Page 1 of 2
08/16/19Report date:
Project Title: Oxoboxo Lofts Building A
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg A ResCheck.rck Page 2 of 2
08/16/19Report date:
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
0.00Above-Grade Wall
0.00Below-Grade Wall
0.00Floor
0.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
0.50Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
Inspection Checklist
Requirements: 94.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.5
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building A
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg A ResCheck.rck Page 1 of 8
08/16/19Report date:
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.2
[FO1]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.2
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.9
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building A
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg A ResCheck.rck Page 2 of 8
08/16/19Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.4
[FR1]1
Door U-factor.U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 08520
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07275
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building A
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg A ResCheck.rck Page 3 of 8
08/16/19Report date:
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building A
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg A ResCheck.rck Page 4 of 8
08/16/19Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building A
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg A ResCheck.rck Page 5 of 8
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building A
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg A ResCheck.rck Page 6 of 8
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building A
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg A ResCheck.rck Page 7 of 8
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building A
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg A ResCheck.rck Page 8 of 8
08/16/19Report date:
REScheck Software Version 4.6.5
Compliance Certificate
Project Oxoboxo Lofts Building AB Connector
Energy Code:2015 IECC
Location:New London, Connecticut
Construction Type:Multi-family
Project Type:Alteration
Orientation:Bldg. faces 0 deg. from North
Climate Zone:5 (5951 HDD)
Permit Date:
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Permit Number:
Compliance: Average fenestration U-factor exceeds maximum
Maximum UA:86 Your UA:113
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1: Flat Ceiling or Scissor Truss
Exemption: Framing cavity filled with insulation
---------------
Wall 1: Steel Frame, 16" o.c.
Orientation: Front
Exemption: Framing cavity filled with insulation
---------------
Wall 3: Steel Frame, 16" o.c.
Orientation: Back
Exemption: Framing cavity filled with insulation
---------------
Window 1: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
27 0.270 7
Door 1: Solid
Orientation: Unspecified
21 0.500 11
Floor 1: Slab-On-Grade:Unheated
Insulation depth: 0.0'
91 0.0 1.042 95
Project Title: Oxoboxo Lofts Building AB Connector
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg AB Connector
ResCheck.rck
Page 1 of 9
08/16/19Report date:
Inspection Checklist
Requirements: 94.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.5
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building AB Connector
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg AB Connector
ResCheck.rck
Page 2 of 9
08/16/19Report date:
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.2
[FO1]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.2
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.9
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building AB Connector
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg AB Connector
ResCheck.rck
Page 3 of 9
08/16/19Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.4
[FR1]1
Door U-factor.U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 08520
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07275
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building AB Connector
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg AB Connector
ResCheck.rck
Page 4 of 9
08/16/19Report date:
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building AB Connector
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg AB Connector
ResCheck.rck
Page 5 of 9
08/16/19Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building AB Connector
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg AB Connector
ResCheck.rck
Page 6 of 9
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building AB Connector
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg AB Connector
ResCheck.rck
Page 7 of 9
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building AB Connector
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg AB Connector
ResCheck.rck
Page 8 of 9
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building AB Connector
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg AB Connector
ResCheck.rck
Page 9 of 9
08/16/19Report date:
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
0.00Above-Grade Wall
0.00Below-Grade Wall
0.00Floor
0.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
0.50Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
COMcheck Software Version 4.1.1.0
Envelope Compliance Certificate
Project Title:
2015 IECC
Project Type:Alteration
Vertical Glazing / Wall Area:12%
Location:New London, Connecticut
Climate Zone:5a
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Project Information
Energy Code:
Oxoboxo Lofts Building B
Building Area Floor Area
1-Total Gross SF (Multifamily) : Residential 27908
Envelope Assemblies
R-Value
Post-Alteration Assembly Cavity Cont.U-Factor
Proposed
SHGC
Max. Allowed
U-Factor SHGC
Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1 - Total Gross
SF], Exemption: Framing cavity filled with insulation.
------------------
Floor 1: Slab-On-Grade:Unheated, [Bldg. Use 1 - Total Gross SF]------1.000 ---0.540 ---
NORTH
Exterior Wall 1: Other Mass Wall, Heat capacity 1.0, [Bldg. Use 1
- Total Gross SF], Exemption: Framing cavity not exposed. (a)
------------------
Window 1: Wood Frame:Operable, Other, Operable, Operable,
[Bldg. Use 1 - Total Gross SF]
------0.270 0.180 0.450 0.531
Door 1: Wood, Swinging, [Bldg. Use 1 - Total Gross SF]------0.500 ---0.370 ---
EAST
Exterior Wall 2: Other Mass Wall, Heat capacity 1.0, [Bldg. Use 1
- Total Gross SF], Exemption: Framing cavity not exposed. (a)
------------------
Window 2: Wood Frame:Operable, Other, Operable, Operable,
[Bldg. Use 1 - Total Gross SF]
------0.270 0.180 0.450 0.400
Door 3: Wood, Swinging, [Bldg. Use 1 - Total Gross SF]------0.500 ---0.370 ---
Door 4: Wood, Swinging, [Bldg. Use 1 - Total Gross SF]------0.500 ---0.370 ---
SOUTH
Exterior Wall 3: Other Mass Wall, Heat capacity 1.0, [Bldg. Use 1
- Total Gross SF], Exemption: Framing cavity not exposed. (a)
------------------
Window 3: Wood Frame:Operable, Other, Operable, Operable,
[Bldg. Use 1 - Total Gross SF]
------0.270 0.180 0.450 0.400
WEST
Exterior Wall 4: Other Mass Wall, Heat capacity 1.0, [Bldg. Use 1
- Total Gross SF], Exemption: Framing cavity not exposed. (a)
------------------
Window 4: Wood Frame:Operable, Other, Operable, Operable,------0.270 0.180 0.450 0.400
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
191 ofPage
R-Value
Post-Alteration Assembly Cavity Cont.U-Factor
Proposed
SHGC
Max. Allowed
U-Factor SHGC
[Bldg. Use 1 - Total Gross SF]
Door 2: Wood, Swinging, [Bldg. Use 1 - Total Gross SF]------0.500 ---0.370 ---
(a)'Other' components require supporting documentation for proposed U-factors.
(b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Envelope FAILS
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
192 ofPage
COMcheck Software Version 4.1.1.0
Interior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:Alteration
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Project Information
Energy Code:
Oxoboxo Lofts Building B
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-Total Gross SF (Multifamily)27908 0.51 14233
14233Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
Total Gross SF ( Multifamily 27908 sq.ft.)
LED 1: LED A Lamp 8W:3 99 24 2376
Compact Fluorescent 1: Circline 32W: Electronic:1 34 32 1088
LED 2: LED Linear 17W:1 77 17 1309
LED 3: LED Other Fixture Unit 25W:1 16 25 400
LED 4: LED MR 2W:2 3 4 12
LED 5: LED MR 2W:2 8 4 32
LED 6: LED MR 2W:2 21 4 84
5301Total Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting PASSES
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
193 ofPage
COMcheck Software Version 4.1.1.0
Exterior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:Alteration
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Project Information
Energy Code:
Oxoboxo Lofts Building B
2 (Residentially zoned area)Exterior Lighting Zone
Allowed Exterior Lighting Power
A
Area/Surface Category
B
Quantity
C
Allowed
Watts / Unit
D
Tradable
Wattage
E
Allowed Watts
(B X C)
Main entry 1 ft of door 20 Yes 20
Other door (not main entry)2 ft of door 20 Yes 40
Total Tradable Watts (a) =
Total Allowed Watts =
Total Allowed Supplemental Watts (b) =
60
60
600
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b) A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
Main entry (1 ft of door width): Tradable Wattage
LED 1: LED A Lamp 8W:2 1 16 16
Other door (not main entry) (2 ft of door width): Tradable Wattage
LED 2: LED A Lamp 8W:2 2 16 32
48Total Tradable Proposed Watts =
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting
systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Exterior Lighting PASSES
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
194 ofPage
COMcheck Software Version 4.1.1.0
Mechanical Compliance Certificate
Project Title:
2015 IECC
Project Type:Alteration
Location:New London, Connecticut
Climate Zone:5a
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Project Information
Energy Code:
Oxoboxo Lofts Building B
Mechanical Systems List
Quantity System Type & Description
Water Source Heat Pump
Heating Mode: Capacity = 22 kBtu/h,
Proposed Efficiency = 4.80 COP, Required Efficiency = 4.30 COP
Cooling Mode: Capacity = 18 kBtu/h,
Proposed Efficiency = 13.30 EER, Required Efficiency: 13.00 EER
Fan System: None
22 HVAC System 1 (Single Zone):
Gas Instantaneous Water Heater, Capacity: 100 gallons, Input Rating: 600 kBtu/h w/ Circulation Pump
Proposed Efficiency: 95.10 % Et, Required Efficiency: 80.00 % Et
1 Water Heater 1:
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
195 ofPage
Inspection Checklist
Requirements: 2.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.1.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR1]1
Plans and/or specifications provide all
information with which compliance
can be determined for the building
envelope and document where
exceptions to the standard are
claimed.
Complies
Does Not
Not Observable
Not Applicable
C103.2
[PR2]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the mechanical
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
Complies
Does Not
Not Observable
Not Applicable
C103.2
[PR3]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the service water
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
Complies
Does Not
Not Observable
Not Applicable
C103.2
[PR4]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the interior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
C103.2
[PR8]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the exterior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include exterior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
C402.4.1
[PR10]1
The vertical fenestration area <= 30
percent of the gross above-grade wall
area.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
196 ofPage
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C402.4.1
[PR11]1
The skylight area <= 3 percent of the
gross roof area.
Complies
Does Not
Not Observable
Not Applicable
C402.4.2
[PR14]1
In enclosed spaces > 2,500 ft2
directly under a roof with ceiling
heights >15 ft. and used as an office,
lobby, atrium, concourse, corridor,
storage, gymnasium/exercise center,
convention center, automotive
service, manufacturing, non-
refrigerated warehouse, retail store,
distribution/sorting area,
transportation, or workshop, the
following requirements apply: (a) the
daylight zone under skylights is >=
half the floor area; (b) the skylight
area to daylight zone is >= 3 percent
with a skylight VT >= 0.40; or a
minimum skylight effective aperture
>= 1 percent.
Complies
Does Not
Not Observable
Not Applicable
C405.6
[PR16]1
Group R-2 dwelling units have
separate electrical meters.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
197 ofPage
Section
#
& Req.ID
Footing / Foundation Inspection Complies?Comments/Assumptions
C303.2
[FO4]2
Slab edge insulation installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
C303.2.1
[FO6]1
Exterior insulation protected against
damage, sunlight, moisture, wind,
landscaping and equipment
maintenance activities.
Complies
Does Not
Not Observable
Not Applicable
C402.2.5
[FO3]2
Slab edge insulation R-value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[FO12]3
Radiant heating systems panels
insulated to >=R-3.5 on face opposite
space being heated.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
See the Envelope Assemblies table for values.
C403.2.4.
5,
C403.2.4.
6
[FO9]3
Snow/ice melting system sensors for
future connection to controls. Freeze
protection systems have automatic
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
198 ofPage
Section
#
& Req.ID
Framing / Rough-In Inspection Complies?Comments/Assumptions
C303.1.3
[FR12]2
Fenestration products rated in
accordance with NFRC.
