Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Maggiore - Sketch - LOG 20-128
OXOBOXO LOFTS Number SKS-01 SKS-02 SKS-03 SKS-04 SKS-05 SKS-06 SKS-07 SKS-08 SKS-08R1 SKS-09 SKS-09R1 SKS-10 SKS-10R1 SKS-11 SKS-12 SKS-13 SKS-13R1 SKS-14 SKS-15 SKS-16 SKS-17 SKS-18 SKS-19 SKS-20 SKS-21 SKS-22 SKS-23 SKS-24 SKS-25 SKS-25R1 SKS-26 SKS-27 SKS-28 SKS-28R1 SKS-29 SKS-31 SKS-32 SKS-33 SKS-34 SKS35 SKS-36 SKS-37 SKS-38 SKS-39 SKS-40 SKS-41 SKS-42 SKS-43 SKS-44 SKS-45 SKS-46 SKS-47 SKS-48 SKS-49 SKS-50 SKS-51 SKS-52 SKS-53 SKS-54 SKS-55 SKS-56 SKS-57 SKS-58 SKS-59 SKS-60 SKS-61 SKS-62 SKS-62 SKS-64 ASK-01 ASK-01R1 ASK-02 ASK-03 ASK-04 ASK-05 ASK-06 ASK-07 ASK-08 ASK-09 ASK-10 ASK-11 ASK-12 ASK-13 ASK-14 ASK-15 ASK-16 ASK-17 ASK-18 ASK-19 ASK-20 ASK-21 ASK-22 ASK-23 ASK-24 ASK-25 ASK-26A R1 ASK-26B R1 ASK-26C R2 ASK-26D R1 ASK-26E R1 ASK-26F R1 ASK-27 ASK-28 ASK-29 ASK-30 ASK-31 ASK-32 ASK-33 ASK-34 ASK-35 ASK-36 ASK-37 ASK-38 A-D ASK-39A-C ASK-40 ASK-41 ASK-41R1 ASK-42 ASK-43 A,B&C ASK-44 ASK-45A,B,C,D ASK-46 ASK-47 ASK-48 ASK-49 ASK-88 Sitework CSK-01a CSK-01b CSK-02 CSK-03 CSK-04 CSK-05 Plumbing PSK ABC-PB1.1 PSK ABC-PB1.2 PSK ABC-PB1.3 PSK ABC-PB1.4 PSK ABC-PB1.B PSK ABC-PB1.SB PSK DE-PB1.1 PSK F-PB1.1 PSK G-PB1.1 PSK HK-PB1.1 PSK J-PB1.1 PSK LM-PB1.1 Electrical ESK ABC-EL1.1 ESK ABC-EL1.2 ESK ABC-EL1.3 ESK ABC-EL1.4 ESK ABC-EL1.B ESK ABC-EL1.SB ESK ABC-EP1.1 ESK ABC-EP1.2 ESK ABC-EP1.3 ESK ABC-EP1.4 ESK ABC-EP1.B ESK ABC-EP1.SB ESK DE-EL1.1 ESK DE-EP1.1 ESK E3.1 ESK E3.2 ESK F-EL1.1 ESK F-EP1.1 ESK GH-EL1.1 ESK GH-EP1.1 ESK J-EL1.1 ESK J-EP1.1 ESK K-EL1.1 ESK K-EP1.1 ESK LM-EL1.1 ESK LM-EP1.1 Mechanical MSK ABC-MD1.1 MSK ABC-MD1.2 MSK ABC-MD1.3 MSK ABC-MD1.4 MSK ABC-MD1.5 MSK ABC-MD1.B MSK ABC-MD1.SB MSK ABC-MP1.1 MSK ABC-MP1.2 MSK ABC-MP1.3 MSK ABC-MP1.4 MSK ABC-MP1.B MSK ABC-MP1.SB MSK DE-MD1.1 MSK DE-MP1.1 MSK F-MD1.1 MSK F-MP1.1 MSK G-MD1.1 MSK G-MP1.1 MSK HK-MD1.1 MSK HK-MP1.1 MSK J-MD1.1 MSK J-MP1.1 MSK LM-MD1.1 MSK LM-MP1.1 MSK M2.1 MSK M2.2 MSK M3.4 SKETCH LOG Description Helical Piles Helical Piles Floor infill at Bldg B basement Floor infill at Bldg B level 1 Floor infill at Bldg B level 2 Floor infill at Bldg B level 3 Floor infill at Bldg B Level 4 Wall and piers at Bldg K Wall and piers at Bldg K Wall at Bldg K Wall at Bldg K Pier at Bldg K Pier at Bldg K Section at Bldg B infill Bldg A-Plan for truss repair Bldg A -Detail for truss repair Bldg A -Detail for truss repair Bldg B- Header section Bldg B level 3, new header Bldg B level 4, new header Bldg B level 1 new header Bldg B level 1-new header Bldg D-wall rebuild -level 1 Bldg D wall rebuild level 2 Bldg D-wall rebuild Bldg D-Reinforce column Bldg K -Pier Building F design Building F design Building D columns Bldg A Northeast Corner repairs Building D column reconfiguration Bldg G/H wall penetration Boiler knee wall supports Bldg G/H wall penetration Bldg B Existing column reinforcement Bldg B Level B Framing plan Bldg B Level 1 framing plan Bldg B level 2 framing plan Bldg B level 3 framing plan Bldg B level 4 framing plan Bldg M beam end repairs Elevator Shaft Plan Detail Elevator Shaft Wall Section Bldg B Level SB Foundation Plan Bldg B Level B Foundation Plan Bldg B Level One Framing Plan Bldg B Level Two Framing Plan Bldg B Level Three Framing plan Bldg B Level Four Framing plan Bldg C Plans Bldg D Plans Foundation Schedule B Bldg Post at Stair B Bldg Landing at Stair D Bldg section at Stair D Bldg infill B Bldg wall bracing B Bldg Stair Wall B Bldg Beam Splice B Bldg Roof Truss Support B Bldg Infill Bldg B