HomeMy WebLinkAboutASK052 - D-A2.1 BUILDING D ELEVATIONSBLDG D - LEVEL 2 53' - 6 7/8" 1 BLDG D - LEVEL 1 42' - 3 3/8" O1O2O3O4O5 BLDG D - ROOF 66' - 7 7/8" BLDG E REMOVE PLANTER BOX AND REPLACE THE MASONRY BELOW THE WINDOW SILLS REPLACE MIN 7 ROWS OF FACE BRICK ALONG THE WALL REPOINT BANK OF BRICK BETWEEN WINDOWS REMOVE EXISTING WOOD STRUCTURE NEW ALUM GUTTERS & DOWNSPOUTS , TIE INTO NEW BELOW- GRADE PERIMETER DRAINAGE SYSTEM NEW LOW SLOPED ROOFING SYSTEM NEW BRICK INFILL AT EXISTING DOOR OPENING BELOW NEW WINDOW SILL. 4.5 GRADE NEW WINDOW IN EXISTING MANSONRY OPENING,TYP. BLDG D - LEVEL 2 53' - 6 7/8" BLDG D - LEVEL 1 42' - 3 3/8" BLDG D - ROOF 66' - 7 7/8" REMOVE DETERIORATED OUTRIGGER AND REBUILD AREA W/ NEW MASONRY THE CORNER OF THIS BLDG IS IN STRUCTURAL DISTRESS AND MUST BE REBUILT IN TOTAL, INCLUDING THE INSTALLATION OF A REINFORCEDFOUNDATION. REFER TO STRUCTURAL DWGS. REMOVE EXISTING STEEL STAIR ENTRY TO UNIT D-2 GRADE NEW WINDOW IN EXISTING MASONRY OPENING TYP. BLDG D - LEVEL 2 53' - 6 7/8" BLDG D - LEVEL 1 42' - 3 3/8" O1 O2 O3 O4 O5 BLDG D - ROOF 66' - 7 7/8" REBUILD ARCHED BRICK LINTELS & BRICK ABOVE , INCLUDING ALL ASSOCIATED PORTIONS OF EXISTING CORNICE REPOINT ALL BRICK ABOVE 1ST FLOOR WINDOWS REBUILD PORTION OF WALL THE CORNER OF THIS BLDG IS IN STRUCTURAL DISTRESS AND MUST BE REBUILT IN TOTAL, INCLUDING THE INSTALLATION OF A REINFORCED FOUNDATION. REFER TO STRUCTURAL DWGS. REPOINT 5 ROWS OF BRICK THIS WALL REPAIR THIS AREA, INCLUDING SECTION OF STONE FOUNDATION WALL REMOVE EXISTING STEEL STAIR NEW LOW SLOPED ROOFING SYSTEM ENTRY TO UNIT D-1 ENTRY TO UNIT D-3 AND D-4 4.5 NEW WINDOW IN EXISTING MASONRY OPENING TYP. GRADE BLDG D - LEVEL 2 53' - 6 7/8" BLDG D - LEVEL 1 42' - 3 3/8" BLDG D - ROOF 66' - 7 7/8" GRADE Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 42 PINK ROW SKETCH NUMBER RFI REFERENCE SHEET NUMBER DATE 1/8" = 1'-0" D-A2.1 BUILDING D ELEVATIONS Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 01/23/2020 16-063 1/8" = 1'-0"D-A2.1 12 BUILDING D - ELEVATION NORTH 1/8" = 1'-0"D-A2.1 15 BUILDING D - ELEVATION EAST 1/8" = 1'-0"D-A2.1 13 BUILDING D - ELEVATION SOUTH 1/8" = 1'-0"D-A2.1 14 BUILDING D - ELEVATION WEST BUILDING 'D' RENOVATION NOTES: 1. REPOINT 50% OF EXISTING BRICK WALL. BUDGET 20% FOR NEW EXTERIOR BRICK WALL RECONSTRUCTION. THERE ARE MANY BRICKS ON THIS BLDG THAT HAVE LOST THEIR GLAZING 2. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE , INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR A B D E C F G H J K L M NORTH SITE KEY PLAN ASK-052 02/06/20