Loading...
HomeMy WebLinkAbout2019-02-01 Bid Set With Addendum 1Glastonbury, Connecticut 06033 860 652 8227 300 Winding Brook Drive IN UNCASVILLE JULY 13, 2018 L-1.1 PLANTING PLAN (SOUTH) OXOBOXO LOFTS CONNECTICUT 42 PINK ROW MATCHLINE - SEE SHEET L-1.0 PLANT SCHEDULE SHEET L-1.1 FINAL CONSTRUCTION DOCUMENTS 2A-A5.21A-A5.11A-A5.13" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.DNDN3" RADONRISERLOCATION,TYP.3" RADON RISERLOCATION, TYP.UPDNDNDN3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.CUT OPEN HOLE 6" TO 18" RADIUSCUT HOLE IN EXIST'GSLAB FOR 3" RADON RISERSEALANT AROUND PIPE3" RADON RISER TO ROOF-TOPEXHAUST FAN. SEAL ALL JOINTS,TYP. & PROVIDE IDENTIFICATIONOF PIPE ON EACH FLOOR OF BLDG.1BUILDING A - LEVEL ONEScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT 1/8" = 1'-0"9/6/2016 9:22:16 AM EV1.1BUILDINGSA, C, D, E, F, G, LRADONMITIGATIONPLANSDakotaPartners, Inc.OXOBOXOLOFTSSOSONov. 1, 201616-063No.DescriptionDateGlastonbury, Connecticut 06033860 652 8227300 Winding Brook Drive 1/16" = 1'-0"2BUILDING A - LEVEL TWO7BUILDING E - LEVEL ONE8BUILDING E - LEVEL TWO5BUILDING D - LEVEL ONE6BUILDING D - LEVEL TWO 1/16" = 1'-0" 1/16" = 1'-0" 1/16" = 1'-0" 1/16" = 1'-0" 1/16" = 1'-0"BUILDING C - LEVEL ONE 1/16" = 1'-0"4BUILDING C - LEVEL TWO 1/16" = 1'-0"39BUILDING F - LEVEL ONE 1/16" = 1'-0"10BUILDING F - LEVEL TWO 1/16" = 1'-0"12BUILDING L - LEVEL ONE 1/16" = 1'-0"11BUILDING G - LEVEL ONE 1/16" = 1'-0"13TYPICAL SUB-SLAB DEPRESSURIZATION DETAIL 1" = 1'-0"Final CD's7/13/18 DNDN3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP.3" RADON RISER LOCATION, TYP.3" RADON RISERLOCATION, TYP.3" RADON RISERLOCATION, TYP. 1/16" = 1'-0"1BLDG B - SUB-BASEMENT 1/8" = 1'-0"9/6/2016 9:22:16 AM EV1.2BUILDINGSB, H, J, K, MRADONMITIGATIONPLANSDakotaPartners, Inc.OXOBOXOLOFTSSOSONov. 1, 201616-063No.DescriptionDateScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CTGlastonbury, Connecticut 06033860 652 8227300 Winding Brook Drive2BLDG B - BASEMENT3BLDG B - LEVEL 1 1/16" = 1'-0" 1/16" = 1'-0"4BLDG B - LEVEL 2 1/16" = 1'-0"5BLDG B - LEVEL 3 1/16" = 1'-0"6BLDG B - LEVEL 4 1/16" = 1'-0" 1/16" = 1'-0"7BUILDINGS H, J, K & M - LEVEL ONEFinal CD's7/13/18 1. CONTRACTOR SHALL COMPLY WITH ALL STATE LOCAL AND FEDERAL REGULATIONS.2. CONTRACTOR SHALL PROTECT ALL EXISTING TREES AND SHRUBS SCHEDULED TO REMAIN & SHALL PROTECT EXISTING ADJACENT BUILDING3. CONTRACTOR SHALL SECURE ALL REQUIRED PERMITS4. NO CONSTRUCTIONS MATERIALS SHALL BE STORED WITHIN THE DRIP LINE OF EXISTING TREES5. DO NOT SCALE DRAWINGS. ALL DIMENSIONS ARE GIVEN FROM FACE OF FRAMING TO FACE OF FRAMING UNLESS OTHERWISE