Loading...
HomeMy WebLinkAbout1 Sketch - LOG 4-9-20OXOBOXO LOFTS 4/9/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete SKS-01 Helical Piles PPB MMC 10/30/19 SKS-02 Helical Piles PPB MMC 10/30/19 SKS-03 Floor infill at Bldg B basement PPB MMC 10/21/19 RFI #15 SKS-04 Floor infill at Bldg B level 1 PPB MMC 10/21/19 RFI #15 SKS-05 Floor infill at Bldg B level 2 PPB MMC 10/21/19 RFI #15 SKS-06 Floor infill at Bldg B level 3 PPB MMC 10/21/19 RFI #15 SKS-07 Floor infill at Bldg B Level 4 PPB MMC 10/21/19 RFI #15 SKS-08 Wall and piers at Bldg K PPB MMC 10/21/19 from field visit due to existing conditions SKS-08R1 Wall and piers at Bldg K PPB MMC 11/11/19 Revised SKS-09 Wall at Bldg K PPB MMC 10/21/19 from field visit due to existing conditions voided SKS-09R1 Wall at Bldg K PPB MMC 10/28/19 from field visit due to existing conditions SKS-10 Pier at Bldg K PPB MMC 10/21/19 from field visit due to existing conditions SKS-10R1 Pier at Bldg K PPB MMC 11/11/19 Revised SKS-11 Section at Bldg B infill PPB MMC 10/21/19 RFI #15 SKS-12 Bldg A-Plan for truss repair PPB MMC 10/24/19 RFI #6 SKS-13 Bldg A -Detail for truss repair PPB MMC 10/24/19 RFI #6 voided SKS-13R1 Bldg A -Detail for truss repair PPB MMC 10/28/19 RFI #6 SKS-14 Bldg B- Header section PPB MMC 10/28/19 from field visit due to existing conditions SKS-15 Bldg B level 3, new header PPB MMC 10/28/19 from field visit due to existing conditions SKS-16 Bldg B level 4, new header PPB MMC 10/28/19 from field visit due to existing conditions SKS-17 Bldg B level 1 new header PPB MMC 10/29/19 from field visit due to existing conditions SKS-18 Bldg B level 1-new header PPB MMC 10/29/19 from field visit due to existing conditions SKS-19 Bldg D-wall rebuild -level 1 PPB MMC 11/9/19 Bldg D falling down SKS-20 Bldg D wall rebuild level 2 PPB MMC 11/9/19 Bldg D falling down SKS-21 Bldg D-wall rebuild PPB MMC 11/9/19 Bldg D falling down SKS-22 Bldg D-Reinforce column PPB MMC 11/9/19 Bldg D falling down SKS-23 Bldg K -Pier PPB MMC 11/9/19 Rebuild bldg K SKS-24 Building F design PPB MMC 12/9/19 Redesign of F SKS-25 Building F design PPB MMC 12/9/19 Redesign of F SKS-25R1 Building D columns PPB MMC 12/12/19 Answering column layout issues SKS-26 Bldg A Northeast Corner repairs PPB MMC 12/12/10 Brick wall cracking repairs & beam/footing SKS-27 Building D column reconfiguration DM MMC 12/12/19 Answering column layout issues SKS-28 Bldg G/H wall penetration DM MMC 12/12/19 New brick opening structural support SKS-28R1 Boiler knee wall supports DM MMC 12/19/19 Support water tanks in boiler room H bldg SKS-29 Bldg G/H wall penetration PPB MMC 12/12/19 New brick opening structural support SKS-30 Bldg B floor Infill DM MMC 12/19/20 Fill in floor between wood girders part of addendum 08 price SKS-31 Bldg B Existing column reinforcement DM MMC 12/20/19 Reinforcement Existing columns SKS-32 Bldg B Level B Framing plan DM MMC 12/20/19 Correct out of level existing wood floor OXOBOXO LOFTS 4/9/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete SKS-33 Bldg B Level 1 framing plan DM MMC 12/20/19 Correct out of level existing wood floor SKS-34 Bldg B level 2 framing plan DM MMC 12/20/19 Correct out of level existing wood floor SKS35 Bldg B level 3 framing plan DM MMC 12/20/19 Correct out of level existing wood floor SKS-36 Bldg B