HomeMy WebLinkAboutASK053 -E-D1.1 BUILDING E DEMO PLANSREMOVE ALL NON- STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELY REMOVE ALL WINDOWS ON THIS LEVEL. DEMO BRICK WALL BELOW WINDOW OPENING TO FLOOR LEVEL FOR NEW DOOR REMOVE ALL NON- STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELY SHORE STRUCTURE. DEMOLISH FLOOR AND FRAMING TO ACCOMMODATE NEW STAIR WELL. REMOVE ALL WINDOWS ON THIS LEVEL. DEMO BRICK WALL BELOW WINDOW OPENING TO FLOOR LEVEL FOR NEW DOOR REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS. GENERAL DEMOLITION NOTES: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. LEGEND DEMOLISHED ELEMENT Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 42 PINK ROW SKETCH NUMBER RFI REFERENCE SHEET NUMBER DATE As indicated E-D1.1 BUILDING E DEMO PLANS Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 01/23/2020 16-063 1/8" = 1'-0"E-D1.1 1 BUILDING E - LEVEL 1 DEMOLITION PLAN 1/8" = 1'-0"E-D1.1 2 BUILDING E - LEVEL 2 DEMOLITION PLAN E-D1.1 3 BUILDING E - DEMOLITION AXONOMETRIC A B D E C F G H J K L M NORTH SITE KEY PLAN ASK-053 02/06/20