Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Maggiore - Sketch - LOG - 200214
OXOBOXO LOFTS 2/14/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete SKS-01 Helical Piles PPB MMC 10/30/19 SKS-02 Helical Piles PPB MMC 10/30/19 SKS-03 Floor infill at Bldg B basement PPB MMC 10/21/19 RFI #15 SKS-04 Floor infill at Bldg B level 1 PPB MMC 10/21/19 RFI #15 SKS-05 Floor infill at Bldg B level 2 PPB MMC 10/21/19 RFI #15 SKS-06 Floor infill at Bldg B level 3 PPB MMC 10/21/19 RFI #15 SKS-07 Floor infill at Bldg B Level 4 PPB MMC 10/21/19 RFI #15 SKS-08 Wall and piers at Bldg K PPB MMC 10/21/19 from field visit due to existing conditions SKS-08R1 Wall and piers at Bldg K PPB MMC 11/11/19 Revised SKS-09 Wall at Bldg K PPB MMC 10/21/19 from field visit due to existing conditions voided SKS-09R1 Wall at Bldg K PPB MMC 10/28/19 from field visit due to existing conditions SKS-10 Pier at Bldg K PPB MMC 10/21/19 from field visit due to existing conditions SKS-10R1 Pier at Bldg K PPB MMC 11/11/19 Revised SKS-11 Section at Bldg B infill PPB MMC 10/21/19 RFI #15 SKS-12 Bldg A-Plan for truss repair PPB MMC 10/24/19 RFI #6 SKS-13 Bldg A -Detail for truss repair PPB MMC 10/24/19 RFI #6 voided SKS-13R1 Bldg A -Detail for truss repair PPB MMC 10/28/19 RFI #6 SKS-14 Bldg B- Header section PPB MMC 10/28/19 from field visit due to existing conditions SKS-15 Bldg B level 3, new header PPB MMC 10/28/19 from field visit due to existing conditions SKS-16 Bldg B level 4, new header PPB MMC 10/28/19 from field visit due to existing conditions SKS-17 Bldg B level 1 new header PPB MMC 10/29/19 from field visit due to existing conditions SKS-18 Bldg B level 1-new header PPB MMC 10/29/19 from field visit due to existing conditions SKS-19 Bldg D-wall rebuild -level 1 PPB MMC 11/9/19 Bldg D falling down SKS-20 Bldg D wall rebuild level 2 PPB MMC 11/9/19 Bldg D falling down SKS-21 Bldg D-wall rebuild PPB MMC 11/9/19 Bldg D falling down SKS-22 Bldg D-Reinforce column PPB MMC 11/9/19 Bldg D falling down SKS-23 Bldg K -Pier PPB MMC 11/9/19 Rebuild bldg K SKS-24 Building F design PPB MMC 12/9/19 Redesign of F SKS-25 Building F design PPB MMC 12/9/19 Redesign of F SKS-25R1 Building D columns PPB MMC 12/12/19 Answering column layout issues SKS-26 Bldg A Northeast Corner repairs PPB MMC 12/12/10 Brick wall cracking repairs & beam/footing SKS-27 Building D column reconfiguration DM MMC 12/12/19 Answering column layout issues SKS-28 Bldg G/H wall penetration DM MMC 12/12/19 New brick opening structural support SKS-28R1 Boiler knee wall supports DM MMC 12/19/19 Support water tanks in boiler room H bldg SKS-29 Bldg G/H wall penetration PPB MMC 12/12/19 New brick opening structural support SKS-31 Bldg B Existing column reinforcement DM MMC 12/20/19 Reinforcement Existing columns SKS-32 Bldg B Level B Framing plan DM MMC 12/20/19 Correct out of level existing wood floor OXOBOXO LOFTS 2/14/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete SKS-33 Bldg B Level 1 framing plan DM MMC 12/20/19 Correct out of level existing wood floor SKS-34 Bldg B level 2 framing plan DM MMC 12/20/19 Correct out of level existing wood floor SKS35 Bldg B level 3 framing plan DM MMC 12/20/19 Correct out of level existing wood floor SKS-36 Bldg B level 4 framing plan DM MMC 12/20/19 