level 4 framing plan DM MMC 12/20/19 Correct out of level existing wood floor SKS-37 Bldg M beam end repairs DM MMC 12/20/19 Repair rafter tails SKS-38 Elevator Shaft Plan Detail DM MMC 12/30/19 Elevator details SKS-39 Elevator Shaft Wall Section DM MMC 12/30/19 Elevator details SKS-40 Bldg B Level SB Foundation Plan DM MMC 1/6/20 SKS-41 Bldg B Level B Foundation Plan DM MMC 1/6/20 SKS-42 Bldg B Level One Framing Plan DM MMC 1/6/20 SKS-43 Bldg B Level Two Framing Plan DM MMC 1/6/20 SKS-44 Bldg B Level Three Framing plan DM MMC 1/6/20 SKS-45 Bldg B Level Four Framing plan DM MMC 1/6/20 SKS-46 Bldg C Plans DM MMC 1/6/20 SKS-47 Bldg D Plans DM MMC 1/6/20 SKS-48 Foundation Schedule DM MMC 1/6/20 SKS-49 B Bldg Post at Stair DM MMC 1/6/20 SKS-50 B Bldg Landing at Stair DM MMC 1/6/20 SKS-51 D Bldg section at Stair DM MMC 1/6/20 SKS-52 D Bldg infill DM MMC 1/6/20 SKS-53 B Bldg wall bracing DM MMC 1/6/20 SKS-54 B Bldg Stair Wall DM MMC 1/6/20 SKS-55 B Bldg Beam Splice DM MMC 1/6/20 Where? SKS-56 B Bldg Roof Truss Support DM MMC 1/6/20 SKS-57 B Bldg Infill DM MMC 1/6/20 SKS-58 Bldg B Attic truss bracing DM MMC 1/13/20 Adding rods and turnbuckles SKS-59 Bldg B Attic truss bracing DM MMC 1/13/20 Adding rods and turnbuckles SKS-60 Bldg B Post for beam support level SB DM MMC 1/22/20 Answers RFI#42 fix rotten beam SKS-61 Bldg B Post for beam support for level B DM MMC 1/22/20 Answers RFI#42 " SKS-62 Bldg B Post for beam support for level 1 DM MMC 1/22/20 Answers RFI#42 " SKS-62 Bldg B Section at Stair infill DM MMC 1/22/20 Answers RFI#42 " SKS-64 Bldg B Post for Beam - foundation footing detail DM MMC 1/22/20 Answers RFI#42 foundation for added post SKS-65 Bldg B Elevator beam support DM MMC 2/1/20 clarifies wood beam support @ masonry shaft Adds steel angle to support beam SKS-66 Bldg B elevator cap Section DM MMC 2/1/20 clarifies wood beam support at masonry shaft SKS-67 Bldg B Elevator Cap framing plan DM MMC 2/1/20 clarifies wood beam support at masonry shaft SKS-68 Pipe Hanger details for MEP's DM MMC 2/1/20 Clarifies supports for corridor MEP's SKS-69 Bldg H Delaminated Brick repair DM MMC 2/4/20 Detail to fix brick delamination SKS-70 Crawl Space Bearing wall DM MMC 2/4/20 Bldg H crawl space opening SKS-71 BD Bridge Connector DM MMC 4/9/20 SKS-72 BD Bridge Connector DM MMC 4/9/20 OXOBOXO LOFTS 4/9/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete SKS-73 BD Bridge Connector DM MMC 4/9/20 SKS-74 Bldg F low roof- VOID DM See SKS-97R1 SKS-75 Bldg B Attic framing plan DM MMC 3/3/20 Replacement for attic turnbuckles SKS-76 Bldg B Re. Attic bracing detail DM MMC 3/3/20 Replacement for attic turnbuckles SKS-77 Bldg B Re. Attic bracing detail DM MMC 3/3/20 Replacement for attic turnbuckles SKS-78 Bldg B Re. Attic Bracing detail SKS-79 Bldg B Level B -Gypsum floor DM MMC 2/26/20 Gypsum floor at Bldg B SKS-80 Bldg B Level One -Gypsum floor DM MMC 2/26/20 Gypsum floor at Bldg B SKS-81 Bldg B Level two-Gypsum floor DM MMC 2/26/20 Gypsum floor at Bldg B SKS-82 Bldg B level There-Gypsum Floor DM MMC 2/26/20 Gypsum floor at Bldg B SKS-83 Bldg B Level Four-Gypsum concrete DM MMC 2/26/20 Gypsum floor at Bldg B SKS-84 Typical Poured Gypsum Concrete leveling detail DM MMC 2/26/20 Gypsum floor at Bldg B SKS-85 Bldg B Rotted Beam @ Level 1 DM MMC 3/3/20 Fix to repair rotted