Loading...
HomeMy WebLinkAboutP_R19OA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.1 O1 O2 O3 O4 O5 W1 W2 W3 W4 W5 W6 W7 W8 W9 L2.L 4.5 BUILDING D BUILDING B BUILDING C BUILDING G BUILDING A UNIT A-1 (2 BEDROOM) UNIT A-2 (1 BEDROOM) UNIT B-3 (1 BEDROOM)TYPE 'A' UNIT B-4(2 BEDROOM) UNIT B-5(1 BEDROOM) UNIT B-6(1 BEDROOM) UNIT B-7(STUDIO) UNIT A-2 (2 BEDROOM) WCO 2"ø2" W UP& DN 4"ø 3"ø 3"ø3/4"ø 4" WUP&DN L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 S-1 3" HW & 1" HWR DN S-1 S-1 L-1 WC-1 B-1 L-1 SH-1 L-1 WC-1 B-1 L-1 WC-1 B-1L-1 WC-1B-1 L-1 WC-1B-1 S-1 S-1 S-1 2"ø2"ø 1 1/2"ø 1 1/2"ø 1 1/2"ø 2"ø 3" V UP 2"ø 1 1/2"ø 2"ø 2 1/2"ø 3" VUP 2 1/2"ø 2"ø2"ø 1 1/2"ø1 1/2"ø2"ø 3" VUP 1 1/2"ø 2"ø2"ø 1 1/2"ø 2 1/2"ø3" VUP 2"ø 1 1/2"ø 3"ø 2"ø 2 1/2"ø 1 1/2"ø 3" VUP 1 1/2"ø 3" V UP 3" V UP 2"ø2"ø 1 1/2"ø 2 1/2"ø 2"ø 4" W UP 2"ø HP1 2"ø 3/4" CONDENSATEDRAIN WITH INDIRECTWASTE CONNECTIONTO NEAREST SANITARY,VERIFY LOCATION ANDROUTING IN FIELD(TYPICAL) 2"ø 2"ø 3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) HP1 HP1 HP1 HP1 3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) 3"ø 6"ø3"ø DCW3"ø DHW1"ø DHWR2"ø DCW2"ø DHW1"ø DHWR1/2"ø1/2"ø 1"ø 2"ø 2"ø 3" V UP 2"ø 6" SAN UP& DN IN WALL 6"ø HP1 S-1 4" 4" HP1 6"ø 4"ø W 4" SANITARY FROMBATHROOM GROUPSABOVE (TYPICAL) FCO WC-1 9 FCO FCO A B D E C F G H J K L M NORTH SITE KEY PLAN Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-PB1.1 PLUMBING PLANBLDG 'A'-LEVEL 1 BLDG 'B'-LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 No.Description Date 1 6 Arch Revisions 12/20/19 8 Addendum 8 11/15/19 9 02/14/2020 PSK ABC-PB1.1R1 PSK ABC-PB1.1R1 OA L2.2 L2.A L2.B L2.C L2.D L2.E L2.J L2.K L2.M L2.N L2.1 O1 O2 O3 O4 O5 W1 W2 W3 W4 W5 W6 W7 W8 W9 L2.L 4.5 UNIT B-1(2 BEDROOM) TYPE A UNIT B-2(2 BEDROOM) UNIT C-3(2 BEDROOM)TYPE A UNIT C-4 (2 BEDROOM)TYPE A ELEVATOR BUILDING B BUILDING C BUILDING A CRAWL SPACE BUILDING G BUILDING D BUILDING F 1" HWR UP&DN 3" HW UP&DN 3" CW UP&DN L-1 WC-1 B-1 S-1 L-1WC-1 B-1 S-1 L-1WC-1 B-1 S-1 L-1 WC-1 B-1 S-1 3" VDN,4"VTR 1 1/2"ø 1/2"ø1/2"ø 3/4"ø 1/2"ø 1/2"ø 3/4"ø1/2"ø 1/2"ø 1/2"ø1/2"øERV-1 HP-5 HP2 HP2 HP21"ø1/2"ø1"ø3/4"ø 3/4"ø3/4"ø1/2"ø1/2"ø 1/2"ø1/2"ø 1/2"ø1/2"ø 1/2"ø1/2"ø1/2"ø1/2"ø1/2"ø 1/2"ø 3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) 3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) YCO 6" SANITARY FROM BUILDING B,SEE DRAWING ABC-PB1.SB FORCONTINUATION HP2 1 1/2"ø 1/2"ø1/2"ø 3/4"ø 1 1/2"ø FCO 3/4" CW