HomeMy WebLinkAboutE_R1933BUILDING D
BUILDING B
BUILDING C
BUILDING G
BUILDING A
UNIT A-1(2 BEDROOM)UNIT A-2(1 BEDROOM)
UNIT B-3(1 BEDROOM)TYPE 'A'
UNIT B-4(2 BEDROOM)
UNIT B-5(1 BEDROOM)
UNIT B-6(1 BEDROOM)
UNIT B-7(STUDIO)
UNIT A-2(2 BEDROOM)
B
BB
C
C
B
B
B
C
TPB3 -3
TPB3 -10
TPB3
TPB4
TPB5
E
BB
B
B B
C
C
TPB4 -10TPB4-3
B
B
B
C
TPB5 -10
C C
C
E
B
B B
TPB6 -10TPB6-3
C
E
B
B
B
TPB7C
TPB7 -10
TPB7 -3
C
E
TPB5 -3
TPB6
A
A
A
A
AAACC
C
C
C C C
C
C
E
E
E
B
B
B
B B B B B
BB
B
B B B
B
B
TPA1
TPA2
TPA3
TPA1 -3 TPA1 -10
TPA2 -3
TPA2 -10
TPA3 -3
TPA3 -10
XE
XE
XE
XE
XE
XE
EM
EM
EM
HPB1 -26
HPB1 -26
A
A
TYP B1 AND A1 CORRIDOR LTG
EM
XF
XF
XF
XF
XEHC
A
A
A
HPB1 -26
LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-EL1.1
ELECTRICAL
LIGHTING PLAN
BLDGS A-B-C
LEVEL 1
Dakota
Partners, Inc.
OXOBOXO
LOFTS
Checker
Author
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
7 Permit ReviewComments 08/05/2019
Revision 9 DATE 9
ESK ABC-EL1.1R1
ESK ABC-EL1.1R1 02/14/20209
UNIT B-8(1 BEDROOM)TYPE A
UNIT B-9(2 BEDROOM)
UNIT B-10(1 BEDROOM)
UNIT B-11(1 BEDROOM)
UNIT B-12(1 BEDROOM)
BUILDING B
BUILDING C
BUILDING A
BUILDING G
BUILDING D
C
C
C C
C
E
E
E
E TPB17TPB11TPB16
TPB13TPB8
TPB9
TPB10
TPB12
A
A
B
B
B
B
B B
B
B
BB
B
A
B
B B
B
BB
C
C
B
C
A
A
B
B
C
C
C
TPB12 -10
TPB11 -10TPB11-3
TPB10 -3
TPB10 -10
TPB9 -10TPB9-3
C
TPB8 -3
TPB8 -10
XE
XEC
EM
EM
HPB1 -27 HPB1 -25
CCC
C
EM
LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED
HPB1 -6
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-EL1.2
ELECTRICAL
LIGHTING PLAN
BLDGS A-B-C
LEVEL 2
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
Revision 9 DATE 9
ESK ABC-EL1.2R1
ESK ABC-EL1.2R1 02/14/20209
BUILDING G
BUILDING D
BUILDING B
BUILDING C
BUILDING A
UNIT A-4(1 BEDROOM)H.C.
UNIT A-5(1 BEDROOM)UNIT A-6(2 BEDROOM)H.C.
