Loading...
HomeMy WebLinkAboutASK115 - SHEET AB-A3.2 - BUILDING AB SECTIONSBLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL 4 BEAMS88' - 4 7/8"8' - 6"10' - 0"9' - 3"10' - 6"2' - 0"NEW BRICK VENEER WALL. SEE SCHEDULE FOR INFORMATION.NEW GWB WALL AND STAIR BEYOND.F31F31W9W1W9AF03ASK-11413' - 0"ROOF RIDGE HEIGHTTOP PLATE HEIGHT7' - 1 1/2"13' - 0"7' - 6"14' - 3"BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG AB - LEVEL B41' - 2 7/8"BLDG A - LEVEL 267' - 5"BLDG A - LEVEL 3 attic78' - 1 7/8"BLDG A - LEVEL 155' - 5"10' - 0"9' - 3"10' - 6"8' - 11"7' - 0"9' - 0"8' - 0"7' - 6"ENLARGED EXISTING OPENING WITH NEW STEEL LINTEL TO ACCOMMODATE HEADROOM.NEW WOOD DECK AND FRAMING. SEE SCHEDULE FOR FLOOR FINISH.NEW BRICK VENEER WALL. SEE SCHEDULE FOR INFORMATION.OPEN TO BEYOND.REPAIR, RESTORE AND CLEAN BRICK FACADE AT ALL INTERIOR SURFACES.REPAIR, RESTORE, REPOINT AND CLEAN STONE FOUNDATION AT ALL INTERIOR SURFACES.REPAIR, RESTORE AND CLEAN BRICK FACADE AT ALL INTERIOR SURFACES.REPAIR, RESTORE AND CLEAN BRICK FACADE AT ALL INTERIOR SURFACES.SEE BUILDING ELEVATION 2/A-A2.1 FOR EXTEROIR NOTES.NEW CONCRETE UNDERPINNING AT EXISTING FOUNDATION (BUILDING A).F31F31F03W9W9AW1BLDG B - ELEVATOR -OVERRIDE83' - 8 7/8"4' - 7" 2' - 9"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROW1/4" = 1'-0"AB-A3.2BUILDING ABCONNECTORSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor05/20/2016-0631/4" = 1'-0"AB-A3.21SECTION OF CONNECTOR LOOKING WEST1/4" = 1'-0"AB-A3.22SECTION OF CONNECTOR LOOKING WESTNo. Description Date3 Permit Set 2/26/194 Addendum 03 4/12/19104 ASK-116 05/20/20ASK-11505/20/20