FROMBOLOW 3/4" HW & 1/2" HWRFROM BELOW 6" SAN UP & DN FCO 1/2"ø1/2"ø 4"ø1 1/ 2 " ø 4"ø 9 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-PB1.B PLUMBING PLANBLDG A-CRAWL SPACE BLDG 'B'-LEVEL B BLDG 'C'-LEVEL 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 6 Arch Revisions 12/20/19 8 Addendum 8 11/15/19 9 02/14/2020 PSK ABC-PB1.BR1 9 PSK-ABC-PB1.BR1 BFP L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.H L2.J L2.1 L2.L 4.5 UNIT C-1 (2 BEDROOM) UNIT C-2(2 BEDROOM) STAIR 2 ELECTRICALMETERROOM MAINTENANCEROOM BUILDING B BUILDING C BUILDING A (ABOVE) BUILDING D BUILDING G ET2 B1 TMV1 P2 (2) 300 GALLON INDIRECT HOT WATERSTORAGE TANKS SEE 11/P3.2 FORPIPING DIAGRAM GAS FIRED DOMESTICHOT WATER BOILER FOR DOMESTIC WATERSERVICE INSTALLATIONSEE 7/P3.1 3"CW UP 6" SANITARY FROM ABOVE,PROVIDE CLEANOUT AT BASEOF RISER 3/4"ø 4"ø W 2"ø V 1 1/2"ø 1 1/2"ø 1 1/2"ø 4"ø W1 1/2" V UP 1 1/2" V UP 1/2" H&CW DNTYP OF BATHTUB 3/4"ø DHWR 4" SANITARY FROM BUILDING E,SEE DRAWING DE-PB1.1 FORCONTINUATION 3"HW UP 1"HWR FROM ABOVE S-1 L-1 WC-1 B-1 WC-1 L-1 S-1 4" SANITARY TO BUILDING F,SEE DRAWING F-PB1.1 FORCONTINUATION 1 1/4" GAS FROMBUILDING F, SEEDRAWING F-PB1.1 FORCONTINUATION 2"ø DCW 3/4" HW AND1/2" HWR UP 3/4" CWUP L-1 1 1/2" CW TO BUILDING F,SEE DRAWING F-PB1.1FOR CONTINUATION B-1 SANITARY PIPING FROMRESPECTIVE FIXTURESABOVE (TYPICAL FOR ALL) SANITARY PIPING FROMRESPECTIVE FIXTURESABOVE (TYPICAL FOR ALL) 3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) 1 1/2"ø CWFCO CO YCO 6" SANITARY TO BUILDING F,SEE DRAWING F-PB1.1 FOR CONTINUATION ET1 G G PRESSURE REDUCING VALVE BYPLUMBING CONTRACTOR, SIZE ASPER BOILER REQUIREMENTSG 4"ø 2"ø P1 AS1 AS2 3"ø 4" CW SERVICE IN, SEESITE UTILITY PLAN FORCONTINUATION SPRINKLER SERVICE, FIREDEPT CONNECTION ANDBACKFLOW EQUIPTMENT,SEE FIRE PROTECTIONDRAWINGS G HP23" V UP 4"ø NEW SERVICE EJECTOR PIT WITHDUPLEX PUMP SET.PROVIDE ACCESSIBLE CHECK VALVEON DISCHARGE CONNECTION TOGRAVITY SANITARY AS REQUIREDAND VENT CONNECTION AS SHOWN."HOMA" GRINDER SERIES#GRP16/3, OR APPROVED EQUAL.1.5HP, 208V, 3, 25 GPM, 14 FT. HD.FIBERGLASS BASIN WITH ACCESSIBLECOVER, DUPLEX CONTROL PANEL CO FD-1 2"ø 2 1/2"ø FD-1 4"ø2"ø HP2 4"3"øCO CO 6" INSULATED ENCLOSUREBY ARCHITECT ALONGRETAINING WALL FORSANITARY MAIN BYARCHITECT 9 2"ø Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-PB1.SB PLUMBING PLANBLDG 'B'-LEVEL SB BLDG 'C'-LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 6 Arch Revisions 