UNIT B-13(1 BEDROOM)TYPE A
UNIT B-14(2 BEDROOM)
UNIT B-15(1 BEDROOM)
UNIT B-16(1 BEDROOM)
UNIT B-17(1 BEDROOM)
C BE
B B
B
C
TPB17 -10
TPB17
C C
CE
B
B B
TPB16 -10TPB16-3
TPB16
C
B
B
B
C
TPB15 -10
C
E TPB15 -3
TPB14
BB
B
B
C
C
TPB14 -3E
B
TPB14 -10
B
BB
C
C
B
C
B
B
C
TPB13 -3
TPB13 -10 TPB13
A
A
AAAAA
A
C
C C
C
C C
E
E
B
B B
B
B B B
BB
B B
B
B
TPA4 TPA6TPA5
C
TPA4 -10
TPA4 -3 TPA5 -10
TPA5 -3 TPA6 -10
TPA6 -3
XEEM
XEC
XE
EM
EM
HPB1 -28
HPB1 -28
CORRIROR LIGHTINGON THIS LEVEL A&B TO HPB1CIRCUIT 28 B
C
HEHC
HPB1 -28
LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED
A
A
A
A
HPB1 -6
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-EL1.3
ELECTRICAL
LIGHTING PLAN
BLDGS A-B-C
LEVEL 3
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
7 Permit ReviewComments 08/05/2019
Revision 9 DATE 9
ESK ABC-EL1.3R1
ESK ABC-EL1.3R1 02/14/20209
BUILDING D
BUILDING G
BUILDING B
BUILDING C
BUILDING A
BUILDING F
UNIT B-18(1 BEDROOM)
UNIT B-19(2 BEDROOM)
UNIT B-20(1 BEDROOM)
UNIT B-21(1 BEDROOM)
UNIT B-22(1 BEDROOM)
ATTIC SPACE
C BE
B B
B
C TPB22-3TPB22 -10
TPB22
TPB21
C C
C
E
B
TPB21 -10TPB21-3
B
B
B
TPB20 -10
C
E TPB20 -3
E
TPB19
BB
B
C
C
TPB19 -10TPB19-3
B
BB
C
C
B
C
B
B
C
TPB18 -3
TPB18 -10
TPB18
TPB20
CB
A
A
XEC
XE
EM
EM
HPB1 -28
LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED
HPB1 -6
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-EL1.4
ELECTRICAL
LIGHTING PLAN
BLDGS A-B-C
LEVEL 4
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
Revision 9 DATE 9
ESK ABC-EL1.4R1
ESK ABC-EL1.4R1 02/14/20209
UNIT B-1(2 BEDROOM)TYPE A
UNIT B-2(2 BEDROOM)
UNIT C-3(2 BEDROOM)TYPE A
UNIT C-4(2 BEDROOM)TYPE A
ELEVATOR
BUILDING B
BUILDING CBUILDING A
BUILDING G
BUILDING D
A
A
A
A
A
C
CC
C
C
C
C
C
B
B
B
B
B B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
C
TPC4
TPC4 -10
TPC4 -3
TPC3
C
C
TPC3 -10
TPC3 -3
TPC4 -10
TPB1
TPB2
TPB2 -3
TPB1 -3
TPB1 -10
XE
XE
XE
XE
XEC
HPB1 -25TYP OF CORRIDOR LIGHTING ON BB
XHCXHC
B
TPB2 -10
LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED
HPB1 -6
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-EL1.B
ELECTRICAL
LIGHTING PLAN
BUILDINGS B-C
LEVEL B
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
7 Permit ReviewComments 08/05/2019
Revision 9 DATE 9ESK ABC-EL1.BR1
ESK ABC-EL1.BR1
02/14/20209
UNIT C-1(2 BEDROOM)
UNIT C-2(2 BEDROOM)
STAIR 2
ELECTRICALMETER ROOM
BOILER ROOMSPRINKLER ROOM
BUILDING B BUILDING C
BUILDING A
(ABOVE)
BUILDING D
BUILDING G
B
TPC1
TPC2
E B
B
B B
E
B
B
B
B
B
TPC4
C
B
TPC2 -10
TPC2 -3
TPC1 -3C
C
HPB1 -24
HPB1 -24
XE
XE
XE
TPC1 -10
HPB1 -24
HPB1 -24
G G G
GG
G
G
G
GGG
G G G
GG
LINEAR LEDW/BATTERY BACKUP, LUMEX CLDLED
HPB1 -6
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
ABC-EL1.SB
ELECTRICAL
LIGHTING PLAN
BUILDINGS B-C
LEVEL SB
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
Revision 9 DATE 9ESK ABC-EL1.SBR1
ESK ABC-EL1.SBR1
02/14/20209
33
33DN
BUILDING D
UNIT D-1(2 BEDROOM)
UNIT D-2(1 BEDROOM)
RECEPTION
OFFICE
FITNESSROOM
OFFICE
WAITINGAREA
REST RM
JAN.
