HomeMy WebLinkAboutMaggiore - Sketch - LOG - 191223OXOBOXO LOFTS
Number
SKS-01
SKS-02
SKS-03
SKS-04
SKS-05
SKS-06
SKS-07
SKS-08
SKS-08R1
SKS-09
SKS-09R1
SKS-10
SKS-10R1
SKS-11
SKS-12
SKS-13
SKS-13R1
SKS-14
SKS-15
SKS-16
SKS-17
SKS-18
SKS-19
SKS-20
SKS-21
SKS-22
SKS-23
SKS-24
SKS-25
SKS-25R1
SKS-27
SKS-28
SKS-28R1
SKS-29
SKS-31
SKS-32
SKS-33
SKS-34
SKS35
SKS-36
SKS-37
ASK-01
ASK-01R1
ASK-02
ASK-03
ASK-04
ASK-05
ASK-06
ASK-07
ASK-08
ASK-09
ASK-10
ASK-11
ASK-12
ASK-13
ASK-14
ASK-15
ASK-16
ASK-17
ASK-18
ASK-19
ASK-20
ASK-22
ASK-23
ASK-24
ASK-25
ASK-26A
ASK-26B
ASK-26C
ASK-26D
ASK-26E
ASK-26F
ASK-27
ASK-28
ASK-29
ASK-30
ASK-31
SKETCH LOG
Description
Helical Piles
Helical Piles
Floor infill at Bldg B basement
Floor infill at Bldg B level 1
Floor infill at Bldg B level 2
Floor infill at Bldg B level 3
Floor infill at Bldg B Level 4
Wall and piers at Bldg K
Wall and piers at Bldg K
Wall at Bldg K
Wall at Bldg K
Pier at Bldg K
Pier at Bldg K
Section at Bldg B infill
Bldg A-Plan for truss repair
Bldg A -Detail for truss repair
Bldg A -Detail for truss repair
Bldg B- Header section
Bldg B level 3, new header
Bldg B level 4, new heaader
Bldg B level 1 new header
Bldg B level 1-new header
Bldg D-wall rebuild -level 1
Bldg D wall rebuild level 2
Bldg D-wall rebuild
Bldg D-Reinforce column
Bldg K -Pier
Building F design
Building F design
Buildng D columns
Building D col;umn reconfiguration
Bldg G/H wall penetration
Boiler knee wall supports
Bldg G/H wall penetration
Bldg B Exisiting column reinforcement
Bldg B Level B Framing plan
Bldg B Level 1 framing plan
Bldg B level 2 framing plan
Bldg B level 3 framiong plan
Bldg B lvel 4 framing plan
Bldg M beam end repairs
Bldg B Basement redesign around wood trusses
Bldg B Basement redesign around wood trusses
Bldg B Partial 2nd & 3rd flr plan
Bldg K reconfitgure bathrooms & kitchen over bridge
Bldg B level SB revisions
Flood Vent Bldg K
Flood Vent Bldg G
Flood Vent Bldg J
Flood Vent Bldg H
Flood Vent Bldg M
Flood Vent Details on Existing Foundation wall
Flood Vent Details on Wood Frame
Existing window details
Existing window details
Existing window details
Existing window details
Existing window details
Existing window details
Existing window details
Bldg E 1st floor plan
Bldg L 1st floor
Floor Vent Bldg L
Bldb B, Level B, doors moved
Bldg F, Level 1 demo plan
Bldg F roof plan
Bldg A,D,E Finish floor pattern plans
Bldg B Finish floor Pattern plans
Bldg B Finish floor Pattern plans
Bldg C,F, & L Finish Floor Pattern Plans
Bldg G Finish Floor Pattern plan
Bldg H,J,K & M Finish Floor Pattern Plan
Floor and Ceiling types
Bldg B Roof Eave detail
Stair #2 landing column location at Bldg B
SHPO window clearances
Existing Masonry Openings at Bldg's M&K
Prepared By
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
DM
DM
DM
PPB
DM
DM
DM
DM
DM
DM
DM
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
PPB
12/23/2019
Sent To
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
Dakota
Dakota
Dakota
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
MMC
Date Sent
10/30/2019
10/30/2019
10/21/2019
10/21/2019
10/21/2019
10/21/2019
10/21/2019
10/21/2019
11/11/2019
10/21/2019
10/28/2019
10/21/2019
11/11/2019
10/21/2019
10/24/2019
10/24/2019
10/28/2019
10/28/2019
10/28/2019
10/28/2019
10/29/2019
10/29/2019
11/9/2019
11/9/2019
11/9/2019
11/9/2019
11/9/2019
12/9/2019
12/9/2019
12/12/2019
12/12/2019
12/12/2019
12/19/2019
12/12/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/4/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/17/2019
12/17/2019
12/17/2019
12/17/2019
12/17/2019
12/17/2019
12/18/2019
12/20/2019
12-201-9
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/20/2019
12/21/2019
12/21/2019
12/21/2019
Comments
RFI #15
RFI #15
RFI #15
RFI #15
RFI #15
from field visit due to existing conditions
Revised
from field visit due to existing conditions
from field visit due to existing conditions
from field visit due to existing conditions
Revised
RFI #15
RFI #6
RFI #6
RFI #6
from field visit due to existing conditions
from field visit due to existing conditions
from field visit due to existing conditions
from field visit due to existing conditions
from field visit due to existing conditions
Bldg D falling down
Bldg D falling down
Bldg D falling down
Bldg D falling down
Rebuild bldg K
Redesign of F
Redesign of F
Answering column layout issues
Answering column layout issues
New brick opening structural support
Support water tanks in boiler room H bldg
New brick opening structural support
Reinforcement Existing columns
Correct out of level existing wood floor
Correct out of level existing wood floor
Correct out of level existing wood floor
Correct out of level existing wood floor
Correct out of level existing wood floor
Repair rafter tails
Design options for Owner review
Design options for Owner review
Design options for Owner review
Move bathrm & kitchen away from over the river
New design for spinkler room and adjacent MEP's
Existing window profiles with dimensions
part of RFI#19
\
new 3x3 access panel in new floor
Clarify removing elevator
Finish floor plans and materials
Level SB, B and 1
Level 2,3 & 4
Clarifies floor types with insulation
Clarrifies Bldg Department concerns
Clarrifies RFI#31
Clarrifies distances from windows
Answers RFI#21
Complete
voided
voided
not for const.
not for const.
not for const.
informational
?
Bldg depart.
Bldg depart.
Bldg depart.
Bldg depart.