Loading...
HomeMy WebLinkAboutE_16066_42PINKROW_R1933BUILDING D BUILDING B BUILDING C BUILDING G BUILDING A UNIT A-1 (2 BEDROOM)UNIT A-2(1 BEDROOM) UNIT B-3(1 BEDROOM)TYPE 'A' UNIT B-4(2 BEDROOM) UNIT B-5(1 BEDROOM) UNIT B-6(1 BEDROOM) UNIT B-7(STUDIO) UNIT A-2(2 BEDROOM) B BB C C B B B C TPB3 - 3 TPB3 - 10 TPB3 TPB4 TPB5 E BB B B B C C TPB4 - 10TPB4- 3 B B B C TPB5 - 10 C C C E B B B TPB6 - 10TPB6- 3 C E B B B TPB7C TPB7 - 10 TPB7 - 3 C E TPB5 - 3 TPB6 A A A A AAACC C C C C C C C E E E B B B B B B B B BB B B B B B B TPA1 TPA2 TPA3 TPA1 - 3 TPA1 - 10 TPA2 - 3 TPA2 - 10 TPA3 - 3 TPA3 - 10 XE XE XE XE XE XE EM EM EM HPB1 - 26 HPB1 - 26 A A TYP B1 AND A1 CORRIDOR LTG EM XF XF XF XF XEHC Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EL1.1 ELECTRICAL LIGHTING PLAN BLDGS A-B-C LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 7 Permit ReviewComments 08/05/2019 ESK ABC-EL1.1 12/31/19 ESK ABC-EL1.1 UNIT B-8(1 BEDROOM)TYPE A UNIT B-9 (2 BEDROOM) UNIT B-10(1 BEDROOM) UNIT B-11(1 BEDROOM) UNIT B-12(1 BEDROOM) BUILDING B BUILDING C BUILDING A BUILDING G BUILDING D C C C C C E E E E TPB11 TPB8 TPB9 TPB10 TPB12 A A B B B B B B B B BB B A B B B B BB C C B C A A B B C C C TPB12 - 10 TPB11 - 10TPB11- 3 TPB10 - 3 TPB10 - 10 TPB9 - 10TPB9- 3 C TPB8 - 3 TPB8 - 10 XE XEC EM EM HPB1 - 27 HPB1 - 25 CCC C Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EL1.2 ELECTRICAL LIGHTING PLAN BLDGS A-B-C LEVEL 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date ESK ABC-EL1.2 12/31/19 ESK ABC-EL1.2 BUILDING G BUILDING D BUILDING B BUILDING C BUILDING A UNIT A-4(1 BEDROOM)H.C. UNIT A-5(1 BEDROOM)UNIT A-6(2 BEDROOM)H.C. UNIT B-13 (1 BEDROOM)TYPE A UNIT B-14(2 BEDROOM) UNIT B-15(1 BEDROOM) UNIT B-16 (1 BEDROOM) UNIT B-17 (1 BEDROOM) C BE B B B C TPB17 - 10 TPB17 C C CE B B B TPB16 - 10TPB16- 3 TPB16 C B B B C TPB15 - 10 C E TPB15 - 3 TPB14 BB B B C C TPB14 - 3E B TPB14 - 10 B BB C C B C B B C TPB13 - 3 TPB13 - 10 TPB13 A A AAAAA A C C C C C C E E B B B B B B B BB B B B B TPA4 TPA6TPA5 C TPA4 - 10 TPA4 - 3 TPA5 - 10 TPA5 - 3 TPA6 - 10 TPA6 - 3 XEEM XEC XE EM EM A A HPB1 - 28 HPB1 - 28 CORRIROR LIGHTING ON THIS LEVEL A&B TO HPB1 CIRCUIT 28 B C HEHC Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EL1.3 ELECTRICAL LIGHTING PLAN BLDGS A-B-C LEVEL 3 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 7 Permit ReviewComments 08/05/2019 ESK ABC-EL1.3 12/31/19 ESK ABC-EL1.3 BUILDING D BUILDING G BUILDING B BUILDING C BUILDING A BUILDING F UNIT B-18(1 BEDROOM) UNIT B-19(2 BEDROOM) UNIT B-20(1 BEDROOM) UNIT B-21(1 BEDROOM) UNIT B-22(1 BEDROOM) ATTIC SPACE C BE B B B C TPB22- 3TPB22 - 10 TPB22 TPB21 C C C E B TPB21 - 10TPB21- 3 B B B TPB20 - 10 C E TPB20 - 3 E TPB19 BB B C C TPB19 - 10TPB19- 3 B BB C C B C B B C TPB18 - 3 TPB18 - 10 TPB18 TPB20 CB A A A A A XEC XE EM EM HPB1 - 28 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EL1.4 ELECTRICAL LIGHTING PLAN BLDGS A-B-C LEVEL 4 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date ESK ABC-EL1.4 12/31/19 ESK ABC-EL1.4 UNIT B-1(2 BEDROOM)TYPE A UNIT B-2(2 BEDROOM) UNIT C-3(2 BEDROOM)TYPE A UNIT C-4(2 BEDROOM)TYPE A ELEVATOR BUILDING B BUILDING CBUILDING A BUILDING G BUILDING D A A A A A C CC C C C C C B B B B B B B B B B B B B B B B B B B B B B B C TPC4 TPC4 - 10 TPC4 - 3 TPC3 C C TPC3 - 10 TPC3 - 3 TPC4 - 10 TPB1 TPB2 TPB2 - 3 TPB1 - 3 TPB1 - 10 XE XE XE XE XEC HPB1 - 25TYP OF CORRIDOR LIGHTING ON BB XHCXHC B TPB2 - 10 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EL1.B ELECTRICAL LIGHTING PLAN BUILDINGS B-C LEVEL B Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 7 Permit ReviewComments 08/05/2019 ESK ABC-EL1.B 12/31/19 ESK ABC-EL1.B UNIT C-1(2 BEDROOM) UNIT C-2(2 BEDROOM) STAIR 2 ELECTRICALMETER ROOM BOILER ROOMSPRINKLER ROOM BUILDING B BUILDING C BUILDING A (ABOVE) BUILDING D BUILDING G B TPC1 TPC2 E B B B B E B B B B B TPC4 C B TPC2 - 10 TPC2 - 3 TPC1 - 3C C HPB1 - 24 HPB1 - 24 XE XE XE TPC1 - 10 HPB1 - 24 HPB1 - 24 G G G GG G G G GGG G G G GG Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EL1.SB ELECTRICAL LIGHTING PLAN BUILDINGS B-C LEVEL SB Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date ESK ABC-EL1.SB 12/31/19 ESK ABC-EL1.SB GFIGFIGFI GFI FF GFI GFIGFIGFIFF F J GFIJGFI GFIGFIGFIJGFIS FF S S J S S GFIGFIGFIGFI J GFI J S S GFI GFIGFIGFIGFI JGFI GFI GFIJ GFIGFIGFI GFI GFIJ GFIGFIGFIGFIGFIGFIGFIGFI GFI J J FFFFGFIGFIGFIGFIGFI J S S S TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV S S TV TV TV TV TV TV TV TV TV TVTV TV TV J J J J J J J J J J J J J J J J J J BUILDING D BUILDING B LEVEL 1 BUILDING C BUILDING G BUILDING A LEVEL 1 UNIT A-1(2 BEDROOM) UNIT A-2 (1 BEDROOM) UNIT B-3 (1 BEDROOM)TYPE 'A' UNIT B-4(2 BEDROOM) UNIT B-5(1 BEDROOM) UNIT B-6(1 BEDROOM) UNIT B-7(STUDIO) UNIT A-2 (2 BEDROOM) TPB7 TPB7 - 3 TPB4 - 1 TPB4 - 2 TPB4 - 3 TPB4 - 14 TPB4 - 4TPB4- 9 TPB4 - 7 1 1 1 TPA2 - 1 2 2 2 TPA2 - 2 TPA2 - 3 4 TPA2 - 4 5 5 4 TPA2 9 TPA2 - 9 TPA2 - 5 TPA2 - 6,8 TPA2 - 7 TPA2 - 11,13 KEF 2 HP TPA2 - 12 HPB1 - 17 HPB1 - 17 HP TPA1 - 1 1 1 1 TPA1 - 2 2 2 22 TPA1 - 3 4 TPA1 - 4 5 TPA1 - 5 TPA1 - 6,8 TPA1 - 7 TPA1 - 9 TPA1 - 11,13 HP TPA3 2 2 5 1 1 TPA3 - 1 TPA3 - 2 TPA3 - 3 4 TPA3 - 4 5 TPA3 - 5 TPA3 - 6,8TPA3- 7 TPA3 - 9 TPA3 - 11,13 14 14 14 TPA3 - 14 22 1 1 11 2 TPB7 - 1 TPB7 - 4 4 TPB7 - 5 TPB7 - 6,8 TPB7 - 7 TPB7 - 9 HP TPB7 - 11,13 TPB6 1 1 1 TPB6 - 1 22 2 2 TPB6 - 2 TPB6 - 3 HP 4 5 4 95 TPB6 - 6,8 TPB6 - 7TPB6- 4 TPB6 - 11,13 55 TPB4 - 5 4 4 11 1 2 2 2 14 14 HP TPB5 1 1 1 2 2 2 HP TPB5 - 2 TPB5 - 3 5 4 5 TPB5 - 6,8 TPB5 - 7 TPB5 - 9 TPB5 - 11,13 14 TPB4 - 6,8 TPB4 - 11,13TPB4 TPB3 1 1 1 TPB3 - 1 2 2 2 2 TPB3 - 2 4 TPB3 - 3 55 5 TPB3 - 5 TPB3 - 6,8 TPB3 - 7 4 TPB3 - 9 1TPB3- 4 HP TPB3 - 11,13 TPA3 - 12 TPA3 - 15 TPA1 TPA1 - 12 14 14 14 TPA1 - 14 TPA1 - 15 EF KEF 1 TPB5 - 1 TPB5 - 4 S/CO S/CO S/CO S/CO S/CO 1A * 1A * 1A * 1A * FAAP HPB-19 EF-1 1A * 1A * HPB1 - 17 1A * S/CO S/CO S/CO 1A * INDICATED CIRCUIT # IN ASSOC. APARTMENTTENANT. PANEL (TP) TYP 2 TS FS EWH-3 SME SM SME SME SME SME SME SM 2 2 2 2 2 2 2 GFI TPA3 - 16 TPA3 - 17 TPB7 - 12 TPB7 - 14 TPB6 - 12 TPB6 - 14 TPB5 - 12 TPB5 - 14 TPB4 - 12 TPB4 - 15 TPB3 - 12 TPB3 - 14 2 14 4 8 8 8 8 8 2 2 NOTE: HEAT PUMP (HP) CONDENSATE PUMPSTO BE WIRED INTO THE SAME CIRCUIT AS HEATPUMP. 