Complies
Does Not
Not Observable
Not Applicable
C303.1.3
[FR13]1
Fenestration products are certified as
to performance labels or certificates
provided.
Complies
Does Not
Not Observable
Not Applicable
C402.4.3
[FR10]1
Vertical fenestration SHGC value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.3,
C402.4.3.
4
[FR8]1
Vertical fenestration U-Factor.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.4
[FR14]2
U-factor of opaque doors associated
with the building thermal envelope
meets requirements.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1
[FR16]1
The building envelope contains a
continuous air barrier that is sealed in
an approved manner and either
constructed or tested in an approved
manner. Air barrier penetrations are
sealed in an approved manner.
Complies
Does Not
Not Observable
Not Applicable
C402.5.2,
C402.5.4
[FR18]3
Factory-built fenestration and doors
are labeled as meeting air leakage
requirements.
Complies
Does Not
Not Observable
Not Applicable
C402.5.7
[FR17]3
Vestibules are installed on all building
entrances. Doors have self-closing
devices.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
199 ofPage
Section
#
& Req.ID
Plumbing Rough-In Inspection Complies?Comments/Assumptions
C404.5,
C404.5.1,
C404.5.2
[PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
C404.5,
C404.5.1,
C404.5.2
[PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
C404.6.1,
C404.6.2
[PL3]1
Automatic time switches installed to
automatically switch off the
recirculating hot-water system or heat
trace.
Complies
Does Not
Not Observable
Not Applicable
C404.6.3
[PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
C404.6.3
[PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
1910 ofPage
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C402.2.6
[ME41]3
Thermally ineffective panel surfaces of
sensible heating panels have
insulation >= R-3.5.
Complies
Does Not
Not Observable
Not Applicable
C402.5.5,
C403.2.4.
3
[ME3]3
Stair and elevator shaft vents have
motorized dampers that automatically
close.
Complies
Does Not
Not Observable
Not Applicable
C402.5.5,
C403.2.4.
3
[ME58]3
Outdoor air and exhaust systems have
motorized dampers that automatically
shut when not in use and meet
maximum leakage rates. Check
gravity dampers where allowed.
Complies
Does Not
Not Observable
Not Applicable
C403.2.12
.1
[ME65]3
HVAC fan systems at design
conditions do not exceed allowable
fan system motor nameplate hp or fan
system bhp.
Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.2.12
.3
[ME117]2
Fans have efficiency grade (FEG) >=
67. The total efficiency of the fan at
the design point of operation <= 15%
of maximum total efficiency of the
fan.
Complies
Does Not
Not Observable
Not Applicable
C403.2.13
[ME71]2
Unenclosed spaces that are heated
use only radiant heat.
Complies
Does Not
Not Observable
Not Applicable
C403.2.3
[ME55]2
HVAC equipment efficiency verified.Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.2.6.
1
[ME59]1
Demand control ventilation provided
for spaces >500 ft2 and >25
people/1000 ft2 occupant density and
served by systems with air side
economizer, auto modulating outside
air damper control, or design airflow
>3,000 cfm.
Complies
Does Not
Not Observable
Not Applicable
C403.2.6.
2
[ME115]3
Enclosed parking garage ventilation
has automatic contaminant detection
and capacity to stage or modulate
fans to 50% or less of design capacity.
Complies
Does Not
Not Observable
Not Applicable
C403.2.7
[ME57]1
Exhaust air energy recovery on
systems meeting Table C403.2.7(1)
and C403.2.7(2).
Complies
Does Not
Not Observable
Not Applicable
C403.2.8
[ME116]3
Kitchen exhaust systems comply with
replacement air and conditioned
supply air limitations, and satisfy hood
rating requirements and maximum
exhaust rate criteria.
Complies
Does Not
Not Observable
Not Applicable
C403.2.9
[ME60]2
HVAC ducts and plenums insulated.
Where ducts or plenums are installed
in or under a slab, verification may
need to occur during Foundation
Inspection.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
1911 ofPage
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C403.2.9
[ME10]2
Ducts and plenums sealed based on
static pressure and location.
Complies
Does Not
Not Observable
Not Applicable
C403.2.9.
1.3
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
C403.4.2.
3.2.2
[ME122]3
Open- or closed circuit cooling towers
have a separate heat exchanger to
isolate the cooling tower from the
heat pump loop, and heat loss is
controlled by shutting down the
circulation pump on the cooling tower
loop.
Complies
Does Not
Not Observable
Not Applicable
C403.4.4.
6
[ME110]3
Multiple zone VAV systems with DDC
of individual zone boxes have static
pressure setpoint reset controls.
Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C408.2.2.
1
[ME53]3
Air outlets and zone terminal devices
have means for air balancing.
Complies
Does Not
Not Observable
Not Applicable
C403.5,
C403.5.1,
C403.5.2
[ME123]3
Refrigerated display cases, walk-in
coolers or walk-in freezers served by
remote compressors and remote
condensers not located in a
condensing unit, have fan-powered
condensers that comply with Sections
C403.5.1 and refrigeration compressor
systems that comply with C403.5.2..
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
1912 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
C405.2.1
[EL15]1
Lighting controls installed to uniformly
reduce the lighting load by at least
50%.
Complies
Does Not
Not Observable
Not Applicable
C405.2.1
[EL18]1
Occupancy sensors installed in
required spaces.
Complies
Does Not
Not Observable
Not Applicable
C405.2.1,
C405.2.2.
3
[EL23]2
Independent lighting controls installed
per approved lighting plans and all
manual controls readily accessible and
visible to occupants.
Complies
Does Not
Not Observable
Not Applicable
C405.2.2.
1
[EL22]2
Automatic controls to shut off all
building lighting installed in all
buildings.
Complies
Does Not
Not Observable
Not Applicable
C405.2.3
[EL16]2
Daylight zones provided with
individual controls that control the
lights independent of general area
lighting.
Complies
Does Not
Not Observable
Not Applicable
C405.2.3,
C405.2.3.
1,
C405.2.3.
2
[EL20]1
Primary sidelighted areas are
equipped with required lighting
controls.
Complies
Does Not
Not Observable
Not Applicable
C405.2.3,
C405.2.3.
1,
C405.2.3.
3
[EL21]1
Enclosed spaces with daylight area
under skylights and rooftop monitors
are equipped with required lighting
controls.
Complies
Does Not
Not Observable
Not Applicable
C405.2.4
[EL4]1
Separate lighting control devices for
specific uses installed per approved
lighting plans.
Complies
Does Not
Not Observable
Not Applicable
C405.2.4
[EL8]1
Additional interior lighting power
allowed for special functions per the
approved lighting plans and is
automatically controlled and
separated from general lighting.
Complies
Does Not
Not Observable
Not Applicable
C405.2.5
[EL25]null
Automatic lighting controls for exterior
lighting installed. Controls will be
daylight controlled, set based on
business operation time-of-day, or
reduce connected lighting > 30%.
Complies
Does Not
Not Observable
Not Applicable
C405.3
[EL6]1
Exit signs do not exceed 5 watts per
face.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
1913 ofPage
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
1914 ofPage
Section
#
& Req.ID
Insulation Inspection Complies?Comments/Assumptions
C303.1
[IN3]1
Roof insulation installed per
manufacturer’s instructions. Blown or
poured loose-fill insulation is installed
only where the roof slope is <=3 in
12.
Complies
Does Not
Not Observable
Not Applicable
C303.1
[IN10]2
Building envelope insulation is labeled
with R-value or insulation certificate
providing R-value and other relevant
data.
Complies
Does Not
Not Observable
Not Applicable
C303.2
[IN7]1
Above-grade wall insulation installed
per manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
C303.2.1
[IN14]2
Exterior insulation is protected from
damage with a protective material.
Verification for exposed foundation
insulation may need to occur during
Foundation Inspection.
Complies
Does Not
Not Observable
Not Applicable
C402.2.1
[IN17]3
Insulation intended to meet the roof
insulation requirements cannot be
installed on top of a suspended
ceiling. Mark this requirement
compliant if insulation is installed
accordingly.
Complies
Does Not
Not Observable
Not Applicable
C402.2.3
[IN6]1
Above-grade wall insulation R-value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.5
[IN8]2
Floor insulation R-value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[IN18]3
Radiant panels and associated
components, designed for heat
transfer from the panel surfaces to the
occupants or indoor space are
insulated with a minimum of R-3.5.
Complies
Does Not
Not Observable
Not Applicable
C402.2.2
[IN2]1
Roof R-value. For some ceiling
systems, verification may need to
occur during Framing Inspection.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1.
1
[IN1]1
All sources of air leakage in the
building thermal envelope are sealed,
caulked, gasketed, weather stripped
or wrapped with moisture vapor-
permeable wrapping material to
minimize air leakage.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
1915 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C303.3,
C408.2.5.
2
[FI17]3
Furnished O&M instructions for
systems and equipment to the
building owner or designated
representative.
Complies
Does Not
Not Observable
Not Applicable
C303.3,
C408.2.5.
3
[FI8]3
Furnished O&M manuals for HVAC
systems within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
C402.5.3
[FI51]3
Where open combustion air ducts
provide combustion air to open
combustion fuel burning appliances,
the appliances and combustion air
opening are located outside the
building thermal envelope or enclosed
in a room, isolated from inside the
thermal envelope. Such rooms are
sealed and insulated.
Complies
Does Not
Not Observable
Not Applicable
C402.5.6
[FI37]1
Weatherseals installed on all loading
dock cargo doors.
Complies
Does Not
Not Observable
Not Applicable
C402.5.8
[FI26]3
Recessed luminaires in thermal
envelope to limit infiltration and be IC
rated and labeled. Seal between
interior finish and luminaire housing.
Complies
Does Not
Not Observable
Not Applicable
C403.2.2
[FI27]3
HVAC systems and equipment
capacity does not exceed calculated
loads.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1.1
[FI42]3
Heat pump controls prevent
supplemental electric resistance heat
from coming on when not needed.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1.2
[FI38]3
Thermostatic controls have a 5 °F
deadband.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1.3
[FI20]3
Temperature controls have setpoint
overlap restrictions.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
2
[FI39]3
Each zone equipped with setback
controls using automatic time clock or
programmable control system.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
1916 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C403.2.4.
2.1,
C403.2.4.
2.2
[FI40]3
Automatic Controls: Setback to 55°F
(heat) and 85°F (cool); 7-day clock, 2-
hour occupant override, 10-hour
backup
Complies
Does Not
Not Observable
Not Applicable
C404.3
[FI11]3
Heat traps installed on supply and
discharge piping of non-circulating
systems.
Complies
Does Not
Not Observable
Not Applicable
C404.4
[FI25]2
All piping insulated in accordance with
section details and Table C403.2.10.
Complies
Does Not
Not Observable
Not Applicable
C404.6.1
[FI12]3
Controls are installed that limit the
operation of a recirculation pump
installed to maintain temperature of a
storage tank. System return pipe is a
dedicated return pipe or a cold water
supply pipe.
Complies
Does Not
Not Observable
Not Applicable
C405.4.1
[FI18]1
Interior installed lamp and fixture
lighting power is consistent with what
is shown on the approved lighting
plans, demonstrating proposed watts
are less than or equal to allowed
watts.
Complies
Does Not
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values.
C405.5.1
[FI19]1
Exterior lighting power is consistent
with what is shown on the approved
lighting plans, demonstrating
proposed watts are less than or equal
to allowed watts.
