HomeMy WebLinkAboutABC-MD1.SBL2.2
L2.A
L2.B
L2.C
L2.D
L2.E
L2.F
L2.H
L2.J
L2.K
L2.M
L2.N
L2.1
L2.L
4.5
UNIT C-1(2 BEDROOM)
UNIT C-2
(2 BEDROOM)
STAIR 2
ELECTRICALMETER
ROOM
MAINTENANCE
ROOM
BUILDING B
BUILDING C
BUILDING A
(ABOVE)
BUILDING D
BUILDING G
T HP2
T
HP2
EF-1
EWH-1
EF-1
EF-1
EF-1
DOMESTIC HOT WATER BOILER
6" FLUE VENT AND 8" COMBUSTION AIRINTAKE
AXG
AXG
AXG
B-1
6" FLUE EXHAUST AND 8"COMBUSTION AIR INTAKE TOWALL TERMINAL KIT. SIZE,ROUTING, LOCATION ANDINSTALLATION AS PERMANUFACTURER'SRECOMMENDATIONS (TYPICAL)
8"ø 4"ø12X6" AIR TRANSFERGRILLE ASSEMBLY(AXG). PROVIDE 12"X3"TRANSFER DUCT INWALL WITH HIGHINLET GRILLE ANDLOW OUTLET GRILLE(TYPICAL FOR ALL)
C-250 B-150
C-250 B-150
8"x8"
HP2
R7-800
AXG
B-150
HP2
B-150C-250
10"x10"
C-250 10"x8"
R7-800
EUH-1
T
EUH-1
6"ø
8"ø
EXHAUST FAN WITH 4" EA DISCHARGETO WEATHER PROOF WALL CAP FORCAVITY SPACE VENTILATION. MOUNTEXHAUST OUTLET MAXIMUM 12" BELOWTOP OF CAVITY. PROVIDE ACCESS DOORAS SHOWN FOR SERVICE AND MAINTENANCE,COORDINATE WITH ARCHITECTURAL
EF-3
4"ø
4"ø
4" OA DUCT FROM WEATHERPROOFINTAKE CAP FOR CAVITY SPACEVENTILATION. MOUNT INTAKE OPENINGAT MAXIMUM 12" ABOVE BOTTOM OFCAVITY
A/D
4" EA UP IN DUCTCHASE ABOVE(TYPICAL FOR 4)
4"ø
4"ø 4"ø
PROVIDE FLOW SENSORIN EXHAUST DUCT TOACTIVATE INDICATORLIGHT IN THE EVENT OFFAN FAILURE
BUILDING 'C' CAVITY SPACE EXHAUST FANFAILURE INDICATOR LIGHT. COORDINATELOCATION AND OPERATION WITH OWNERAND FACILITY MAINTENANCE
10
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-MD1.SB
MECHANICALDUCTWORK PLAN
BLDG 'B'-LEVEL SB
BLDG 'C'-LEVEL 1
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2017
16-063
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
8 Addendum 8 11/5/19
9 02/14/20
10 04/03/20
MSK ABC-MD1.SBR3
MSK ABC-MD1.BR3
10