Correct out of level existing wood floor SKS-37 Bldg M beam end repairs DM MMC 12/20/19 Repair rafter tails SKS-38 Elevator Shaft Plan Detail DM MMC 12/30/19 Elevator details SKS-39 Elevator Shaft Wall Section DM MMC 12/30/19 Elevator details SKS-40 Bldg B Level SB Foundation Plan DM MMC 1/6/20 SKS-41 Bldg B Level B Foundation Plan DM MMC 1/6/20 SKS-42 Bldg B Level One Framing Plan DM MMC 1/6/20 SKS-43 Bldg B Level Two Framing Plan DM MMC 1/6/20 SKS-44 Bldg B Level Three Framing plan DM MMC 1/6/20 SKS-45 Bldg B Level Four Framing plan DM MMC 1/6/20 SKS-46 Bldg C Plans DM MMC 1/6/20 SKS-47 Bldg D Plans DM MMC 1/6/20 SKS-48 Foundation Schedule DM MMC 1/6/20 SKS-49 B Bldg Post at Stair DM MMC 1/6/20 SKS-50 B Bldg Landing at Stair DM MMC 1/6/20 SKS-51 D Bldg section at Stair DM MMC 1/6/20 SKS-52 D Bldg infill DM MMC 1/6/20 SKS-53 B Bldg wall bracing DM MMC 1/6/20 SKS-54 B Bldg Stair Wall DM MMC 1/6/20 SKS-55 B Bldg Beam Splice DM MMC 1/6/20 Where? SKS-56 B Bldg Roof Truss Support DM MMC 1/6/20 SKS-57 B Bldg Infill DM MMC 1/6/20 SKS-58 Bldg B Attic truss bracing DM MMC 1/13/20 Adding rods and turnbuckles SKS-59 Bldg B Attic truss bracing DM MMC 1/13/20 Adding rods and turnbuckles SKS-60 Bldg B Post for beam support level SB DM MMC 1/22/20 Answers RFI#42 fix rotten beam SKS-61 Bldg B Post for beam support for level B DM MMC 1/22/20 Answers RFI#42 " SKS-62 Bldg B Post for beam support for level 1 DM MMC 1/22/20 Answers RFI#42 " SKS-62 Bldg B Section at Stair infill DM MMC 1/22/20 Answers RFI#42 " SKS-64 Bldg B Post for Beam - foundation footing detail DM MMC 1/22/20 Answers RFI#42 foundation for added post SKS-65 Bldg B Elevator beam support DM MMC 2/1/20 clarifies wood beam support @ masonry shaft Adds steel angle to support beam SKS-66 Bldg B elevator cap Section DM MMC 2/1/20 clarifies wood beam support at masonry shaft SKS-67 Bldg B Elevator Cap framing plan DM MMC 2/1/20 clarifies wood beam support at masonry shaft SKS-68 Pipe Hanger details for MEP's DM MMC 2/1/20 Clarifies supports for corridor MEP's SKS-69 Bldg H Delaminated Brick repair DM MMC 2/4/20 Detail to fix brick delamination OXOBOXO LOFTS 2/14/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete SKS-70 Crawl Space Bearing wall DM MMC 2/4/20 Bldg H crawl space opening OXOBOXO LOFTS 2/14/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete ASK-01 Bldg B Basement redesign around wood trusses PPB Dakota Design options for Owner review not for const. ASK-01R1 Bldg B Basement redesign around wood trusses PPB Dakota Design options for Owner review not for const. ASK-02 Bldg B Partial 2nd & 3rd flr plan PPB Dakota Design options for Owner review not for const. ASK-03 Bldg K reconfigure bathrooms & kitchen over bridge PPB MMC Move bathrm & kitchen away from over the river ASK-04 Bldg B level SB revisions PPB MMC 4-Dec-19 New design for sprinkler room and adjacent MEP's ASK-05 Flood Vent Bldg K PPB MMC 20-Dec-19 ASK-06 Flood Vent Bldg G PPB MMC 20-Dec-19 ASK-07 Flood Vent Bldg J PPB MMC 20-Dec-19 ASK-08 Flood Vent Bldg H PPB MMC 20-Dec-19 ASK-09 Flood Vent Bldg M PPB MMC 20-Dec-19 ASK-10 Flood Vent Details on Existing Foundation wall PPB MMC 20-Dec-19 ASK-11 Flood Vent Details on Wood Frame PPB MMC 20-Dec-19 ASK-12 Flood Vent Bldg L PPB MMC 17-Dec-19 Existing