8 5 GFI 4 8 8 8 8 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT CONCEPT 1/8" = 1'-0" ABC-EP1.1 ELECTRICAL POWER PLAN BLDGS A-B-C - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 Addendum 3 4/12/19 8 Addendum 8 11/5/19 ESK ABC-EP1.1 12/31/19 ESK ABC-EP1.1 GFI J GFIJ FF S GFIGFIGFI GFIGFI J GFIGFIGFIGFIGFI J GFIGFIGFI GFI GFI GFIJ S S S S S TV TV TV TV TV TV TV TV TV TV TV S J TV TV TV TV TV J J J J J J J J TV GFIGFI UNIT B-8(1 BEDROOM)TYPE A UNIT B-9(2 BEDROOM) UNIT B-10(1 BEDROOM) UNIT B-11(1 BEDROOM) UNIT B-12(1 BEDROOM) BUILDING B LEVEL 2 TPB9 TPB9 - 1 1 1 1 TPB9 - 2 2 2 2 TPB9 - 3 54 4 5 5 TPB9 - 5TPB9- 6,8 TPB9 - 7 TPB9 - 9 TPB9 - 11,13 HP6 14 14 14 TPB9 - 14 TPB10 1 1 TPB10 - 1 2 4 TPB10 - 4 5 5 TPB10 - 6,8TPB10- 7 2 TPB10 - 2 TPB10 - 9 TPB10 - 11,13 HPB1 - 18 18 2 1 2 2 2 TPB8 - 2 TPB8 - 3 44 5 5 TPB8 - 6,8 TPB8 - 7 TPB8 TPB8 - 4 5 5 2 1 1 1 TPB8 - 9 TPB10 - 5 TPB11 1 1 1 TPB11 - 1 2 2 2 TPB11 - 2 TPB11 - 3 4 5 TPB10 - 3 TPB11 - 5 9 TPB11 - 6,8 TPB11 - 7 TPB11 - 11,13 1 TPB12 - 1 22 2 TPB12 - 2 TPB12 - 3 4 TPB12 - 4 5 TPB12 - 5 TPB12 - 6,8 TPB12 - 7 4 TPB12 - 9 5 TPB12 - 11,13 TPB8 - 11,13 1A * 1 S/CO S/CO S/CO S/CO S/CO 1A *1A * HP 1A * HP HP HP 1A * 1A * TS FS HPB1 - 5 EWH-4 2 SME 2 2 SME 2 SME 2SME TPB12 - 14TPB12- 15 TPB10 - 14 TPB10 - 12 TPB9 - 12 TPB9 - 15 TPB8 - 14 TPB8 - 12 1 8 8 NOTE: HEAT PUMP (HP) CONDENSATE PUMPSTO BE WIRED INTO THE SAME CIRCUIT AS HEATPUMP. 8 8 84 8 TPB12 1 18 HPB1 - 14,16 HPB1 - 13,15HPB1- 9,11 HPB1 - 10,12 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EP1.2 ELECTRICAL POWER PLAN BLDGS A-B-C - LEVEL 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 Addendum 3 4/12/19 8 Addendum 8 11/5/19 ESK ABC-EP1.B 12/31/19 ESK ABC-EP1.2 GFIGFIGFIGFIGFIJ GFI GFIGFI GFI GFIGFI J FFGFIGFI GFI GFI GFIGFIS S J F GFI GFI GFI GFIGFIGFI J GFIGFIGFIGFIJ GFI GFIGFIS S S S J GFIGFIGFI GFI GFI J S SS GFIGFIGFI GFI GFI GFIS SJ GFI GFIGFIS J TV TV TV TV TV TV TVTV TV TV TV TV TV TV TV TV TV TV S J TV TV TV TV TV TVTV TV TV J J J J J J J J J J J J J JGFI GFIBUILDING G BUILDING D BUILDING B LEVEL 3 BUILDING A LEVEL 2 UNIT A-4(1 BEDROOM)H.C. UNIT A-5(1 BEDROOM) UNIT A-6 (2 BEDROOM) H.C. UNIT B-13(1 BEDROOM) TYPE A UNIT B-14(2 BEDROOM) UNIT B-15 (1 BEDROOM) UNIT B-16(1 BEDROOM) UNIT B-17 (1 BEDROOM) HP2 TPB14 1 1 1 TPB14 - 1 2 2 2 2 TPB14 - 3 TPB14 - 2 4 TPB14 - 4 55 TPB14 - 5 TPB14 - 6,8 TPB14 - 7 TPB14 - 9 TPB14 - 11,13 TPB14 - 14 14 14 14 TPB15 1 11 1 TPB15 - 1 2 2 TPB15 - 3 45 5 TPB15 - 5 TPB15 - 6,8 TPB15 - 7 TPB15 - 2 TPB15 - 9 TPB15 - 11,13 HP TPA6 TPA6 - 1 1 1 1 2 2 TPA6 - 2 TPA6 - 3 TPA6 - 4 4 5 5 TPA6 - 6,8 TPA6 - 7 TPA6 - 11,13 TPA6 - 9 14 14 14 14 KEF TPA6 - 12 HPB1 - 19 19 HP TPA4 TPA4 - 1 1 1 12 2 TPA4 - 2 TPA4 - 344 TPA4 - 4 TPA4 - 5 TPA4 - 6,8 TPA4 - 7 TPA4 - 9 TPA4 - 11,13 HP TPA5 1 1 1 TPA5 - 2 2 2 2 TPA5 - 3 4 4 TPA5 - 5 5 TPA5 - 6,8 TPA5 - 7 TPA5 - 9 TPB17 1 1 TPB17 - 2 2 2 22 TPB17 - 3 4 TPB17 - 4 TPB17 - 5 4 5 TPB17 - 6,8 TPB17 - 7 HP2 2 TPB17 - 9 TPB17 - 11,13 HP TPB16 1 1 1 1 2 2 2 TPB16 - 2 TPB16 - 3 4 4 4 TPB16 - 4 5 TPB16 - 6,8 TPB16 - 7 TPB16 - 9 TPB16 - 11,13 TPB13 TPB13 - 1 1 11 1 2 2 2 2 2 TPB13 - 2 TPB13 - 3 TPB13 - 4 44 55TPB13- 5 5 TPB13 - 6,8 TPB13 - 7 TPB13 - 9 HP HP 19 TS FS S/C S/C S/C S/C S/C S/C S/C 1 1 11 1 1 TPB17 - 14 EWH-6 SME SME SME SME SME SME SME 2 2 2 2 SME 2 2 2 2 TPA4 - 12 TPA4 - 14 TPA5 - 14TPA5 - 12 TPA6 - 15 TPA6 - 16 TPB17 - 16 TPB17 - 15 TPB15 - 14 TPB15 - 12 TPB14 - 15 TPB14 - 12 TPB13 - 14 TPB13 - 12 5 5 5 TPA5 - 11,13 5 4 GFI GFI 4 TPB13 - 11,13 8 8 8 8 8 NOTE: HEAT PUMP (HP) CONDENSATE PUMPSTO BE WIRED INTO THE SAME CIRCUIT AS HEATPUMP. 8 GFI 8 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EP1.3 ELECTRICALPOWER PLAN BLDGS A-B-C - LEVEL 3 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 Addendum 3 4/12/19 8 Addendum 8 11/5/19 ESK ABC-EP1.B 12/31/19 ESK ABC-EP1.3 GFIGFIGFIGFI J GFIGFIGFIGFI GFI GFI GFIS J GFI GFIGFIGFI S J GFIGFIGFI GFI GFIGFIS GFIGFIGFIGFIGFI J S S S J GFI F F TV TV TV TV TV TV TV TV TV TV TV FF S S J TV TV TV TV TV J J J J J J J J J J BUILDING B LEVEL 4 BUILDING A UNIT B-18 (1 BEDROOM) UNIT B-19(2 BEDROOM) UNIT B-20 (1 BEDROOM) UNIT B-21 (1 BEDROOM) UNIT B-22(1 BEDROOM) ATTIC SPACE KEF TPB19 1 1 TPB19 - 1 1 2 TPB19 - 2 2 2 TPB19 - 3 4 TPB19 - 4 55 TPB19 - 6,8 TPB19 - 7 TPB19 - 5 TPB19 - 9 TPB19 - 12 TPB19 - 11,13 14 14 14 TPB19 - 14 TPB18 - 1 1 11 1 2 2 2 2 2 TPB18 - 3 TPB18 - 2 55 444 TPB18 - 6,8 TPB18 - 9 1 1 1 25 TPB22 - 3 4 TPB22 - 44 5 TPB22 - 6,8 HP6 2 TPB22 - 9 1 11 TPB20 - 1 2 TPB20 - 6,8 TPB20 - 9 TPB21 - 2 TPB21 - 3 TPB21 - 6,8TPB21- 7 TPB18 - 4 TPB18 - 5 TPB18 - 7 TPB18 TPB18 - 11,13 TPB20 1 2 2 TPB20 - 2 TPB20 - 3 4 4 5 5 TPB20 - 7 TPB20 - 4 TPB20 - 11,13 TPB21 1 11 TPB21 - 1 2 2 4 4 5 9 TPB21 - 4 TPB21 - 11,13 TPB22 TPB22 - 1 TPB22 - 2 2 2 5 TPB22 - 7 10 TPB22 - 11,13 HPB1 - 20 20 HPB1 - 29 ERV2 IN B ATTIC HP4 IN B ATTIC HPB1 - 30,32 HP6 HP6 HP6 HP 1 1 1 TS FS S/C S/C S/C S/C S/C 1 1 1 1 TPB22 - 12 HPB1 - 34 DRYER BOOSTER FANIN ATTIC SME 2 2SME 2 SME 2 SME 2SME TPB22 - 15 TPB22 - 14 TPB21 - 12 TPB21 - 14 TPB20 - 14 TPB20 - 12 TPB19 - 16 TPB19 - 17 TPB18 - 12 TPB18 - 14 8 TPB19 - 11,13 4 2 8 NOTE: HEAT PUMP (HP) CONDENSATE PUMPSTO BE WIRED INTO THE SAME CIRCUIT AS HEATPUMP. GFI 8 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EP1.4 ELECTRICAL POWER PLAN BLDGS A-B-C - LEVEL 4 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 Addendum 3 4/12/19 8 Addendum 8 11/5/19 ESK ABC-EP1.4 12/31/19 ESK ABC-EP1.4 FF FF J GFIGFI GFIGFIGFIGFI GFIGFIGFIGFIGFIGFIGFIGFIGFIGFI GFIGFI GFIJ J J GFI GFI J J GFIGFIGFIGFIGFIGFIGFIGFI GFI S S S S S TV TVTV TV TV TV SS S S S S TV TV TV TV TV TV TV TV TV TV TV MMMMS J J J J TV TV TV TV TV TV J J J J J JJ J J J J J J GFIUNIT B-1 (2 BEDROOM)TYPE A UNIT B-2(2 BEDROOM) UNIT C-3(2 BEDROOM)TYPE A UNIT C-4(2 BEDROOM) TYPE A ELEVATOR 1 BUILDING B LEVEL B BUILDING C LEVEL 2BUILDING A CRAWL SPACE BUILDING G BUILDING D TPC4 TPC4 - 1 1 11 TPC4 - 2 2 2 2 2 TPC4 - 3 4 4 9 5 TPC4 - 6,8 TPC4 - 7 TPC4 - 11,13 TPC4 - 14 14 14 EF-1 TPB2 TPB1 TPC3 HP-2 2 2 TPB2 - 2 2 2 TPB2 - 1 1 1 1 14 14 14 TPB2 - 14 TPB2 - 4 TPB2 - 9 TPB2 - 5 TPB2 - 7 TPB2 - 6,8 TPB2 - 11,13 554 4 TPB2 - 3 12 TPB1 - 2 TPB1 - 1 TPB1 - 5 TPB1 - 7 TPB1 - 4 TPB1 - 6,8 2 2 2 2 5 5 5 4 4 1 1 1 14 14 14 TPB1 - 14 TPB1 - 11,13 12 TPC3 - 1 TPC3 - 4 TPC3 - 14 TPC3 - 2 TPC3 - 7 TPC3 - 3 TPC3 - 6,8 TPC3 - 9 TPC3 - 5 2 2 2 2 14 14 14 14 1 1 5 TPC3 - 11,13 4 4 4 4 HPB - 12,14,16 ERV-1 HP-5 HPB1 - 22 HPB1 - 21,23 TPC4 - 12 TPC4 - 15 TPC3 - 12 EF-1 HP EF-1 HP EF 1A* 1A *1A * 1A * 1A * 1A * TPB1 - 9 S/CO S/COS/CO S/CO HPB1 - 33 DENOTES CIRCUIT # FOR RECEPTACLEOUTLETS IN ASSOCIATED APARTMENTS TENANT PANEL TS FS EWH-2Z HPB - 22 GFI GFI GFI GFI 2 2 2 TPB2 - 15 TPB2 - 16 TPB1 - 15 TPB1 - 16 TPC3 - 15 TPC3 - 16 TPC4 - 16 TPC4 - 17 5 4 14 8SME 8 8 NOTE: HEAT PUMP (HP) CONDENSATE PUMPSTO BE WIRED INTO THE SAME CIRCUIT AS HEATPUMP. 8 14 1 1 1 1 S/CO 5 4 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EP1.B ELECTRICAL POWER PLAN BLDGS B-C - LEVEL B Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 Addendum 3 4/12/19 8 Addendum 8 11/5/19 ESK ABC-EP1.B 12/31/19 ESK ABC-EP1.B GFIGFIGFI FFFFFF FFGFIGFIGFIGFI J GFI GFI GFI GFI GFI GFIJ S S S S J TV TV TV TV TV S J J J TV TV TV J J JJ F F UNIT C-1(2 BEDROOM) UNIT C-2(2 BEDROOM) STAIR 2 ELECTRICAL METER ROOM MAINTENANCE ROOM BOILER ROOM BUILDING B LEVEL SB BUILDING C LEVEL 1 BUILDING A (ABOVE) BUILDING D BUILDING G TPC1 TPC1 - 1 TPC2 TPC2 - 1 TPC2 - 14 TPC2 - 3 TPC1 - 2 TPC1 - 3 TPC1 - 14 HPB1 - 2 HPB1 - 3 HPB1 HPB TPC1 - 4 TPC1 - 5 TPC1 - 11,13 TPC1 - 12 TPC1 - 4 TPC1 - 7 TPC2 - 5 TPC2 - 4 TPC2 - 6,8 TPC2 - 7 TPC2 - 12 TPC2 - 11,13TPC2- 15 HP EF EF-1 TPC1 - 15 TPC1 - 6,8 HPB1 - 31HPB- 13,15,17 S/CO S/CO P1 P2 B1 1B TS FS S/C STRUCTURED MEDIAENCLOSURE (DEMARK) HPB - 20 HPB - 18 EUH-1 EWH-1 SME SME TPC1 - 16 TPC1 - 17 TPC2 - 16 TPC2 - 17 TPC2 - 9 5 9 HP 8 8 8 8 8 NOTE: HEAT PUMP (HP) CONDENSATE PUMPSTO BE WIRED INTO THE SAME CIRCUIT AS HEAT PUMP. 8 HPB1 - 1HPB- 19,21,23 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EP1.SB ELECTRICAL POWER PLAN BLDG B-C - LEVEL SB Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 Addendum 3 4/12/19 3 Revision 5 Date 5 8 Addendum 8 11/5/19 ESK ABC-EP1.SB 12/31/19 ESK ABC-EP1.SB DN BUILDING D UNIT D-1(2 BEDROOM) UNIT D-2(1 BEDROOM) RECEPTION OFFICE KITCHEN OFFICE WAITINGAREA HC LAV. JAN. MECH'L CONFROOM FITNESSROOM BUILDING E B B B B B B B B C C C E E C D TPD1 - 10 TPD2 - 3 TPD2 - 10 HPE - 9 C C E HPE HPE - 11 HPE - 10 XE XE XE EM C C C C HPE - 9 HPE - 9 XE CCC ELECTRICAL ROOM BEDROOM 1 BEDROOM 2 HPE - 20 XEHC XEHC BUILDING D BUILDING E UNIT D-3(2 BEDROOM) UNIT D-4(1 BEDROOM) UNIT E-2 (2 BEDROOM)UNIT E-3 (2 BEDROOM) TPD4C B B CB B C C B B TPD3 TPD3 - 3 TPD3 - 10 C TPD4 - 3 C C B TPD4 - 10 D D B B B B B B B B B B TPE3 C C CC E TPE3 - 3 C CC D TPE2 D D TPE2 - 10TPE2- 3 TPE3 - 10 HPE - 9HPE- 9 EM EM EM Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" DE-EL1.1 ELECTRICAL LIGHTING PLAN BLDGS D-E - LEVELS 1 AND 2 Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 2 Adeendum 4 6/10/19 3 Revision 5 Date 5 4 7 Permit Review Comments 08/05/2019 ESK DE-EL1.1 12/31/19 ESK DE-EL1.1 GFIGFI GFIGFIGFIGFIGFIGFIGFIGFIGFIGFI S S S J J F F FF FF FF TV TV TV TV TV J J J J TV TV TV J J J J J DN GFIGFIGFIGFIGFIJGFIJ FFFFGFIGFIGFIGFIGFI J S S S S S S FF GFI GFIGFIGFIGFI GFI J GFI TV TV TV TV TV TV TV TV TV TV TV TV TV TV J J J J JJ J J BUILDING D UNIT D-1(2 BEDROOM) UNIT D-2(1 BEDROOM) RECEPTION OFFICE KITCHEN OFFICE WAITINGAREA HC LAV. JAN. MECH'L CONFROOM FITNESSROOM BUILDING E HPE HPE - 1 1 1 1 1 2 2 2 2 2 HPE - 2 3 HPE - 3 HPE - 4 HPE - 5 5 7 HPE - 7 HPE - 8 HP TPD1 TPD2 TPD1 - 1 1 1 1 2 2 222 TPD1 - 3 4 9 TPD1 - 4 5 TPD1 - 5 TPD1 - 6,8 TPD1 - 7 4 TPD1 - 2 TPD1 - 11,13 14 14 14 TPD1 - 14 1 1 1 1 TPD2 - 1 2 2 2 TPD2 - 2 TPD2 - 3 TPD2 - 4 445 TPD2 - 6,8 TPD2 - 7 TPD2 - 9 5 TPD2 - 5 TPD2 - 11,13 HPE - 12,14 HPE - 13,15TPD1- 12 TPD1 - 15 TPD2 - 15 TPD2 - 12 H2 HPE - 16 SECURITY HEADEND RACK HPE - 17 H3 SECURITY HEAD END RACK S/CS/C HPE - 18 TPD1 - 16 EWH-8 TPD2 - 14 HPE - 19 EWH-12 2 SME 2SME 1 