Loading...
HomeMy WebLinkAboutASK122 - BUILDING B - REFLECTED CEILING - LEVEL 3AACEBBBBBBBBBBCCCEXITESDSDSDSDSDSDEQEQEQ 8' - 11 7/8" EQ1/3 2/3EQ EQ1/3 2/3EQ EQ4' - 6" 6' - 0" 9' - 8 1/8" 6' - 5 3/4"EQ 6' - 11 3/4" EQ1/3 2/3EQ EQEQEQEQEQ EQ1' - 6"3' - 5"2' - 7"BATHROOMA.F.F.GWB on Mtl Stud7' - 6"BEDROOMBEDROOMBEDROOMBATHROOMA.F.F.GWB on Mtl Stud7' - 0"KITCHENKITCHENEQ EQ B CCDUCT: 4" (8' -2")BEAM: 78' - 7" (8' -8")FLOOR: 69' -11"78' - 7"78' - 6"78' - 7"78' - 7"DUCT: 4" (8' -2")BEAM: 78' - 7" (8' -8")FLOOR: 69' -11"DUCT: 10" (7' -8")BEAM: 78' - 7" (8' -8")FLOOR: 69' -11"DUCT: 10" (7' -6")BEAM: 78' -5" (8' -6")DOOR: (6' -8")FLOOR: 69' -11"78' - 5"78' - 6"DUCT: 10" (7' -7")BEAM: 78' - 6" (8' -7")FLOOR: 69' -11"DUCT: 4" (8' -2")BEAM: 78' - 7" (8' -8")FLOOR: 69' -11"78' - 6"2ASK-1182ASK-1183ASK-1183ASK-118MOVE SPRINKLER NORTH OF WINDOWMOVE SPRINKLER NORTH OF WINDOWMOVE EMERGENCY CORRIDOR LIGHTING TO OPPOSITE WALL.AEBCC AABBB EC BBBCE BEXITSDSDSDSDSDSDSDSDSDEQ EQ2/3 1/3EQ EQ1/3 2/3EQ 14' - 0" EQEQ EQEQ EQ1/3 2/3EQ EQ2/3 1/3EQ 8' - 0" EQ1/3 2/3EQ EQEQ EQ5' - 6"CCEQEQEQEQ EQEQ EQEQ EQEQ EQAAAAEQ EQEQ EQEQ 'C' EQ 'C'EQ EQEQ EQEQ 'A'EQ 'A'EQ EQEQ 'B' EQ 'B'BEDROOMBEDROOMBEDROOMBATHROOMBATHROOMBATHROOMA.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"BBCCCBDUCT: 4" (8' -2")BEAM: 78' -7" (8' -8")FLOOR: 69' -11"78' - 7"78' - 10"78' - 9"78' - 9"78' - 8"78' - 9"77' - 0"DUCT: 4" (8' -5")BEAM: 78' -10" (8' -11")FLOOR: 69' -11"HEAT PUMP: ()BEAM: 78' - 9" (8' -10")FLOOR: 69' -11"78' - 9"DUCT: 4" (8' -4")BEAM: 78' - 9" (8' -10")FLOOR: 69' -11"DUCT: 4" (8' -4")BEAM: 78' - 9" (8' -10")FLOOR: 69' -11"DUCT: 8" (7' -8")BEAM: 78' - 9" (8' -10")FLOOR: 69' -11"DUCT: 8" (7' -8")BEAM: 78' - 8" (8' -9")FLOOR: 69' -11"DUCT: 8" (7' -8")DOOR: (6' -8")FLOOR: 69' -11"2ASK-1182ASK-1183ASK-1183ASK-118MOVE SPRINKLER BRANCH NORTH OF BEAM AND MECHANICAL SHAFT.PROVIDE SPRINKLERUPRIGHT SPRINKLER HEAD IN CORRIDOR.BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedB-A1.15BUILDING BLEVEL THREE -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor05/20/2016-0631/4" = 1'-0"B-A1.151BLDG B - LEVEL THREE, RCP (PART A)1/4" = 1'-0"B-A1.152BLDG B - LEVEL THREE, RCP (PART B)MATCH LINEMATCH LINEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/196 Construction Set 6/11/199 Permit ReviewComments8/05/19115 ASK-122 06/15/2006/15/20ASK-122