Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ASK123 - BUILDING B - REFLECTED CEILING - LEVEL 4
AACEBBBBBBBBBBCCCEXITSDSDSDSDSDSDEQ EQEQ 9' - 0" EQ1/3 2/3EQ EQEQ EQ1/3 2/3EQ 7' - 5 3/4" EQ6' - 0"4' - 6" 6' - 0"EQ 9' - 0 3/8" EQ1' - 3"7' - 9 1/2"EQ EQEQ EQEQ EQEQ EQEQ 5' - 0" EQBATHROOMBEDROOMBEDROOMBEDROOMBATHROOMKITCHENA.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.CCB 2ASK-1182ASK-1183ASK-1183ASK-118MOVE SPRINKLER MAIN AND DUCTWORK UP INTO TRUSS.EBCBC AABBB EC BBBCEB BBEXITSDSDSDSDSDSDSDSDSDEQ EQ2/3 1/3EQ EQEQ 14' - 0" EQEQ EQ1/3 2/3EQ 8' - 0" EQEQ EQ1/3 2/3EQ EQ5' - 6"EQ EQ2/3 1/3EQ EQ7 7/8"6' - 11 3/4"1' - 10 1/4"5' - 6 3/4"EQ EQEQEQEQEQ EQEQ EQEQ EQEQ EQEQ EQAEQ EQEQ EQBEDROOMBATHROOMBATHROOMBATHROOMBEDROOMBEDROOMW.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.W.B.A.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"W.B.W.B.W.B.W.B.CCBCC4ASK-0924ASK-0922ASK-1182ASK-1183ASK-1183ASK-118BREVISE HVAC AND SPRINKLER ARRANGEMENT FOR UPDATED BEDROOM LAYOUT.MOVE SPRINKLER MAIN UP INTO STRUSS.BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedB-A1.16BUILDING BLEVEL FOUR -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor05/20/2016-0631/4" = 1'-0"B-A1.161BLDG B - LEVEL FOUR, RCP (PART A)1/4" = 1'-0"B-A1.162BLDG B - LEVEL FOUR, RCP (PART B)MATCH LINEMATCH LINEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/194 Addendum 03 4/12/196 Construction Set 6/11/199 Permit ReviewComments8/05/19116 ASK-123 06/15/2006/15/20ASK-123