TPD1 - 17 TPD1 - 18 TPD2 - 16TPD2- 17 BRANCH DEVICE METER SOCKETW/100 AMP CB, MODEL EZMH316(TYP OF 9) PLUS A 2 METER SOCKETCOLUMN MAIN DEVICE W/MCB SQUARE D EZM 31200 CB 1200 AMP,208V/120V/3D/4W, FED FROM UTILITY TRANSFORMER SEESHEET E2.2 EWH-9 HPE - 21 HP NOTE: HEAT PUMP (HP) CONDENSATE PUMPSTO BE WIRED INTO THE SAME CIRCUIT AS HEAT PUMP. FIRE ALARM CONTROL PANEL (FACP) SECURITY HEADEND RACK BUILDING D BUILDING E UNIT D-3 (2 BEDROOM) UNIT D-4 (1 BEDROOM)UNIT E-2(2 BEDROOM) UNIT E-3 (2 BEDROOM) TPE3 TPE3 - 1 TPE3 - 2 TPE3 - 3 TPE3 - 4 TPE3 - 5TPE3- 6,8 TPE3 - 7 TPE3 - 9 2 2 2 5 5 5 14 14 14 TPE3 - 14 TPE3 - 11,13 HP TPE3 - 12 1 1 1 1TPD4- 11,13 TPD4 1 1 1 1 TPE3 - 2 2 2 2 TPD4 - 4 TPD4 - 5 TPD4 - 9 TPD4 - 7 4 5 TPD4 - 3 5TPD4- 5 TPD4 - 6,8 TPD4 - 12 TPD3 1 1 1 TPD3 - 1 TPD3 - 2 2 2 2 2 TPD3 - 3 4 4 TPD3 - 4 TPD3 - 55 TPD3 - 6,8 TPD3 - 7TPD3- 9 TPD3 - 11,13 14 14 14 TPD3 - 14 TPE2 1 1 1TPE2 - 1 2 2 2 2TPE2- 2 TPE2 - 3 44 TPE2 - 6,8 5 5TPE2- 5 TPE2 - 7 TPE2 - 9 TPE2 - 4 4 TPE2 - 11,13 10 TPD4 - 15 TPD3 - 15 TPD3 - 12 TPE2 - 12 TPE2 - 15 TPE3 - 15 S/CS/C S/C S/C 2 SME SME 2 2 SME SME 2 HP EF-1 EF-1 EF-1 EF-1 HP TPD3 - 16 TPD3 - 17 TPD4 - 14 TPD4 - 16 TPE2 - 14TPE2- 16 TPE3 - 16 TPE3 - 17 2 2 2 4 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" DE-EP1.1 ELECTRICAL POWER PLAN BLDGS D-E - LEVELS 1 AND 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 Addendum 3 4/12/19 3 Revision 5 Date 5 8 Addendum 8 11/5/19 ESK DE-EP1.1 12/31/19 ESK DE-EP1.1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT E3.1 ELECTRICAL PANELBOARD SCHEDULES Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 Notes: Total Est. Demand:30 A Receptacle 180 VA 100.00%180 VA Total Conn.:29 A Other 2160 VA 100.00%2160 VA Total Est. Demand:6250 VA Motor 2116 VA 112.50%2381 VA Total Conn. Load:5986 VA Lighting - Dwelling Unit 17 VA 100.00%17 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:30 A 28 A Total Load:3115 VA 2871 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 Dishwasher 20 A 1 500 VA 16 13 ------529 VA 500 VA 1 20 A Disposal 14 11 HP1 20 A 2 529 VA 1058 VA 1 20 A KEF 12 9 FRIDGE 20 A 1 180 VA 17 VA 1 20 A Lighting - Dwelling Unit 10 7 STOVE FAN 20 A 1 500 VA 90 VA ------8 5 KITCHEN RECEPTACLES 20 A 1 180 VA 90 VA 2 20 A STOVE 6 3 BATHROOM CIRCUITS 20 A 1 14 VA 180 VA 1 20 A KITCHEN RECEPTACLES 4 1 BEDROOM RECEPTACLES 20 A 1 720 VA 900 VA 1 20 A LIVING ROOM RECEPTACLES 2 CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT Notes: Enclosure:MCB Rating:100 A Mounting:Recessed Wires:3 Mains Rating:100 A Supply From:Phases:1 Mains Type:MCB Location:Volts:120/208 single A.I.C. Rating: Branch Panel:TPJ4 Notes: Total Est. Demand:41 A Receptacle 180 VA 100.00%180 VA Total Conn.:40 A Other 3420 VA 100.00%3420 VA Total Est. Demand:8582 VA Motor 3174 VA 108.33%3439 VA Total Conn. Load:8318 VA Lighting - Dwelling Unit 17 VA 100.00%17 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:44 A 35 A Total Load:4723 VA 3595 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 Disposal 20 A 1 500 VA 500 VA 1 20 A Dishwasher 18 15 Motor 20 A 1 2116 VA 180 VA 1 20 A Other 16 13 ------529 VA 1080 VA 1 20 A BEDROOM 2 RECEPTACLES 14 11 HP1 20 A 2 529 VA 0 VA 1 20 A Spare 12 9 FRIDGE 20 A 1 0 VA 44 VA 1 20 A APARTMENT LIGHTING 10 7 STOVE FAN 20 A 1 500 VA 90 VA ------8 5 KITCHEN RECEPTACLE 20 A 1 180 VA 90 VA 2 20 A STOVE 6 3 BATHROOM CIRCUIT 20 A 1 0 VA 180 VA 1 20 A KITCHEN RECEPTACLE 4 1 BEDROOM 1 RECEPTACLES 20 A 1 720 VA 1080 VA 1 20 A LIVING ROOM RECEPTACLES 2 CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT Notes: Enclosure:MCB Rating:100 A Mounting:Recessed Wires:3 Mains Rating:100 A Supply From:Phases:1 Mains Type:MCB Location:Volts:120/208 single A.I.C. Rating: Branch Panel:TPJ3 Notes: Total Est. Demand:37 A Total Conn.:36 A Other 3600 VA 100.00%3600 VA Total Est. Demand:7662 VA Motor 2116 VA 112.50%2381 VA Total Conn. Load:7398 VA Lighting - Dwelling Unit 17 VA 100.00%17 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:44 A 24 A Total Load:4898 VA 2499 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 Power 20 A 1 500 VA 22 19 Power 20 A 1 500 VA 41 VA 1 20 A Lighting 20 17 Security Head End Rack 20 A 1 180 VA 500 VA 1 20 A Power 18 15 ------529 VA 180 VA 1 20 A H2 SECURITY RACK 16 13 HP 20 A 2 529 VA 529 VA ------14 11 Other 20 A 1 0 VA 529 VA 2 20 A HP 12 9 Lighting 20 A 1 140 VA 0 VA 1 20 A Other 10 7 FITNESS RECEPTACLES 20 A 1 360 VA 360 VA 1 20 A FITNESS RECEPTACLES 8 5 FITNESS RECEPTACLES 20 A 1 360 VA 180 VA 1 20 A SPARE 6 3 KITCHENETTE RECEPTACLES 20 A 1 0 VA 0 VA 1 20 A TOILET ROOMS 4 1 OFFICE RECEPTACLES 20 A 1 1080 VA 900 VA 1 20 A OFFICE RECEPTACLES 2 CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT Notes: Enclosure:MCB Rating:100 A Mounting:Recessed Wires:3 Mains Rating:100 A Supply From:HPB Phases:1 Mains Type:MCB Location:Volts:120/208 single A.I.C. Rating: Branch Panel:HPE PANEL TPJ4 IS TYPICAL (AN EXAMPLE) OF ALL ONE BEDROOM ONE BATHROOM APARTMENTSALL CIRCUITS FEEDING RECEPTACLES IN BEDROOMS SHALL BE ARCFAULT PROTECTED (AFC) ANDTHE RECEPTACLES SHALL BE TAMPER PROOF PANEL TPJ5 IS TYPICAL (AN EXAMPLE) OF ALL TWO BEDROOM ONE BATHROOMAPARTMENTSALL CIRCUITS FEEDING BEEDROOM SHALL BE ARC FAUTL PROTECTED AND THERECEPTACLES SHALL BE TAMPER PROOF Notes: Total Est. Demand:31 A Total Conn.:30 A Receptacle 180 VA 100.00%180 VA Total Est. Demand:6423 VA Other 3420 VA 100.00%3420 VA Total Conn. Load:6158 VA