MECH'L
CONFROOM
COMMUNITYROOM
BUILDING E
B
B
B
B
B
B
B
B
C
C
C
E
E C
D
TPD1 -10
TPD2 -3
TPD2 -10
HPE -9
C
E
HPE
HPE -11
XE
XE
XE
EM
C
C
C
XE
CCC
ELECTRICALROOM
BEDROOM 1
BEDROOM 2
HPE -20
XEHC
XEHC
D
REST RM
D D
D
D
D
DDD
HPE -11
D
DD
D
C
B B
B
B
B
B
OCCUPANCY SENSOR(TYP)
BUILDING D BUILDING E
UNIT D-3(2 BEDROOM)
UNIT D-4(1 BEDROOM)
UNIT E-2(2 BEDROOM)UNIT E-3(2 BEDROOM)
TPD4C
B
B
CB B
C C
B
B
TPD3
TPD3 -3
TPD3 -10
C
TPD4 -3
C C
B
TPD4 -10
D
D
B
B
B
B
B
B
B
B B
B
TPE3
C C
CC E
TPE3 -3
C
CC
D
TPE2 D
D
TPE2 -10TPE2-3
TPE3 -10
HPE -9HPE-9
EM
EM
EM
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
DE-EL1.1
ELECTRICAL
LIGHTING PLAN
BLDGS D-E -
LEVELS 1 AND 2
Dakota
Partners, Inc.
OXOBOXO
LOFTS
Checker
Author
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
2 Adeendum 4 6/10/19
3 Revision 5 Date 5
4
7 Permit ReviewComments 08/05/2019
Revision 9 DATE 9
ESK DE-EL1.1R1
ESK DE-EL1.1R1 02/14/20209
GFIGFIGFI GFIGFIGFIGFIGFIGFIGFIGFIGFI GFI
S
S S
J
J F F FFFF
TV
TV
TV
TV
TV
J
J
J
J
TV
TV
TV
J
J
J
J
J
GFIGFIGFIF
F
F
FF
DN GFIGFIGFIGFIGFIJGFIJ
FFFFGFIGFIGFIGFIGFI
J
S S S S
S
S
FF
GFI GFIGFIGFIGFI
GFI
J
GFI
TV
TV
TV
TV
TV
TV TV
TV
TV
TV
TV TV
TV
TV
J
J
J
J
JJ
J
J
BUILDING D
UNIT D-1(2 BEDROOM)
UNIT D-2(1 BEDROOM)
OFFICE
FITNESSROOM
JAN.
COMMUNITYROOM
BUILDING E
HPE
HPE -1
5
5
5 1
2
2
2
3
4
HPE -2
3
HPE -3
HPE -4
8
7
HPE -8HP
TPD1 TPD2
TPD1 -1
1
1
1
2
2
222
TPD1 -3
4
9
TPD1 -4
5
TPD1 -5
TPD1 -6,8
TPD1 -7
4
TPD1 -2
TPD1 -11,13
14
14
14 TPD1 -14
11
1
1
TPD2 -1
2
2
2
TPD2 -2
TPD2 -3
TPD2 -4
445
TPD2 -6,8
TPD2 -7
TPD2 -9
5
TPD2 -5
TPD2 -11,13
HPE -12,14
HPE -13,15
TPD1 -12
TPD1 -15
TPD2 -15
TPD2 -12
H2 HPE -16
SECURITY HEADEND RACK
HPE -17
H3
SECURITY HEAD END RACK
S/CS/C
HPE -18
TPD1 -16
EWH-8 TPD2 -14
HPE -19
EWH-9
2
SME
2SME
1
TPD1 -17
TPD1 -18
TPD2 -16TPD2-17
BRANCH DEVICE METER SOCKETW/100 AMP CB, MODEL EZMH316(TYP OF 9) PLUS A 2 METER SOCKETCOLUMN
MAIN DEVICE W/MCB SQUARE D EZM 31200 CB 1200 AMP,208V/120V/3D/4W, FED FROM UTILITY TRANSFORMER SEESHEET E2.2
EWH-9
HPE -21
HP
NOTE: HEAT PUMP (HP) CONDENSATE PUMPSTO BE WIRED INTO THE SAME CIRCUIT AS HEATPUMP.
