Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ASK045Ar1 - SHEET B-A1.1 - BUILDING B STAIR 2 PARTIAL PLAN - LEVEL SB - 200205
STAIR B (LEVEL SB) 1 ASK-045Br1 1 ASK-045Cr1 NEW 2-HOUR RATED CEILING BELOW EXISTING TIMBER FRAMED FLOOR. NEW WOOD FRAMED STAIR LANDING. NEW WOOD FRAMED STAIR LANDING. NEW COLUMN SUPPORTING CUT WOOD TIMBER NEW COLUMN SUPPORTING NEW STAIR LANDING SEE RESPONSE TO RFI 029 Date Drawn by Scale REF: 3/8" = 1'-0" 2/5/2020 12:29:36 PM OXOBOXO LOFTS 42 Pink Row Uncasville, CT 06382 ASK-045Ar1 01/23/2020, Rev. 1/29/20 BUILDING B STAIR 2 -PLAN AT LEVEL SB Author RFI35 and RFI45 3/8" = 1'-0"ASK-045Ar1 1 BLDG B PARTIAL CEILING PLAN - LEVEL SB