Loading...
HomeMy WebLinkAboutASK101R1 - SHEET A5.1 - WINDOW SCHEDULEGENERAL WINDOW NOTES:1. PREFIN ALUM CLAD WOOD WINDOWS2. PROVIDE FLUSH PREFIN ALUM TRANSOM AT ALL ARCHED TOPPED BRICK AS AN INTEGRAL PART OF THE WINDOW ASSEMBLY.3. WINDOW SCHEDULE DOES NOT INDICATE QUANTITES OF WINDOWS. G.C. SHALL BE RESPONSIBLE CALCULATING QUANTITIES.4. MASONRY OPENING VARY. FIELD VERIFY ALL MASONRY OPENINGS PRIOR TO ORDERING NEW REPLACEMENT WINDOWS.5. PROVIDE TEMPERED GLASS AT ALL SASHES WHERE GLAZING IS WITHIN 18" OF FINISH FLOOR, GRADE OR ROOF SURFACE AND WHERE THE BOTTOM EDGE OF GLAZING IS LESS THAN 60" ABOVE THE WALKING SURFACES WITHIN STAIRWELLS.6. PROVIDE SHOP DRAWINGS SHOWING ALL WINDOW AND INSTALLATION DETAILS FOR ARCHITECT'S REVIEW AND APPROVAL.7. ALL WINDOWS AT H.C. AND TYPE A UNITS TO HAVE ACCESSIBLE OPERATING HARDWARE.8. PROVIDE JAMB COVERS FOR EXTERIOR, COLOR TO MATCH WINDOW.9. GLAZING SHALL BE LOW E 11/WITH ARGON.10. PROVIDE 7/8" SIMULATED DIVIDE LITE. (SDL)11. PROVIDE INSTALLATION BRACKETS FOR ALL WINDOWS.12. ALL WINDOWS MORE THAN 1 STORY ABOVE GRADE TO HAVE OPENING LIMITERS.13. WINDOW WIDTH AND HEIGHT DIMENSIONS GIVEN FOR ESTIMATING PURPOSES ONLY. ALL DIMENSIONS AND CONDITIONS ARE TO BE VERIFIED IN FIELD PRIOR TO FABRICATION AND INSTALLATION.WINDOW A-3 - CHANGED TO A2 TO MATCH THE SAME WINDOWS AT BUILDING A NORTH FACADE.WINDOW A-4 - CHANGED TO EXTERIOR DOORS AT BUILDING A WEST FACADE.WINDOW A-13 - CHANGED TO EXTERIOR DOORS AT BUILDING B NORTH FACADE.WINDOW A-13A - CHANGED TO EXTERIOR DOOR AT BUILDING L NORTH FACADE.WINDOW C-3 - REMOVED FROM PROJECT WITH THE REMOVAL OF SHED ENTRANCE AT BUILDING E EAST FACADE.WINDOW M-1 - REMOVED FROM PROJECT WITH THE REMOVAL OF THE PROGRAM INSIDE BUILDING F.WINDOW F-3 - ADDED TO PROJECT AT BUILDING AB LEVEL 3ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROW1" = 1'-0"A5-1WINDOWSCHEDULEDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor05/20/2016-063Window ScheduleKEYWindowStyleTYPE WIDTH HEIGHT BldgMuntinPatternREMARKSA-1 A Single Hung 3' - 8 1/2" 6' - 5 1/2" A 9/9A-1A F Single Hung 3' - 8 1/2" 6' - 4 1/2" C 12/12A-2 A Single Hung 3' - 8 1/2" 7' - 0" A 9/9A-2A F Single Hung 3' - 8 1/2" 6' - 4 1/2" C 12/12A-3A F Single Hung 3' - 8 1/2" 6' - 4 1/2" C 12/12A-4A F Single Hung 3' - 8 1/2" 6' - 4 1/2" C 12/12A-5 A Single Hung 3' - 4" 5' - 6" B 6/6A-5A F Single Hung 3' - 8 1/2" 6' - 4 1/2" C 12/12A-6 A Single Hung 3' - 4" 5' - 8" B 6/6A-6A H Single Hung 3' - 9" 7' - 0" C 12/12New window in renovated door openingA-6AA A Single Hung 3' - 0" 5' - 8" B 6/6A-7 A Single Hung 3' - 2" 