Complies
Does Not
Not Observable
Not Applicable
See the Exterior Lighting fixture schedule for values.
C408.2.1
[FI28]1
Commissioning plan developed by
registered design professional or
approved agency.
Complies
Does Not
Not Observable
Not Applicable
C408.2.3.
1
[FI31]1
HVAC equipment has been tested to
ensure proper operation.
Complies
Does Not
Not Observable
Not Applicable
C408.2.3.
2
[FI10]1
HVAC control systems have been
tested to ensure proper operation,
calibration and adjustment of controls.
Complies
Does Not
Not Observable
Not Applicable
C408.2.4
[FI29]1
Preliminary commissioning report
completed and certified by registered
design professional or approved
agency.
Complies
Does Not
Not Observable
Not Applicable
C408.2.5.
1
[FI7]3
Furnished HVAC as-built drawings
submitted within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
C408.2.5.
1
[FI16]3
Furnished as-built drawings for
electric power systems within 90 days
of system acceptance.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
1917 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C408.2.5.
3
[FI43]1
An air and/or hydronic system
balancing report is provided for HVAC
systems.
Complies
Does Not
Not Observable
Not Applicable
C408.2.5.
4
[FI30]1
Final commissioning report due to
building owner within 90 days of
receipt of certificate of occupancy.
Complies
Does Not
Not Observable
Not Applicable
C408.3
[FI33]1
Lighting systems have been tested to
ensure proper calibration, adjustment,
programming, and operation.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
1918 ofPage
Project Title:
Data filename:
Oxoboxo Lofts Building B
F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg B ComCheck.cck
08/16/19Report date:
1919 ofPage
REScheck Software Version 4.6.5
Compliance Certificate
Project Oxoboxo Lofts Building C
Energy Code:2015 IECC
Location:New London, Connecticut
Construction Type:Multi-family
Project Type:Alteration
Orientation:Bldg. faces 0 deg. from North
Climate Zone:5 (5951 HDD)
Permit Date:
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Permit Number:
Compliance: Average fenestration U-factor exceeds maximum
Maximum UA:548 Your UA:1176
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1: Cathedral Ceiling 1,887 0.0 24.0 0.039 74
Wall 1: Solid Concrete or Masonry:No Insulation
Orientation: Front
720 0.333 182
Window 3: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
105 0.270 28
Door 1: Solid
Orientation: Unspecified
40 0.500 20
Door 3: Solid
Orientation: Unspecified
28 0.500 14
Wall 2: Solid Concrete or Masonry:No Insulation
Orientation: Left side
816 0.333 261
Window 2: Wood Frame:Double Pane with Low-E
Orientation: Left side
33 0.270 9
Wall 3: Solid Concrete or Masonry:No Insulation
Orientation: Back
1,200 0.333 288
Window 1: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
282 0.270 76
Door 4: Solid
Orientation: Unspecified
27 0.500 14
Door 5: Solid
Orientation: Unspecified
27 0.500 14
Floor 1: Slab-On-Grade:Unheated
Insulation depth: 0.0'
188 0.0 1.042 196
Project Title: Oxoboxo Lofts Building C
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg C ResCheck.rck Page 1 of10
08/16/19Report date:
Project Title: Oxoboxo Lofts Building C
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg C ResCheck.rck Page 2 of10
08/16/19Report date:
Inspection Checklist
Requirements: 94.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.5
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building C
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg C ResCheck.rck Page 3 of10
08/16/19Report date:
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.2
[FO1]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.2
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.9
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building C
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg C ResCheck.rck Page 4 of10
08/16/19Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.4
[FR1]1
Door U-factor.U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 08520
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07275
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building C
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg C ResCheck.rck Page 5 of10
08/16/19Report date:
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building C
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg C ResCheck.rck Page 6 of10
08/16/19Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building C
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg C ResCheck.rck Page 7 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building C
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg C ResCheck.rck Page 8 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building C
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg C ResCheck.rck Page 9 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building C
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg C ResCheck.rck Page 10 of10
08/16/19Report date:
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
0.00Above-Grade Wall
0.00Below-Grade Wall
0.00Floor
24.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
0.50Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
REScheck Software Version 4.6.5
Compliance Certificate
Project Oxoboxo Lofts Building D
Energy Code:2015 IECC
Location:New London, Connecticut
Construction Type:Multi-family
Project Type:Alteration
Orientation:Bldg. faces 0 deg. from North
Climate Zone:5 (5951 HDD)
Permit Date:
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Permit Number:
Compliance: Fails using prescriptive requirements for alteration projects
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1: Cathedral Ceiling 1,887 0.0 24.0 0.039 74
Wall 1: Solid Concrete or Masonry:No Insulation
Orientation: Front
1,360 0.333 355
Window 3: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
294 0.270 79
Wall 2: Solid Concrete or Masonry:Interior Insulation
Orientation: Left side
630 0.0 6.0 0.111 58
Window 2: Wood Frame:Double Pane with Low-E
Orientation: Left side
63 0.270 17
Door 6: Solid
Orientation: Unspecified
48 0.500 24
Wall 3: Solid Concrete or Masonry:Interior Insulation
Orientation: Back
1,632 0.0 6.0 0.111 143
Window 1: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
276 0.270 75
Door 4: Solid
Orientation: Unspecified
40 0.500 20
Door 5: Solid
Orientation: Unspecified
27 0.500 14
Wall 4: Solid Concrete or Masonry:Interior Insulation
Orientation: Unspecified
630 0.0 6.0 0.111 68
Door 7: Solid
Orientation: Unspecified
21 0.500 11
Floor 1: Slab-On-Grade:Unheated
Insulation depth: 0.0'
196 0.0 1.042 204
Project Title: Oxoboxo Lofts Building D
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg D ResCheck.rck Page 1 of10
08/16/19Report date:
Project Title: Oxoboxo Lofts Building D
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg D ResCheck.rck Page 2 of10
08/16/19Report date:
Inspection Checklist
Requirements: 94.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.5
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building D
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg D ResCheck.rck Page 3 of10
08/16/19Report date:
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.2
[FO1]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.2
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.9
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building D
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg D ResCheck.rck Page 4 of10
08/16/19Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.4
[FR1]1
Door U-factor.U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 08520
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07275
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building D
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg D ResCheck.rck Page 5 of10
08/16/19Report date:
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building D
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg D ResCheck.rck Page 6 of10
08/16/19Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building D
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg D ResCheck.rck Page 7 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building D
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg D ResCheck.rck Page 8 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building D
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg D ResCheck.rck Page 9 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building D
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg D ResCheck.rck Page 10 of10
08/16/19Report date:
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
6.00Above-Grade Wall
0.00Below-Grade Wall
0.00Floor
24.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
0.50Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
REScheck Software Version 4.6.5
Compliance Certificate
Project Oxoboxo Lofts Building E
Energy Code:2015 IECC
Location:New London, Connecticut
Construction Type:Multi-family
Project Type:Alteration
Orientation:Bldg. faces 0 deg. from North
Climate Zone:5 (5951 HDD)
Permit Date:
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Permit Number:
Compliance: Average fenestration U-factor exceeds maximum
Maximum UA:620 Your UA:1161
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1: Cathedral Ceiling 1,950 0.0 24.0 0.039 76
Wall 1: Solid Concrete or Masonry:No Insulation
Orientation: Front
1,430 0.333 437
Window 3: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
88 0.270 24
Door 8: Solid
Orientation: Unspecified
30 0.500 15
Wall 2: Solid Concrete or Masonry:Interior Insulation
Orientation: Left side
690 0.0 6.0 0.111 66
Window 2: Wood Frame:Double Pane with Low-E
Orientation: Left side
33 0.270 9
Door 6: Glass
Orientation: Unspecified
63 0.350 22
Wall 3: Solid Concrete or Masonry:Interior Insulation
Orientation: Back
1,690 0.0 6.0 0.111 172
Window 1: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
116 0.270 31
Door 5: Solid
Orientation: Unspecified
27 0.500 14
Wall 4: Solid Concrete or Masonry:Interior Insulation
Orientation: Right side
690 0.0 6.0 0.111 70
Window 4: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
17 0.270 5
Door 7: Solid
Orientation: Right side
44 0.500 22
Project Title: Oxoboxo Lofts Building E
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg E ResCheck.rck Page 1 of10
08/16/19Report date:
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Floor 1: Slab-On-Grade:Unheated
Insulation depth: 0.0'
190 0.0 1.042 198
Project Title: Oxoboxo Lofts Building E
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg E ResCheck.rck Page 2 of10
08/16/19Report date:
Inspection Checklist
Requirements: 94.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.5
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building E
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg E ResCheck.rck Page 3 of10
08/16/19Report date:
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.2
[FO1]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.2
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.9
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building E
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg E ResCheck.rck Page 4 of10
08/16/19Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.4
[FR1]1
Door U-factor.U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 08520
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07275
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building E
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg E ResCheck.rck Page 5 of10
08/16/19Report date:
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building E
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg E ResCheck.rck Page 6 of10
08/16/19Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building E
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg E ResCheck.rck Page 7 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building E
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg E ResCheck.rck Page 8 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building E
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg E ResCheck.rck Page 9 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building E
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg E ResCheck.rck Page 10 of10
08/16/19Report date:
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
6.00Above-Grade Wall
0.00Below-Grade Wall
0.00Floor
24.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
0.35Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
REScheck Software Version 4.6.5
Compliance Certificate
Project Oxoboxo Lofts Building F
Energy Code:2015 IECC
Location:New London, Connecticut
Construction Type:Multi-family
Project Type:Alteration
Orientation:Bldg. faces 0 deg. from North
Climate Zone:5 (5951 HDD)
Permit Date:
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Permit Number:
Compliance: Average fenestration U-factor exceeds maximum
Maximum UA:691 Your UA:1941
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1: Cathedral Ceiling 2,000 0.0 24.0 0.039 78
Wall 1: Solid Concrete or Masonry:No Insulation
Orientation: Front
960 0.333 261
Window 3: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
92 0.270 25
Window 5: Wood Frame:Single Pane
Orientation: Unspecified
63 0.800 50
Door 8: Solid
Orientation: Unspecified
21 0.500 11
Wall 2: Solid Concrete or Masonry:No Insulation
Orientation: Left side
1,039 0.333 289
Window 2: Wood Frame:Single Pane
Orientation: Left side
49 0.800 39
Door 6: Glass
Orientation: Unspecified
121 0.350 42
Wall 3: Solid Concrete or Masonry:No Insulation
Orientation: Back
1,690 0.333 546
Window 1: Wood Frame:Single Pane
Orientation: Unspecified
49 0.800 39
Wall 4: Solid Concrete or Masonry:No Insulation
Orientation: Right side
1,039 0.333 320
Window 4: Wood Frame:Single Pane
Orientation: Unspecified
49 0.800 39
Door 7: Solid
Orientation: Right side
28 0.500 14
Project Title: Oxoboxo Lofts Building F
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg F ResCheck.rck Page 1 of10
08/16/19Report date:
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Floor 1: Slab-On-Grade:Unheated
Insulation depth: 0.0'
180 0.0 1.042 188
Project Title: Oxoboxo Lofts Building F
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg F ResCheck.rck Page 2 of10
08/16/19Report date:
Inspection Checklist
Requirements: 94.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.5
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building F
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg F ResCheck.rck Page 3 of10
08/16/19Report date:
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.2
[FO1]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.2
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.9
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building F
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg F ResCheck.rck Page 4 of10
08/16/19Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.4
[FR1]1
Door U-factor.U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 08520
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07275
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building F
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg F ResCheck.rck Page 5 of10
08/16/19Report date:
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building F
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg F ResCheck.rck Page 6 of10
08/16/19Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building F
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg F ResCheck.rck Page 7 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building F
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg F ResCheck.rck Page 8 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building F
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg F ResCheck.rck Page 9 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building F
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg F ResCheck.rck Page 10 of10
08/16/19Report date:
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
0.00Above-Grade Wall
0.00Below-Grade Wall
0.00Floor
24.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