window profiles with dimensions informational ASK-13 Existing window details PPB MMC 17-Dec-19 ? ASK-14 Existing window details PPB MMC 17-Dec-19 ASK-15 Existing window details PPB MMC 17-Dec-19 ASK-16 Existing window details PPB MMC 17-Dec-19 ASK-17 Existing window details PPB MMC 17-Dec-19 ASK-18 Req clearances in corridors PPb MMC 21-Dec-19 ASK-19 Bldg E 1st floor plan PPB MMC 18-Dec-19 added bathrooms ASK-20 Bldg L 1st floor PPB MMC 20-Dec-19 part of RFI#19 Bldg depart. ASK-21 Exterior Door detail PPP MMC 18-Dec-20 ASK-22 Bldg B section PPB MMC Bldg depart. Bldg depart. ASK-23 Bldg B, Level B, doors moved PPB MMC 20-Dec-19 new 3x3 access panel in new floor Bldg depart. ASK-24 Bldg F, Level 1 demo plan PPB MMC 20-Dec-19 Clarify removing elevator Bldg depart. ASK-25 Bldg F roof plan PPB MMC 20-Dec-19 Bldg depart. ASK-26A R2 Bldg A,D,E Finish floor pattern plans PPB MMC 13-Feb-20 Finish floor plans and materials revised set 2-12-20 ASK-26B R2 Bldg B Finish floor Pattern plans PPB MMC 13-Feb-20 Level SB, B and 1 revised set 2-12-20 ASK-26C R3 Bldg B Finish floor Pattern plans PPB MMC 13-Feb-20 Level 2,3 & 4 revised set 2-12-20 ASK-26D R2 Bldg C,F, & L Finish Floor Pattern Plans PPB MMC 13-Feb-20 revised set 2-12-20 ASK-26E R2 Bldg G Finish Floor Pattern plan PPB MMC 13-Feb-20 revised set 2-12-20 ASK-26F R2 Bldg H,J,K & M Finish Floor Pattern Plan PPB MMC 13-Feb-20 revised set 2-12-20 ASK-27 Floor and Ceiling types PPB MMC 20-Dec-19 Clarifies floor types with insulation ASK-28 Bldg B Roof Eave detail PPB MMC 20-Dec-19 Clarifies Bldg Department concerns ASK-29 Stair #2 landing column location at Bldg B PPB MMC 12/21/2019 Clarifies RFI#31 OXOBOXO LOFTS 2/14/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete ASK-30 SHPO window clearances PPB MMC 12/21/2019 Clarifies distances from windows ASK-31 Existing Masonry Openings at Bldg's M&K PPB MMC 12/21/2019 Answers RFI#21 ASK-32R1 Bldg M plan, level 1 adjust openings PPB MMC 12/23/2019 ASK-33 Bldg M plan, level 1, part B, move doors and closet PPB MMC 12/23/2019 Adjust door opening around archs, and closets ASK-34 Building J level one PPB MMC 12/23/2019 Move walls to fit electric panels ASK-35 All Bldgs, life safety plans PPB Bldg Dept.12/23/2019 Plans adjusted for Uncasville Bldg Dept. ASK-36 Typical waterproofing ASK-37 Bldg G,H & J crawl space access hatches PPB MMC 12/26/2019 Locates access hatches, see new spec on Flor doors 083483 ASK-38 A-D Revised Drawing lists PPB MMC 12/26/2019 ASK-39A-C Gutter and downspout locations PPB MMC 12/26/2019 ASK-40 Elevator plan & sections PPB MMC 12/30/2019 Adding a ceiling to elevator shaft ASK-41 Wall type R.5 PPB MMC 12/27/2019 Add concrete curb and waterproofing to C Bldg ASK-41R1 Wall types R.5 PPB MMC 1/28/2020 Wall type 13- wall at stair #2 eliminate shaft wall construction ASK-42 Bldg C revised floor plan PPB MMC 12/27/2019 Wall layout for added curb ASK-43 A,B&C Closet door revisions PPB MMC 12/26/2019 Units G1, G3 & G7 43C door tag, 43b door smaller, 43A changed a pair to single ASK-44 Bldg J unit J-1 PPB MMC 1/28/2020 Reconfigures unit J-1 RFI#41 ASK-045Ar1 Bldg B Stair 2-Plan at level SB PPB MMC 2/13/2020 Clarrifies wal partition type and configurationRFI135 & 145 ASK--45Br1 Bldg B Stair- N-S Section PPB MMC 2/13/2020 