HomeMy WebLinkAboutP_R19OA
L2.2
L2.A
L2.B
L2.C
L2.D
L2.E
L2.F
L2.G
L2.H
L2.J
L2.K
L2.1
O1 O2 O3 O4 O5
W1 W2 W3 W4 W5
W6
W7 W8 W9
L2.L
4.5
BUILDING D
BUILDING B
BUILDING C
BUILDING G
BUILDING A
UNIT A-1
(2 BEDROOM)
UNIT A-2
(1 BEDROOM)
UNIT B-3
(1 BEDROOM)TYPE 'A'
UNIT B-4(2 BEDROOM)
UNIT B-5(1 BEDROOM)
UNIT B-6(1 BEDROOM)
UNIT B-7(STUDIO)
UNIT A-2
(2 BEDROOM)
WCO
2"ø2" W UP& DN
4"ø 3"ø 3"ø3/4"ø
4" WUP&DN
L-1
WC-1
B-1
S-1
L-1
WC-1
B-1
S-1
3" HW & 1" HWR DN
S-1
S-1
L-1
WC-1
B-1
L-1
SH-1
L-1
WC-1
B-1
L-1
WC-1
B-1L-1
WC-1B-1
L-1
WC-1B-1
S-1
S-1
S-1
2"ø2"ø
1 1/2"ø 1 1/2"ø
1 1/2"ø
2"ø
3" V UP
2"ø
1 1/2"ø
2"ø
2 1/2"ø
3" VUP
2 1/2"ø
2"ø2"ø
1 1/2"ø1 1/2"ø2"ø
3" VUP
1 1/2"ø
2"ø2"ø
1 1/2"ø
2 1/2"ø3" VUP
2"ø
1 1/2"ø
3"ø
2"ø
2 1/2"ø
1 1/2"ø
3" VUP
1 1/2"ø
3" V UP
3" V UP
2"ø2"ø
1 1/2"ø
2 1/2"ø
2"ø
4" W UP
2"ø
HP1
2"ø
3/4" CONDENSATEDRAIN WITH INDIRECTWASTE CONNECTIONTO NEAREST SANITARY,VERIFY LOCATION ANDROUTING IN FIELD(TYPICAL)
2"ø
2"ø
3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL)
HP1
HP1
HP1
HP1
3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL)
3"ø
6"ø3"ø DCW3"ø DHW1"ø DHWR2"ø DCW2"ø DHW1"ø DHWR1/2"ø1/2"ø
1"ø
2"ø
2"ø
3" V UP
2"ø
6" SAN UP& DN IN WALL
6"ø
HP1
S-1 4"
4"
HP1
6"ø
4"ø W
4" SANITARY FROMBATHROOM GROUPSABOVE (TYPICAL)
FCO
WC-1
9
FCO
FCO
A B
D E
C F
G H J
K
L M
NORTH
SITE KEY PLAN
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-PB1.1
PLUMBING PLANBLDG 'A'-LEVEL 1
BLDG 'B'-LEVEL 1
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2017
16-063
No.Description Date
1
6 Arch Revisions 12/20/19
8 Addendum 8 11/15/19
9 02/14/2020
PSK ABC-PB1.1R1
PSK ABC-PB1.1R1
OA
L2.2
L2.A
L2.B
L2.C
L2.D
L2.E
L2.J
L2.K
L2.M
L2.N
L2.1
O1 O2 O3 O4 O5
W1 W2 W3 W4 W5
W6
W7 W8 W9
L2.L
4.5
UNIT B-1(2 BEDROOM)
TYPE A
UNIT B-2(2 BEDROOM)
UNIT C-3(2 BEDROOM)TYPE A UNIT C-4
(2 BEDROOM)TYPE A
ELEVATOR
BUILDING B
BUILDING C
BUILDING A
CRAWL SPACE
BUILDING G
BUILDING D
BUILDING F
1" HWR UP&DN
3" HW UP&DN
3" CW UP&DN
L-1
WC-1
B-1 S-1
L-1WC-1
B-1
S-1
L-1WC-1
B-1
S-1
L-1
WC-1
B-1
S-1
3" VDN,4"VTR
1 1/2"ø
1/2"ø1/2"ø
3/4"ø
1/2"ø
1/2"ø
3/4"ø1/2"ø
1/2"ø
1/2"ø1/2"øERV-1
HP-5
HP2
HP2
HP21"ø1/2"ø1"ø3/4"ø
3/4"ø3/4"ø1/2"ø1/2"ø
1/2"ø1/2"ø
1/2"ø1/2"ø 1/2"ø1/2"ø1/2"ø1/2"ø1/2"ø
1/2"ø
3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL)
3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL)
YCO
6" SANITARY FROM BUILDING B,SEE DRAWING ABC-PB1.SB FORCONTINUATION
HP2
1 1/2"ø 1/2"ø1/2"ø
3/4"ø
1 1/2"ø
FCO
3/4" CW FROMBOLOW
3/4" HW & 1/2" HWRFROM BELOW
6" SAN UP & DN
FCO
1/2"ø1/2"ø
4"ø1 1/
