Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ASK075Fr1 - SHEET K-A4.1 - BUILDING K - ROOF DETAILS
EXISTING EXTERIOR BUILDING BRICK WALLEXISTING PAINTED ROOF RAFTER OUTRIGGER. EXISTING PAINTED WOOD FASCIA TRIM.EXISTING ALUMINUM FASCIA.EXISTING ROOF MEMBRANE.EXISTING ROOF DECK.9"EXISTING ROOF DECK TO REMAIN. INSPECT FOR DAMAGE AND REPLACE DAMAGED MATERIAL.NEW ALUMINUM DRIP EDGE. ARCHITECT TO SELECT COLOR FROM MANF. STANDARD COLORS.NEW P.T. WOOD BLOCKING.NEW PAINTED CEDAR OR POLYMER COMPOSITE 5/4" RAKE BOARD. PROVIDE BOARD WIDTH TO MATCH EXISTINGEXISTING EXTERIOR BUILDING BRICK WALLNEW EPDM ROOF FLASHING.NEW EPDM ROOF MEMBRANE.NEW ROOF PROTECTION BOARD.NEW POLYISO RIGID ROOF INSULATION. TAPER TO 8" THICKNESS MINIMUM AT PEAK.EXISTING EXPOSED ROOF DECKING. SCRAP, SAND AND REPAINT.9"EXISTING ROOF DECK TO REMAIN. INSPECT FOR DAMAGE AND REPLACE DAMAGED MATERIAL.EXISTING WOOD RAKE BOARDEXISTING ROOF MEMBRANE.EXISTING ROOF EDGE FLASHING.EXISTING EXTERIOR BUILDING BRICK WALLEXISTING EXOPOSED PAINTED ROOF DECKING.9"EXISTING ROOF DECK TO REMAIN. INSPECT FOR DAMAGE AND REPLACE DAMAGED MATERIAL.NEW ALUMINUM DRIP EDGE. ARCHITECT TO SELECT COLOR FROM MANF. STANDARD COLORS.NEW P.T. WOOD BLOCKING.NEW PAINTED CEDAR OR POLYMER COMPOSITE 5/4" FASCIA. PROVIDE BOARD WIDTH TO MATCH EXISTING.EXISTING EXTERIOR BUILDING BRICK WALLNEW EPDM ROOF FLASHING.NEW EPDM ROOF MEMBRANE.NEW ROOF PROTECTION BOARD.NEW POLYISO RIGID ROOF INSULATION. TAPER TO 8" MINIMUM THICKNESS AT PEAK.EXISTING ROOF RAFTER OUTRIGGER. SCRAP, SAND AND REPAINT.9"26' - 6"8"TOP OF PROPOSED ROOF INSULATION.LINE OF EXISTING ROOF RIDGE.ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT42 PINK ROWAs indicatedK-A4.1BUILDING KDETAIL ROOFEAVE, RAKE,PARAPETDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor12/20/19,REV.02/21/2016-063No. Description Date3 Permit Set 2/26/193" = 1'-0"K-A4.11ROOF K - EAVE DETAIL - EXISTING3" = 1'-0"K-A4.12ROOF K - RAKE DETAIL - PROPOSED3" = 1'-0"K-A4.13ROOF K - RAKE DETAIL - EXISTING3" = 1'-0"K-A4.14ROOF K - EAVE DETAIL - PROPOSEDBUILDING K EXISTING ROOF EDGEASK075Fr1(revised 2/10/2020)1/8" = 1'-0"K-A4.15BUILDING K - ELEVATION WEST(revised 2/26/2020)