HomeMy WebLinkAboutASK28 - BUILDING B ROOF EAVE DETAIL WITH NEW KNEE WALL DETAILEXISTING GRANITE WALL TO REMAIN.EXISTING BRICK INFILL BETWEEN WOOD RAFTERS/OUTRIGGERS.EXISTING ROOF EAVE SOFFIT, FACIA AND TRIM TO REMAIN.NEW RAIN GUTTER.NEW FIBERGLASS BATT INSULATION BETWEEN EXISTING ROOF RAFTERS.NEW PAINTED GWB FASTENED TO UNDERSIDE OF FATERS.NEW KNEE WALL WITH EXTERIOR SIDE ALIGNED WITH EXISTING EXTERIOR WALL.FILL SPACE FROM EXTERIOR FACE OF BRICK WALL TO EDGE OF EXISTING FLOOR WITH NEW WOOD SUBFLOOR. MATCH THICKNESS OF EXISTING HEAVY TIMBER FLOOR AND ALIGNED WITH EXISTING FLOOR. DEMOLISH EXISTING PLASTER AND LATHE KNEE WALL.EXISTING WOOD POSTS TO REMAIN.NEW FRAMING BETWEEN EXISTING WOOD POSTS.PACK VOID WITH MINERAL WOOL. EXISTING PLASTER AND LATHE AT MASONRY WALL TO REMAIN.EXISTING HEAVY TIMBER BEAMS/JIOSTS TO REMAIN.EXISTING HEAVY TIMBER FLOOR TO REMAIN.NEW TAPERED WOOD SLEEPERS.NEW SUBFLOOR PANELS.NEW GYPCRETE UNDERLAYMENT.NEW FINISH FLOOR SEE FINISH FLOOR PLANS. NEW ACOUSTIC MAT.DateDrawn byScaleREF:1" = 1'-0"12/20/2019 4:14:25 PMOXOBOXO LOFTS42 Pink Row Uncasville, CT 06382ASK-02812/20/2019BUILDING B ROOF EAVE DETAIL-WITH NEWKNEE WALL DETAILSKBUILDINGOFFICIALCOMMENT