Loading...
HomeMy WebLinkAboutMaggiore - Sketch - LOG 191029OXOBOXO LOFTS Number 1 2 SKS-03 SKS-04 SKS-05 SKS-06 SKS-07 SKS-08 SKS-09 SKS-09R1 SKS-10 SKS-11 SKS-12 SKS-13 SKS-13R1 SKS-14 SKS-15 SKS-16 37 SKETCH LOG Description Floor infill at Bldg B basement Floor infill at Bldg B level 1 Floor infill at Bldg B level 2 Floor infill at Bldg B level 3 Floor infill at Bldg B Level 4 Wall and piers at Bldg K Wall at Bldg K Wall at Bldg K Pier at Bldg K Section at Bldg B infill Bldg A-Plan for truss repair Bldg A -Detail for truss repair Bldg A -Detail for truss repair Bldg B- Header section Bldg B level 3, new header Bldg B level 4, new heaader Prepared By PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB PPB 10/29/2019 Sent To MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC MMC Date Sent 10/21/2019 10/21/2019 10/21/2019 10/21/2019 10/21/2019 10/21/2019 10/21/2019 10/28/2019 10/21/2019 10/21/2019 10/24/2019 10/24/2019 10/28/2019 10/28/2019 10/28/2019 10/28/2019 Comments RFI #15 RFI #15 RFI #15 RFI #15 RFI #15 from field visit due to existing conditions from field visit due to existing conditions from field visit due to existing conditions from field visit due to existing conditions RFI #15 RFI #6 RFI #6 RFI #6 from field visit due to existing conditions from field visit due to existing conditions from field visit due to existing conditions Complete