Clarrifies wal partition type and configurationRFI135 & 145 ASK-45Cr1 Bldg B Stair 2 E-W Section PPB MMC 2/13/2020 Clarrifies wal partition type and configurationRFI135 & 145 ASK-45A,B,C,D Bldg B stair#2 PPB MMC 1/15/2020 Answers RFI#35 clarifies fire rating and walls ASK-46 Bldg H- unit H-5 PPB MMC 1/28/2020 Corrects clearance needed at entry door shortens the kitchen length ASK-47 Connector B D PPB MMC 1/6/2020 new ext. board & batten siding, roof, drywall ASK-48 Connector D E PPB MMC 1/6/2020 new ext. board & batten siding, roof, drywall ASK-49 Bldg B existing wood floor condition PPB MMC 2/3/2020 Bldg A&B existing floor conditions ASK-50A Bldg B plan of Stair #2 PPB MMC 2/4/2020 Clarifies stair risers & elevations ASK-50B Bldg B plan of Stair #2 PPB MMC 2/4/2020 Clarifies stair risers & elevations ASK-51 Bldg D plans D-A1.1 PPB MMC 2/4/2020 changes stair layout ASK-52 Bldg D Elevations D-A2.1 PPB MMC 2/4/2020 ASK-53 Bldg E demo plans E-D1.1 PPB MMC 2/4/2020 ASK-54 Bldg E Plans E-A1.1 PPB MMC 2/4/2020 Reconfigure stair risers and layout ASK-55 Bldg E Plans E-A1.2 PPB MMC 2/4/2020 Removes old front structure ASK-56 Bldg E Elevations E-A2.1 PPB MMC 2/4/2020 details on connector siding and roof ASK-57R1 Bldg E Sections E-A3.1 PPB MMC 2/14/2020 section details on stair changes ASK-58 Bldg E toilet plans & Elevations E-A6.1 PPB MMC 2/4/2020 bathroom changes due to stair changes ASK-59 Bldg E kitchen plans & elevations E-A6.2 PPB MMC 2/4/2020 Kitchen changes due to stair changes ASK-60 Bldg L Demo plans L-D1.1 PPB MMC 2/4/2020 Added "remove exterior doors", deleted removing stoop OXOBOXO LOFTS 2/14/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete ASK-61 Bldg L Building elevations L-A2.1 PPB MMC 2/4/2020 Leave wood stairs in place ASK-62 Bldg L Building L sections L-A3.1 PPB MMC 2/4/2020 Changed to reflect actual conditions ASK-63 Bldg G kitchen plan & Elevation PPB MMC 2/4/2020 reconfigure layout of kitchen ASK-64 ASK-65 ASK-66 ASK-67 C-A2.1, Bldg C Elevations 2/13/2020 swop door and window locations ASK-68 F-A2.1, Bldg F Elevations 2/13/2020 new windows ASK--72 B-A1.3, Bldg B Level plan one 2/13/2020 adjust floor layout via deminsios ASK-74 C D1.1, Bldg C Demo plan 2/13/2020 swop door and window locations ASK-76 B-A4.1, Bldg B Roof details 2/13/2020 underside of roof changes ASK-88 VOID, Disregard PPB MMC 1/16/2020 RFI #39, clarifies stair details See ASK-51 Plumbing PSK ABC-PB1.1 Plumbing Plan Bldg A & B Level 1 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK ABC-PB1.2 Plumbing Plan Bldg B Level 2 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK ABC-PB1.3 Plumbing Plan Bldg A-level 2 Bldg B-level 3 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK ABC-PB1.4 Plumbing Plan Bldg A-Attic Bldg B-level 4 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK ABC-PB1.B Plumbing Plan Bldg A-Crawl Space Bldg B-level B Bldg C - Level 2 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK ABC-PB1.SB Plumbing Plan Bldg B-Level SB Bldg C-Level 1 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK DE-PB1.1 Plumbing Plan Bldg D & E - Levels 1 & 2 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK F-PB1.1 Plumbing Plan Bldg F - Level 1,2 & Mezzanine Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK G-PB1.1 Plumbing Plan Bldg G Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK HK-PB1.1 Plumbing Plan Bldg H & K - Level 1 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK J-PB1.1 Plumbing Plan Bldg J - Level 1 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK LM-PB1.1 Plumbing Plan Bldg L & M - Level 1 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 Electrical ESK ABC-EL1.1 Electrical Lighting Plan Bldgs A-B-C Level 1 Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EL1.2 Electrical Lighting Plan Bldgs A-B-C Level 2 Aztec MMC 12/31/2019 Latest electrical design OXOBOXO LOFTS 2/14/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete ESK ABC-EL1.3 Electrical Lighting Plan Bldgs A-B-C Level 3 Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EL1.4 Electrical Lighting Plan Bldgs A-B-C Level 4 Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EL1.B Electrical Lighting Plan Bldgs B-C Level B Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EL1.SB Electrical Lighting Plan Bldgs B-C Level SB Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EP1.1 Electrical Power Plan Bldgs A-B-C Level 1 concept Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EP1.2 Electrical Power Plan Bldgs A-B-C Level 2 Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EP1.3 Electrical Power Plan Bldgs A-B-C Level 3 Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EP1.4 Electrical Power Plan Bldgs A-B-C Level 4 Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EP1.B Electrical Power Plan Bldgs B-C Level B Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EP1.SB Electrical Power Plan Bldgs B-C Level SB Aztec MMC 12/31/2019 Latest electrical design ESK DE-EL1.1 Electrical Lighting Plan Bldgs D-E Levels 1 and 2 Aztec MMC 12/31/2019 Latest electrical design ESK DE-EP1.1 Electrical Power Plan Bldgs D-E Levels 1 and 2 Aztec MMC 12/31/2019 Latest electrical design ESK E3.1 Electrical Panelboard Schedules Aztec MMC 12/31/2019 Latest electrical design ESK E3.2 Electrical Panelboard Schedules Aztec MMC 12/31/2019 Latest electrical design ESK F-EL1.1 Electrical Lighting Plans Bldg F - Levels 1 and 2 Aztec MMC 12/31/2019 Latest electrical design ESK F-EP1.1 Electrical Power Plans Bldg F - Levels 1 and 2 Aztec MMC 12/31/2019 Latest electrical design ESK GH-EL1.1 Electrical Lighting Plan Building G and H Aztec MMC 12/31/2019 Latest electrical design ESK GH-EP1.1 Electrical Power Plan Bldg G and H Aztec MMC 12/31/2019 Latest electrical design ESK J-EL1.1 Electrical Lighting Plan Building J Level 1 Aztec MMC 12/31/2019 Latest electrical design ESK J-EP1.1 Electrical Power Plan Building J Level 1 Aztec MMC 12/31/2019 Latest electrical design ESK K-EL1.1 Electrical Lighting Plan Building K Level 1 Aztec MMC 12/31/2019 Latest electrical design ESK K-EP1.1 Electrical Power Plan Building K Level 1 Aztec MMC 12/31/2019 Latest electrical design ESK LM-EL1.1 Electrical Lighting Plan Bldgs L and M Level 1 Aztec MMC 12/31/2019 Latest electrical design ESK LM-EP1.1 Electrical Power Plan Bldg L and M Level 1 Aztec MMC 12/31/2019 Latest electrical design Mechanical MSK ABC-MD1.1 Mechanical Ductwork Plan BLDGS A,B,C - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MD1.2 Mechanical Ductwork Plan BLDGS A,B,C - Level 2 