2
"
ø
4"ø
9
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-PB1.B
PLUMBING PLANBLDG A-CRAWL SPACE
BLDG 'B'-LEVEL B
BLDG 'C'-LEVEL 2
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2017
16-063
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
1
6 Arch Revisions 12/20/19
8 Addendum 8 11/15/19
9 02/14/2020
PSK ABC-PB1.BR1
9
PSK-ABC-PB1.BR1
BFP
L2.2
L2.A
L2.B
L2.C
L2.D
L2.E
L2.F
L2.H
L2.J
L2.1
L2.L
4.5
UNIT C-1
(2 BEDROOM)
UNIT C-2(2 BEDROOM)
STAIR 2
ELECTRICALMETERROOM
MAINTENANCEROOM
BUILDING B
BUILDING C
BUILDING A
(ABOVE)
BUILDING D
BUILDING G
ET2
B1
TMV1
P2
(2) 300 GALLON INDIRECT HOT WATERSTORAGE TANKS SEE 11/P3.2 FORPIPING DIAGRAM
GAS FIRED DOMESTICHOT WATER BOILER
FOR DOMESTIC WATERSERVICE INSTALLATIONSEE 7/P3.1
3"CW UP
6" SANITARY FROM ABOVE,PROVIDE CLEANOUT AT BASEOF RISER
3/4"ø
4"ø W
2"ø V
1 1/2"ø
1 1/2"ø
1 1/2"ø
4"ø W1 1/2" V UP
1 1/2" V UP
1/2" H&CW DNTYP OF BATHTUB
3/4"ø DHWR
4" SANITARY FROM BUILDING E,SEE DRAWING DE-PB1.1 FORCONTINUATION
3"HW UP
1"HWR FROM ABOVE
S-1
L-1
WC-1
B-1
WC-1
L-1
S-1
4" SANITARY TO BUILDING F,SEE DRAWING F-PB1.1 FORCONTINUATION
1 1/4" GAS FROMBUILDING F, SEEDRAWING F-PB1.1 FORCONTINUATION
2"ø DCW
3/4" HW AND1/2" HWR UP
3/4" CWUP
L-1
1 1/2" CW TO BUILDING F,SEE DRAWING F-PB1.1FOR CONTINUATION
B-1
SANITARY PIPING FROMRESPECTIVE FIXTURESABOVE (TYPICAL FOR ALL)
SANITARY PIPING FROMRESPECTIVE FIXTURESABOVE (TYPICAL FOR ALL)
3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL)
1 1/2"ø
CWFCO
CO
YCO
6" SANITARY TO BUILDING F,SEE DRAWING F-PB1.1 FOR CONTINUATION
ET1
G G
PRESSURE REDUCING VALVE BYPLUMBING CONTRACTOR, SIZE ASPER BOILER REQUIREMENTSG
4"ø
2"ø
P1
AS1
AS2
3"ø
4" CW SERVICE IN, SEESITE UTILITY PLAN FORCONTINUATION
SPRINKLER SERVICE, FIREDEPT CONNECTION ANDBACKFLOW EQUIPTMENT,SEE FIRE PROTECTIONDRAWINGS
G
HP23" V UP
4"ø
NEW SERVICE EJECTOR PIT WITHDUPLEX PUMP SET.PROVIDE ACCESSIBLE CHECK VALVEON DISCHARGE CONNECTION TOGRAVITY SANITARY AS REQUIREDAND VENT CONNECTION AS SHOWN."HOMA" GRINDER SERIES#GRP16/3, OR APPROVED EQUAL.1.5HP, 208V, 3, 25 GPM, 14 FT. HD.FIBERGLASS BASIN WITH ACCESSIBLECOVER, DUPLEX CONTROL PANEL
CO
FD-1
2"ø 2 1/2"ø
FD-1 4"ø2"ø HP2
4"3"øCO
CO
6"
INSULATED ENCLOSUREBY ARCHITECT ALONGRETAINING WALL FORSANITARY MAIN BYARCHITECT
9
2"ø
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-PB1.SB
PLUMBING PLANBLDG 'B'-LEVEL SB
BLDG 'C'-LEVEL 1
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2017
16-063
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
1
6 Arch Revisions 12/20/19