beam SKS-86 Bldg B Rotted Beam detail DM MMC 3/3/20 Fix to repair rotted beam SKS-87 Bldg H Delaminated brick DM MMC 3/3/20 Bldg H Brick repair SKS-88 Bldg B Stair#2 DM MMC 3/19/20 Clarrifies stair support SKS-89 Bldg B Stair#2, detail DM MMC 3/19/20 Detail for stair support SKS-90 Bldg B Stair blocking DM MMC 3/19/20 SKS-91 Bldg B Column @ L2.2/L2.f DM MMC 3/19/20 SKS-92 Bldg B Column @ L2.2/L2.f DM MMC 3/19/20 SKS-93 AB Connector-SJ @ Roof roof & detail DM MMC 3/19/20 SKS-94 AB Connector-SJ @ Roof roof & detail DM MMC 3/19/20 SKS-95 AB Connector-Detail DM MMC 3/19/20 SKS-96 Bldg A -Lintel Repair DM MMC 3/19/20 SKS-97 Bldg F Low roof support for cooling tower DM MMC 3/23/20 VOID SKS-97R1 Bldg F Low roof support for cooling tower DM MMC 3/26/20 SKS-98 Bldg F First floor suport for sump tank DM MMC 3/23/20 SKS-99 Bldg F Low roof support detail for cooling tower DM MMC 3/23/20 OXOBOXO LOFTS 4/9/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete SKS-100 Bldg F Low Roof deck Support detail DM MMC 3/26/20 SKS-101 Bldg M- Rotted roof beam repair plan DM MMC 4/6/20 SKS-102 Bldg B-Rotted Rof beam repair DM MMC 4/6/20 Part of Bldg M , SKS-101 incorrect label, should be M SKS-103 Bldg M Rotted Roof beam repair DM MMC 4/6/20 not for const. ASK-01 Bldg B Basement redesign around wood trusses PPB Dakota Design options for Owner review not for const. ASK-01R1 Bldg B Basement redesign around wood trusses PPB Dakota Design options for Owner review not for const. ASK-02 Bldg B Partial 2nd & 3rd flr plan PPB Dakota Design options for Owner review ASK-03 Bldg K reconfigure bathrooms & kitchen over bridge PPB MMC Move bathrm & kitchen away from over the river ASK-04 Bldg B level SB revisions PPB MMC 4-Dec-19 New design for sprinkler room and adjacent MEP's Infill old windows ASK-04R1 Bldg B level SB revisions, B-A1.1 PPB MMC 16-Mar-20 Infill existing window masonry ASK-05 Flood Vent Bldg K PPB MMC 20-Dec-19 ASK-06 Flood Vent Bldg G PPB MMC 20-Dec-19 ASK-07 Flood Vent Bldg J PPB MMC 20-Dec-19 ASK-08 Flood Vent Bldg H PPB MMC 20-Dec-19 ASK-09 Flood Vent Bldg M PPB MMC 20-Dec-19 ASK-10 Flood Vent Details on Existing Foundation wall PPB MMC 20-Dec-19 ASK-11 Flood Vent Details on Wood Frame PPB MMC 20-Dec-19 informational ASK-12 Flood Vent Bldg L PPB MMC 17-Dec-19 Existing window profiles with dimensions ? ASK-13 Existing window details PPB MMC 17-Dec-19 ASK-14 Existing window details PPB MMC 17-Dec-19 ASK-15 Existing window details PPB MMC 17-Dec-19 ASK-16 Existing window details PPB MMC 17-Dec-19 ASK-17 Existing window details PPB MMC 17-Dec-19 ASK-18 Req clearances in corridors PPb MMC 21-Dec-19 ASK-19 Bldg E 1st floor plan PPB MMC 18-Dec-19 added bathrooms Bldg depart. ASK-20 Bldg L 1st floor PPB MMC 20-Dec-19 part of RFI#19 ASK-21 Exterior Door detail PPP MMC 18-Dec-20 Bldg depart. ASK-22 Bldg B section PPB MMC Bldg depart. Bldg depart. ASK-23 Bldg B, Level B, doors moved PPB MMC 20-Dec-19 new 3x3 access panel in new floor Bldg depart. ASK-24 Bldg F, Level 1 demo plan PPB MMC 20-Dec-19 Clarify removing elevator Bldg depart. ASK-25 Bldg F roof plan PPB MMC 20-Dec-19 ASK-25R1 Bldg F roof plan F-A1.4 PPB MMC 9-Mar-20 Updated roof plan revised set 2-12-20 ASK-26A R2 Bldg A,D,E Finish floor pattern plans PPB MMC 13-Feb-20 Finish floor plans and materials revised set 