12/20/19 8 Addendum 8 11/15/19 9 02/14/2020 PSK ABC-PB1.SBR1 PSK-ABC-PB1.SBR1 DN 1 A B 2 OA O1 O2 O3 O4 O54.5 BUILDING D UNIT D-1(2 BEDROOM) UNIT D-2(1 BEDROOM) ENTRYVESTIBULE OFFICE KITCHEN FITNESSROOM JAN.COMMUNITYROOM BUILDING E 1/2"ø DHW 1" C&HW UP 1/2"C&HWUP 1 1/2"CW & 1 1/4"HW UP 1/2"ø 1/2"ø1/2"ø1"ø DHW 1"ø DCW 1/2"ø 1/2"ø1/2"ø1/2"ø1/2"ø 4"ø4"ø W 4"ø W UP 2"ø W 2"ø 4"ø 1 1/2"ø 4"ø 4"ø W 1 1/2" W UP 4" SANITARY TO BUILDING F,SEE DRAWING F-PB1.1 FORCONTINUATION LEVEL 1 1 1/2"ø 1 1/2"ø 3" V UP 2 1/2"ø 2"ø2"ø 1 1/2"ø 2 1/2"ø V UP 2"ø S-1 S-1 L-1WC-1 WC-1 L-1 B-1 HP7 BEDROOM STAIRS D1 BEDROOM 4" W DN, PROVIDEWALL CLEANOUT ATBASE OF RISER 2"ø BEDROOM 1/2"ø1/2"øWC-1 2"ø 3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTIONTO NEAREST SANITARY, VERIFYLOCATION AND ROUTING IN FIELD (TYPICAL) B-1 2"ø2"ø HP1 HP2 YCO FCO 4"ø FCO MECH OFFICE RESTROOM VESTIBULE9 FCO S-1 S-2 3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTIONTO NEAREST SANITARY, VERIFYLOCATION AND ROUTING IN FIELD(TYPICAL) HP7 S-1 2"ø 2"ø RESTROOM WC-1 1/2" H&CW & 1 1/2" V UP,2" W DN 4" FROM ABOVE 9 FCO 4" W 1 A B 2 OA O1 O2 O3 O4 O54.5 BUILDING D BUILDING E UNIT D-3(2 BEDROOM) UNIT D-4 (1 BEDROOM) UNIT E-2(1 BEDROOM) UNIT E-3(2 BEDROOM) 1 1/2"ø1 1/4"ø1/2"ø 1/2"ø1/2"ø 1 1/2"ø 1/2"ø1/2"ø1/2"ø 1" C&HW DN 3/4"ø1/2"ø1/2"ø 3/4"ø3/4"ø 1/2"ø DHWR 1"ø DHW1"ø DCW1/2"ø1/2"ø 1/2"ø1/2"ø1/2"ø 1 1/4"ø1"ø1/2"ø1/2"ø1"ø 1 1/4"ø1/2"ø1/2" CW&HW DN 1 1/4"ø 1/2"ø1/2"ø1/2"ø1/2"ø1/2"ø1/2"ø DCW DHWDHWR 1"ø DCW1 1/4"ø DHW1/2"ø DHWR 1 1/2" CW &1 1/4" HWDN 4"ø W DN 4"ø W DN 1/2"ø 1 1/2"ø W 1 1/2"ø 2"ø 4"ø 1 1/2" W DN 4" W DN 2" W DN 1 1/2" W DN LEVEL 2 1 1/2" W DN 4" W DN 3" V DN&UPTO 4" VTR 1 1/2"ø 1 1/2"ø 2"ø2"ø 1 1/2"ø 1 1/2"ø 2"ø 1 1/2"ø 2"ø2"ø 2 1/2"ø2 1/2"ø 4"ø 4" VENTTO VTR 2 1/2"ø 1 1/2"ø2"ø 2"ø HP2 HP2 3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTIONTO NEAREST SANITARY, VERIFYLOCATION AND ROUTING IN FIELD(TYPICAL) 3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTIONTO NEAREST SANITARY, VERIFYLOCATION AND ROUTING IN FIELD(TYPICAL)HP1 HP1 1 1/2" 1/2" H&CW, 1 1/2" V DN 1/2"1/2" 1 1/2" 9 1/2"ø1/2"ø Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" DE-PB1.1 PLUMBING PLANBLDGS 'D' AND 'E'- LEVEL 1 AND 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN S-1 S-1 S-1 S-1 L-1 WC-1 B-1 B-1 WC-1 L-1 B-1 L-1 L-1 WC-1 WC-1 B-1 ELECTRICALROOM No.Description Date 1 5 Revision 5 06/10/19 6 Arch Revisions 12/20/19 8 Addendum 8 11/15/19 9 02/14/2020 