0.35Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
REScheck Software Version 4.6.5
Compliance Certificate
Project Oxoboxo Lofts Building G
Energy Code:2015 IECC
Location:New London, Connecticut
Construction Type:Multi-family
Project Type:Alteration
Orientation:Bldg. faces 0 deg. from North
Climate Zone:5 (5951 HDD)
Permit Date:
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Permit Number:
Compliance: Fails using prescriptive requirements for alteration projects
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1: Cathedral Ceiling 6,439 0.0 24.0 0.039 251
Wall 1: Solid Concrete or Masonry:No Insulation
Orientation: Front
2,171 0.333 506
Window 3: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
595 0.270 161
Door 8: Glass
Orientation: Unspecified
56 0.350 20
Wall 3: Solid Concrete or Masonry:No Insulation
Orientation: Back
2,800 0.333 684
Window 1: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
746 0.270 201
Wall 4: Solid Concrete or Masonry:No Insulation
Orientation: Right side
633 0.333 155
Window 4: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
168 0.270 45
Floor 1: Slab-On-Grade:Unheated
Insulation depth: 0.0'
370 0.0 1.042 386
Project Title: Oxoboxo Lofts Building G
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg G ResCheck.rck Page 1 of10
08/16/19Report date:
Project Title: Oxoboxo Lofts Building G
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg G ResCheck.rck Page 2 of10
08/16/19Report date:
Inspection Checklist
Requirements: 94.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.5
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building G
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg G ResCheck.rck Page 3 of10
08/16/19Report date:
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.2
[FO1]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.2
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.9
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building G
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg G ResCheck.rck Page 4 of10
08/16/19Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 08520
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07275
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building G
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg G ResCheck.rck Page 5 of10
08/16/19Report date:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building G
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg G ResCheck.rck Page 6 of10
08/16/19Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building G
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg G ResCheck.rck Page 7 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building G
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg G ResCheck.rck Page 8 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building G
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg G ResCheck.rck Page 9 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building G
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg G ResCheck.rck Page 10 of10
08/16/19Report date:
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
0.00Above-Grade Wall
0.00Below-Grade Wall
0.00Floor
24.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
0.35Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
REScheck Software Version 4.6.5
Compliance Certificate
Project Oxoboxo Lofts Building H
Energy Code:2015 IECC
Location:New London, Connecticut
Construction Type:Multi-family
Project Type:Alteration
Orientation:Bldg. faces 0 deg. from North
Climate Zone:5 (5951 HDD)
Permit Date:
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Permit Number:
Compliance: Fails using prescriptive requirements for alteration projects
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1: Cathedral Ceiling 4,280 0.0 24.0 0.039 167
Wall 1: Solid Concrete or Masonry:No Insulation
Orientation: Front
875 0.333 212
Window 3: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
168 0.270 45
Door 8: Glass
Orientation: Unspecified
70 0.350 25
Wall 3: Solid Concrete or Masonry:No Insulation
Orientation: Back
840 0.333 205
Window 1: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
224 0.270 60
Wall 4: Solid Concrete or Masonry:No Insulation
Orientation: Right side
136 0.333 45
Wall 5: Solid Concrete or Masonry:No Insulation
Orientation: Left side
176 0.333 40
Window 4: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
56 0.270 15
Floor 1: Slab-On-Grade:Unheated
Insulation depth: 0.0'
285 0.0 1.042 297
Project Title: Oxoboxo Lofts Building H
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg H ResCheck.rck Page 1 of10
08/16/19Report date:
Project Title: Oxoboxo Lofts Building H
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg H ResCheck.rck Page 2 of10
08/16/19Report date:
Inspection Checklist
Requirements: 94.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.5
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building H
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg H ResCheck.rck Page 3 of10
08/16/19Report date:
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.2
[FO1]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.2
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.9
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building H
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg H ResCheck.rck Page 4 of10
08/16/19Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 08520
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07275
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building H
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg H ResCheck.rck Page 5 of10
08/16/19Report date:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building H
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg H ResCheck.rck Page 6 of10
08/16/19Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building H
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg H ResCheck.rck Page 7 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building H
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg H ResCheck.rck Page 8 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building H
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg H ResCheck.rck Page 9 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building H
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg H ResCheck.rck Page 10 of10
08/16/19Report date:
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
0.00Above-Grade Wall
0.00Below-Grade Wall
0.00Floor
24.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
0.35Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
REScheck Software Version 4.6.5
Compliance Certificate
Project Oxoboxo Lofts Building J
Energy Code:2015 IECC
Location:New London, Connecticut
Construction Type:Multi-family
Project Type:Alteration
Orientation:Bldg. faces 0 deg. from North
Climate Zone:5 (5951 HDD)
Permit Date:
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Permit Number:
Compliance: Fails using prescriptive requirements for alteration projects
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1: Cathedral Ceiling 8,000 0.0 24.0 0.039 312
Wall 1: Solid Concrete or Masonry:No Insulation
Orientation: Front
2,560 0.333 488
Window 3: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
1,026 0.270 277
Door 8: Glass
Orientation: Unspecified
70 0.350 25
Wall 3: Solid Concrete or Masonry:No Insulation
Orientation: Back
3,520 0.333 905
Window 1: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
802 0.270 217
Wall 4: Solid Concrete or Masonry:No Insulation
Orientation: Right side
128 0.333 43
Wall 5: Solid Concrete or Masonry:No Insulation
Orientation: Left side
950 0.333 242
Window 4: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
224 0.270 60
Floor 1: Slab-On-Grade:Unheated
Insulation depth: 0.0'
420 0.0 1.042 438
Project Title: Oxoboxo Lofts Building J
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg J ResCheck.rck Page 1 of10
08/16/19Report date:
Project Title: Oxoboxo Lofts Building J
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg J ResCheck.rck Page 2 of10
08/16/19Report date:
Inspection Checklist
Requirements: 94.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.5
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building J
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg J ResCheck.rck Page 3 of10
08/16/19Report date:
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.2
[FO1]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.2
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.9
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building J
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg J ResCheck.rck Page 4 of10
08/16/19Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 08520
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07275
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building J
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg J ResCheck.rck Page 5 of10
08/16/19Report date:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building J
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg J ResCheck.rck Page 6 of10
08/16/19Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building J
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg J ResCheck.rck Page 7 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building J
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg J ResCheck.rck Page 8 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building J
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg J ResCheck.rck Page 9 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building J
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg J ResCheck.rck Page 10 of10
08/16/19Report date:
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
0.00Above-Grade Wall
0.00Below-Grade Wall
0.00Floor
24.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
0.35Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
REScheck Software Version 4.6.5
Compliance Certificate
Project Oxoboxo Lofts Building K
Energy Code:2015 IECC
Location:New London, Connecticut
Construction Type:Multi-family
Project Type:Alteration
Orientation:Bldg. faces 90 deg. from North
Climate Zone:5 (5951 HDD)
Permit Date:
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Permit Number:
Compliance: Fails using prescriptive requirements for alteration projects
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1: Cathedral Ceiling 3,880 0.0 24.0 0.039 151
Wall 1: Solid Concrete or Masonry:No Insulation
Orientation: Front
1,596 0.333 359
Window 3: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
518 0.270 140
Wall 3: Solid Concrete or Masonry:No Insulation
Orientation: Back
1,596 0.333 359
Window 1: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
518 0.270 140
Wall 5: Solid Concrete or Masonry:No Insulation
Orientation: Left side
209 0.333 70
Floor 1: Slab-On-Grade:Unheated
Insulation depth: 0.0'
265 0.0 1.042 276
Project Title: Oxoboxo Lofts Building K
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg K ResCheck.rck Page 1 of 9
08/16/19Report date:
Inspection Checklist
Requirements: 94.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.5
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building K
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg K ResCheck.rck Page 2 of 9
08/16/19Report date:
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.2
[FO1]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.2
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.9
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building K
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg K ResCheck.rck Page 3 of 9
08/16/19Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 08520
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07275
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building K
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg K ResCheck.rck Page 4 of 9
08/16/19Report date:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building K
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg K ResCheck.rck Page 5 of 9
08/16/19Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building K
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg K ResCheck.rck Page 6 of 9
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building K
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg K ResCheck.rck Page 7 of 9
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building K
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg K ResCheck.rck Page 8 of 9
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building K
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg K ResCheck.rck Page 9 of 9
08/16/19Report date:
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
0.00Above-Grade Wall
0.00Below-Grade Wall
0.00Floor
24.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
REScheck Software Version 4.6.5
Compliance Certificate
Project Oxoboxo Lofts Building L
Energy Code:2015 IECC
Location:New London, Connecticut
Construction Type:Multi-family
Project Type:Alteration
Orientation:Bldg. faces 180 deg. from North
Climate Zone:5 (5951 HDD)
Permit Date:
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Permit Number:
Compliance: Fails using prescriptive requirements for alteration projects
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1: Cathedral Ceiling 999 0.0 24.0 0.039 39
Wall 1: Solid Concrete or Masonry:No Insulation
Orientation: Front
405 0.333 108
Window 3: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
32 0.270 9
Door 1: Solid
Orientation: Unspecified
48 0.500 24
Wall 3: Solid Concrete or Masonry:No Insulation
Orientation: Back
405 0.333 118
Window 1: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
52 0.270 14
Wall 5: Solid Concrete or Masonry:No Insulation
Orientation: Left side
555 0.333 185
Wall 6: Solid Concrete or Masonry:No Insulation
Orientation: Right side
555 0.333 153
Window 4: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
96 0.270 26
Floor 1: All-Wood Joist/Truss:Over Unconditioned Space 128 0.0 0.0 0.249 32
Project Title: Oxoboxo Lofts Building L
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg L ResCheck.rck Page 1 of10
08/16/19Report date:
Project Title: Oxoboxo Lofts Building L
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg L ResCheck.rck Page 2 of10
08/16/19Report date:
Inspection Checklist
Requirements: 92.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.5
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building L
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg L ResCheck.rck Page 3 of10
08/16/19Report date:
Section
#
& Req.ID
Foundation Inspection Complies?Comments/Assumptions
303.2.1
[FO11]2
A protective covering is installed to
protect exposed exterior insulation
and extends a minimum of 6 in. below
grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is not applicable.
403.9
[FO12]2
Snow- and ice-melting system controls
installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is not applicable.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building L
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg L ResCheck.rck Page 4 of10
08/16/19Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.4
[FR1]1
Door U-factor.U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 08520
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07275
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building L
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg L ResCheck.rck Page 5 of10
08/16/19Report date:
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building L
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg L ResCheck.rck Page 6 of10
08/16/19Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.6
[IN1]1
Floor insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2,
402.2.7
[IN2]1
Floor insulation installed per
manufacturer’s instructions and
in substantial contact with the
underside of the subfloor, or floor
framing cavity insulation is in
contact with the top side of
sheathing, or continuous
insulation is installed on the
underside of floor framing and
extends from the bottom to the
top of all perimeter floor framing
members.