8 Addendum 8 11/15/19
9 02/14/2020
PSK ABC-PB1.SBR1
PSK-ABC-PB1.SBR1
DN
1
A
B
2
OA
O1 O2 O3 O4 O54.5
BUILDING D
UNIT D-1(2 BEDROOM)
UNIT D-2(1 BEDROOM)
ENTRYVESTIBULE
OFFICE
KITCHEN
FITNESSROOM
JAN.COMMUNITYROOM
BUILDING E
1/2"ø DHW
1" C&HW UP
1/2"C&HWUP 1 1/2"CW & 1 1/4"HW UP
1/2"ø
1/2"ø1/2"ø1"ø DHW
1"ø DCW 1/2"ø
1/2"ø1/2"ø1/2"ø1/2"ø
4"ø4"ø W
4"ø W UP
2"ø W
2"ø
4"ø
1 1/2"ø
4"ø
4"ø W
1 1/2" W UP
4" SANITARY TO BUILDING F,SEE DRAWING F-PB1.1 FORCONTINUATION
LEVEL 1
1 1/2"ø
1 1/2"ø
3" V UP
2 1/2"ø
2"ø2"ø
1 1/2"ø
2 1/2"ø V UP
2"ø
S-1
S-1
L-1WC-1
WC-1
L-1
B-1
HP7
BEDROOM
STAIRS D1
BEDROOM
4" W DN, PROVIDEWALL CLEANOUT ATBASE OF RISER
2"ø
BEDROOM
1/2"ø1/2"øWC-1
2"ø
3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTIONTO NEAREST SANITARY, VERIFYLOCATION AND ROUTING IN FIELD (TYPICAL)
B-1
2"ø2"ø
HP1
HP2
YCO
FCO
4"ø
FCO
MECH
OFFICE
RESTROOM
VESTIBULE9
FCO
S-1
S-2
3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTIONTO NEAREST SANITARY, VERIFYLOCATION AND ROUTING IN FIELD(TYPICAL)
HP7
S-1
2"ø
2"ø
RESTROOM
WC-1
1/2" H&CW & 1 1/2" V UP,2" W DN
4" FROM ABOVE
9
FCO 4" W
1
A
B
2
OA
O1 O2 O3 O4 O54.5
BUILDING D BUILDING E
UNIT D-3(2 BEDROOM)
UNIT D-4
(1 BEDROOM)
UNIT E-2(1 BEDROOM)
UNIT E-3(2 BEDROOM)
1 1/2"ø1 1/4"ø1/2"ø
1/2"ø1/2"ø
1 1/2"ø
1/2"ø1/2"ø1/2"ø
1" C&HW DN 3/4"ø1/2"ø1/2"ø
3/4"ø3/4"ø
1/2"ø DHWR
1"ø DHW1"ø DCW1/2"ø1/2"ø 1/2"ø1/2"ø1/2"ø
1 1/4"ø1"ø1/2"ø1/2"ø1"ø 1 1/4"ø1/2"ø1/2" CW&HW DN
1 1/4"ø
1/2"ø1/2"ø1/2"ø1/2"ø1/2"ø1/2"ø
DCW DHWDHWR
1"ø DCW1 1/4"ø DHW1/2"ø DHWR
1 1/2" CW &1 1/4" HWDN 4"ø W DN
4"ø W DN
1/2"ø
1 1/2"ø W
1 1/2"ø
2"ø 4"ø
1 1/2" W DN
4" W DN
2" W DN
1 1/2" W DN
LEVEL 2
1 1/2" W DN
4" W DN
3" V DN&UPTO 4" VTR
1 1/2"ø
1 1/2"ø
2"ø2"ø
1 1/2"ø
1 1/2"ø
2"ø
1 1/2"ø 2"ø2"ø
2 1/2"ø2 1/2"ø
4"ø 4" VENTTO VTR
2 1/2"ø
1 1/2"ø2"ø
2"ø
HP2
HP2
3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTIONTO NEAREST SANITARY, VERIFYLOCATION AND ROUTING IN FIELD(TYPICAL)
3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTIONTO NEAREST SANITARY, VERIFYLOCATION AND ROUTING IN FIELD(TYPICAL)HP1
HP1
1 1/2"
1/2" H&CW, 1 1/2" V DN
1/2"1/2"
1 1/2"
9
1/2"ø1/2"ø
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
DE-PB1.1
PLUMBING PLANBLDGS 'D' AND 'E'-
LEVEL 1 AND 2
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2017
16-063
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
S-1 S-1
S-1
S-1
L-1
WC-1
B-1
B-1
WC-1 L-1
B-1
L-1
L-1
WC-1
WC-1
B-1
ELECTRICALROOM
No.Description Date
1
5 Revision 5 06/10/19
6 Arch Revisions 12/20/19
8 Addendum 8 11/15/19
9 02/14/2020