PSK DE-PB1.1R1 PSK DE-PB1.1R1 1 1/2" CW FROM BLDG 'C',SEE DRAWINGABC-PB1.SB FORCONTINUATION 1" CW MAKE UP TOBOILER LOOP LEVEL 1 INCOMING GAS SERVICEAND METER BY LOCALUTILITY COMPANY.SEE SITE UTILITY PLANFOR CONTINUATION GAS ON TOBELOW SLABGG6" W FROM ABOVE, SEE LEVEL 2THIS SHEET FOR CONTINUATION.PROVIDE CLEANOUT AT BASE OFRISER GG B-1 B-1 SUMP 6" W TO BLDG 'G', SEEDRAWING G-PB1.1FOR CONTINUATION 1" CW FILL FORSUMP TANK 1 1/4" GAS TO BLDG 'B', SEEDRAWING ABC-PB1.1 FORCONTINUATION CO GG CHEMICAL TREATMENTSYSTEMS FOR COOLINGTOWER AND SOURCE WATERLOOPS AS SPECIFIED ANDDETAILED. COORDINATEEQUIPMENT, PUMP AND ACCESSORYSELECTION, INSTALLATION ANDOPERATION WITH COOLING TOWERMANUFACTURER 3/4"ø 1 1/4" CW UP 1 1/4"ø AREA RESERVED FORSVE EQUIPMENT HX-1 1 1/4"ø 1"ø 3/4" CONDENSATEDRAIN FROM ABOVE 1 1/4" GAS TO BLDG 'G', SEEDRAWIN G-PB1.1 FORCONTINUATION SAND FILTRATION EQUIPMENTWITH BACKWASH TANK ANDCONTROL PANEL AS SPECIFIED ANDDETAILED. COORDINATEEQUIPMENT, PUMP AND ACCESSORYSELECTION, INSTALLATION ANDOPERATION WITH COOLING TOWERMANUFACTURER, PROVIDE MINIMUM3/4" CW CONNECTION AND 1 1/2"BACKWASH DRAIN PIPING WITH FLOWDISCHARGE THROTTLE VALVE TO FLOORDRAIN 1 1/4" GAS OUT TO GENERATORSEE SITE UTILITY PLAN FORCONTINUATION 1 1/4" 3"2 1/2" 2" 1 1/2" 2 1/2" 1 1/4" GAS TO BOILER. PROVIDEPRESSURE REDUCING VALVEIN ACCESSIBLE LOCATION.COORDINATE SIZE AND VENTINGREQUIREMENTS WITH BOILERMANUFACTURER (TYPICAL FOR 2) CF-1 CF-2 1 1/2"ø1 1/4" SUMP PIT WITH EJECTORPUMP AND 2" DISCHARGEUP, SEE LEVEL 2 THIS SHEETFOR CONTINUATION SUMP TANK DRAIN TO FLOORDRAIN, COORDINATE INSTALLATIONAND OPERATION WITH COOLINGTOWER MANUFACTURER FD-14"ø 4" FD-1 FD-1 LEVEL 2 G 2"ø G 2" GAS FROM BELOW,SEE LEVEL 1 THISSHEET FORCONTINUATION 2" GAS OUT TO GENERATOR,SEE SITE UTILITY PLAN FORCONTINUATION 6" W DN, SEE LEVEL 1 THIS SHEETFOR CONTINUATION HP93/4" CONDENSATEDRAIN DN 6" 4" W FROMBLDGS 'D' & 'E',SEEDRAWING ABC-PB1.SB FORCONTINUATION 6" W FROM BLDGSA,B,&C. SEEDRAWING ABC-PB1.SB FORCONTINUATION 4" 6" 2" SANITARY FROM SUMPPIT EJECTOR PUMPBELOW, SEE LEVEL 1THIS SHEET FORCONTINUATION 1 1/4" CW MAKE UP TO COOLING TOWER 2"ø 4" VTR 9 4" V FROM BELOWTO 4" VTR ROOF CT-1 1 1/4" CW MAKE UPTO COOLING TOWER 1 1/4"ø Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" F-PB1.1 PLUMBING PLANBUILDING 'F'- LEVEL 1, LEVEL 2 AND MEZZANINE Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 6 Arch Revisions 12/20/19 9 02/14/2020 PSK F-PB1.1R1 PSK F-PB1.1R1 9 9