2-12-20 ASK-26B R2 Bldg B Finish floor Pattern plans PPB MMC 13-Feb-20 Level SB, B and 1 revised set 2-12-20 ASK-26C R3 Bldg B Finish floor Pattern plans PPB MMC 13-Feb-20 Level 2,3 & 4 revised set 2-12-20 ASK-26D R2 Bldg C,F, & L Finish Floor Pattern Plans PPB MMC 13-Feb-20 revised set 2-12-20 ASK-26E R2 Bldg G Finish Floor Pattern plan PPB MMC 13-Feb-20 revised set 2/14/2020 ASK-26F R2 Bldg H,J,K & M Finish Floor Pattern Plan PPB MMC 13-Feb-20 ASK-27 Floor and Ceiling types PPB MMC 20-Dec-19 Clarifies floor types with insulation OXOBOXO LOFTS 4/9/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete ASK-28 Bldg B Roof Eave detail PPB MMC 20-Dec-19 Clarifies Bldg Department concerns ASK-29 Stair #2 landing column location at Bldg B PPB MMC 12/21/2019 Clarifies RFI#31 ASK-30 SHPO window clearances PPB MMC 12/21/2019 Clarifies distances from windows ASK-31 Existing Masonry Openings at Bldg.'s M&K PPB MMC 12/21/2019 Answers RFI#21 ASK-32R1 Bldg M plan, level 1 adjust openings PPB MMC 12/23/2019 ASK-33 Bldg M plan, level 1, part B, move doors and closet PPB MMC 12/23/2019 Adjust door opening around archs, and closets ASK-34 Building J level one PPB MMC 12/23/2019 Move walls to fit electric panels for Bldg dept showing L bldg as storage ASK-35Dr1 All Bldgs., life safety plans PPB Bldg Dept.2/20/2020 Plans adjusted for Uncasville Bldg Dept. ASK-36 Typical waterproofing ASK-37 Bldg G,H & J crawl space access hatches PPB MMC 12/26/2019 Locates access hatches, see new spec. on Floor access doors 083483 ASK-38 A-D Revised Drawing lists PPB MMC 12/26/2019 ASK-39A-C Gutter and downspout locations PPB MMC 12/26/2019 add leader to lower roofs ASK-39AR1 Bldg B roof plan B-A1.7 PPB MMC 3/9/2020 Updated roof plan for SHPO ASK-40 Elevator plan & sections PPB MMC 12/30/2019 Adding a ceiling to elevator shaft ASK-41 Wall type R.5 PPB MMC 12/27/2019 Add concrete curb and waterproofing to C Bldg eliminate shaft wall construction revised set 1/28/2020 ASK-41R1 Wall types R.5 PPB MMC 1/28/2020 Wall type 13- wall at stair #2 revised set 1/21/2020 ASK-42R1 Bldg C revised floor plan dated 2-6-20 PPB MMC 2/14/2020 Wall layout for added curb 43C door tag, 43b door smaller, 43A changed a pair to single ASK-43 A,B&C Closet door revisions PPB MMC 12/26/2019 Units G1, G3 & G7 RFI#41 ASK-44 Bldg J unit J-1 PPB MMC 1/28/2020 Reconfigures unit J-1 RFI135 & 145 ASK-045Ar1 Bldg B Stair 2-Plan at level SB PPB MMC 2/13/2020 Clarifies wall partition type and configurationRFI135 & 145 ASK--45Br1 Bldg B Stair- N-S Section PPB MMC 2/13/2020 Clarifies wall partition type and configurationRFI135 & 145 ASK-45Cr1 Bldg B Stair 2 E-W Section PPB MMC 2/13/2020 Clarifies wall partition type and configuration clarifies fire rating and walls ASK-45A,B,C,D Bldg B stair#2 PPB MMC 1/15/2020 Answers RFI#35 shortens the kitchen length ASK-46 Bldg H- unit H-2, HJ-A1.1 PPB MMC 1/28/2020 Corrects clearance needed at entry door ASK-47 Connector B D PPB MMC 1/6/2020 new ext. board & batten siding, roof, drywall ASK-48 Connector D E PPB MMC 1/6/2020 new ext. board & batten siding, roof, drywall ASK-49 Bldg B existing wood floor condition PPB MMC 2/3/2020 Bldg A&B existing floor conditions ASK-50A Bldg B plan of Stair #2 PPB MMC 2/4/2020 Clarifies stair risers & elevations ASK-50B Bldg B plan of Stair #2 PPB MMC 