PSK DE-PB1.1R1
PSK DE-PB1.1R1
1 1/2" CW FROM BLDG 'C',SEE DRAWINGABC-PB1.SB FORCONTINUATION
1" CW MAKE UP TOBOILER LOOP
LEVEL 1
INCOMING GAS SERVICEAND METER BY LOCALUTILITY COMPANY.SEE SITE UTILITY PLANFOR CONTINUATION
GAS ON TOBELOW SLABGG6" W FROM ABOVE, SEE LEVEL 2THIS SHEET FOR CONTINUATION.PROVIDE CLEANOUT AT BASE OFRISER
GG
B-1 B-1
SUMP
6" W TO BLDG 'G', SEEDRAWING G-PB1.1FOR CONTINUATION
1" CW FILL FORSUMP TANK
1 1/4" GAS TO BLDG 'B', SEEDRAWING ABC-PB1.1 FORCONTINUATION
CO GG
CHEMICAL TREATMENTSYSTEMS FOR COOLINGTOWER AND SOURCE WATERLOOPS AS SPECIFIED ANDDETAILED. COORDINATEEQUIPMENT, PUMP AND ACCESSORYSELECTION, INSTALLATION ANDOPERATION WITH COOLING TOWERMANUFACTURER
3/4"ø
1 1/4" CW UP
1 1/4"ø
AREA RESERVED FORSVE EQUIPMENT
HX-1
1 1/4"ø
1"ø
3/4" CONDENSATEDRAIN FROM ABOVE
1 1/4" GAS TO BLDG 'G', SEEDRAWIN G-PB1.1 FORCONTINUATION
SAND FILTRATION EQUIPMENTWITH BACKWASH TANK ANDCONTROL PANEL AS SPECIFIED ANDDETAILED. COORDINATEEQUIPMENT, PUMP AND ACCESSORYSELECTION, INSTALLATION ANDOPERATION WITH COOLING TOWERMANUFACTURER, PROVIDE MINIMUM3/4" CW CONNECTION AND 1 1/2"BACKWASH DRAIN PIPING WITH FLOWDISCHARGE THROTTLE VALVE TO FLOORDRAIN
1 1/4" GAS OUT TO GENERATORSEE SITE UTILITY PLAN FORCONTINUATION
1 1/4"
3"2 1/2"
2"
1 1/2"
2 1/2"
1 1/4" GAS TO BOILER. PROVIDEPRESSURE REDUCING VALVEIN ACCESSIBLE LOCATION.COORDINATE SIZE AND VENTINGREQUIREMENTS WITH BOILERMANUFACTURER (TYPICAL FOR 2)
CF-1
CF-2
1 1/2"ø1 1/4"
SUMP PIT WITH EJECTORPUMP AND 2" DISCHARGEUP, SEE LEVEL 2 THIS SHEETFOR CONTINUATION
SUMP TANK DRAIN TO FLOORDRAIN, COORDINATE INSTALLATIONAND OPERATION WITH COOLINGTOWER MANUFACTURER
FD-14"ø
4"
FD-1
FD-1
LEVEL 2
G
2"ø
G
2" GAS FROM BELOW,SEE LEVEL 1 THISSHEET FORCONTINUATION
2" GAS OUT TO GENERATOR,SEE SITE UTILITY PLAN FORCONTINUATION
6" W DN, SEE LEVEL 1 THIS SHEETFOR CONTINUATION
HP93/4" CONDENSATEDRAIN DN
6"
4" W FROMBLDGS 'D' & 'E',SEEDRAWING ABC-PB1.SB FORCONTINUATION
6" W FROM BLDGSA,B,&C. SEEDRAWING ABC-PB1.SB FORCONTINUATION
4"
6"
2" SANITARY FROM SUMPPIT EJECTOR PUMPBELOW, SEE LEVEL 1THIS SHEET FORCONTINUATION
1 1/4" CW MAKE UP TO COOLING TOWER
2"ø
4" VTR
9
4" V FROM BELOWTO 4" VTR
ROOF
CT-1
1 1/4" CW MAKE UPTO COOLING TOWER
1 1/4"ø
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
F-PB1.1
PLUMBING PLANBUILDING 'F'-
LEVEL 1, LEVEL 2
AND MEZZANINE
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2017
16-063
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
1
6 Arch Revisions 12/20/19
9 02/14/2020
PSK F-PB1.1R1
PSK F-PB1.1R1
9
9