Loading...
HomeMy WebLinkAboutHK-PB1.1BFPBFP UNIT H-2 (2 BEDROOM) METERROOM LAUNDRY ROOM LOBBY BUILDING H (2) 300 GALLONINDIRECT HOT WATERSTORAGE TANKS,SEE 11/P3.2 FORPIPING DIAGRAM GAS FIRED DOMESTICHOT WATER BOILER UNIT H-1(1 BEDROOM) BOILER ANDSPRINKLER ROOM JANITOR BUILDING J BUILDING K TMV1 B1 ET1 AS-1 3/4"ø DHWR 1"ø DHW 6"ø W 3/4"ø3/4"ø1 1/2"ø 1 1/4"ø UNIT K-2(1 BEDROOM)UNIT K-4 (1 BEDROOM) UNIT K-1(1 BEDROOM)UNIT K-3(1 BEDROOM) P-1 P-2 3"ø 3/4"ø S-1 L-1 WC-11 1/4"ø2"øFD-13"ø B-1L-1 WC-1 B-1 H&CW TO WASHING MACHINESUPPLY MANIFOLD, PROVIDELAUNDRY MATE CONNECTION FOREACH UNIT AS SCHEDULED WMF-1 WMF-1 3/4"ø 3" STANDPIPE FORWASHING MACHINEINDIRECT DRAINS S-1 L-1 WC-1 B-1 1"ø DCW 2"ø L-1 L-1WC-1 WC-1 B-1 B-1 S-1 B-1 S-1 S-1 FCO 1 1/2"ø 2"ø2 1/2"ø 3"ø 4"ø 1 1/2"ø 2 1/2"ø 4" VTR 2 1/2"ø 4" VTR 2"ø 1 1/2"ø 2"ø SAN, CW, HW & HWR TOBUILDING G, SEE DRAWINGG-PB1.1 FOR CONTINUATION SAN, CW, HW & HWR TOBUILDING J, SEE DRAWINGJ-PB1.1 FOR CONTINUATION SAN, CW, HW & HWRTO BUILDINGS L & M,SEE DRAWING LM-PB1.1FOR CONTINUATION HP8 HP8 HP1 HP6 HP1 HP1 HP2 3/4" CONDENSATE DRAIN WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) 1/2"ø1/2"ø 3/4"ø 3/4"ø 1/2"ø1/2"ø 3/4"ø3/4"ø 6"ø FCO 4"ø 4"ø FCO 1 1/4" GAS FROM ROOFABOVE, SEE DRAWINGG-PB1.1 FORCONTINUATION. PROVIDEPRESSURE REDUCINGVALVE IN ACCESSIBLELOCATION. COORDINATESIZE AND VENTINGREQUIREMENTS WITHBOILER MANUFACTURER 6"ø 1 1/2"ø 2 1/2"ø 1/2"ø1/2"ø1 1/2"ø HP1 1/2"ø1/2"ø 1 1/2"ø 1 1/2"ø S-1 1 1/2"ø1 1/2"ø 1 1/2"ø L-1 3/4"ø3/4"ø 3"ø WC-1 2"ø 1 1/2"ø 1 1/2"ø 3"ø SS-1 1/2"ø1/2"ø D D D D W W W W WMF-1 1 1/4"ø1 1/4"ø 1"ø 10 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" HK-PB1.1 PLUMBING PLANBLDGS 'H' & 'K'-LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 6 Arch Revisions 12/20/19 8 Addendum 8 11/15/19 9 02/14/20 10 04/03/20 PSK HK-PB1.1R1 PSK HK-PB1.1 PSK HK-PB1.1R1