FIRE ALARM CONTROL PANEL (FACP)
SECURITY HEADEND RACK
OFFICE
ENTRYVESTIBULE
VESTIBULE
MECH.
RESTRM.RESTRM.
PACKAGES
7
8
77
22
22
23
BUILDING D BUILDING E
UNIT D-3(2 BEDROOM)
UNIT D-4(1 BEDROOM)UNIT E-2(2 BEDROOM)
UNIT E-3(2 BEDROOM)
TPE3
TPE3 -1
TPE3 -2
TPE3 -3
TPE3 -4
TPE3 -5TPE3-6,8
TPE3 -7
TPE3 -9
2 2
2
5 5
5
14
14
14
TPE3 -14
TPE3 -11,13
HP
TPE3 -12
1
1
1
1TPD4-11,13
TPD4
1
1
1
1 TPE3 -2
2
2
2
TPD4 -4
TPD4 -5
TPD4 -9
TPD4 -7
4
5
TPD4 -3
5TPD4-5
TPD4 -6,8
TPD4 -12
TPD3
1
1
1 TPD3 -1
TPD3 -2
2 2
2
2
TPD3 -3
4
4
TPD3 -4
TPD3 -55
TPD3 -6,8
TPD3 -7TPD3-9
TPD3 -11,13
14 14
14
TPD3 -14
TPE2
1 1
1TPE2 -1
2
2
2
2TPE2-2
TPE2 -3
44
TPE2 -6,8
5
5TPE2-5
TPE2 -7
TPE2 -9 TPE2 -4
4
TPE2 -11,13
10
TPD4 -15
TPD3 -15TPD3-12
TPE2 -12 TPE2 -15
TPE3 -15
S/CS/C
S/C
S/C
2
SME SME
2
2
SME
SME
2
HP
EF-1
EF-1
EF-1
EF-1
HP
TPD3 -16
TPD3 -17
TPD4 -14
TPD4 -16
TPE2 -14TPE2-16
TPE3 -16
TPE3 -17
2
2
2
4
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
1/8" = 1'-0"
DE-EP1.1
ELECTRICAL
POWER PLAN
BLDGS D-E -
LEVELS 1 AND 2
Dakota
Partners, Inc.
OXOBOXO
LOFTS
DA
RS
11/01/2016
16066.01
A B
D E
C F
G H
J
K
L M
NORTH
SITE KEY PLAN
No.Description Date
1 Addendum 3 4/12/19
3 Revision 5 Date 5
8 Addendum 8 11/5/19
Revision 9 DATE 9
ESK DE-EP1.1R1
ESK DE-EP1.1R1 02/14/20209
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
E3.1
ELECTRICAL
PANELBOARD
SCHEDULES
Dakota
Partners, Inc.