2/4/2020 Clarifies stair risers & elevations ASK-51 Bldg D plans D-A1.1 PPB MMC 2/4/2020 changes stair layout ASK-52 Bldg D Elevations D-A2.1 PPB MMC 2/4/2020 ASK-53 Bldg E demo plans E-D1.1 PPB MMC 2/4/2020 ASK-54 Bldg E Plans E-A1.1 PPB MMC 2/4/2020 Reconfigure stair risers and layout ASK-55 Bldg E Plans E-A1.2 PPB MMC 2/4/2020 Removes old front structure ASK-55R1 Bldg E roof plan E-A1.2 PPB MMC 3/9/2020 Updated roof plan for SHPO ASK-56 Bldg E Elevations E-A2.1 PPB MMC 2/4/2020 details on connector siding and roof ASK-57R1 Bldg E Sections E-A3.1 PPB MMC 2/14/2020 section details on stair changes ASK-58 Bldg E toilet plans & Elevations E-A6.1 PPB MMC 2/4/2020 bathroom changes due to stair changes OXOBOXO LOFTS 4/9/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete ASK-59 Bldg E kitchen plans & elevations E-A6.2 PPB MMC 2/4/2020 Kitchen changes due to stair changes ASK-60 Bldg L Demo plans L-D1.1 PPB MMC 2/4/2020 Added "remove exterior doors", deleted removing stoop ASK-61 Bldg L Building elevations L-A2.1 PPB MMC 2/4/2020 Leave wood stairs in place ASK-62 Bldg L Building L sections L-A3.1 PPB MMC 2/4/2020 Changed to reflect actual conditions ASK-63 Bldg G kitchen plan & Elevation PPB MMC 2/4/2020 reconfigure layout of kitchen ASK-64 Bldg H, A6.3, cabinet & laundry room details PPB MMC 3/20/2020 Reconfigure laundry rm, make elec. rm larger ASK-65R1 Bldg A Elevations, A-A2.1 PPB MMC 3/11/2020 Exterior window changes ASK-66R1 Bldg B Elevations, B-A2.1 PPB MMC 3/11/2020 Exterior window changes ASK-67 C-A2.1, Bldg C Elevations PPB MMC 2/13/2020 swop door and window locations ASK-68 F-A2.1, Bldg F Elevations PPB MMC 2/13/2020 new windows ASK-69 K-A2.1, Bldg K Elevations PPB MMC 3/30/2020 New fill in crawl spaces, new window ASK-70 M-A2.1, Bldg M elevations PPB MMC 3/30/2020 New fill in crawl spaces, new window ASK-71 A-A1.2, Bldg A Level 2 plan PPB MMC 2/14/2020 ASK--72 B-A1.3, Bldg B Level plan one PPB MMC 2/13/2020 adjust floor layout via dimensions ASK-73R1 B-A1.5, Bldg B Level 3 PPB MMC 3/11/2020 new floor infill @ platforms, at north bump out 2-4, fixed doors, closets ASK-74 C D1.1, Bldg C Demo plan PPB MMC 2/13/2020 swap door and window locations ASK-75Ar1 C-A4.1, Bldg C detail roof eave,rake & parapet PPB MMC 3/30/2020 Updated roof details ASK-75Br1 D-A4.1, Bldg D detail roof eave, rake & parapet PPB MMC 3/30/2020 Updated roof details ASK-75Cr1 E-A4.1, Bldg E detail roof eave, rake & parapet PPB MMC 3/30/2020 Updated roof details ASK-75Dr1 G-A4.1, Bldg G detail roof eave, rake & parapet PPB MMC 3/30/2020 Updated roof details ASK-75Er1 HJ-A4.1, Bldg HJ detail roof eave, rake & parapet PPB MMC 3/30/2020 Updated roof details ASK-75Fr1 K-A4.1, Bldg K detail roof eave, rake & parapet PPB MMC 3/30/2020 Updated roof details ASK-75Gr1 M-A4.1, Bldg M detail roof eave, rake & parapet PPB MMC 3/30/2020 Updated roof details ASK-75J F-A4.2, Bldg F detail roof eave, rake & parapet PPB MMC 3/30/2020 Updated roof details ASK-76 B-A4.1, Bldg B Roof details PPB MMC 2/13/2020 underside of roof changes ASK-77 Reference sheet Code PPb Bldg Dept 2/14/2020 For Bldg Inspector ASK-78R1 B-A1.4, Bldg B level two PPB MMC new floor infill @ platforms, at north bump out 2-4, fixed doors, closets ASK-79R1 B-A1.6, Bldg B Level four PPB MMC 3/11/2020 new floor infill @ platforms, at north bump out 2-4, fixed doors, closets ASK-80 K-A1.1, BVldg K level one PPB MMC 3/30/2020 Unit K-4- kitchen & bathrm moved swapped locations ASK-81 Bldg K Kitchen Plan and elevation PPB MMC 3/12/2020 reconfigure kitchen cabinets ASK-82 A-A1.3 Bldg A Roof plan PPB MMC 3/9/2020 Updated roof plan for SHPO ASK-83 G-A1.3 Bldg G Roof Plan PPB MMC 3/9/2020 Updated roof plan for SHPO ASK-84 HJ-A1.4, Bldg HJ Roof plan PPB MMC 3/9/2020 Updated roof plan for SHPO ASK-85 K-A1.2, Bldg K Roof Plan PPB MMC 3/9/2020 Updated roof plan for SHPO ASK-86 L-A1.1, Bldg L Roof Plan PPB MMC 3/9/2020 Updated roof plan for SHPO ASK-87 M-A1.7, Bldg M Updated roof plan PPB MMC 3/9/2020 Updated roof plan for SHPO See ASK-51 ASK-88 VOID, Disregard PPB MMC 1/16/2020 RFI #39, clarifies stair details ASK-89R1 Bldg B elevations, B-A2.2 PPB MMC 3/11/2020 Exterior window and door changes ASK-90A New masonry opening infill detail PPB MMC 3/16/2020 Infill old openings in B building ASK-90B New masonry opening infill detail PPB MMC 3/16/2020 Infill old openings in B building OXOBOXO LOFTS 4/9/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete ASK-91 Bldg F elevations, F-A2.2 PPB MMC 3/11/2020 added new window & door ASK-92 Bldg B Bump out revisions PPB MMC 3/27/2020 Revised level 2,3 & 4 bumpout addded stair & railing level 3&4 ASK-93 D-A1.2, Bldg D Updated roof plan PPB MMC 3/9/2020 Updated roof plan for SHPO ASK-94 C-A1.2, Bldg C Updated roof plan PPB MMC 3/9/2020 Updated roof plan for SHPO ASK-95 Bldg M, M-A1.6 level A, part C PPB MMC 3/30/2020 Relocated sprinkler room door Move door over ASK-96 Bldg B, B-A1.1, Level SB PPB MMC 3/17/2020 Added masonry infill at existing windows Replaces ASK-004R1 ASK-97 Bldg MJ Connector, MJ-A4.1 roof plan & details PPB MMC 3/17/2020 New roof details for connector Plumbing revised set 2/14/2020 PSK ABC-PB1.1R1 Plumbing Plan Bldg A & B Level 1 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK ABC-PB1.2 Plumbing Plan Bldg B Level 2 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK ABC-PB1.3 Plumbing Plan Bldg A-level 2 Bldg B-level 3 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK ABC-PB1.4 Plumbing Plan Bldg A-Attic Bldg B-level 4 Aztec BSC 12/24/2019 Latest plumbing design revised set 2/14/2020 PSK ABC-PB1.BR1 Plumbing Plan Bldg A-Crawl Space Bldg B-level B Bldg C - Level 2 Aztec BSC 12/24/2019 Latest plumbing design revised set 2/14/2020 PSK ABC-PB1.SBR1 Plumbing Plan Bldg B-Level SB Bldg C-Level 1 Aztec BSC 12/24/2019 Latest plumbing design revised set 2/14/2020 PSK DE-PB1.1R1 Plumbing Plan Bldg D & E - Levels 1 & 2 Aztec BSC 12/24/2019 Latest plumbing design revised set 2/14/2020 PSK F-PB1.1R1 Plumbing Plan Bldg F - Level 1,2 & Mezzanine Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK G-PB1.1 Plumbing Plan Bldg G Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK HK-PB1.1 Plumbing Plan Bldg H & K - Level 1 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK J-PB1.1 Plumbing Plan Bldg J - Level 1 Aztec BSC 12/24/2019 Latest plumbing design revised set 12/31/2019 PSK LM-PB1.1 Plumbing Plan Bldg L & M - Level 1 Aztec BSC 12/24/2019 Latest plumbing design Electrical revised set 2/14/2020 ESK ABC-EL1.1R1 Electrical Lighting Plan Bldgs. A-B-C Level 1 Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EL1.2 