Attic truss bracing Bldg B Attic truss bracing Bldg B Post for beam support level SB Bldg B Post for beam support for level B Bldg B Post for beamsupport for level 1 Bldg B Section at Stair infill Bldg B Post for Beam - foundation footing detail Bldg B Basement redesign around wood trusses Bldg B Basement redesign around wood trusses Bldg B Partial 2nd & 3rd flr plan Bldg K reconfigure bathrooms & kitchen over bridge Bldg B level SB revisions Flood Vent Bldg K Flood Vent Bldg G Flood Vent Bldg J Flood Vent Bldg H Flood Vent Bldg M Flood Vent Details on Existing Foundation wall Flood Vent Details on Wood Frame Flood Vent Bldg L Existing window details Existing window details Existing window details Existing window details Existing window details Req clearances in corridors Bldg E 1st floor plan Bldg L 1st floor Exterior Door detail Bldg B section Bldg B, Level B, doors moved Bldg F, Level 1 demo plan Bldg F roof plan Bldg A,D,E Finish floor pattern plans Bldg B Finish floor Pattern plans Bldg B Finish floor Pattern plans Bldg C,F, & L Finish Floor Pattern Plans Bldg G Finish Floor Pattern plan Bldg H,J,K & M Finish Floor Pattern Plan Floor and Ceiling types Bldg B Roof Eave detail Stair #2 landing column location at Bldg B SHPO window clearances Existing Masonry Openings at Bldg's M&K Bldg M plan, level 1 adjust openings Bldg M plan, level 1, part B, move doors and closet Building J level one All Bldgs, life safety plans Typical waterproofing Bldg G,H & J crawl space access hatches Revised Drawing lists Gutter and downspout locations Elevator plan & sections Wall type R.5 Wall types R.5 Bldg C revised floor plan Closet door revisions Bldg J unit J-1 Bldg B stair#2 Bldg H- unit H-5 Connector B D Connector D E Bldg B existing wood floor condition Bldg D Stair details Clarifies RFI#27 Clarifies RFI#27 stairs details Site lighting? Gas & sanitary coordination Bldg B side entrance Plumbing Plan Bldg A & B Level 1 Plumbing Plan Bldg B Level 2 Plumbing Plan Bldg A-level 2 Bldg B-level 3 Plumbing Plan Bldg A-Attic Bldg B-level 4 Plumbing Plan Bldg A-Crawl Space Bldg B-level B Bldg C - Level 2 Plumbing Plan Bldg B-Level SB Bldg C-Level 1 Plumbing Plan Bldg D & E - Levels 1 & 2 Plumbing Plan Bldg F - Level 1,2 & Mezzanine Plumbing Plan Bldg G Plumbing Plan Bldg H & K - Level 1 Plumbing Plan Bldg J - Level 1 Plumbing Plan Bldg L & M - Level 1 Electrical Lighting Plan Bldgs A-B-C Level 1 Electrical Lighting Plan Bldgs A-B-C Level 2 Electrical Lighting Plan Bldgs A-B-C Level 3 Electrical Lighting Plan Bldgs A-B-C Level 4 Electrical Lighting Plan Bldgs B-C Level B Electrical Lighting Plan Bldgs B-C Level SB Electrical Power Plan Bldgs A-B-C Level 1 concept Electrical Power Plan Bldgs A-B-C Level 2 Electrical Power Plan Bldgs A-B-C Level 3 Electrical Power Plan Bldgs A-B-C Level 4 Electrical Power Plan Bldgs B-C Level B Electrical Power Plan Bldgs B-C Level SB Electrical Lighting Plan Bldgs D-E Levels 1 and 2 Electrical Power Plan Bldgs D-E Levels 1 and 2 Electrical Panelboard Schedules Electrical Panelboard Schedules Electrical Lighting Plans Bldg F - Levels 1 and 2 Electrical Power Plans Bldg F - Levels 1 and 2 Electrical Lighting Plan Building G and H Electrical Power Plan Bldg G and H Electrical Lighting Plan Building J Level 1 Electrical Power Plan Building J Level 1 Electrical Lighting Plan Building K Level 1 Electrical Power Plan Building K Level 1 Electrical Lighting Plan Bldgs L and M Level 1 Electrical Power Plan Bldg L and M Level 1 Mechanical Ductwork Plan BLDGS A,B,C - Level 1 