OXOBOXO
LOFTS
Checker
Author
11/01/2016
16066.01
Notes:
Total Est. Demand:30 A
Receptacle 180 VA 100.00%180 VA Total Conn.:29 A
Other 2160 VA 100.00%2160 VA Total Est. Demand:6250 VA
Motor 2116 VA 112.50%2381 VA Total Conn. Load:5986 VA
Lighting - Dwelling Unit 17 VA 100.00%17 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps:30 A 28 A
Total Load:3115 VA 2871 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 24
21 22
19 20
17 18
15 Dishwasher 20 A 1 500 VA 16
13 ------529 VA 500 VA 1 20 A Disposal 14
11 HP1 20 A 2 529 VA 1058 VA 1 20 A KEF 12
9 FRIDGE 20 A 1 180 VA 17 VA 1 20 A Lighting - Dwelling Unit 10
7 STOVE FAN 20 A 1 500 VA 90 VA ------8
5 KITCHEN RECEPTACLES 20 A 1 180 VA 90 VA 2 20 A STOVE 6
3 BATHROOM CIRCUITS 20 A 1 14 VA 180 VA 1 20 A KITCHEN RECEPTACLES 4
1 BEDROOM RECEPTACLES 20 A 1 720 VA 900 VA 1 20 A LIVING ROOM RECEPTACLES 2
CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT
Notes:
Enclosure:MCB Rating:100 AMounting:Recessed Wires:3 Mains Rating:100 A
Supply From:Phases:1 Mains Type:MCB
Location:Volts:120/208 single A.I.C. Rating:
Branch Panel:TPJ4
Notes:
Total Est. Demand:41 A
Receptacle 180 VA 100.00%180 VA Total Conn.:40 A
Other 3420 VA 100.00%3420 VA Total Est. Demand:8582 VA
Motor 3174 VA 108.33%3439 VA Total Conn. Load:8318 VA
Lighting - Dwelling Unit 17 VA 100.00%17 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps:44 A 35 A
Total Load:4723 VA 3595 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 24
21 22
19 20
17 Disposal 20 A 1 500 VA 500 VA 1 20 A Dishwasher 18
15 Motor 20 A 1 2116 VA 180 VA 1 20 A Other 16
13 ------529 VA 1080 VA 1 20 A BEDROOM 2 RECEPTACLES 14
11 HP1 20 A 2 529 VA 0 VA 1 20 A Spare 12
9 FRIDGE 20 A 1 0 VA 44 VA 1 20 A APARTMENT LIGHTING 10
7 STOVE FAN 20 A 1 500 VA 90 VA ------8
5 KITCHEN RECEPTACLE 20 A 1 180 VA 90 VA 2 20 A STOVE 6
3 BATHROOM CIRCUIT 20 A 1 0 VA 180 VA 1 20 A KITCHEN RECEPTACLE 4
1 BEDROOM 1 RECEPTACLES 20 A 1 720 VA 1080 VA 1 20 A LIVING ROOM RECEPTACLES 2
CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT
Notes:
Enclosure:MCB Rating:100 AMounting:Recessed Wires:3 Mains Rating:100 A
Supply From:Phases:1 Mains Type:MCB
Location:Volts:120/208 single A.I.C. Rating:
Branch Panel:TPJ3
Notes:
Total Est. Demand:39 A
Total Conn.:38 A
Other 3780 VA 100.00%3780 VA Total Est. Demand:8066 VA
Motor 2116 VA 112.50%2381 VA Total Conn. Load:7802 VA
Lighting - Dwelling Unit 238 VA 100.00%238 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps:40 A 34 A
Total Load:4283 VA 3519 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 Fridge Receptacle 20 A 1 0 VA 24
21 Power 20 A 1 500 VA 0 VA 1 20 A Kitchennette Receptacle 22