5' - 5" B 6/6A-7A F Single Hung 3' - 9" 6' - 8 1/2" F 12/12A-8 A Single Hung 3' - 2" 5' - 8 1/2" B 6/6A-8A F Single Hung 3' - 9" 7' - 0" F 12/12A-8AA F Single Hung 3' - 9" 7' - 0"F 12/12 Restore Original WindowA-9 A Single Hung 3' - 3 1/2" 5' - 6 1/2" B 6/6A-10 A Single Hung 3' - 0" 5' - 4" B 6/6A-11 A Single Hung 2' - 8 1/2" 4' - 11" B 6/6B-1A G Single Hung 3' - 9" 6' - 8 1/2" D 12/12B-1AA H Single Hung 3' - 9" 6' - 8 1/2" D 12/12 New window in renovated door openingB-2A G Single Hung 3' - 9" 6' - 8 1/2" D 12/12B-3A G Single Hung 3' - 9" 5' - 9" D 8/8B-4A G Single Hung 3' - 0" 6' - 10" D 12/12B-5A G Single Hung 3' - 6" 5' - 6" E 2/2B-6A G Single Hung 3' - 0" 8' - 9" D 12/12B-7A G Single Hung 3' - 6" 5' - 6" E 2/2B-8A G Single Hung 4' - 0" 8' - 0" L 12/12B-9A G Single Hung 3' - 9" 4' - 10" D 8/8B-10A G Single Hung 3' - 9" 4' - 5" D 8/8B-11A G Single Hung 3' - 9" 3' - 5" D 8/8C-1 E Picture 2' - 6" B 3C-2 Z Picture 3' - 0" 3' - 0" B 4x3D-1 U Picture 5' - 0" 3' - 7" F 4x2D-1L V Louver 5' - 0" 3' - 7" F LOUVERD-2 S Picture 4' - 9" 3' - 7" F 4x2D-2L T Louver 4' - 9" 3' - 7" F LOUVERE-1A J Single Hung Double with transom 7' - 0 1/2" 8' - 6" M, JM 6/6/6 Tempered glass in lower sash - buildings M, J and M-J ConnectorE-1AA J Single Hung Double with transom 7' - 0 1/2" 8' - 6" H, J, M 6/6/6 Tempered glass in lower sash - buildings J, H, G and ME-1AB W Single Hung Double 5' - 9" 6' - 2" E 2/2E-1ACT X Single Hung Double 7' - 0 1/2" 8' - 6" K 6/6E-1AT J Single Hung Double with transom 7' - 0 1/2" 8' - 6" G 6/6/6 Tempered glass in lower sash - Building GE-2A J Single Hung Double with transom 7' - 2" 8' - 6" M, JM 6/6/6 Tempered glass in lower sash - Buildings M and M-J ConnectorE-3A J Single Hung Double with transom 7' - 2" 8' - 3 1/2" K 6/6/6 Tempered glass in lower sash - Building KE-4A J Single Hung Double with transom 7' - 3" 8' - 4 1/2" J 6/6/6 Tempered glass in lower sash - Building JF-1 N Picture 7' - 2" 3' - 4" K 6x2F-2 C Picture 3' - 4" 5' - 0" AB 2x3F-3 Picture 3' - 4" 3' - 3 1/2" AB 2x2H-1A M Picture Double 7' - 2" 2' - 10" K, M 3x2H-2A K Picture Double 7' - 2" 3' - 1" G, J 3x2K-1A P Single Hung Triple 9' - 0" 6' - 3" C 12/12L-1A L1 Flood Vent 7' - 2" 2' - 10" M VENTL-2A L2 Flood Vent 4' - 0" 2' - 4" L VENTY1 Y1 Interior 2' - 0" 2 interior bedroom lightY3 Y3 Interior 2' - 0" 2 interior bedroom lightVARIESNo. Description Date1 Addendum 01 2/1/193 Permit Set 2/26/194 Addendum 03 4/12/196 Construction Set 6/11/198 Addendum 06 7/15/1989 ASK-101 04/08/2090 ASK-101R1 05/20/20VARIESVARIESASK-101R1(04/08/20)(REVISED 05/20/20)