Mechanical Ductwork Plan BLDGS A,B,C - Level 2 Mechanical Ductwork Plan BLDGS A,B,C - Level 3 Mechanical Ductwork Plan BLDGS A,B,C - Level 4 Mechanical Ductwork Plan BLDGS A,B,C - Attic Mechanical Ductwork Plan BLDG A-Crawl Space BLDG B - Level B BLDG C - Level 2 Mechanical Ductwork Plan BLDG B - Level SB BLDG C - Level 1 Mechanical Piping Plan BLDG B, C - Level 1 Mechanical Piping Plan BLDG B, C - Level 2 Mechanical Piping Plan BLDG B, C - Level 3 Mechanical Piping Plan BLDG B, C - Level 4 & Attic Mechanical Piping Plan BLDG B, C - Level B Mechanical Piping Plan BLDG B, C - Level SB Mechanical Ductwork Plan BLDG D,E - Levels 1&2 Mechanical Piping Plan BLDG D,E - Levels 1 & 2 Mechanical Ductwork Plan BLDG F - Levels 1&2 Mechanical Piping Plan BLDG F - Levels 1,2 & Roof Mechanical Ductwork Plan BLDG G - Level 1 Mechanical Piping Plan BLDG G - Level 1 Mechanical Ductwork Plan BLDG H & K - Level 1 Mechanical Piping Plan BLDG H & K - Level 1 Mechanical Ductwork Plan BLDG J - Level 1 Mechanical Piping Plan BLDG J - Level 1 Mechanical Ductwork Plan BLDG L & M Mechanical Piping Plan BLDG L & M - Level 1 Mechanical Schedules Mechanical Schedules Mechanical Detail Prepared By PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB DM DM DM PPB DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM DM PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPb PPB PPB PPP PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB BCS BCS BSC BSC BSC Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec Aztec 1/17/2020 Sent To MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC Dakota Dakota Dakota MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC Bldg Dept. MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC PPB PPB MMC MMC MMC BSC BSC BSC BSC BSC BSC BSC BSC BSC BSC BSC BSC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC Date Sent 10/30/2019 10/30/2019 10/21/2019 10/21/2019 10/21/2019 10/21/2019 10/21/2019 10/21/2019 11/11/2019 10/21/2019 10/28/2019 10/21/2019 11/11/2019 10/21/2019 10/24/2019 10/24/2019 10/28/2019 10/28/2019 10/28/2019 10/28/2019 10/29/2019 10/29/2019 11/9/2019 11/9/2019 11/9/2019 11/9/2019 11/9/2019 12/9/2019 12/9/2019 12/12/2019 12/12/2010 12/12/2019 12/12/2019 12/19/2019 12/12/2019 12/20/2019 12/20/2019 12/20/2019 12/20/2019 12/20/2019 12/20/2019 12/20/2019 12/30/2019 12/30/2019 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/13/2020 1/13/2020 1/22/2020 1/22/2020 1/22/2020 1/22/2020 1/22/2020 12/4/2019 12/20/2019 12/20/2019 12/20/2019 12/20/2019 12/20/2019 12/20/2019 12/20/2019 12/17/2019 12/17/2019 12/17/2019 12/17/2019 12/17/2019 12/17/2019 12/21/2019 12/18/2019 12/20/2019 12/18/2020 Bldg depart. 12/20/2019 12/20/2019 12/20/2019 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 1/6/2020 12/20/2019 12/20/2019 12/21/2019 12/21/2019 12/21/2019 12/23/2019 12/23/2019 12/23/2019 12/23/2019 12/26/2019 12/26/2019 12/26/2019 12/30/2019 12/27/2019 1/28/2020 12/27/2019 12/26/2019 1/28/2020 1/15/2020 1/28/2020 1/6/2020 1/6/2020 1/16/2020 12/12/2019 12/12/2019 12/23/2019 1/7/2020 1/15/2020 12/24/2019 12/24/2019 12/24/2019 12/24/2019 12/24/2019 12/24/2019 12/24/2019 12/24/2019 12/24/2019 12/24/2019 12/24/2019 12/24/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 12/31/2019 Comments RFI #15 RFI #15 RFI #15 RFI #15 RFI #15 from field visit due to existing conditions Revised from field visit due to existing conditions from field visit due to existing conditions from field visit due to existing conditions Revised RFI #15 RFI #6 RFI #6 RFI #6 from