Motor 1058 VA 125.00%1323 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:34 A 24 A Total Load:3679 VA 2479 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 Dishwasher 20 A 1 500 VA 16 13 ------529 VA 720 VA 1 20 A BEDROOM 2 RECEPTACLES 14 11 HP 20 A 2 529 VA 500 VA 1 20 A Disposal 12 9 FRIDGE 20 A 1 180 VA 0 VA 1 20 A LIGHTING 10 7 STOVE FAN 20 A 1 500 VA 90 VA ------8 5 KITCHEN CIRCUIT 20 A 1 540 VA 90 VA 2 20 A STOVE 6 3 BATHROOM CIRCUITS 20 A 1 0 VA 360 VA 1 20 A KITCHEN CIRCUIT 4 1 BEDROOM 1 RECEPTACLES 20 A 1 720 VA 900 VA 1 20 A LIVING ROOM RECEPTACLES 2 CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT Notes: Enclosure:MCB Rating:100 A Mounting:Recessed Wires:3 Mains Rating:100 A Supply From:Phases:1 Mains Type:MCB Location:Volts:120/208 single A.I.C. Rating: Branch Panel:TPB9 PANEL TPB9 IS TYPICAL (AN EXAMPLE) OF TWO BEDROOM ONE BATHROOM APARTMENTS IN THE B BUILDINGALL CIRCUITS FEEDING RECEPTACLES IN BEDROOMS SHALL BE ARCFAULT PROTECTED (AFC) AND THERECEPTACLES SHALL BE TAMPER PROOF No.Description Date 1 Addendum 3 4/12/19 ESK E3.1 12/31/19 ESK E3.1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT E3.2 ELECTRICAL PANELBOARD SCHEDULES Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 Notes: Total Est. Demand:75 A Receptacle 14352 VA 100.00%14352 VA Total Conn.:74 A Other 5400 VA 100.00%5400 VA Total Est. Demand:27011 VA Motor 3274 VA 108.08%3539 VA Total Conn. Load:26746 VA Lighting - Dwelling Unit 2848 VA 100.00%2848 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:120 A 98 A 25 A Total Load:13192 VA 10557 VA 3001 VA 41 42 39 40 37 38 35 Lighting - Dwelling Unit 20 A 1 448 VA 36 33 Other 20 A 1 540 VA 529 VA ------34 31 Lighting - Dwelling Unit 20 A 1 448 VA 529 VA 2 20 A Motor 32 29 Motor 20 A 1 0 VA 0 VA 1 20 A Power 30 27 Motor 20 A 1 550 VA 529 VA ------28 25 Security Head End Rack 20 A 1 360 VA 529 VA 2 20 A Motor 26 23 Lighting - Dwelling Unit 20 A 1 0 VA 0 VA 1 20 A Security Head End Rack 24 21 Lighting 20 A 1 0 VA 0 VA 1 20 A Lighting 22 19 ------529 VA 832 VA 1 20 A Lighting 20 17 SEWAGE EJECTOR PUMP 20 A 2 0 VA 0 VA 1 20 A Other 18 15 Lighting 20 A 1 224 VA 1080...1 20 A CORRIDOR RECEPTACLES 16 13 Spare 20 A 1 0 VA 540 VA 1 20 A CORRIDOR RECEPTACLES 14 11 CORRIDOR RECEPTACLES 20 A 1 0 VA 0 VA 1 20 A CORRIDOR RECEPTACLES 12 9 WASHER 20 A 1 0 VA 0 VA 1 20 A CORRIDOR RECEPTACLES 10 7 ------2392...0 VA 1 20 A WASHER 8 5 DRYER 30 A 2 2392...180 VA 1 20 A WASHER 6 3 ------2392...2392...------4 1 DRYER 30 A 2 2392...2392...2 30 A DRYER 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:MCB Rating:100 A Mounting:Recessed Wires:4 Mains Rating:225 A Supply From:HPB Phases:3 Mains Type:MCB Location:Volts:120/208 Wye A.I.C. Rating: Branch Panel:HPH1 Notes: Receptacle 15072 VA 65.00%9797 VA Total Est. Demand:326 A Other 14940 VA 100.00%14940 VA Total Conn.:334 A Motor 73479 VA 104.59%76854 VA Total Est. Demand:117413 VA Lighting - Exterior 350 VA 125.00%438 VA Total Conn. Load:120376 VA Lighting - Dwelling Unit 4849 VA 75.21%3647 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:378 A 360 A 285 A Total Load:44192 VA 41990 VA 34197 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 ------1233...24 21 ------1233...500 VA 1 20 A Power 22 19 EUH-1 30 A 3 1233...1000...1 20 A Power 20 17 ------987 VA 1000...1 20 A Power 18 15 ------987 VA 3300...------16 13 Motor 20 A 3 987 VA 3300...------14 11 ------1773...3300...3 80 A ELEVATOR 1 12 9 ------1723...1055...------10 7 HPFA 225 A 3 1954...1319...2 100 A HPH1 8 5 ------4442...2499...------6 3 ------3279...4898...2 100 A HPE 4 1 HPB1A 225 A 3 4766...180 VA 1 20 A Security Head End Rack 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:Type 1 MCB Rating:400 A Mounting:Surface Wires:4 Mains Rating:400 A Supply From:Phases:3 Mains Type: Location:Volts:120/208 Wye A.I.C. Rating: Branch Panel:HPB Notes: Total Est. Demand:37 A Receptacle 720 VA 100.00%720 VA Total Conn.:35 A Other 4500 VA 100.00%4500 VA Total Est. Demand:13370 VA Motor 4791 VA 118.44%5674 VA Total Conn. Load:12487 VA Lighting - Dwelling Unit 1472 VA 100.00%1472 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:41 A 27 A 39 A Total Load:4766 VA 3279 VA 4442 VA 41 42 39 40 37 38 35 36 33 Other 20 A 1 540 VA 50 VA 1 20 A Motor 34 31 Power 20 A 1 550 VA 1767...------32 29 ERV2 20 A 1 50 VA 1767...2 30 A HP-4 30 27 Lighting 20 A 1 160 VA 352 VA 1 20 A Lighting 28 25 Lighting 20 A 1 200 VA 288 VA 1 20 A Lighting 26 23 ------529 VA 538 VA 1 20 A Lighting 24 21 Motor 20 A 2 529 VA 50 VA 1 20 A Motor 22 19 LEVLEL 3 CORRIDOR RECEPTACLES 20 A 1 540 VA 360 VA 1 20 A LEVEL 4 CORRIDOR RECEPTACLES 20 17 LEVEL 1 CORRIDOR RECEPTACLES 20 A 1 540 VA 360 VA 1 20 A LEVEL 2 CORRIDOR RECEPTACLES 18 15 ------90 VA 90 VA ------16 13 DRYER 50 A 2 90 VA 90 VA 2 50 A DRYER 14 11 ------90 VA 90 VA ------12 9 DRYER 50 A 2 90 VA 90 VA 2 50 A DRYER 10 7 8 5 WASHER 20 A 1 500 VA 6 3 MAINTENANCE RECEPTACLES 20 A 1 720 VA 540 VA 1 20 A B CORRIDOR RECEPTACLES 4 1 BOILER ROOM RECEPTACLE 20 A 1 360 VA 540 VA 1 20 A SB RECEPTACLES 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:Type 1 MCB Rating:225 A Mounting:Surface Wires:4 Mains Rating:225 A Supply From:HPB Phases:3 Mains Type: Location:Volts:120/208 Wye A.I.C. Rating: Branch Panel:HPB1 Notes: Total Est. Demand:161 A Other 1260 VA 100.00%1260 VA Total Conn.:151 A Motor 50438 VA 106.69%53813 VA Total Est. Demand:57976 VA Lighting - Exterior 350 VA 125.00%438 VA Total Conn. Load:54518 VA Lighting - Dwelling Unit 512 VA 100.00%512 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:163 A 144 A 148 A Total Load:19541 VA 17239 VA 17739 VA 41 42 39 40 37 38 35 36 33 34 31 BOILERS 20 A 1 1000...350 VA 1 20 A Lighting - Exterior 32 29 CHEMICAL TREATMENT SYSTEM 20 A 1 500 VA 250 VA ------30 27 Security Head End Rack 20 A 1 0 VA 250 VA 2 60 A SVE EQUIPMENT 28 25 BLDG F LIGHTING 20 A 1 512 VA 987 VA ------26 23 ------529 VA 987 VA ------24 21 HP9 30 A 2 529 VA 987 VA 3 20 A CT-1 22 19 RECEPTACLES 20 A 1 540 VA 720 VA 1 20 A RECEPTACLES 20 17 ------2250...2250...