Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ASK120 - BUILDING B - REFLECTED CEILING - LEVEL 1
4B-A3.44B-A3.4B-A2.27ACEBBBBBBBBBBCCCCB EEXITSDSDSDSDSDSDBATHROOMBATHROOM3' - 6"EQEQ2/31/39' - 0 1/8"EQEQEQEQ2/31/35' - 0"6' - 0"4' - 0"KITCHENBEDROOMBEDROOMBEDROOMKITCHENCH: 7'-0"AAEQ EQEQEQEQEQ EQEQEQEQ EQEQEQEQ EQ1' - 6"3' - 4"2' - 7"AA.F.F.GWB on Mtl Stud8' - 0"EQ EQCDUCT: 4" (8' -2")BEAM: 58' -10" (8' -8")FLOOR: 50' -2"58' - 10"DUCT: 4" (8' -4")BEAM: 59' -0" (8' -10")FLOOR: 50' -2"59' - 0"DUCT: 4" (8' -4")BEAM: 59' -0" (8' -10")FLOOR: 50' -2"59' - 0"DUCT: 4" (8' -5")BEAM: 59' -1" (8' -11")FLOOR: 50' -2"59' - 1"DUCT: 10" (7' -11")BEAM: 59' -1" (8' -11")FLOOR: 50' -2"59' - 1"59' - 0"59' - 0"DUCT: 10" (7' -10")BEAM: 59' -0" (8' -10")FLOOR: 50' -2"DUCT: 10" (7' -10")BEAM: 59' -0" (8' -10")FLOOR: 50' -2"2ASK-1182ASK-1183ASK-1183ASK-118EQ EQRECESSED HEAD SHOULD BE EXPOSED.AECBBB BEC BBBCEB BAEXITEXITEXITSDSDSDSDSDSDSDSDSDBATHROOMBATHROOMBATHROOMEQEQEQEQEQEQ2/31/3EQEQ1/32/3EQEQ2/31/35' - 0"EQEQ5' - 6"EQEQEQEQ2/31/3EQEQ1/32/3KITCHENBEDROOMKITCHENKITCHENBEDROOMCCEQEQA15' - 0"2' - 2 7/8" EQEQEQEQEQEQ EQA.F.F.GWB on Mtl Stud8' - 0"A.F.F.GWB on Mtl Stud7' - 0"A.F.F.GWB on Mtl Stud8' - 0"C2' - 3" 2' - 3"CCASK-111R1258' - 10"DUCT: 4" (8' -2")BEAM: 58' - 10" (8' -8")FLOOR: 50' -2"DUCT: 8" (7' -10")BEAM: 58' - 10" (8' -8")FLOOR: 50' -2"DUCT: 4" (8' -4")BEAM: 59' -0" (8' -10")FLOOR: 50' -2"59' - 0"59' - 1"DUCT: 4" (8' -5")BEAM: 59' -1" (8' -11")FLOOR: 50' -2"T.O. PUMP: (#' -#")BEAM: 59' -1" (8' -11")FLOOR: 50' -2"59' - 1"59' - 2"DUCT: 4" (8' -6")BEAM: 59' -2" (9' -0")FLOOR: 50' -2"DUCT: 4" (8' -4")BEAM: 59' -0" (8' -10")FLOOR: 50' -2"59' - 0"58' - 10"T.O. PUMP: (#' -#")BEAM: 58' -10" (8' -8")FLOOR: 50' -2"DUCT: 10" (7' -8")BEAM: 58' - 10" (8' -8")FLOOR: 50' -2"58' - 10"DUCT: 8" (8' -0")BEAM: 59' - 0" (8' -10")FLOOR: 50' -2"2ASK-1182ASK-1183ASK-1183ASK-118AANO SPRINKLER AT FOYER?MOVE EMERGENCY LIGHTING TO OPPOSITE WALL OF CORRIDOR.TOP OF HEAT PUMP MAY CONFLICT WITH BEAM ABOVE.SPRINKLER HEAD IN BATHROOM. OTHER BATHROOMS HAVE NONE.TOP OF HEAT PUMP MAY CONFLICT WITH BEAM ABOVE.CORRIDOR SPRINKLERCORRIDOR SPRINKLERCORRIDOR SPRINKLERCORRIDOR SPRINKLERBCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFW.B.BEAM BRACING AT TOP OF INTERIOR PARTITION. WALL BRACING SYMBOLSW.P.POST UP BRACING AT TOP OF INTERIOR PARTITION. REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedB-A1.13BUILDING BLEVEL ONE -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor05/20/2016-0631/4" = 1'-0"B-A1.131BLDG B - LEVEL ONE, RCP (PART A)1/4" = 1'-0"B-A1.132BLDG B - LEVEL ONE, RCP (PART B)MATCH LINEMATCH LINEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date3 Permit Set 2/26/196 Construction Set 6/11/199 Permit ReviewComments8/05/19113 ASK-120 06/15/2006/15/20ASK-120