Loading...
HomeMy WebLinkAboutMSK ABC-MD1.SBR2WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.H L2.J L2.K L2.M L2.N L2.1 L2.L 4.5 UNIT C-1(2 BEDROOM) UNIT C-2 (2 BEDROOM) STAIR 2 ELECTRICALMETERROOM MAINTENANCE ROOM BUILDING B BUILDING C BUILDING A (ABOVE) BUILDING D BUILDING G T HP2 T HP2 EF-1 EWH-1 EF-1 EF-1 EF-1 DOMESTIC HOT WATER BOILER 6" FLUE VENT AND 8" COMBUSTION AIRINTAKE AXG AXG AXG B-1 6" FLUE EXHAUST AND 8"COMBUSTION AIR INTAKE TOWALL TERMINAL KIT. SIZE,ROUTING, LOCATION ANDINSTALLATION AS PERMANUFACTURER'SRECOMMENDATIONS (TYPICAL) 8"ø 4"ø12X6" AIR TRANSFERGRILLE ASSEMBLY(AXG). PROVIDE 12"X3"TRANSFER DUCT INWALL WITH HIGHINLET GRILLE ANDLOW OUTLET GRILLE(TYPICAL FOR ALL) C-250 B-150 C-250 B-150 8"x8" HP2 R7-800 AXG B-150 HP2 B-150C-250 10"x10" C-250 10"x8" R7-800 EUH-1 T EUH-1 6"ø 8"ø EXHAUST FAN WITH 4" EA DISCHARGETO WEATHER PROOF WALL CAP FORCAVITY SPACE VENTILATION. MOUNTEXHAUST INTAKE MAXIMUM 12" BELOWTOP OF CAVITY. PROVIDE ACCESS DOORAS SHOWN FOR SERVICEAND MAINTENANCE,COORDINATE WITH ARCHITECTURAL EF-3 4"ø 4"ø 4" OA DUCT FROM WEATHERPROOFINTAKE CAP FOR CAVITY SPACEVENTILATION. MOUNT INTAKE OPENINGAT MAXIMUM 12" ABOVE BOTTOM OFCAVITY A/D 4" EA UP IN DUCTCHASE ABOVE(TYPICAL FOR 4) 4"ø 4"ø 4"ø 10 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-MD1.SB MECHANICALDUCTWORK PLAN BLDG 'B'-LEVEL SB BLDG 'C'-LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 8 Addendum 8 11/5/19 9 10 MSKABC-MD1.SBR2 02/21/20 MSK ABC-MD1.SBR2