------18 15 ------2250...2250...------16 13 P5 50 A 3 2250...2250...3 50 A P6 14 11 ------987 VA 987 VA ------12 9 ------987 VA 987 VA ------10 7 P3 20 A 3 987 VA 987 VA 3 20 A P4 8 5 ------4500...4500...------6 3 ------4500...4500...------4 1 P1 (VFD)80 A 3 4500...4500...3 80 A P2 (VFD)2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:Type 1 MCB Rating:225 A Mounting:Surface Wires:4 Mains Rating:225 A Supply From:HPB Phases:3 Mains Type: Location:ELEVATOR C-3 Volts:120/208 Wye A.I.C. Rating: Branch Panel:HPF No.Description Date ESK E3.2 12/31/19 ESK E3.2 TO LTG ABOVE TO LTG ABOVE HPF HPF - 25 HPF - 25 XE XE HPF - 32 THROUGH PHTOCELLCONTROL 8 BOILER ROOM HPF - 25 TO SWITCH BELOW TO SWITCH BELOW 8 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" F-EL1.1 ELECTRICAL LIGHTING PLANS BLDG F - LEVELS 1 AND 2 Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 7 Permit ReviewComments 08/05/2019 8 Addendum 8 11/5/19 ESK ABC-EL1.B 12/31/19 ESK F-EL1.1 F F J J JJ HPF - 20 HPF - 19 B1 B2 P3 P4 P1 P2 BOILER ROOM HPF P6P5 HPF - 1,3,5 HPF - 2,4,6 HPF - 8,10,12 VFD VFD SECURITY HEAD END RACK HPF - 27 HPF - 14,16,18 HPF - 13,15,17 HPF - 28,30 HPF - 29 HPF - 31 HPF - 7,9,11 CHEMICAL FEEDSYSTEM SVEEQUIPMENT 8 BOILER ROOM HPF - 21,23 S/C S/C S/C S/C HP9 8 HPF - 22,24,26 CT-1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" F-EP1.1 ELECTRICAL POWER PLANS BLDG F - LEVELS 1 AND 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 Addendum 3 4/12/19 8 Addendum 8 11/5/19 ESK F-EP1.1 12/31/19 ESK F-EP1.1 3 333 333 3 3 BUILDING K BUILDING H BUILDING G B B B B BB BB B C C E CC C B B B B E E E E E E C C C E B B EC B TPG9 TPG9 - 10 TPG9 - 3 TPG8TPG7 TPG8 - 3 TPG8 - 10 TPG7 - 3 TPG6 - 10 TPG5 - 3 TPG6 TPG5 TPG2 TPG1 TPG3 TPG4 TPG6 - 3 TPG3 - 10 TPG4 - 10 TPG1 - 10TPG2- 10 TPG3 - 3 XE EM EM UNIT G-5(2 BEDROOM) UNIT G-6(1 BEDROOM) UNIT G-7 (1 BEDROOM) UNIT G-8(1 BEDROOM)UNIT G-9(2 BEDROOM) UNIT G-4(1 BEDROOM) UNIT G-3(1 BEDROOM) UNIT G-2(1 BEDROOM) UNIT G-1(2 BEDROOM)LAUNDRYROOM UNIT G-9(1 BEDROOM) TPG7 - 10 TPG5 - 10 TPG2 - 3 TPG1 - 3 TPG4 - 3 D B B B1 B BB B DB B B D C B B D B B B B B B1 D B D B B D B BDB B B D ? B A A A A A A A XEC A XEC A A A A A A B B B B B B TPK2 B B TPK4 BB B A A A HPH1 - 20 G G G G D TPH1 D TPH1 - 10 E C C E D C E TPK4 - 10 HPH1 - 20 XF XF XF XF XHC BUILDING G CRAWL SPACE BUILDING H CRAWL SPACE HPH1 - 35 HPH1 - 35 THRU 3-WAY SWITCH ON LEVEL ABOVE THRU 3-WAY SWITCH ON LEVEL ABOVE G G G G G G G G G G G G G G 8 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" GH-EL1.1 ELECTRICAL LIGHTING PLAN BUILDING 'G' AND 'H' Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 7 Permit ReviewComments 08/05/2019 8 Addendum 8 11/5/19 ESK GH-EL1.1 12/31/19 ESK GH-EL1.1 S GFIGFIGFI GFI F F GFIGFI GFI GFI GFI GFIJ GFI J GFIGFIJ GFI GFI GFIGFI GFIGFIGFIGFIJ GFI GFIGFI GFI GFI GFIGFI GFI GFI GFIGFI GFI J J GFIGFI GFI GFI GFI JGFIGFI GFIGFI GFI GFI GFI J J J S S GFIGFIGFIGFIGFI GFIGFI GFI GFIGFIGFIGFIGFIJ GFIFFFF FF GFI GFI GFI GFIGFI S S S S S S S S S S S FFMM TV TV TV TVTV TV TV TV TV MM TV TV M TV MTVTV TV TV MMMMMMTV TV TVMTV TV TV TV TV MM MM TV J MTV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV J J J J J J JJ JJ JJ J J F J J J J BUILDING K BUILDING H BUILDING G TPG6 2 2 14 2 1 TPG6 - 3 4 TPG6 - 4 5 5 TPG6 - 5 TPG6 - 6,8 TPG6 - 7 TPG6 - 11,13 TPG4 2 2 TPG4 - 3TPG4- 5 TPG4 - 4 TPG4 - 6,8 TPG4 - 7 TPG4 - 9 TPG4 - 11,1344 55 2 2 TPG1 - 4 4 4 5 TPG2 2 2 TPG2 - 2 TPG2 - 3 4 4 TPG2 - 4 5 TPG2 - 5 TPG2 - 6,8 TPG2 - 7 TPG2 - 11,13 HP HP HP HP TPG7 2TPG7- 2 4 5 5 5 TPG7 - 6,8 TPG7 - 7TPG7- 5 TPG7 - 9 TPG7 - 3 TPG7 - 11,13 TPG8 TPG8 - 3 4 TPG8 - 2 5 TPG8 - 6,8 TPG8 - 7 TPG8 - 9 TPG8 - 11,13 2 TPG4 - 2 TPG3 - 3 TPG3 - 44 5TPG3- 7TPG3- 9 TPG3 - 11,13 TPG9 2 2 2 TPG9 - 3 4 TPG9 - 4 5 TPG9 - 6,8TPG9 - 7 TPG9 - 9 TPG9 - 11,13 TPG5 TPG5 - 1 TPG5 - 3 1 1 2 2 2 4 4 TPG5 - 5 5TPG5- 6,8 TPG5 - 9 5 TPG5 - 12 TPG5 - 4 TPG5 - 7 TPG5 - 11,13 TPG5 - 2 HP HP HP HP KEF KEF KEF KEF EF-1 EF-1 EF EF EF-1 EF EF KEF 12 12 12 TPG3 - 12 TPG9 - 12 TPG7 - 12 TPG8 - 12 TPG7 - 12 TPG2 - 12 TPG2 - 12 12 HPH1 - 18 114 14 141 4 UNIT G-5(2 BEDROOM) UNIT G-6 (1 BEDROOM) UNIT G-7(1 BEDROOM)UNIT G-8(1 BEDROOM) UNIT G-9 (2 BEDROOM) UNIT G-4(1 BEDROOM)UNIT G-3 (1 BEDROOM)UNIT G-2(1 BEDROOM) UNIT G-1(2 BEDROOM) LAUNDRYROOM REVISED UNIT G-9(1 BEDROOM)TPG5 - 12 TPG6 - 2 1 1TPG6- 1 TPG3 1 1 1 TPG4 - 1 22 2 1 1 1 1 2 2 4 5 4 4 TPG9 - 1 1 1 1 TPG9 - 2 5 TPG9 - 5 5 TPG8 - 5 1 1 1 TPG7 - 1 2 2 4 4 TPG9 - 12 EF-1EF EF-1 EF HP 2 1 1 1 TPG2 - 1 1 1 1 TPG1 - 1 2 2 14 14 TPG1 - 14 TPG1 - 3 5 TPG1 - 6,8 TPG1 - 9 S/COS/COS/CO S/CO S/CO S/CO S/CO S/CO S/CO HPH1 - 18 HPH1 - 18 2 2 24 45 1 1 1 12 TPH1 - 1 TPH1 - 7 TPH1 - 4 TPH1 - 5 TPH1 - 6,8 TPH1 - 9 TPH1 - 2 TPH1 - 3 TPH1 - 11,13 14 14 14 TPH2 - 14 TPH2 - 2 2 2 TPK2 - 2 2 2 4 4 TPK2 - 55 TPK2 - 6,85 TPK2 - 9 TPK4 - 3 4 2 1 TPK4 - 2 2 TPK4 - 5 TPK4 - 9 2 TPK2 - 11,13 TPK4 - 17 TPK2 TPK4 TPH1 S/CO S/CO HPH1 - 1,3 HPH1 - 2,4 HPH1 - 5,7 HPH1 - 6 HPH1 - 8 HPH1 - 9 TPG4 - 12 EF-1 1 1A * 1A * TPG6 - 9 1A * 1 1A * 1 2 2 2 4 TPG3 - 6,8 2 TPG2 - 9 1A * 4 1 1A * 1A *1A * EF-1 EF-1 TPG9 - 12 EF-1 TPH1 - 12 EF-1 1A * 1A * 1A TPK2 - 11,13HP EF-1 TPK4 - 17 TPG1 - 12 1A * BACK BOX AND FOR FUTURE FA ADDRESSABLEMODULE IF APARTMENT IS COVERTED FORHEARING IMPAIRED TENANTS EF EF EF SME 2 SME 2 2 SME 2 SME 2SME2SMESME2 SME 2 SME 2 TPG5 - 16 TPG5 - 17 TPG6 - 15 TPG6 - 16 TPG7 - 14 TPG7 - 15 TPG8 - 14TPG8- 15 TPG9 - 14TPG9- 15 TPG1 TPG1 - 11,13 TPG1 - 12 HP 8 8 8 8 8 8 8 8 NOTE: HEAT PUMP (HP) CONDENSATE PUMPSTO BE WIRED INTO THE SAME CIRCUIT AS HEATPUMP. HPH1 - 33HPH1- 29 HPH1 - 32,34 HPH1 - 26,28 HPH1 - 27 B-1 P-1 P-2 HP3 HP3 14 14 14 14TPK2- 14 2 2 S/CO Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" GH-EP1.1 ELECTRICAL POWER PLAN BLDG 'G' AND 'H' Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 Addendum 3 4/12/19 8 Addendum 8 11/5/19 ESK GH-EP1.1 12/31/19 ESK GH-EP1.1 333333333333UNIT H-2(2 BEDROOM) METERROOM LAUNDRYROOM BUILDING J B C A A A A A A A B BB B B TPJ3 TPJ3 - 10 A A BBB BBB BB BB B B A E C E C E A B DB B B B BB D D D B E ED B EE D D D C C C C C C C C C C C C B B B B B B B E B B E E B B B TPJ4 - 10 TPJ4 - 3 TPJ3 - 3 TPJ5 TPJ5 - 3 TPJ5 - 3 TPJ5 - 10 TPJ6 TPJ6 - 3 TPJ6 - 10 TPJ7 TPJ7 - 3 TPJ7 - 10 TPJ8 TPJ8 - 3 C TPJ8 - 10 TPJ2 - 3 TPJ2 - 10 TPJ1 TPJ2 TPJ1 - 3 TPJ1 - 10 TPJ1 - 10 XE XE XE XE EM EM HPH1 - 20 HPH1 - 20 HPH1 - 20 A A A HPH1 - 23 G G HPH1 - 20 TPH2 - 3,18 XF HPH1 - 20 BUILDING J CRAWL SPACE HPH1 - 31 TO CRAWL SPACE LIGHTS G G G G G G G G G G G G G G HPH1 - 31 THRU 3 WAY SWITCHON FLOOR ABOVE THRU 3 WAY SWITCHON FLOOR ABOVE HPH1 - 31 8 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" J-EL1.1 ELECTRICAL LIGHTING PLAN BUILDING J LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA Author 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 8 Addendum 8 11/5/19 ESK J-EL1.1 12/31/19 ESK J-EL1.1 GFI GFI GFI J S S GFIGFI GFIGFIGFI SS GFI GFI GFI GFIGFI J J GFIGFIGFIJGFI GFIFF GFI GFIGFI GFI GFI J GFIGFI GFIGFIGFIGFI J GFIGFI GFI GFI GFI S S S GFIJ GFIGFI GFI GFI J S S S S GFI GFIGFI GFIGFI J GFIS S S S SS S S GFI GFI MTV TV TVTVTV TV TV TVTV MMTVTV TV TV MMMMMMMM TVMMTVTV TV TV TV TV TV TVTV MMM MMMJ TV TV TV TV TV TV TV TV TV TV TV J J J J JJ J J JJ JJ J J J J J J J J MMUNIT H-2(2 BEDROOM) METERROOM HPH1 TPH2 TPH2 - 1 TPH2 - 2 TPH2 - 5 TPH2 - 6,8 TPH2 - 9 TPH2 - 7 TPH2 - 11,13 HP1 AUTOMATICTRANSFERSWITCH(ATS2) GENERATOR DS(GDS2) SECONDARY FEEDS FROM UTILITY TRANSFORMER MAIN DEVICE W/MCB SQUARE DEZM 3800 CBU 800 AMP, 208V/120V/3D/4W TENANT METERS IN SQUARE D EZ METER -PAK 3D IN-1D OUT EZM316125,1000 AMP, 208V/120V HP1 TPJ7 TPJ7 - 1 TPJ7 - 2 TPJ7 - 11,13 TPJ7 - 3 TPJ7 - 5 TPJ7 - 6,8 TPJ7 - 4 TPJ3 TPJ3 - 1 1 1 1TPJ3- 2 22 2 TPJ3 - 3 4 4 TPJ3 - 4 5 5 TPJ3 - 6,8TPJ3- 9 TPJ3 - 7 TPJ3 - 11,13 HP 14 14 14 14 TPJ3 - 14 TPJ7 - 7 TPJ4 1 1 1 TPJ4 - 3 TPJ4 - 11,13 HP1 TPJ4 - 1 2 2 2 2 4 4 4 TPJ4 - 5 TPJ4 - 6,8 TPJ4 - 7 TPJ4 - 4 TPJ4 - 2 75 TPJ5 TPJ5 - 1 1 1 1 2 2 2 2 2 2 4 4 TPJ5 - 3 TPJ5 - 2 TPJ5 - 4 5 5 5 9 TPJ5 - 7 TPJ5 - 9 14 14 14 TPJ5 - 15 TPJ6 11 1 TPJ6 - 1 2 2 2 2 2 4 TPJ6 - 3 4 4 5 5 TPJ6 - 6,8 TPJ6 - 7 14 14 14 TPJ6 - 14 TPJ6 - 15 2 14 1 11 TPJ8 - 1 2 2 2 2 2 TPJ8 - 3 TPJ8 - 2 4 55 5 TPJ8 - 6,8 TPJ8 - 7 TPJ8 - 4TPJ8- 9 TPJ8 - 11,13 TPJ8 - 14 14 14 14 14 TPJ8 - 5 TPJ1 1 1 1 1 TPJ1 - 1 TPJ1 - 2 2 2 2 2 TPJ1 - 3 4 TPJ1 - 4 55 5 TPJ1 - 6,8 TPJ1 - 7 TPJ1 - 5 TPJ1 - 9 10 TPJ1 - 11,13 TPJ2 - 12 14 14 14 TPJ2 - 14 1 1 1 1 1 TPJ2 - 1 2 2 2 2 TPJ2 - 2 TPJ2 TPJ2 - 3 4 TPJ2 - 5 5 5 TPJ2 - 4 TPJ2 - 6,8 TPJ2 - 7 TPJ2 - 9 TPJ2 - 11,13 TPJ2 - 12 2 TPJ5 - 14 14 14 HPH1 - 14 10 TPJ6 - 11,13 TPH1 - 11,13 HPH1 - 17,19 SEWAGE EJECTOR PUMP HPH1 - 24 H5 SECURITY SYSTEM HEAD END RACK 1A * TPJ4 - 12 5 TPJ4 - 9 TPJ5 - 6,8 TPJ5 - 16,18 1A * S/CO 1A * HP1 EF-1 TPJ5 - 17 EF-1 TPJ5 - 5 TPJ5 - 19EF-1 TPJ6 - 12 EF-1 TPJ6 - 16 EF-1 HP TPJ6 - 9 TPJ6 - 17 TPJ6 - 5 EF-1 EF-1 TPJ3 - 15EF-1 TPJ3 - 16 S/CO55 5 4 2 2 2 2 TPJ7 - 9 S/CO S/CO 11 1 1A * 1A * HP-1 HP EF-1 EF-1 EF-1 EF-1 TPJ7 - 12 1 1 1 1 EF-1 HP1 TPJ8 - 15 EF-1 TPJ8 TPJ8 - 16 1515 15 15 DENOTES CIRCUIT IN ASSOCIATED APARTMENT TENANT PANEL TP S/CO S/CO EF-1 FIRE ALARMCONTROLPANEL (FACP) STRUCTURED MEDIA ENCLOSURE (DEMARK) HPH1 - 30 EWH-13 SME 2 SME 2SME 2 SME SME 22 SME 2 SME 2 SME SME 2 2 TPH2 - 15 TPH2 - 16 TPJ7 - 14 TPJ7 - 15 TPJ6 - 19 TPJ6 - 18 TPJ5 - 20 TPJ5 - 21 TPJ4 - 14 TPJ4 - 15 TPJ3 - 17 TPJ3 - 18 TPJ2 - 16 TPJ2 - 15 TPJ1 - 17TPJ1 - 16 2 2 2 2 TPH2 - 4 8 8 8 8 8 8 8 8 8 8 8 NOTE: HEAT PUMP (HP) CONDENSATE PUMPSTO BE WIRED INTO THE SAME CIRCUIT AS HEAT PUMP. 8 TPH1 - 16 TPH1 - 15 TPH1 - 12GFI GFI GFI GFI TPH2 - 3 EF-1 14 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" J-EP1.1 ELECTRICAL POWER PLAN BLDG J - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 Addendum 3 4/12/19 8 Addendum 8 11/5/19 ESK J-EP1.1 12/31/19 ESK J-EP1.1 3 33 3 BUILDING K A A A A A A E C D B B B B B B C C C C E E C E E B D B B B B TPK4 - 10 TPK4 - 3TPK2-10,<unnamed> B1B B B D D EM XE XE TPK1 HPH1 - 21 HPH1 - 21 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" K-EL1.1 ELECTRICAL LIGHTING PLAN BLDG K LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date ESK K-EL1.1 12/31/19 ESK K-EL1.1 SGFIGFIGFI GFI J S S S SGFIGFIGFIGFIGFIGFIGFIGFIGFIGFIGFIGFIGFIGFIGFIGFITV TV TV MM MMTV TV TV TV TV TV MMMM TV