19 Power 20 A 1 500 VA 41 VA 1 20 A Lighting 20
17 Security Head End Rack 20 A 1 180 VA 500 VA 1 20 A Power 18
15 ------529 VA 180 VA 1 20 A H2 SECURITY RACK 16
13 HP 20 A 2 529 VA 529 VA ------14
11 lLighting 20 A 1 122 VA 529 VA 2 20 A HP 12
9 Lighting 20 A 1 99 VA 153 VA 1 20 A LIGHTNG 10
7 Community Room Receptacle 20 A 1 720 VA 540 VA 1 20 A Community Room receptacle 8
5 FITNESS RECEPTACLES 20 A 1 540 VA 180 VA 1 20 A SPARE 6
3 Fitness Receptacles 20 A 1 360 VA 0 VA 1 20 A TOILET ROOMS 4
1 OFFICE RECEPTACLES 20 A 1 540 VA 540 VA 1 20 A OFFICE RECEPTACLES 2
CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT
Notes:
Enclosure:MCB Rating:100 AMounting:Recessed Wires:3 Mains Rating:100 A
Supply From:HPB Phases:1 Mains Type:MCB
Location:Volts:120/208 single A.I.C. Rating:
Branch Panel:HPE
PANEL TPJ4 IS TYPICAL (AN EXAMPLE) OF ALL ONE BEDROOM ONE BATHROOM APARTMENTSALL CIRCUITS FEEDING RECEPTACLES IN BEDROOMS SHALL BE ARCFAULT PROTECTED (AFC) ANDTHE RECEPTACLES SHALL BE TAMPER PROOF
PANEL TPJ5 IS TYPICAL (AN EXAMPLE) OF ALL TWO BEDROOM ONE BATHROOMAPARTMENTSALL CIRCUITS FEEDING BEEDROOM SHALL BE ARC FAUTL PROTECTED AND THERECEPTACLES SHALL BE TAMPER PROOF
Notes:
Total Est. Demand:31 A
Total Conn.:30 A
Receptacle 180 VA 100.00%180 VA Total Est. Demand:6423 VA
Other 3420 VA 100.00%3420 VA Total Conn. Load:6158 VA
Motor 1058 VA 125.00%1323 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps:34 A 24 A
Total Load:3679 VA 2479 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 24
21 22
19 20
17 18
15 Dishwasher 20 A 1 500 VA 16
13 ------529 VA 720 VA 1 20 A BEDROOM 2 RECEPTACLES 14
11 HP 20 A 2 529 VA 500 VA 1 20 A Disposal 12
9 FRIDGE 20 A 1 180 VA 0 VA 1 20 A LIGHTING 10
7 STOVE FAN 20 A 1 500 VA 90 VA ------8
5 KITCHEN CIRCUIT 20 A 1 540 VA 90 VA 2 20 A STOVE 6
3 BATHROOM CIRCUITS 20 A 1 0 VA 360 VA 1 20 A KITCHEN CIRCUIT 4
1 BEDROOM 1 RECEPTACLES 20 A 1 720 VA 900 VA 1 20 A LIVING ROOM RECEPTACLES 2
CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT
Notes:
Enclosure:MCB Rating:100 AMounting:Recessed Wires:3 Mains Rating:100 A
Supply From:Phases:1 Mains Type:MCB
Location:Volts:120/208 single A.I.C. Rating:
Branch Panel:TPB9
PANEL TPB9 IS TYPICAL (AN EXAMPLE) OF TWO BEDROOM ONE BATHROOM APARTMENTS IN THE B BUILDINGALL CIRCUITS FEEDING RECEPTACLES IN BEDROOMS SHALL BE ARCFAULT PROTECTED (AFC) AND THERECEPTACLES SHALL BE TAMPER PROOF
No.Description Date
1 Addendum 3 4/12/19
Revision 9 DATE 9
ESK E3.1R1
ESK E3.1R1 02/14/20209
Scale
Date
Drawn By
Checked By
Project Number
UNCASVILLE, CT
E3.2
ELECTRICAL
PANELBOARD
SCHEDULES
Dakota
Partners, Inc.