field visit due to existing conditions from field visit due to existing conditions from field visit due to existing conditions from field visit due to existing conditions from field visit due to existing conditions Bldg D falling down Bldg D falling down Bldg D falling down Bldg D falling down Rebuild bldg K Redesign of F Redesign of F Answering column layout issues Brick wall cracking repaiirs & beam/footing Answering column layout issues New brick opening structural support Support water tanks in boiler room H bldg New brick opening structural support Reinforcement Existing columns Correct out of level existing wood floor Correct out of level existing wood floor Correct out of level existing wood floor Correct out of level existing wood floor Correct out of level existing wood floor Repair rafter tails Elevator details Elevator details Where? Adding rods and turnbuckles Adding rods and turnbuckles Answers RFI#42 Answers RFI#42 Answers RFI#42 Answers RFI#42 Answers RFI#42 Design options for Owner review Design options for Owner review Design options for Owner review Move bathrm & kitchen away from over the river New design for sprinkler room and adjacent MEP's Existing window profiles with dimensions added bathrooms part of RFI#19 new 3x3 access panel in new floor Clarify removing elevator Finish floor plans and materials Level SB, B and 1 Level 2,3 & 4 Clarifies floor types with insulation Clarifies Bldg Department concerns Clarifies RFI#31 Clarifies distances from windows Answers RFI#21 Adjust door opening around archs, and closets Move walls to fit electric panels Plans adjusted for Uncasville Bldg Dept. Locates access hatches, see new spec on Flor doors 083483 Adding a ceiling to elevator shaft Add concrete curb and waterproofing to C Bldg Wall type 13- wall at stair #2 Wall layout for added curb Units G1, G3 & G7 Reconfigures unit J-1 Answers RFI#35 Corrects clearance needed at entry door new ext. board & batten siding, roof, drywall new ext. board & batten siding, roof, drywall RFI #39, clarrifeis stair details & supports RFI#27 RFI#27 Clarifies RFI#27 & 28 Elevation adjustment Latest plumbing design Latest plumbing design Latest plumbing design Latest plumbing design Latest plumbing design Latest plumbing design Latest plumbing design Latest plumbing design Latest plumbing design Latest plumbing design Latest plumbing design Latest plumbing design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design Latest electrical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design latest mechanical design Complete voided voided fix rotten beam " " " foundation for added post not for const. not for const. not for const. informational ? Bldg depart. Bldg depart. Bldg depart. Bldg depart. Bldg depart. revised set 1-03-20 revised set 1-03-20 revised set 1-08-20 revised set 1-03-20 revised set 1-03-20 revised set 1-03-20 eliminate shaft wall construction 43C door tag, 43b door smaller, 43A changed a pair to single RFI#41 clarrifies fire rating and walls shortens the kitchen length revised set 12/31/2019 revised set 12/31/2019 revised set 12/31/2019 revised set 12/31/2019 revised set 12/31/2019 revised set 12/31/2019 revised set 12/31/2019 revised set 12/31/2019 revised set 12/31/2019 revised set 12/31/2019 revised set 12/31/2019 revised set 12/31/2019 mislabeled mislabeled Labeled MSK-ABC-MD1.incorrectly Sketch to follow -10000 100000 15000 100000 50000 5000 10000 10000 $5,000 for access hatches added 3 full height downspouts, delte gutters, 10,000 5' of shaft not doing 18000