Electrical Lighting Plan Bldgs. A-B-C Level 2 Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EL1.3 Electrical Lighting Plan Bldgs. A-B-C Level 3 Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EL1.4 Electrical Lighting Plan Bldgs. A-B-C Level 4 Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EL1.B Electrical Lighting Plan Bldgs. B-C Level B Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EL1.SB Electrical Lighting Plan Bldgs. B-C Level SB Aztec MMC 12/31/2019 Latest electrical design revised set 2/14/2020 ESK ABC-EP1.1R1 Electrical Power Plan Bldgs. A-B-C Level 1 concept Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EP1.2 Electrical Power Plan Bldgs. A-B-C Level 2 Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EP1.3 Electrical Power Plan Bldgs. A-B-C Level 3 Aztec MMC 12/31/2019 Latest electrical design revised set 2/14/2020 ESK ABC-EP1.4R1 Electrical Power Plan Bldgs. A-B-C Level 4 Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EP1.B Electrical Power Plan Bldgs. B-C Level B Aztec MMC 12/31/2019 Latest electrical design ESK ABC-EP1.SB Electrical Power Plan Bldgs. B-C Level SB Aztec MMC 12/31/2019 Latest electrical design OXOBOXO LOFTS 4/9/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete ESK DE-EL1.1 Electrical Lighting Plan Bldgs. D-E Levels 1 and 2 Aztec MMC 12/31/2019 Latest electrical design ESK DE-EP1.1 Electrical Power Plan Bldgs. D-E Levels 1 and 2 Aztec MMC 12/31/2019 Latest electrical design ESK E3.1 Electrical Panelboard Schedules Aztec MMC 12/31/2019 Latest electrical design ESK E3.2 Electrical Panelboard Schedules Aztec MMC 12/31/2019 Latest electrical design ESK F-EL1.1 Electrical Lighting Plans Bldg F - Levels 1 and 2 Aztec MMC 12/31/2019 Latest electrical design ESK F-EP1.1 Electrical Power Plans Bldg F - Levels 1 and 2 Aztec MMC 12/31/2019 Latest electrical design ESK GH-EL1.1 Electrical Lighting Plan Building G and H Aztec MMC 12/31/2019 Latest electrical design ESK GH-EP1.1 Electrical Power Plan Bldg G and H Aztec MMC 12/31/2019 Latest electrical design ESK J-EL1.1 Electrical Lighting Plan Building J Level 1 Aztec MMC 12/31/2019 Latest electrical design ESK J-EP1.1 Electrical Power Plan Building J Level 1 Aztec MMC 12/31/2019 Latest electrical design ESK K-EL1.1 Electrical Lighting Plan Building K Level 1 Aztec MMC 12/31/2019 Latest electrical design ESK K-EP1.1 Electrical Power Plan Building K Level 1 Aztec MMC 12/31/2019 Latest electrical design ESK LM-EL1.1 Electrical Lighting Plan Bldgs. L and M Level 1 Aztec MMC 12/31/2019 Latest electrical design ESK LM-EP1.1 Electrical Power Plan Bldg L and M Level 1 Aztec MMC 12/31/2019 Latest electrical design Mechanical MSK ABC-MD1.1 Mechanical Ductwork Plan BLDGS A,B,C - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MD1.2 Mechanical Ductwork Plan BLDGS A,B,C - Level 2 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MD1.3 Mechanical Ductwork Plan BLDGS A,B,C - Level 3 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MD1.4 Mechanical Ductwork Plan BLDGS A,B,C - Level 4 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MD1.5 Mechanical Ductwork Plan BLDGS A,B,C - Attic Aztec MMC 12/31/2019 latest mechanical design revised set 2/21/2020 MSK ABC-MD1.BR2 Mechanical Ductwork Plan BLDG A-Crawl Space BLDG B - Level B BLDG C - Level 2 Aztec