Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ESK ABC-EP1.4R1
GFIGFIGFIGFI J GFIGFIGFIGFI GFI GFI GFIS J GFI GFIGFIGFI S J GFIGFIGFI GFI GFIGFIS GFIGFIGFIGFIGFI J S S S J GFI F F TV TV TV TV TV TV TV TV TV TV TV FF S S J TV TV TV TV TV J J J J J J J J J J BUILDING B LEVEL 4 BUILDING A UNIT B-18(1 BEDROOM) UNIT B-19(2 BEDROOM) UNIT B-20(1 BEDROOM) UNIT B-21(1 BEDROOM) UNIT B-22(1 BEDROOM) ATTIC SPACE KEF TPB19 1 1 TPB19 -11 2 TPB19 -2 2 2 TPB19 -3 4 TPB19 -4 55TPB19-6,8 TPB19 -7 TPB19 -5 TPB19 -9 TPB19 -12 TPB19 -11,13 14 14 14 TPB19 -14 TPB18 -1 1 11 1 2 2 2 2 2 TPB18 -3 TPB18 -2 55 444 TPB18 -6,8 TPB18 -9 1 1 1 25 TPB22 -3 4 TPB22 -44 5 TPB22 -6,8 HP6 2 TPB22 -9 1 11 TPB20 -1 2 TPB20 -6,8 TPB20 -9 TPB21 -2 TPB21 -3 TPB21 -6,8TPB21-7 TPB18 -4 TPB18 -5 TPB18 -7 TPB18 TPB18 -11,13 TPB20 1 2 2 TPB20 -2 TPB20 -3 4 4 5 5 TPB20 -7 TPB20 -4 TPB20 -11,13 TPB21 1 11TPB21-1 2 2 4 4 5 9 TPB21 -4 TPB21 -11,13 TPB22 TPB22 -1 TPB22 -2 2 2 5 TPB22 -7 10 TPB22 -11,13 HPB1 -20 20 HPB1 -29 ERV2 IN BATTIC HP4 IN B ATTIC HPB1 -30,32 HP6 HP6 HP6 HP 1 1 1 TS FS S/C S/C S/C S/C S/C 1 1 1 1 TPB22 -12 HPB1 -34 DRYER BOOSTER FANIN ATTIC SME 2 2SME 2 SME 2 SME 2SME TPB22 -15 TPB22 -14 TPB21 -12 TPB21 -14 TPB20 -14 TPB20 -12 TPB19 -16 TPB19 -17 TPB18 -12 TPB18 -14 TPB19 -11,13 4 2 NOTE: HEAT PUMP (HP) CONDENSATE PUMPSTO BE WIRED INTO THE SAME CIRCUIT AS HEATPUMP. GFI 9 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1/8" = 1'-0" ABC-EP1.4 ELECTRICAL POWER PLAN BLDGS A-B-C - LEVEL 4 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 1 Addendum 3 4/12/19 8 Addendum 8 11/5/19 9 02/14/2020ESK ABC-EP1.4R1 ESK ABC-EP1.4R1