HomeMy WebLinkAbout2019-07-16 Addendum 6 Revised
Information contained in this document is proprietary and confidential and may not be disseminated to any party other than the intended recipient without the written consent of Paul B. Bailey Architect, LLC.
ADDENDUM 6
Issue Date: July 15, 2019, Revised July 16, 2019
Oxoboxo Lofts
42 Pink Row, Uncasville, CT
General Information:
This Addendum shall become a part of the Contract and the Contractor shall be bound thereby.
Changes to the Drawings and Specifications Following the Final Construction Documents dated
10/12/2018.
This Addendum reflects changes to the floor levels in Buildings G, H, J, K, M and J/M Connector,
and associated site work.
1. Site drawing sheets:
C-4.0 with hand-written notes indicating the new scope of work.
2. Architectural drawing sheets:
LS 1.7 with hand-written notes indicating the new scope of work.
A5-1 with hand-written notes indicating the new scope of work.
END OF ADDENDUM 6