MMC 12/31/2019 latest mechanical design revised set 2/21/2020 MSK ABC-MD1.SBR2 Mechanical Ductwork Plan BLDG B - Level SB BLDG C - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MP1.1 Mechanical Piping Plan BLDG B, C - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MP1.2 Mechanical Piping Plan BLDG B, C - Level 2 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MP1.3 Mechanical Piping Plan BLDG B, C - Level 3 Aztec MMC 12/31/2019 latest mechanical design MSK ABC-MP1.4 Mechanical Piping Plan BLDG B, C - Level 4 & Attic Aztec MMC 12/31/2019 latest mechanical design revised set 2/14/2020 MSK ABC-MP1.BR1 Mechanical Piping Plan BLDG B, C - Level B Aztec MMC 12/31/2019 latest mechanical design revised set 2/14/2020 MSK ABC-MP1.SBR1 Mechanical Piping Plan BLDG B, C - Level SB Aztec MMC 12/31/2019 latest mechanical design revised set 2/21/2020 MSK DE-MD1.1R2 Mechanical Ductwork Plan BLDG D,E - Levels 1&2 Aztec MMC 12/31/2019 latest mechanical design revised set 2/14/2020 MSK DE-MP1.1R1 Mechanical Piping Plan BLDG D,E - Levels 1 & 2 Aztec MMC 12/31/2019 latest mechanical design Labeled MSK-ABC-MD1.incorrectly MSK F-MD1.1 Mechanical Ductwork Plan BLDG F - Levels 1&2 Aztec MMC 12/31/2019 latest mechanical design revised set 2/14/2020 MSK F-MP1.1R1 Mechanical Piping Plan BLDG F - Levels 1,2 & Roof Aztec MMC 12/31/2019 latest mechanical design MSK G-MD1.1 Mechanical Ductwork Plan BLDG G - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK G-MP1.1 Mechanical Piping Plan BLDG G - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK HK-MD1.1 Mechanical Ductwork Plan BLDG H & K - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK HK-MP1.1 Mechanical Piping Plan BLDG H & K - Level 1 Aztec MMC 12/31/2019 latest mechanical design revised set 2/14/2020 OXOBOXO LOFTS 4/9/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete MSK J-MD1.1R1 Mechanical Ductwork Plan BLDG J - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK J-MP1.1 Mechanical Piping Plan BLDG J - Level 1 Aztec MMC 12/31/2019 latest mechanical design revised set 2/14/2020 MSK LM-MD1.1R1 Mechanical Ductwork Plan BLDG L & M Aztec MMC 12/31/2019 latest mechanical design MSK LM-MP1.1 Mechanical Piping Plan BLDG L & M - Level 1 Aztec MMC 12/31/2019 latest mechanical design MSK M2.1 Mechanical Schedules Aztec MMC 12/31/2019 latest mechanical design MSK M2.2 Mechanical Schedules Aztec MMC 12/31/2019 latest mechanical design MSK M3.4 Mechanical Detail Aztec MMC 12/31/2019 latest mechanical design OXOBOXO LOFTS 4/9/2020 SKETCH LOG Number Description Prepared By Sent To Date Sent Comments Complete Sitework CSK-01a Clarifies RFI#27 BCS PPB 12/12/2019 RFI#27 CSK-01b Clarifies RFI#27 BCS PPB 12/12/2019 RFI#27 CSK-02 stairs details BSC MMC 12/23/2019 Clarifies RFI#27 & 28 CSK-03 Site lighting? CSK-04 Gas & sanitary coordination BSC MMC 1/7/2020 CSK-05 Bldg B side entrance BSC MMC 1/15/2020 Elevation adjustment ? CSK-07 Bldg H door & site walls BSC MMC 1/31/2020 Specifies Bldg H electric room door, stair and site wall gradings CSK-08A Additional Drainage behind F & G BSC MMC 3/24/2020 adds an area drain and piping Adds stair West side of A CSK-10 Bldg A West side added stair BSC MMC 2/27/2020 Remove bridge Bldg B south elev. CSK-12 Roof leader drains BSC MMC 3/24/2020 adds drainage for roof drainage