TV TV TV GFITV J J J J J J BUILDING K TPK4 TPK4 - 1 TPK4 - 9 TPK4 - 6,8 TPK4 - 3 TPK4 - 7 TPH1 TPK1 1 1 1 1 TPK1 - 1 TPK1 - 2 2 2 2 2 TPK1 - 3 4 5 5 TPK1 - 6,8 TPK1 - 9 5 10 TPK1 - 11,13 TPK1 - 4 TPK2 1 1 1 1 TPK2 - 1 2 2 2 2 2 2 TPK2 - 2 TPK2 - 3 4 4 TPK2 - 4 5 5 TPK2 - 5 TPK2 - 6,8 TPK2 - 9 TPK2 - 11,13 14 14 14 14 TPK3 1 1 1 1 TPK3 - 1 22 2 2 TPK3 - 3 4 TPK3 - 4 5 5 5 TPK3 - 6,8 TPK3 - 9 TPK3 - 11,13 10 2 1 2 2 2 1 1 5 4 TPK4 - 17 EF-1 EF-1 HP TPK2 - 11,13 HP EF-1 TPK3 - 12 EF-1TPK1- 12 EF-1 EF-1 ? TPK4 - 17 1 EF-1 EF-1 HP HPS/C S/C S/C S/C 2 SME 2SME SME 2 2 SME TPK2 - 16 TPK2 - 15 TPK4 - 16 TPK4 - 15 TPK3 - 14 TPK3 - 15 2 2 8 2 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" K-EP1.1 ELECTRICAL POWER PLAN BLDG K LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 Addendum 3 4/12/19 8 Addendum 8 11/5/19 ESK K-EP1.1 12/31/19 ESK K-EP1.1 33333333 3 C CC B B B B B B B B B B B B B B B B B B BB B BBBB B B B B B BB B B B B B B B B B B B B B B B B B B B B B B B B B B B C E E TPM10 TPM10 - 10 TPM10 - 10 TPM10 - 10 TPM10 - 10 TPM10 - 3 TPM11 TPM11 - 10 TPM11 - 3 TPM11 - 10 TPM11 - 10 TPM11 - 10 TPM5 TPM5 - 3 TPM5 - 10 TPM5 - 10 TPM5 - 10 TPM5 - 10 TPM4 TPM3 E C E C D E C C A TPM4 - 10 TPM4 - 10 TPM4 - 10 TPM4 - 15 TPM4 - 10 TPM4 - 3 E D D TPM3 - 10 TPM3 - 10 TPM9 TPM9 - 10 TPM8 TPM7 - 10 TPM8 - 10 TPM8 - 3 TPM7 TPM7 - 3 TPM6 - 3TPM6- 10 TPM1 - 3 TPM1 - 10 TPM2 TPM2 - 3 TPM2 - 10 XE XEC XEC EM EM A A A A A A A A A A A A A A A HPH1 - 22 HPH1 - 22 HPH1 - 22 UNIT M-11(2 BEDROOM) UNIT M-10(2 BEDROOM) UNIT M-9(2 BEDROOM) UNIT M-8 (2 BEDROOM)UNIT M-7(2 BEDROOM) UNIT M-6(2 BEDROOM) UNIT M-1 (1 BEDROOM) UNIT M-2(2 BEDROOM) UNIT M-3(2 BEDROOM) UNIT M-4 (2 BEDROOM) UNIT M-5(2 BEDROOM) XF XF XF XF XE XF XEHC HPL HPL - 2 G G G G MAINTENANCEOFFICE/ STORAGE XE G G G G Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" LM-EL1.1 ELECTRICAL LIGHTING PLAN BLDGS L AND M LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 7 Permit ReviewComments 08/05/2019 ESK LM-EL1.1 12/31/19 ESK LM-EL1.1 GFI GFI S S S J GFIGFI GFIJGFIFF GFISS S S GFI GFI J GFIGFIGFI GFI GFIGFI GFIJ GFIGFI GFI GFI GFIGFIGFIGFI GFIGFI GFIGFI GFI GFI GFI GFI J J J GFIGFI GFIGFIGFI GFIGFI GFI GFI GFIGFI GFIJ GFIGFIGFIGFI GFI GFI GFIGFI J J J GFIGFIGFIGFI GFI GFI GFIGFIGFIGFI GFIGFIGFI GFI S S F F S S S S S S S S S S S S TV TV TV MMTV TVTV MMMTV TV MMMTV TVTV MM TV TV TV TV TV TV TV TV MTV TV TV TV TV M MM MM MTV TV TV TV M MMM MTVTV MS TV TV TV TV TV TV TV TV TV TV TV TV TV GFI JJ J J JJ J J J J J J JJ J J J J J J J J TPM9 TPM9 - 1 EF-1 TPM9 - 7 TPM9 - 5 TPM9 - 2 TPM9 - 14 TPM9 - 6,8 TPM9 - 9 TPM9 - 4 TPM9 - 11,13 TPM9 - 3 TPM9 - 12 TPM1 TPM1 - 2 TPM1 - 1 TPM1 - 4 TPM1 - 5 TPM1 - 6,8 TPM1 - 7 TPM1 - 9 TPM1 - 11,13 EF-1 HP HP TPM11 11 1 2 22 TPM11 - 2 TPM11 - 1 TPM11 - 3 4 4 455 TPM11 - 6,8 TPM11 - 4 TPM11 - 5 TPM11 - 7 TPM11 - 9 TPM11 - 11,13 TPM11 - 14 14 14 14 TPM10 EF-1 11 1 TPM10 - 1 2 22 2 TPM10 - 2 TPM10 - 3 4 4 5 55 TPM10 - 4 TPM10 - 6,8 TPM10 - 7 4 TPM10 - 9 TPM10 - 11,13 TPM10 - 12 14 14 14 TPM10 - 14 1 1 1 1 3 22 2 2 2 TPM594 5 5 5 4 TPM5 - 11,13 TPM5 - 12 1414 14 14 14 TPM4 1 1 1 2 22 2 3 4 4 455 9 14 1414 TPM4 - 11,13 TPM4 - 6,8 TPM4 - 12 TPM4 - 1 TPM3 - 12 TPM3 - 5 TPM3 - 2 TPM3 - 7 TPM3 - 6,8 TPM3 - 9 TPM3 - 111 1 222 2TPM3TPM3- 4 4 4 5 TPM3 - 3 2 2 2 2 2 1 1 5 4 4 1 TPM2 TPM2 - 12 TPM2 - 5 TPM2 - 4 TPM2 - 7 TPM2 - 11,13 TPM2 - 1 TPM2 - 2 TPM8 TPM7 TPM6 2 1 222 1 1 5 5 4 4 2 TPM8 - 5 TPM8 - 1 TPM8 - 14 TPM8 - 12 TPM8 - 11,13TPM8- 6,8 TPM8 - 7 TPM8 - 4 TPM8 - 3 TPM8 - 9 14 14 14 TPM7 - 6,8 TPM7 - 5 TPM7 - 4 TPM7 - 3 TPM7 - 11,13 TPM7 - 2 TPM7 - 14 2 2 22 1414 14 14 1 1 1 5 5 4 4 TPM6 - 1 TPM6 - 14 TPM6 - 2 TPM6 - 3 TPM6 - 12 TPM6 - 4 TPM6 - 5 TPM6 - 11,13 TPM6 - 7 TPM6 - 6,81 1 1 2 2 14 14 14 2 2 5 5 4 4 TPM1 - 12 TPM2 - 3 16 16 16 16 16 HPH1 - 16 UNIT M-11(2 BEDROOM) UNIT M-10(2 BEDROOM)UNIT M-9 (2 BEDROOM) UNIT M-8(2 BEDROOM)UNIT M-7(2 BEDROOM) UNIT M-6 (2 BEDROOM) UNIT M-1(1 BEDRROM) UNIT M-2(2 BEDROOM) UNIT M-3 (2 BEDROOM) UNIT M-4(2 BEDROOM) UNIT M-5(2 BEDROOM) HPH1 - 25 H6 SECURITY HEADEND RACK S/CO 1A * EF-1 EF-1 TPM11 - 12 1A * TPM10 - 12 1A * 1A * S/CO EF-1 EF-1 TPM5 - 6,8 EF-1 HP TPM5 - 15 TPM5 - 7 1A * TPM4 - 14 TPM4 - 5 TPM4 - 2 TPM4 - 15 TPM4 - 7 TPM5 - 2 TPM5 - 14 EF-1 EF-1 TPM4 - 12 HP 14 14 S/CO 1A *1A * 1A * 1A * 1A *1A * 1A * S/CO 1 1 1 1S/CO S/CO EF-1 TPM7 - 12 TPM7 - 9 TPM7 - 12 EF-1 EF-1 EF-1 EF-1 EF-1 14 14 14 14 TPM2 - 14 14 14 14 14 TPM3 - 14 S/CO HP EF-1 EF-1 TPM2 - 9 TPM1 - 3 TPM1 - 12 S/CO S/CO EF-1 EF-1 HP 1A * TPM3 - 11,13 EF-1 DENOTES CIRCUIT # INASSOCIATED TENANTPANEL-TP (TYP) TPM7 - 1 S/CO S/CO DENOTES CIRCUIT # INPANEL HPH1 FORCORRIDOR RECEPTACLES (TYP) TPM5 - 1 TS FS EF-1 2SME SME 2 SME 2 2 SME 2 SME 2 2 SME SME 2 SME 2 2 SME 2 SME TPM11 - 15 TPM11 - 16 TPM5 - 17 TPM5 - 16TPM4- 17 TPM4 - 16 TPM10 - 15 TPM10 - 16 TPM9 - 15TPM9 - 16 TPM3 - 15TPM3- 16 TPM2 - 16 TPM2 - 15 TPM1 - 14 TPM6 - 15 TPM6 - 16 TPM7 - 16TPM7 - 15 TPM8 - 15 TPM8 - 16 TPM1 - 15 4 GFI SME 2 2 HP HP HP HPTPM6- 12 8 8 8 8 8 8 8 8 8 8 NOTE: HEAT PUMP (HP) CONDENSATE PUMPSTO BE WIRED INTO THE SAME CIRCUIT AS HEAT PUMP. 8 HPL 1 HPL - 1 HPL - 3 H7 SECURITY HEAD ENDRACK BUILDING L DENOTES CIRCUIT # IN PANEL HPL (TYP) HPL - 4,6,8 EUH-2 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" LM-EP1.1 ELECTRICAL POWER PLAN BLDG L AND M LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 Addendum 3 4/12/19 8 Addendum 8 11/5/19 ESK LM-EP1.1 12/31/19 ESK LM-EP1.1