Complies
Does Not
Not Observable
Not Applicable
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building L
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg L ResCheck.rck Page 7 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building L
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg L ResCheck.rck Page 8 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building L
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg L ResCheck.rck Page 9 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building L
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg L ResCheck.rck Page 10 of10
08/16/19Report date:
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
0.00Above-Grade Wall
0.00Below-Grade Wall
0.00Floor
24.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
0.50Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
REScheck Software Version 4.6.5
Compliance Certificate
Project Oxoboxo Lofts Building M
Energy Code:2015 IECC
Location:New London, Connecticut
Construction Type:Multi-family
Project Type:Alteration
Orientation:Bldg. faces 90 deg. from North
Climate Zone:5 (5951 HDD)
Permit Date:
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Permit Number:
Compliance: Invalid U-Factor(s)
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1: Cathedral Ceiling 11,440 0.0 24.0 0.039 446
Wall 1: Solid Concrete or Masonry:No Insulation
Orientation: Front
832 0.333 179
Window 3: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
224 0.270 60
Door 1: Solid
Orientation: Unspecified
70 0.000 0
Wall 3: Solid Concrete or Masonry:No Insulation
Orientation: Back
832 0.333 202
Window 1: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
224 0.270 60
Wall 5: Solid Concrete or Masonry:No Insulation
Orientation: Left side
3,520 0.333 645
Window 5: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
1,064 0.270 287
Window 6: Wood Frame:Single Pane
Orientation: Unspecified
518 0.800 414
Wall 6: Solid Concrete or Masonry:No Insulation
Orientation: Right side
2,848 0.333 551
Window 4: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
896 0.270 242
Window 4 copy 1: Wood Frame:Single Pane
Orientation: Unspecified
228 0.800 182
Door 2: Solid
Orientation: Unspecified
70 0.500 35
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg M ResCheck.rck Page 1 of10
08/16/19Report date:
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Floor 1: Slab-On-Grade:Unheated
Insulation depth: 0.0'
544 0.0 1.042 567
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg M ResCheck.rck Page 2 of10
08/16/19Report date:
Inspection Checklist
Requirements: 94.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.5
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg M ResCheck.rck Page 3 of10
08/16/19Report date:
Section
#
& Req.ID
Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.2
[FO1]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.2
[FO3]1
Slab edge insulation
depth/length.
_____ ft _____ ft Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2.1
[FO11]2
A protective covering is installed
to protect exposed exterior
insulation and extends a
minimum of 6 in. below grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.9
[FO12]2
Snow- and ice-melting system
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg M ResCheck.rck Page 4 of10
08/16/19Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.4
[FR1]1
Door U-factor.U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 08520
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07275
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg M ResCheck.rck Page 5 of10
08/16/19Report date:
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg M ResCheck.rck Page 6 of10
08/16/19Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg M ResCheck.rck Page 7 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg M ResCheck.rck Page 8 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg M ResCheck.rck Page 9 of10
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg M ResCheck.rck Page 10 of10
08/16/19Report date:
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
0.00Above-Grade Wall
0.00Below-Grade Wall
0.00Floor
24.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
REScheck Software Version 4.6.5
Compliance Certificate
Project Oxoboxo Lofts Building M
Energy Code:2015 IECC
Location:New London, Connecticut
Construction Type:Multi-family
Project Type:Alteration
Orientation:Bldg. faces 90 deg. from North
Climate Zone:5 (5951 HDD)
Permit Date:
Construction Site:
42 Pink Row
Uncasville, CT 06382
Owner/Agent:
Dakota Partners
1264 Main Street
Waltham, MA 02451
Designer/Contractor:
Paul B. Bailey Architect LLC
110 Audubon Street
New Haven, CT 06510
203-776-8888
Permit Number:
Compliance: Fails using prescriptive requirements for alteration projects
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling 1: Cathedral Ceiling 837 0.0 24.0 0.039 33
Wall 1: Solid Concrete or Masonry:No Insulation
Orientation: Front
1,316 0.333 382
Window 3: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
168 0.270 45
Wall 3: Solid Concrete or Masonry:No Insulation
Orientation: Back
1,316 0.333 382
Window 1: Wood Frame:Double Pane with Low-E
Orientation: Unspecified
168 0.270 45
Floor 1: All-Wood Joist/Truss:Over Outside Air 204 0.0 0.0 0.249 51
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg JM Connector
ResCheck.rck
Page 1 of 9
08/16/19Report date:
Inspection Checklist
Requirements: 92.0% were addressed directly in the REScheck software
REScheck Software Version 4.6.5
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Pre-Inspection/Plan Review Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
103.1,
103.2
[PR1]1
Construction drawings and
documentation demonstrate
energy code compliance for the
building envelope. Thermal
envelope represented on
construction documents.
Complies
Does Not
Not Observable
Not Applicable
103.1,
103.2,
403.7
[PR3]1
Construction drawings and
documentation demonstrate
energy code compliance for
lighting and mechanical systems.
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
302.1,
403.7
[PR2]2
Heating and cooling equipment is
sized per ACCA Manual S based
on loads calculated per ACCA
Manual J or other methods
approved by the code official.
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Heating:
Btu/hr_____
Cooling:
Btu/hr_____
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg JM Connector
ResCheck.rck
Page 2 of 9
08/16/19Report date:
Section
#
& Req.ID
Foundation Inspection Complies?Comments/Assumptions
303.2.1
[FO11]2
A protective covering is installed to
protect exposed exterior insulation
and extends a minimum of 6 in. below
grade.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is not applicable.
403.9
[FO12]2
Snow- and ice-melting system controls
installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is not applicable.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg JM Connector
ResCheck.rck
Page 3 of 9
08/16/19Report date:
Section
#
& Req.ID
Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.3.1,
402.3.3,
402.5
[FR2]1
Glazing U-factor (area-weighted
average).
U-_____U-_____Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.3
[FR4]1
U-factors of fenestration products
are determined in accordance
with the NFRC test procedure or
taken from the default table.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 08520
402.4.1.1
[FR23]1
Air barrier and thermal barrier
installed per manufacturer’s
instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07275
402.4.3
[FR20]1
Fenestration that is not site built
is listed and labeled as meeting
AAMA /WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC
400 that do not exceed code
limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.5
[FR16]2
IC-rated recessed lighting fixtures
sealed at housing/interior finish
and labeled to indicate ≤2.0 cfm
leakage at 75 Pa.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
403.3.1
[FR12]1
Supply and return ducts in attics
insulated >= R-8 where duct is
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and
return ducts in other portions of
the building insulated >= R-6 for
diameter >= 3 inches and R-4.2
for < 3 inches in diameter.
Complies
Does Not
Not Observable
Not Applicable
Exception: Ducts located
completely inside the
building envelope.
403.3.5
[FR15]3
Building cavities are not used as
ducts or plenums.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4
[FR17]2
HVAC piping conveying fluids
above 105 ºF or chilled fluids
below 55 ºF are insulated to ≥R-
3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.4.1
[FR24]1
Protection of insulation on HVAC
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.6
[FR19]2
Automatic or gravity dampers are
installed on all outdoor air
intakes and exhausts.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg JM Connector
ResCheck.rck
Page 4 of 9
08/16/19Report date:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg JM Connector
ResCheck.rck
Page 5 of 9
08/16/19Report date:
Section
#
& Req.ID
Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled
or the installed R-values
provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.1.1,
402.2.6
[IN1]1
Floor insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2,
402.2.7
[IN2]1
Floor insulation installed per
manufacturer’s instructions and
in substantial contact with the
underside of the subfloor, or floor
framing cavity insulation is in
contact with the top side of
sheathing, or continuous
insulation is installed on the
underside of floor framing and
extends from the bottom to the
top of all perimeter floor framing
members.
Complies
Does Not
Not Observable
Not Applicable
402.1.1,
402.2.5,
402.2.6
[IN3]1
Wall insulation R-value. If this is a
mass wall with at least ½ of the
wall insulation on the wall
exterior, the exterior insulation
requirement applies (FR10).
R-_____
Wood
Mass
Steel
R-_____
Wood
Mass
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.2
[IN4]1
Wall insulation is installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg JM Connector
ResCheck.rck
Page 6 of 9
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
402.1.1,
402.2.1,
402.2.2,
402.2.6
[FI1]1
Ceiling insulation R-value.R-_____
Wood
Steel
R-_____
Wood
Steel
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies
table for values.
303.1.1.1,
303.2
[FI2]1
Ceiling insulation installed per
manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Section 07210
402.2.3
[FI22]2
Vented attics with air permeable
insulation include baffle adjacent
to soffit and eave vents that
extends over insulation.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
402.2.4
[FI3]1
Attic access hatch and door
insulation ≥R-value of the
adjacent assembly.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5
ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =_____ACH 50 =_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.3.4
[FI4]1
Duct tightness test result of <=4
cfm/100 ft2 across the system or
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in
tests, verification may need to
occur during Framing Inspection.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.3
[FI27]1
Ducts are pressure tested to
determine air leakage with
either: Rough-in test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the system including
the manufacturer’s air handler
enclosure if installed at time of
test. Postconstruction test: Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer’s air
handler enclosure.
_____ cfm/100
ft2
_____ cfm/100
ft2
Complies
Does Not
Not Observable
Not Applicable
Exception: All ducts and air
handlers are located within
conditioned space.
403.3.2.1
[FI24]1
Air handler leakage designated
by manufacturer at <=2% of
design air flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.1
[FI9]2
Programmable thermostats
installed for control of primary
heating and cooling systems and
initially set by manufacturer to
code specifications.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.1.2
[FI10]2
Heat pump thermostat installed
on heat pumps.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1
[FI11]2
Circulating service hot water
systems have automatic or
accessible manual controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg JM Connector
ResCheck.rck
Page 7 of 9
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
403.6.1
[FI25]2
All mechanical ventilation system
fans not part of tested and listed
HVAC equipment meet efficacy
and air flow limits.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.2
[FI26]2
Hot water boilers supplying heat
through one- or two-pipe heating
systems have outdoor setback
control to lower boiler water
temperature based on outdoor
temperature.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.1
[FI28]2
Heated water circulation systems
have a circulation pump. The
system return pipe is a dedicated
return pipe or a cold water supply
pipe. Gravity and thermos-
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.1.2
[FI29]2
Electric heat trace systems
comply with IEEE 515.1 or UL
515. Controls automatically
adjust the energy input to the
heat tracing to maintain the
desired water temperature in the
piping.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.2
[FI30]2
Water distribution systems that
have recirculation pumps that
pump water from a heated water
supply pipe back to the heated
water source through a cold
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 104ºF.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
403.5.4
[FI31]2
Drain water heat recovery units
tested in accordance with CSA
B55.1. Potable water-side
pressure loss of drain water heat
recovery units < 3 psi for
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement is
not applicable.
404.1
[FI6]1
75% of lamps in permanent
fixtures or 75% of permanent
fixtures have high efficacy lamps.