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MD1.3 Mechanical Ductwork Plan BLDGS A,B,C - Level 3 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MD1.4 Mechanical Ductwork Plan BLDGS A,B,C - Level 4 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MD1.5 Mechanical Ductwork Plan BLDGS A,B,C - Attic Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MD1.B Mechanical Ductwork Plan BLDG A-Crawl Space BLDG B - Level B BLDG C - Level 2 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MD1.SB Mechanical Ductwork Plan BLDG B - Level SB BLDG C - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MP1.1 Mechanical Piping Plan BLDG B, C - Level 1 Aztec MMC 12/31/2019 latest mechanical design OXOBOXO LOFTS 2/14/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete MSK ABC-MP1.2 Mechanical Piping Plan BLDG B, C - Level 2 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MP1.3 Mechanical Piping Plan BLDG B, C - Level 3 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MP1.4 Mechanical Piping Plan BLDG B, C - Level 4 & Attic Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MP1.B Mechanical Piping Plan BLDG B, C - Level B Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MP1.SB Mechanical Piping Plan BLDG B, C - Level SB Aztec MMC 12/31/2019 latest mechanical design MSK DE-MD1.1 Mechanical Ductwork Plan BLDG D,E - Levels 1&2 Aztec MMC 12/31/2019 latest mechanical design mislabeled MSK DE-MP1.1 Mechanical Piping Plan BLDG D,E - Levels 1 & 2 Aztec MMC 12/31/2019 latest mechanical design mislabeled MSK F-MD1.1 Mechanical Ductwork Plan BLDG F - Levels 1&2 Aztec MMC 12/31/2019 latest mechanical design Labeled MSK-ABC-MD1.incorrectly MSK F-MP1.1 Mechanical Piping Plan BLDG F - Levels 1,2 & Roof Aztec MMC 12/31/2019 latest mechanical design MSK G-MD1.1 Mechanical Ductwork Plan BLDG G - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK G-MP1.1 Mechanical Piping Plan BLDG G - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK HK-MD1.1 Mechanical Ductwork Plan BLDG H & K - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK HK-MP1.1 Mechanical Piping Plan BLDG H & K - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK J-MD1.1 Mechanical Ductwork Plan BLDG J - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK J-MP1.1 Mechanical Piping Plan BLDG J - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK LM-MD1.1 Mechanical Ductwork Plan BLDG L & M Aztec MMC 12/31/2019 latest mechanical design MSK LM-MP1.1 Mechanical Piping Plan BLDG L & M - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK M2.1 Mechanical Schedules Aztec MMC 12/31/2019 latest mechanical design MSK M2.2 Mechanical Schedules Aztec MMC 12/31/2019 latest mechanical design MSK M3.4 Mechanical Detail Aztec MMC 12/31/2019 latest mechanical design OXOBOXO LOFTS 2/14/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete Sitework CSK-01a Clarifies RFI#27 BCS PPB 12/12/2019 RFI#27 CSK-01b Clarifies RFI#27 BCS PPB 12/12/2019 RFI#27 CSK-02 stairs details BSC MMC 12/23/2019 Clarifies RFI#27 & 28 CSK-03 Site lighting? CSK-04 Gas & sanitary coordination BSC MMC 1/7/2020 CSK-05 Bldg B side entrance BSC MMC 1/15/2020 Elevation adjustment ? CSK-07 Bldg H door & site walls BSC MMC 1/31/2020 Specify's Bldg H electric room door, stair and site wall gradings