Loading...
HomeMy WebLinkAboutABC-MD1.SBL2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.H L2.J L2.K L2.M L2.N L2.1 L2.L 4.5 UNIT C-1(2 BEDROOM) UNIT C-2 (2 BEDROOM) STAIR 2 ELECTRICALMETER ROOM MAINTENANCE ROOM BUILDING B BUILDING C BUILDING A (ABOVE) BUILDING D BUILDING G T HP2 T HP2 EF-1 EWH-1 EF-1 EF-1 EF-1 DOMESTIC HOT WATER BOILER 6" FLUE VENT AND 8" COMBUSTION AIRINTAKE AXG AXG AXG B-1 6" FLUE EXHAUST AND 8"COMBUSTION AIR INTAKE TOWALL TERMINAL KIT. SIZE,ROUTING, LOCATION ANDINSTALLATION AS PERMANUFACTURER'SRECOMMENDATIONS (TYPICAL) 8"ø 4"ø12X6" AIR TRANSFERGRILLE ASSEMBLY(AXG). PROVIDE 12"X3"TRANSFER DUCT INWALL WITH HIGHINLET GRILLE ANDLOW OUTLET GRILLE(TYPICAL FOR ALL) C-250 B-150 C-250 B-150 8"x8" HP2 R7-800 AXG B-150 HP2 B-150C-250 10"x10" C-250 10"x8" R7-800 EUH-1 T EUH-1 6"ø 8"ø EXHAUST FAN WITH 4" EA DISCHARGETO WEATHER PROOF WALL CAP FORCAVITY SPACE VENTILATION. MOUNTEXHAUST OUTLET MAXIMUM 12" BELOWTOP OF CAVITY. PROVIDE ACCESS DOORAS SHOWN FOR SERVICE AND MAINTENANCE,COORDINATE WITH ARCHITECTURAL EF-3 4"ø 4"ø 4" OA DUCT FROM WEATHERPROOFINTAKE CAP FOR CAVITY SPACEVENTILATION. MOUNT INTAKE OPENINGAT MAXIMUM 12" ABOVE BOTTOM OFCAVITY A/D 4" EA UP IN DUCTCHASE ABOVE(TYPICAL FOR 4) 4"ø 4"ø 4"ø PROVIDE FLOW SENSORIN EXHAUST DUCT TOACTIVATE INDICATORLIGHT IN THE EVENT OFFAN FAILURE BUILDING 'C' CAVITY SPACE EXHAUST FANFAILURE INDICATOR LIGHT. COORDINATELOCATION AND OPERATION WITH OWNERAND FACILITY MAINTENANCE 10 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-MD1.SB MECHANICALDUCTWORK PLAN BLDG 'B'-LEVEL SB BLDG 'C'-LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 8 Addendum 8 11/5/19 9 02/14/20 10 04/03/20 MSK ABC-MD1.SBR3 MSK ABC-MD1.BR3 10