Does not apply to low-voltage
lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
404.1.1
[FI23]3
Fuel gas lighting systems have
no continuous pilot light.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg JM Connector
ResCheck.rck
Page 8 of 9
08/16/19Report date:
Section
#
& Req.ID
Final Inspection Provisions Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
401.3
[FI7]2
Compliance certificate posted.Complies
Does Not
Not Observable
Not Applicable
303.3
[FI18]3
Manufacturer manuals for
mechanical and water heating
systems have been provided.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title: Oxoboxo Lofts Building M
Data filename: F:\Proj 2016\PR 16-063 Uncasville\Documents\ComCheck\Bldg JM Connector
ResCheck.rck
Page 9 of 9
08/16/19Report date:
2015 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
0.00Above-Grade Wall
0.00Below-Grade Wall
0.00Floor
24.00Ceiling / Roof
_______Ductwork (unconditioned spaces):
Glass & Door Rating SHGCU-Factor
0.27Window
Door
Heating & Cooling Equipment Efficiency
_______Heating System:_________________________
_______Cooling System:_________________________
_______Water Heater:___________________________
Name:Date:
Comments
ACBEB
B
B
B
B
B
BB
ECBEXITEXITEXITEXITEXITSDSDSDSDSDSDSDSDSDSDSDBATHROOMBATHROOMBATHROOMBEDROOMCL -7'-6"BEDROOMLIVINGKITCHENCL -7'-6"CL -7'-6"BEDROOMBEDROOMBEDROOMKITCHENKITCHENLIVINGLIVINGCORRIDOREQ EQEQEQ1/32/3EQ7' - 0"EQB
B
4' - 10"EQEQ1/32/3BECBBB
B1/32/3EQEQ2/31/3EQEQ5' - 6" 3' - 11 5/8"EQEQEQEQEQ EQEQ EQAAAEQEQEQ 10' - 0" 10' - 0" 10' - 0" EQEQEQ3' - 7 1/2"B
BBB EQ EQ EQ4' - 10"3' - 6"EQ EQEQ EQEQ EQ4' - 10"B
B
BEQ EQEQ EQBB5' - 0 3/8"3' - 6" 6' - 6 3/4" 3' - 5 7/8"1/34' - 5" 4' - 5"AAAAEQ EQ4' - 7"EQ EQEQ EQEQ EQEQ 'A' EQ 'A'EQ 'B' EQ 'B'EQ EQ5' - 8 7/8"5' - 8 3/4"3' - 3"999EQEQBCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. DBBB
B
EEC
CABB
BBB
DECDB B
BB
EXITEXITEXITEXIT
SDSDSDSDSDSDSDSDSDBATHROOMBATHROOMBEDROOMBEDROOMBEDROOMBEDROOMBATHROOMKITCHENKITCHENKITCHENCORRIDORLIVINGLIVINGLIVINGCL -10' 0"CL -10' 0"6' - 6"EQEQEQEQ2/31/3EQEQ3' - 0"10' - 0"EQEQEQEQ1/32/3EQEQEQEQ2/31/32/31/3EQ 2"EQEQEQAAAAAAA4' - 7 3/8"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"EQEQ EQEQ BEQ BEQ AEQ AEQEQEQ EQEQ EQEQ EQEQEQEQ EQEQ B6' - 0"EQ BEQ EQEQ EQEQEQEQ EQAAAAEQ EQEQ EQEQ EQEQ EQEQ 'B'EQ 'B'EQ EQEQ EQEQ 'A' EQ 'A'A.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.3' - 0"3' - 0"3' - 0"EQ EQ999REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedA-A1.11BUILDING AREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"A-A1.111BLDG A - LEVEL 11/4" = 1'-0"A-A1.112BLDG A - LEVEL 2ABDECFGHJKLMNORTHSITE KEY PLANABNo. Description Date3 Permit Set 2/26/194 Addendum 03 4/12/199 Permit ReviewComments8/5/19
B-A2.27B-A6.356BBBBBBB
ACCCE
EXITSDSDSDSDBATHROOM1/32/3EQEQEQEQEQEQEQEQ6' - 4 5/8"6' - 4 5/8"8' - 0"3' - 6"4' - 0 1/4"4' - 0"EQEQEQEQBEDROOMBEDROOMKITCHENAAAEQ EQEQ EQEQ AEQ AEQ EQEQ BEQ BEQEQEQ EQEQEQEQ EQA.F.F.GWB on Mtl Stud7' - 6"EQEQ9B-A2.28B-A6.323BBBBAAAACCCCEXITEXITEXITEXITBSDSDSDSDSDBBSDBATHROOMEQEQ1/32/32/31/3EQEQEQEQ1/32/3EQEQEQEQEQEQEQEQEQEQEQEQ7' - 11 1/8"EQEQEQBEDROOMBEDROOMKITCHENEQ EQEQ EQEQ EQEQEQ EQEQEQ EQ2' - 4" 3' - 0" 1' - 6"EA.F.F.GWB on Mtl Stud7' - 6"7B-A5.67B-A5.6MIN.3' - 6"9BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedB-A1.12BUILDING BLEVEL B -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"B-A1.121BLDG B - LEVEL B, RCP (PART A)1/4" = 1'-0"B-A1.122BLDG B - LEVEL B, RCP (PART B)MATCH LINEMATCH LINEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
B-A2.27B-A6.398ACEBBBBBBBBBBCCCCB
EEXITSDSDSDSDSDSDBATHROOMBATHROOM3' - 6"EQEQ2/31/39' - 0 1/8"EQEQ2/31/3EQEQEQEQ2/31/36' - 5 3/4"6' - 5 3/4"EQ5' - 11 3/4"EQ5' - 0"6' - 0"4' - 0"4' - 11 3/8"8' - 8 1/8"6' - 6 1/8"1/32/3KITCHENBEDROOMBEDROOMBEDROOMKITCHENCH: 7'-0"AAEQ EQEQEQEQEQ EQEQEQEQ EQEQEQEQ EQ1' - 6"3' - 4"2' - 7"A20' - 0"EQ EQA.F.F.GWB on Mtl Stud8' - 0"9EQ EQ9AECBBB BEC BBBCEB BAEXITEXITEXITSDSDSDSDSDSDSDSDSDBATHROOMBATHROOMBATHROOMEQEQEQEQEQEQ2/31/3EQEQ1/32/3EQEQ2/31/31/32/31/32/35' - 0"EQEQ5' - 6"EQEQEQEQ2/31/3EQEQ1/32/3KITCHENBEDROOMKITCHENKITCHENBEDROOMBEQEQEQ EQBEQ EQEQEQAA15' - 0"2' - 2 7/8" EQEQEQEQEQEQ EQEQ EQEQ EQA.F.F.GWB on Mtl Stud8' - 0"A.F.F.GWB on Mtl Stud7' - 0"9A.F.F.GWB on Mtl Stud8' - 0"9BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedB-A1.13BUILDING BLEVEL ONE -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"B-A1.131BLDG B - LEVEL ONE, RCP (PART A)1/4" = 1'-0"B-A1.132BLDG B - LEVEL ONE, RCP (PART B)MATCH LINEMATCH LINEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
AACEBBBBBBBBBBCCCEXITSDSDSDSDSDSDEQEQEQ9' - 0"EQ1/32/3EQEQEQEQ2/31/3EQ7' - 0"EQ6' - 5 3/4"4' - 5 5/8"6' - 0"9' - 2 1/2"EQ9' - 0"EQ1/32/3EQ EQEQ EQEQEQEQEQEQEQ5' - 0"EQBEDROOMBEDROOMBEDROOMKITCHENBATHROOMA.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud8' - 0"BATHROOM9EQ EQ9AEBCBC
AABBB BEC BBBCEB BBEXITSDSDSDSDSDSDSDSDC1BATHROOMBATHROOMBATHROOMEQ14' - 0"EQEQEQ1/32/3EQEQBEDROOMKITCHENEQEQ1/32/3BEDROOMBEDROOMKITCHENKITCHEN1/32/3EQEQ2/31/3EQEQEQ8' - 0"EQEQEQ5' - 6"EQEQEQ EQ2/3 1/32/31/3EQEQEQ EQEQ EQBEQ EQEQEQBEQEQEQ EQEQ EQEQEQEQ EQEQEQEQ EQAAAEQ EQEQ 'C' EQ 'C'EQ 'B'EQ 'B'EQ 'A' EQ 'A'EQ EQEQ EQEQ EQA.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"999BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedB-A1.14BUILDING BLEVEL TWO -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"B-A1.141BLDG B - LEVEL TWO, RCP (PART A)1/4" = 1'-0"B-A1.142BLDG B - LEVEL TWO, RCP (PART B)MATCH LINEMATCH LINEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
AACEBBBBBBBBBBCCCEXITESDSDSDSDSDSDEQEQEQ 8' - 11 7/8" EQ1/3 2/3EQ EQ1/3 2/3EQ EQ4' - 6" 6' - 0" 9' - 8 1/8" 6' - 5 3/4"EQ 6' - 11 3/4" EQ1/3 2/3EQ 9' - 0" EQEQ EQEQ EQEQEQEQEQ EQ1' - 6"3' - 5"2' - 7"EQ EQEQEQBATHROOMA.F.F.GWB on Mtl Stud7' - 6"BEDROOMBEDROOMBEDROOMBATHROOMA.F.F.GWB on Mtl Stud7' - 0"KITCHENKITCHEN9EQ EQ9AEBCBC
AABBB BEC BBBCEB BEXITSDSDSDSDSDSDSDSDSDEQ EQ2/3 1/3EQ EQ2/3 1/3EQ 14' - 0" EQEQ EQEQ EQ1/3 2/3EQ EQ2/3 1/3EQ EQEQ 8' - 0" EQ1/3 2/3EQ EQEQ EQ5' - 6"2/3 1/3 0"EQ EQEQ EQEQ EQBEQ EQEQEQBEQEQEQ EQEQ EQEQ EQEQEQEQEQ EQEQ EQEQ EQEQEQ EQAAAAEQ EQEQ EQEQ 'C' EQ 'C'EQ EQEQ EQEQ 'A'EQ 'A'EQ EQEQ 'B' EQ 'B'BEDROOMBEDROOMBEDROOMBATHROOMBATHROOMBATHROOMA.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"999BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedB-A1.15BUILDING BLEVEL THREE -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"B-A1.151BLDG B - LEVEL THREE, RCP (PART A)1/4" = 1'-0"B-A1.152BLDG B - LEVEL THREE, RCP (PART B)MATCH LINEMATCH LINEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
AACEBBBBBBBBBBCCCEXITSDSDSDSDSDSDEQ EQEQ 9' - 0" EQ1/3 2/3EQ EQEQ EQ1/3 2/3EQ 7' - 5 3/4" EQ6' - 0"4' - 6" 6' - 0"EQ 9' - 0 3/8" EQEQEQEQEQEQ EQEQ EQEQ EQEQ EQEQ EQEQ 5' - 0" EQBATHROOMBEDROOMBEDROOMBEDROOMBATHROOMKITCHENA.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.9EQ EQ9AEBCBC
