HomeMy WebLinkAboutMSK ABC-MD1.SBR2WA
L2.2
L2.A
L2.B
L2.C
L2.D
L2.E
L2.F
L2.H
L2.J
L2.K
L2.M
L2.N
L2.1
L2.L
4.5
UNIT C-1(2 BEDROOM)
UNIT C-2
(2 BEDROOM)
STAIR 2
ELECTRICALMETERROOM
MAINTENANCE
ROOM
BUILDING B
BUILDING C
BUILDING A
(ABOVE)
BUILDING D
BUILDING G
T HP2
T
HP2
EF-1
EWH-1
EF-1
EF-1
EF-1
DOMESTIC HOT WATER BOILER
6" FLUE VENT AND 8" COMBUSTION AIRINTAKE
AXG
AXG
AXG
B-1
6" FLUE EXHAUST AND 8"COMBUSTION AIR INTAKE TOWALL TERMINAL KIT. SIZE,ROUTING, LOCATION ANDINSTALLATION AS PERMANUFACTURER'SRECOMMENDATIONS (TYPICAL)
8"ø 4"ø12X6" AIR TRANSFERGRILLE ASSEMBLY(AXG). PROVIDE 12"X3"TRANSFER DUCT INWALL WITH HIGHINLET GRILLE ANDLOW OUTLET GRILLE(TYPICAL FOR ALL)
C-250 B-150
C-250 B-150
8"x8"
HP2
R7-800
AXG
B-150
HP2
B-150C-250
10"x10"
C-250 10"x8"
R7-800
EUH-1
T
EUH-1
6"ø
8"ø
EXHAUST FAN WITH 4" EA DISCHARGETO WEATHER PROOF WALL CAP FORCAVITY SPACE VENTILATION. MOUNTEXHAUST INTAKE MAXIMUM 12" BELOWTOP OF CAVITY. PROVIDE ACCESS DOORAS SHOWN FOR SERVICEAND MAINTENANCE,COORDINATE WITH ARCHITECTURAL
EF-3
4"ø
4"ø
4" OA DUCT FROM WEATHERPROOFINTAKE CAP FOR CAVITY SPACEVENTILATION. MOUNT INTAKE OPENINGAT MAXIMUM 12" ABOVE BOTTOM OFCAVITY
A/D
4" EA UP IN DUCTCHASE ABOVE(TYPICAL FOR 4)
4"ø
4"ø 4"ø
10
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-MD1.SB
MECHANICALDUCTWORK PLAN
BLDG 'B'-LEVEL SB
BLDG 'C'-LEVEL 1
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2017
16-063
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
8 Addendum 8 11/5/19
9
10 MSKABC-MD1.SBR2 02/21/20
MSK ABC-MD1.SBR2