OXOBOXO
LOFTS
Checker
Author
11/01/2016
16066.01
Notes:
Total Est. Demand:75 A
Receptacle 14352 VA 100.00%14352 VA Total Conn.:74 A
Other 5400 VA 100.00%5400 VA Total Est. Demand:27011 VA
Motor 3274 VA 108.08%3539 VA Total Conn. Load:26746 VA
Lighting - Dwelling Unit 2848 VA 100.00%2848 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps:120 A 98 A 25 A
Total Load:13192 VA 10557 VA 3001 VA
41 42
39 40
37 38
35 Lighting - Dwelling Unit 20 A 1 448 VA 36
33 Other 20 A 1 540 VA 529 VA ------34
31 Lighting - Dwelling Unit 20 A 1 448 VA 529 VA 2 20 A Motor 32
29 Motor 20 A 1 0 VA 0 VA 1 20 A Power 30
27 Motor 20 A 1 550 VA 529 VA ------28
25 Security Head End Rack 20 A 1 360 VA 529 VA 2 20 A Motor 26
23 Lighting - Dwelling Unit 20 A 1 0 VA 0 VA 1 20 A Security Head End Rack 24
21 Lighting 20 A 1 0 VA 0 VA 1 20 A Lighting 22
19 ------529 VA 832 VA 1 20 A Lighting 20
17 SEWAGE EJECTOR PUMP 20 A 2 0 VA 0 VA 1 20 A Other 18
15 Lighting 20 A 1 224 VA 1080...1 20 A CORRIDOR RECEPTACLES 16
13 Spare 20 A 1 0 VA 540 VA 1 20 A CORRIDOR RECEPTACLES 14
11 CORRIDOR RECEPTACLES 20 A 1 0 VA 0 VA 1 20 A CORRIDOR RECEPTACLES 12
9 WASHER 20 A 1 0 VA 0 VA 1 20 A CORRIDOR RECEPTACLES 10
7 ------2392...0 VA 1 20 A WASHER 8
5 DRYER 30 A 2 2392...180 VA 1 20 A WASHER 6
3 ------2392...2392...------4
1 DRYER 30 A 2 2392...2392...2 30 A DRYER 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure:MCB Rating:100 AMounting:Recessed Wires:4 Mains Rating:225 A
Supply From:HPB Phases:3 Mains Type:MCB
Location:Volts:120/208 Wye A.I.C. Rating:
Branch Panel:HPH1
Notes:
Receptacle 15072 VA 65.00%9797 VA Total Est. Demand:327 A
Other 15120 VA 100.00%15120 VA Total Conn.:336 A
Motor 73479 VA 104.59%76854 VA Total Est. Demand:117830 VA
Lighting - Exterior 350 VA 125.00%438 VA Total Conn. Load:121208 VA
Lighting - Dwelling Unit 5518 VA 70.34%3881 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps:377 A 354 A 295 A
Total Load:44315 VA 41496 VA 35400 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 ------1233...24
21 ------1233...500 VA 1 20 A Power 22
19 EUH-1 30 A 3 1233...1000...1 20 A Power 20
17 ------987 VA 1000...1 20 A Power 18
15 ------987 VA 3300...------16
13 Motor 20 A 3 987 VA 3300...------14
11 ------1773...3300...3 80 A ELEVATOR 1 12
9 ------1723...1055...------10
7 HPFA 225 A 3 1954...1319...2 100 A HPH1 8
5 ------4627...3519...------6
3 ------3403...4283...2 100 A HPE 4
1 HPB1A 225 A 3 4888...180 VA 1 20 A Security Head End Rack 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure:Type 1 MCB Rating:400 A
Mounting:Surface Wires:4 Mains Rating:400 A
Supply From:Phases:3 Mains Type:
Location:Volts:120/208 Wye A.I.C. Rating:
Branch Panel:HPB
Notes:
Total Est. Demand:38 A
Receptacle 720 VA 100.00%720 VA Total Conn.:36 A