AABBB BEC BBBCEB BBEXITSDSDSDSDSDSDSDSDSDEQ EQ2/3 1/3EQ EQEQ 14' - 0" EQEQ EQ1/3 2/3EQ EQ2/3 1/3EQ 8' - 0" EQEQ EQ1/3 2/3EQ EQ5' - 6"EQ EQ2/3 1/3EQ EQEQEQEQEQBBEQ EQEQEQ EQEQEQEQEQ EQEQ EQEQ EQEQ EQEQ EQAEQ EQEQ EQBEDROOMBATHROOMBATHROOMBATHROOMBEDROOMBEDROOMEQEQEQ EQW.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.A.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"W.B.W.B.W.B.W.B.W.B.999BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedB-A1.16BUILDING BLEVEL FOUR -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"B-A1.161BLDG B - LEVEL FOUR, RCP (PART A)1/4" = 1'-0"B-A1.162BLDG B - LEVEL FOUR, RCP (PART B)MATCH LINEMATCH LINEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/194 Addendum 03 4/12/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
CEC
BEB
BBBB BB
BSDSDSDSDSDSD2/31/3EQEQ2/31/3EQEQEQ5' - 5 5/8"EQ2/31/3EQEQ2/31/3EQEQ1/32/3EQEQ8' - 0"5' - 6 1/8"BEQ EQEQ9' - 0"EQEQEQEQ EQEQEQEQ EQ9EQEQ
9B CE
B CBB
E
B
BBBB BB
BSDSDSDSDSDSD7' - 0 3/8"4' - 0"1/32/3EQEQEQ7' - 0"EQ1/32/3EQEQEQEQ4' - 9 3/4"5' - 6 5/8"4' - 11 3/8"EQEQEQ8' - 0"EQEQEQEQEQ2/31/3EQEQ2/31/3EQ EQEQEQEQ EQEQ EQ
EQEQ9
SD992/31/3BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedC-A1.11BUILDING CREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"C-A1.111BLDG C - LEVEL ONE, RCP1/4" = 1'-0"C-A1.112BLDG C - LEVEL TWO, RCPABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMBATHROOMBATHROOMCL -7' 0"CL -7' 0"BEDROOMKITCHENBEDROOMCL -7' 0"CL -7' 0"KITCHENBEDROOMKITCHENKITCHENBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMNo. Description Date3 Permit Set 2/26/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
ABCEB
B
B
B
B B
B
BCECACCEXITSDSDSDSDSD2/3 1/3EQ EQ1/3 2/3EQEQEQ EQ2/3 1/3EQ EQEQ 9' - 0" EQEQ 7' - 0" EQ5' - 0"2/3 1/3EQ EQEQ EQEQEQEQ EQEQEQEQ EQEQEQEQ EQEQ EQEQ EQEQEQEQ EQEQ EQEQ EQ9SDMIN.3' - 6"99BBB
B
B
B
B B
B
ACCEEBABSDSDSDSD SD1/3 2/3EQ EQ2/3 1/3EQ EQ1/3 2/3EQ EQEQ 7' - 0" EQ2/3 1/3EQ EQEQ 8' - 0" EQEQ 7' - 0" EQ5' - 0"2/3 1/3EQ EQEQ EQEQ EQEQ EQEQ EQEQEQEQ EQEQEQEQ EQEQ EQ99SD9BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedD-A1.11BUILDING DREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"D-A1.111BLDG D - LEVEL ONE, RCP1/4" = 1'-0"D-A1.112BLDG D - LEVEL TWO, RCPNOTE: CEILINGS IN BLDG 'D', 1ST FLOOR, SHALL BE @ 9'A.F.F. ABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMBATHROOMBATHROOMELECTRICAL ROOMKITCHENKITCHENBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMCL -8' 0"CL -8' 0"No. Description Date3 Permit Set 2/26/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
EBAAAAAAAAABBBBBBBB B
EXITEXITSDSDSDSDSDSDSD1/3 2/3EQ 6' - 0" EQEQ EQ1/3 2/3EQ EQEQ EQEQ 6' - 0" EQEQ EQEQ EQEQ 7' - 0" EQEQ A EQ B EQ B EQ AEQ 1EQ 2EQ 2EQ 1EQEQEQ EQEQ EQ4' - 0"EQAAABBBBB
B B
B
B
BEECCCCCCCSD SDSDSDSDEQ EQEQ EQEQ 7' - 0" EQEQ EQEQ EQ2/3 1/3EQ EQ2/3 1/3EQ EQ1/3 2/31/3 2/3EQ 6' - 0" EQEQ EQEQ 8' - 0" EQEQ EQEQ EQEQ EQEQ EQEQ EQEQ EQ7' - 11 5/8"8' - 0"99SD9BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedE-A1.11BUILDING EREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"E-A1.111BLDG E - LEVEL ONE, RCP1/4" = 1'-0"E-A1.112BLDG E - LEVEL TWO, RCPNOTE: CEILINGS IN BLDG 'E', 1ST FLOOR, SHALL BE @ 9'A.F.F. ABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMBATHROOMCL: 8' 0"CL: 8' 0"No. Description Date3 Permit Set 2/26/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONEXITCBB2/3 1/3
EQ7' - 0"EQ BEQEQ
2/31/3B1/32/3EQ 7' - 0"EQC
EQ EQ
EQEQCBB1/32/3EQEQEQ EQ
2/31/3EQEQEQEQEQ EQ
EQEQB3' - 0"EQ EQB1/32/3B3' - 0"EQ7' - 0"EQ EQEQ
BB
3' - 0"EQEQ2/31/3EQ7' - 1"EQ
BBEQ9' - 0"EQEQEQBEQ EQ
EQ EQCB2/31/3EQ EQEQ
EQEQEQ
B
EQEQ
3' - 0"BBBBBEQ 7' - 0"EQ
2/31/3BBB1/32/3EQ7' - 0"EQ3' - 0"EQ EQCCEQEQEQEQEQEQEQEQB2/31/3EQ EQ
B
EQ EQ
1/32/3B 3' - 0"EQEQBB EQ7' - 0"EQ 2/31/3W.B.W.B.W.B.W.B.W.B.W.B.W.B.A.F.F.GWB on Mtl Stud7' - 6"W.B.W.B.BATHROOMBATHROOMA.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"BATHROOMBATHROOMBATHROOMW.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.A.F.F.GWB on Mtl Stud7' - 6"BATHROOMW.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.A.F.F.GWB on Mtl Stud7' - 6"W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.A.F.F.GWB on Mtl Stud7' - 6"AAAAAAAAAAAEQ EQEQ EQSDSDEFEFSDUNIT G5SDSDEFEFUNIT G6UNIT G7SDEFEFSDEFUNIT G8SDEFSDUNIT G4SDEFEFSDEFUNIT G3SDEFSDEFUNIT G2SDBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMKITCHENKITCHEN KITCHENKITCHENKITCHENKITCHEN KITCHENLVINGLVING LVINGLVINGLVINGLVINGLVINGMIN. 3'-6"9999999ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedG-A1.11BUILDING GLEVEL 1 -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063ABDECFGHJKLMNORTHSITE KEY PLAN1/4" = 1'-0"G-A1.111BUILDING G REFLECTED CEILING PLANNo. Description Date3 Permit Set 2/26/194 Addendum 03 4/12/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONCCCEQEQEQ EQEQEQEQ EQEQEQEQCEQ
EQEQEQ
B
B2/31/3EQ EQ
EQEQ
1/32/3B
1/32/3EQ EQBEQEQEQEQ
BBEQEQEQ EQ EQ
BBEQ 7' - 0"EQ1/3 2/3
B
EQ EQ
3' - 0"B1/3 2/3
EQ EQ
10' - 0"10' - 0"10' - 0"3' - 6"4' - 6"10' - 0"A.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"BATHROOMBATHROOMBATHROOMAAAAAAAW.B.W.B.W.B.W.P.W.P.W.P.W.P.W.B.W.P.W.B.W.B.W.B.W.B.W.B.W.B.W.B.AEFEFSDSDSDSDEFEFUNIT G1EFUNIT G9SDSDBEDROOM BEDROOMBEDROOMBEDROOMKITCHENKITCHENLIVINGLIVINGLIVINGKITCHENSD999SD9ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedG-A1.12BUILDING GLEVEL 1 -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/194 Addendum 03 4/12/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
AAAADB
B
B
B
BBBEXIT SDSDSDSDSDSDSDEQ
EQ
2/31/3EQ
EQ
1/32/3EQ
9' - 0"
EQ EQEQBEQ EQ
EQEQBEQEQEQ A EQ A
BB5' - 10"10' - 0 1/8"5' - 9 7/8"EQ B EQ BBEQEQEQEQEQEQ8' - 0"10' - 0"
8' - 0"
7' - 0"
EQ EQ
6' - 0 1/8"10' - 0"10' - 0"E Q
EQEQ
EQEQ
EQ
AAAAAAAAAABATHROOMCEFEQEQ
A.F.F.GWB on Mtl Stud7' - 6"EQEQBEDROOMKITCHENE BEQEQ2/3 1/3SD
EFLIVINGUNIT H1W.P.W.P.W.P.W.P.W.P.AAEXITEXITKITCHENEF LIVINGBEDROOMUNIT H2W.P.W.P.W.P.9SD99SD9BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedHJ-A1.11BUILDING HREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"HJ-A1.111BLDG H - LEVEL ONE, RCPABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/194 Addendum 03 4/12/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
ACCCCCB
B
B
B
B
B
B
BBBABBB
B
B
B
B
BBBBBBEEEEEEXITEXITSD SDSDSDSDSDSDSDSDSDSDSD2JM-A1.12JM-A1.1EQEQ1/3
2/3 EQEQ2/3 1/3
EQ9' - 0"EQEQEQEQ10' - 0"EQ10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"EQ EQ
BBBEQEQEQEQ
BBB
EQEQ3 ' - 0"
3' - 0"EQEQEQEQEQ
EQEF
BATHROOMA.F.F.GWB on Mtl Stud7' - 6"
EQEQEQEQ
KITCHENLIVINGBEDROOMBEDROOMBEDROOMUNIT H26' - 6"UNIT J81/32/3EQ
EQ BEDROOMKITCHENEQ
EQ
3' - 6"2/31/3EQ
EQEFEQ
EQ EQEQEQEQ3' - 0 "3' - 6"6' - 0"7' - 9"7' - 9"12' - 5"
6' - 0"EQEQEQEQEFEFEQEQEQEQ
W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.2/31/3EQ
EQ
BEDROOMBATHROOMA.F.F.GWB on Mtl Stud7' - 6"W.P.W.P.W.P.W.P.LIVINGLIVINGBATHROOMA.F.F.GWB on Mtl Stud7' - 6"W.P.W.P.W.P.W.P.W.P.EQEQEQEQ3' - 0"KITCHENEFEQEQW.P.W.P.W.P.W.P.W.P.AAAAAAAAAAAAW.P.W.P.W.P.UNIT J7BEDROOMKITCHENEFLIVINGW.P.W.P.W.P.W.P.W.P.BEQ
EQ4' - 0"4' - 0"6' - 0"W.P.W.P.W.P.W.P.EQ EQ
1/32/3EQEQEQ
EQEFA.F.F.GWB on Mtl Stud7' - 6"BATHROOMBEDROOMUNIT J1BATHROOMEQEQEQEQUNIT J2EFA.F.F.GWB on Mtl Stud7' - 6"W.P.1/32/3EQEQ W.P.W.P.W.P.EQEQ4' - 0"W.P.W.P.W.P.4' - 0"9' - 7"4' - 0"EQEQ
BEDROOMLIVINGKITCHEN4' - 0"EQ
EQ BEQEQEQ EQEFW.P.W.P.W.P.BEDROOMEQEQEQEQ1/32/3EQ EQSD
9SD9SD99SD9SDSD99SD99BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedHJ-A1.12BUILDING JREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"HJ-A1.121BLDG J - LEVEL ONE, RCP (PART A)ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/194 Addendum 03 4/12/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
CCCCCCB
B
B
B
B
B
B
B
B
B
B
B
B BBBBEEEEEE XITEXIT
SDSDSDSDSDSDSDSDSDSDSDSDSDSDBEQEQEQ EQ
BEQ EQ
EQEQBEQEQEQ EQEQEQEQEQBEQEQEQEQBB
B
B
EQ EQ
EQEQEQEQEQ EQ
10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"9' - 11 1/2"
10' - 0"
4' - 5"EQEQEQ EQ
10' - 0"10' - 0"EQEQBEQ E Q2/31/31/32/3EQ
EQLIVING
W.P.BEDROOMW.P.W.P.W.P.EQEQEQ EQ
EQ
EQ
4' - 0"9' - 1"4' - 0"KITCHENEFW.P.EQEQ4' - 0"W.P.W.P.W.P.W.P.W.P.A.F.F.GWB on Mtl Stud7' - 6"EFBEDROOMBATHROOM1/32/3EQ
EQ W.P.W.P.EQ
EQ1/32/3BEDROOMBATHROOMEFA.F.F.GWB on Mtl Stud7' - 6"W.P.W.P.W.P.EQEQ4' - 0"10' - 2"4' - 0"LIVINGEQEQEQEQ
EFKITCHENEQEQ4' - 0"W.P.W.P.UNIT J3UNIT J4UNIT J5EFBATHROOMA.F.F.GWB on Mtl Stud7' - 6"LIVINGEQEQ
EQEQEFKITCHEN4' - 0"4' - 0"6' - 0"4' - 0"4' - 0"B EQEQEQEQEFBATHROOMA.F.F.GWB on Mtl Stud7' - 6"BEDROOMW.P.W.P.W.P.W.P.W.P.W.P.AAAAAAAAAAAAAAA.F.F.GWB on Mtl Stud7' - 6"EFBATHROOMBEDROOM1/32/3EQ
EQ W.P.W.P.W.P.W.P.BEDROOM2/31/3EQ
EQW.P.W.P.W.P.W.P.EQEQEQEQ
EFKITCHENB
B 4' - 0"4' - 0"EQEQEQ
EQ
LIVINGB4' - 0"4' - 0"7' - 2"4' - 0"UNIT J6W.P.W.P.W.P.W.P.2/31/3EQ
EQ
BEDROOMEFA.F.F.GWB on Mtl Stud7' - 6"BATHROOM9SD9SD9W.P.W.P.SD99SD99BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedHJ-A1.13BUILDING JREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"HJ-A1.131BLDG J - LEVEL ONE, RCP (PART B)ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/194 Addendum 03 4/12/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. AACCCCBBBBB
BBBBB
BB
E
EEBE
EXITEXITSDSDSDSDSDSDSDSDSDSDSDSDSDSD1/3 2/3
EQEQBEQEQEQEQ
EQ EQ
EQEQEQEQEQ
EQAAAAEQ
EQ
EQ
EQ
EQEQ
AEQ
EQEQEQEQEQ
AEQEQ EQEQBBEQ
EQ
BB1/3EQEQBEDROOM UNIT K2EFBATHROOMA.F.F.GWB on Mtl Stud7' - 6"
EQEQ
4' - 0"4' - 0"
9' - 11"
4' - 0"LIVINGEQEQKITCHENEQ EQ
EQEQEF2/3
1/3 EQEQBEDROOMBEQEQ
EQEQW.P.W.P.W.P.W.P.W.P.W.P.W.P.EQEQEQEQ
EFKITCHENLIVINGB4' - 0"
4' - 0"EQEQEQEQEQEQ
4' - 0"EFA.F.F.GWB on Mtl Stud7' - 6"BATHROOMBEDROOM1/3 2/3
EQEQUNIT K1W.P.W.P.W.P.W.P.W.P.BEDROOM1/32/3
EQEQW.P.W.P.EQ EQ4' - 0"EFBATHROOMA.F.F.GWB on Mtl Stud7' - 6"W.P.LIVINGBEQEQEQEQ
4' - 0"
10' - 11"
4' - 0"EQEQKITCHENEFEQ EQEQEQEF EFKITCHENLIVINGUNIT K4UNIT K3EQEQEQ
EQA.F.F.GWB on Mtl Stud7' - 6"BATHROOMB4' - 0"11' - 11"
4' - 0"EQEQEQEQEQEQ4' - 0"W.P.W.P.W.P.W.P.BEDROOMW.P.W.P.9W.P.9W.P.9W.P.SD99REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedK-A1.11BUILDING KREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"K-A1.111BLDG K - LEVEL 1 CEILINGABDECFGHJKLMNORTHSITE KEY PLANMATCH LINE BUILDING MMATCH LINE BUILDING MNo. Description Date3 Permit Set 2/26/194 Addendum 03 4/12/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
EAAEEEB
B
B
B
B BBBBB
B
BBBBBBB
EXITEXIT
EXIT
SDSDSDSDSDSDSDSDSDSDSDSDSDEQEQEQ EQ
EQEQ
EQEQEQEQEQ EQ
AAAAAAAAEQ EQEQEQEQEQEQALIVINGUNIT M1W.P.BATHROOMEFA.F.F.GWB on Mtl Stud7' - 6"EQEQEQ EQEFKITCHENB4' - 0"10' - 4"4' - 0"6' - 0"2/31/3EQ
EQ
W.P.W.P.W.P.W.P.W.P.UNIT M21/32/3EQ
EQ
W.P.A.F.F.GWB on Mtl Stud7' - 6"EFBATHROOMLIVINGB
B
4' - 0"4' - 0"EQEQ6' - 0"KITCHENEQEQEQEQEF
W.P.W.P.W.P.W.P.UNIT M62/3
1/3EQ EQBEDROOMBEDROOMBEDROOM2/3 1/3EQEQBEDROOMKITCHENB
B
B
6' - 0"4' - 0"4' - 0"EQEQEQEQ
EQEQEFLIVINGBATHROOMEQ EQEQ
EQEFA.F.F.GWB on Mtl Stud7' - 6"BEDROOM3' - 4"6' - 9"EQEQ 3' - 4"6' - 9"EQEQ
BEDROOMW.P.W.P.W.P.W.P.W.P.W.P.W.P.B 4' - 0"10' - 4"4' - 0"6' - 0"EQEQEQEQKITCHENEFEF
BATHROOMA.F.F.GWB on Mtl Stud7' - 6"W.P.W.P.W.P.W.P.W.P.UNIT M7LIVINGW.P.W.P.BEDROOMW.P.B1/32/3 EQEQSDABSDEFEEQEQEQEQ
EQ EQ
DD3' - 0"4' - 6"3' - 0"3' - 0"DD3' - 0"3' - 0"4' - 9"3' - 0"DD3' - 0"3' - 0"5' - 9"3' - 0"DD3' - 0"9' - 5"3' - 0"3' - 0"W.P.9SD9EQ EQ
W.P.W.P.W.P.99SD9W.P.9BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedM-A1.11BUILDING MREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"M-A1.111BLDG M - LEVEL ONE, RCP (PART A)ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/194 Addendum 03 4/12/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
AAAACCCCCDDDDEEEEESDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDB B
B
B
B
B
BB
B
B
B
BBBBBBBB
BBB
EEFBATHROOMEQEQEQEQ
A.F.F.GWB on Mtl Stud7' - 6"
EQ EQEQEQKITCHENEF B
5' - 0"13' - 1"5' - 0"6' - 0"W.P.W.P.LIVINGUNIT M82/31/3EQ EQBEDROOM 2/31/3EQ EQBEDROOM
W.P.W.P.W.P.W.P.W.P.EQEQ1/32/31/32/3EQ EQ
BEDROOMBEDROOMW.P.W.P.W.P.W.P.W.P.W.P.W.P.LIVINGKITCHENEQEQEQEQ
EFEFEQEQEQ
EQB
6' - 0"5' - 0"13' - 1"5' - 0"BATHROOMA.F.F.GWB on Mtl Stud7' - 6"
EQEQEQEQEQEQEQEQEF
BATHROOMA.F.F.GWB on Mtl Stud7' - 6"UNIT M9UNIT M10B 6' - 0"4' - 0"10' - 2"4' - 0"3' - 0"3' - 0"D3' - 0"EQEQDDDD3' - 0"3' - 0"3' - 0"3' - 0"3' - 0"3' - 0"6' - 10"3' - 4"EQEQ 1/32/3EQEQLIVINGBEDROOMBEDROOM
KITCHENEFEQEQEQ EQKITCHENEF3' - 0"EQEQB
5' - 0"13' - 6"5' - 0"UNIT M3LIVING3' - 4"6' - 8"EQ
EQ BEDROOMBATHROOMEQEQEQEQEFA.F.F.GWB on Mtl Stud7' - 6"W.P.W.P.W.P.W.P.W.P.W.P.2/31/3EQ
EQ
BEDROOMBATHROOMEQEQEQ EQ
EFA.F.F.GWB on Mtl Stud7' - 6"LIVINGUNIT M4B
B
5' - 0"5' - 0"EQEQ6' - 0"
6' - 0"D3' - 0"7' - 5"3' - 0"3' - 0"EQEQEQEQ
EFKITCHEN2/31/3BEDROOMBEQEQ EFBATHROOMEQEQEQEQA.F.F.GWB on Mtl Stud7' - 6"W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.EQEQ
9SD9W.P.W.P.W.P.EQ EQSDW.P.W.P.W.P.W.P.9EQEQ
SD9W.P.SD9W.P.9SD9BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedM-A1.12BUILDING MREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"M-A1.121BLDG M - LEVEL ONE, RCP (PART B)ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/194 Addendum 03 4/12/196 Construction Set 6/11/199 Permit ReviewComments8/5/19
AAAAAADDDDCCCCEEEEBBBBEXIT
SDSDSDSDSDSDSDSDSDSDSDSDSDB
B
B
B
B
B
B
B
B
B
B
BUNIT M11EFBATHROOMW.P.UNIT M5EQ EQEQ
EQEFA.F.F.GWB on Mtl Stud7' - 6"
EQEQ
EQEQEQEQ3' - 0"
EQ
EQ 1/32/3BEDROOMKITCHENB 4' - 0"10' - 5"4' - 0"LIVINGW.P.W.P.W.P.W.P.W.P.2/31/3EQEQ
W.P.W.P.W.P.FSPRINKLER ROOMBEQ
EQ1/32/3BEDROOMB
EQEQEQEQKITCHENEF4' - 0"9' - 9"4' - 0"LIVING3' - 0"EQEQ1/32/3EQ
EQ BEDROOMEFEQEQEQ
EQA.F.F.GWB on Mtl Stud7' - 6"BATHROOMW.P.W.P.W.P.W.P.W.P.W.P.W.P.W.P.SDW.P.W.P.W.P.W.P.9EQEQW.P.9SD9SD9SD9W.P.9BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedM-A1.13BUILDING MREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-0631/4" = 1'-0"M-A1.131BLDG M - LEVEL ONE, RCP (PART C)ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/194 Addendum 03 4/12/199 Permit ReviewComments8/5/19