Other 4500 VA 100.00%4500 VA Total Est. Demand:13800 VA
Motor 4791 VA 118.44%5674 VA Total Conn. Load:12918 VA
Lighting - Dwelling Unit 1920 VA 100.00%1920 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps:42 A 28 A 40 A
Total Load:4888 VA 3403 VA 4627 VA
41 42
39 40
37 38
35 36
33 Other 20 A 1 540 VA 50 VA 1 20 A Motor 34
31 Power 20 A 1 550 VA 1767...------32
29 ERV2 20 A 1 50 VA 1767...2 30 A HP-4 30
27 Lighting 20 A 1 160 VA 480 VA 1 20 A Lighting 28
25 Lighting 20 A 1 200 VA 416 VA 1 20 A Lighting 26
23 ------529 VA 538 VA 1 20 A Lighting 24
21 Motor 20 A 2 529 VA 50 VA 1 20 A Motor 22
19 LEVLEL 3 CORRIDOR RECEPTACLES 20 A 1 540 VA 360 VA 1 20 A LEVEL 4 CORRIDOR RECEPTACLES 20
17 LEVEL 1 CORRIDOR RECEPTACLES 20 A 1 540 VA 360 VA 1 20 A LEVEL 2 CORRIDOR RECEPTACLES 18
15 ------90 VA 90 VA ------16
13 DRYER 50 A 2 90 VA 90 VA 2 50 A DRYER 14
11 ------90 VA 90 VA ------12
9 DRYER 50 A 2 90 VA 90 VA 2 50 A DRYER 10
7 8
5 WASHER 20 A 1 500 VA 192 VA 1 20 A Lighting Stairwell 6
3 MAINTENANCE RECEPTACLES 20 A 1 720 VA 540 VA 1 20 A B CORRIDOR RECEPTACLES 4
1 BOILER ROOM RECEPTACLE 20 A 1 360 VA 540 VA 1 20 A SB RECEPTACLES 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure:Type 1 MCB Rating:225 A
Mounting:Surface Wires:4 Mains Rating:225 A
Supply From:HPB Phases:3 Mains Type:
Location:Volts:120/208 Wye A.I.C. Rating:
Branch Panel:HPB1
Notes:
Total Est. Demand:161 A
Other 1260 VA 100.00%1260 VA Total Conn.:151 A
Motor 50438 VA 106.69%53813 VA Total Est. Demand:57976 VA
Lighting - Exterior 350 VA 125.00%438 VA Total Conn. Load:54518 VA
Lighting - Dwelling Unit 512 VA 100.00%512 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps:163 A 144 A 148 A
Total Load:19541 VA 17239 VA 17739 VA
41 42
39 40
37 38
35 36
33 34
31 BOILERS 20 A 1 1000...350 VA 1 20 A Lighting - Exterior 32
29 CHEMICAL TREATMENT SYSTEM 20 A 1 500 VA 250 VA ------30
27 Security Head End Rack 20 A 1 0 VA 250 VA 2 60 A SVE EQUIPMENT 28
25 BLDG F LIGHTING 20 A 1 512 VA 987 VA ------26
23 ------529 VA 987 VA ------24
21 HP9 30 A 2 529 VA 987 VA 3 20 A CT-1 22
19 RECEPTACLES 20 A 1 540 VA 720 VA 1 20 A RECEPTACLES 20
17 ------2250...2250...------18
15 ------2250...2250...------16
13 P5 50 A 3 2250...2250...3 50 A P6 14
11 ------987 VA 987 VA ------12
9 ------987 VA 987 VA ------10
7 P3 20 A 3 987 VA 987 VA 3 20 A P4 8
5 ------4500...4500...------6
3 ------4500...4500...------4
1 P1 (VFD)80 A 3 4500...4500...3 80 A P2 (VFD)2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
Notes:
Enclosure:Type 1 MCB Rating:225 AMounting:Surface Wires:4 Mains Rating:225 A
Supply From:HPB Phases:3 Mains Type:
Location:ELEVATOR C-3 Volts:120/208 Wye A.I.C. Rating:
Branch Panel:HPF
No.Description Date
Revision 9 DATE 9
ESK E3.2R1
ESK E3.2R1 02/14/20209