INDICATED6. PROVIDE SOLID WOOD BLOCKING (FIRE RETARDANT IN RATED LOCATIONS) FOR WALL AND CEILING MOUNTED ITEMS7. ALL WALLS WITH INSULATION (ACOUSTIC OR THEMAL) TO EXTEND TO UNDERSIDE OF SHEATHING OR SOLID FRAMING ABOVE AND ALL JOINTS AND SEAMS SHALL BE SEALED8. FOR RATED ASSEMBLIES, CONSTRUCTION MUST CONFORM TO SPECIFIC U.L. DESIGN OR GYPSUM ASSOCIATION ASSEMBLIES9. ALL RATED WALLS SHALL BE EXTEND TO UNDERSIDE OF SHEATHIMG ABOVE AND SHALL BE SEALED WITH FIRE SAFE CAULK. ALL JOINTS, SEAMS AND PENETRATIONS TO BE FIRE-CHAULKED WITH 4800 00/DW 10. ALL WALLS AROUND PIPE & DUCT CHASES TO BE FIRE RATED 11. CUT AND PATCH ALL OPENINGS REQUIRED FOR NEW ELECTRICAL, PLUMBING AND HVAC WORK WHETHER SHOWN ON THIS PLAN OR NOT.12. FILL SOLID ANY OPENINGS OR PENETRATTION IN WALL, CEILING, AND FLOOR SURFACES WITHIN THE CONTRACT AREA WITH EQUIVALENT MATERIAL AND THICKNESS OF THE ADJACENT SURROUND SURFACE, WHETHER EXPOSED OR NOT.13. DO NOT SCALE DRAWINGS. ALL DIMENSIONS ARE GIVEN FROM FACE OF FRAMING TO FACE OF FRAMING UNLESS OTHERWISE NOTED.14. GYPSUM BOARD TO BE MOLD RESISTANT IN ALL TOILET ROOMS AND AT BACK WALLS OF ALL KITCHENS. GYPSUM BOARD TO BE FIRE CODE AT ALL RATED CONDITIONS. WHEN A RATED WALL OCCURS AT A TOILET ROOM, ETC., USE FIRE CODE, MOLD RESISTANT TYPE "X" GYPSUM BOARD. 5/8" TYPE C (F.C) GYPSUM WALL BOARD MUST EXTEND BEHIND BATHTUB ENCLOSURES AT ALL RATED CONDITIONS.15. INSTALL FIRE BLOCKING AS REQUIRED PER STATE OF CONNECTICUT BUILDING CODE SECTION 717 FOR CONCEALED SPACES OF ALL NEW CONSTRUCTION. INSTALL FIRE BLOCKING AS REQUIRED PER STATE OF CONNETICUT BUILDING CODE SECTTIONS 712 AND 716 AT PENETRATIONS MADE BY ELECTRICAL, MECHANICAL AND PLUMBING SYSTEMS16. REFER TO STRUCTURAL DRAWINGS FOR LOCATION OF SHEAR WALLS WHICH REQUIRE ADDITIONAL LAYERS OF WOOD STRUCTURAL PANELS FRAMING, BLOCKING & FURRING17. G.C SHALL PROVIDE & INSTALL FRAMING, BLOCKING, FURRING, AND FINISH MATERIAL AS REQUIRED FOR SOFFITS, CEILINGS, AND CEILINGS SLOPES SHOWN ON DRAWINGS AS REQUIRED TO ENCLOSE MATERIALS AND EQUIPMENT FOR DIVISION 15 AND 16 WORK.18. G.C. SHALL PROVIDE & INSTALL FRAMING, BLOCKING, FURRING, AND FINISH MATERIAL AS REQUIRED FOR SHAFTS & FURRED OUT WALLS SHOWN AS REQUIRED TO ENCLOSE MATERIALS AND EQUIPMENT FOR DIVISION 15 AND 16 WORK.HANGING & MOUNTING FOR DIVISION 15 & 16 WORK19. G.C. AND/OR SUBCONTRACTOR TO PROVIDE & INSTALL FRAMING, BLOCKING, FURRING, HANGERS, AND STRAPS AS REQUIRED FOR PIPEING,DUCTS, RACEWAYS, AND EQUIPMENT SPECIFIED ON DIVISION 15 & 16 DRAWINGS. MOUNTING AND ATTACHMENT METHODS TO BE COMPLY WITH RECOMMENDED DETAILS OF LUMBER/FRAMING MANUFACTURER.GENERAL NOTES1. PROVIDE FIRE-BLOCKING (AS DEFINED BY BUILDING CODE SECTION 702.1 AND DETAIL BELOW) IN CONCEALED SPACES OF STUD WALLS AND PARTITIONS, INCLUDING AT THE CEILING, FLOOR AND ROOF LEVELS.2. PROVIDE FIRE-BLOCKING (AS DEFINED BY BUILDING CODE SECTION 702.1 AND DETAIL BELOW) AT ALL INTERCONNECTIONS BETWEEN VERTICAL & HORIZONTAL SPACES SUCH AS OCCUR AT SOFFITS OVER CABINETS, DROP CEILINGS, COVE CEILINGS AND SIMILAR LOCATIONS.3. PROVIDE FIRE-BLOCKING (AS DEFINED BY BUILDING CODE SECTION 702.1 AND DETAIL BELOW) IN CONCEALED SPACES BETWEEN STAIRWAY STRINGERS AT THE TOP AND BOTTOM OF THE RUN.4. ALL PENETRATIONS @ RATED ASSEMBLIES AND NON-RATED ASSEMBLIES TO BE FIRE-CAULKED WITH ASTM.E-136 TESTED FIRESTOP SEALANT,5. RATED ASSEMBLIES TO EXTEND TO UNDERSIDE OF FLOOR OR ROOF DECK. JOINTS TO BE FIRE CAULKED WITH ASTM. E-136 TESTED FIRESTOP SEALANT.6. SEE PLUMBING AND MECHANICAL DRAWINGS FOR ADDITIONAL DETAILS ON PENETRATIONS, BLOCKING, AND SEALANT.FIRE BLOCKING & CAULKINGEXISTING WALL CONST. TO REMAIN -PLANSMATERIAL SYMBOLSCONCRETE IN SECTIONBRICK IN SECTIONCONCRETE MASONRY UNIT (C.M.U) IN SECTION CRUSHED GRAVEL FILL IN SECTIONCOMPACTED BACKFILL IN SECTIONUNDISTURBED SOIL IN SECTIONFINISH WOOD TRIM IN SECTIONGYPSUM BOARD IN SECTIONPLYWOOD IN SECTIONSPRAY FIBERGLASS INSULATION IN SECTIONCELLULOSE INSULATION IN SECTIONBATT INSULATION IN SECTIONRIGID INSULATION IN SECTIONNOMINAL LUMBER IN SECTIONBLOCKING IN SECTIONCONSTRUCTION SYMBOLS1011tDETAIL SECTION TAG -CUTDETAIL SECTION TAG -BUBBLEBUILDING SECTION TAG WINDOW TAG -SEE WINDOW SCHEDULEDOOR TAG -SEE DOOR SCHEDULEREVISION CLOUD AND TAGWALL TYPE TAGFLOOR/ LEVEL ELEVATION TAGINTERIOR ELEVATION TAGACCESSIBLE SYMBOL1t1A101SIMA1011SIMA1011Ref1Ref1Ref1RefFLOOR / LEVELEL: X'-X"A1011SIMAREA OF REFUSE ABOVE COUNTER ABOVE FINISHED FLOOR ALUMINIUM AIR CONDITIONING AVERAGE BEAM BOARD BOTTOM BOTTOM OF FOOTING BUILDING CEILING CENTER LINE CENTIMETER CERAMIC TILE COLD FORMED METAL FRAMINGCOLD WATER COLUMN CONTROL JOINT CONCRETE CONCRETE MASONRY UNIT CONSTRUCTION CONTINUOS DEEP OR DEPTH DEMOLITION DETAIL DIAMETER DIMENSION DOWN DRAWING DRINKING FOUNTAIN EACH ELECTRIC ELECTRIC WATER COOLER EQUIPMENT EXHAUST FAN EXISTING EXTERIOR FEET FIRE CODE FIBERGLASS FLUORESCENT FULL SIZE OR SCALE GALVANIZED GAUGE GYPSUM BOARD HARDWOOD HANDICAPPED HEIGHT HORIZONTAL HOT WATER INCH INSULATION INTERIOR LAVATORY LAMINATED VENEER LUMBER MANUFACTURER MASONRY OPENING MATERIAL MAXIMUM MEDIUM DENSITY OVERLAY ABBREVIATIONSMECHANICAL METER MILIMETER MINIMUM MISCELLANEOUS MOISTURE RESISTANT MOUNTED NOMINAL NOT IN CONTRACT NOT TO SCALE ON CENTER OUTSIDE DIAMETER OPENING PARTITION PLASTIC LAMINATE PLYWOOD QUARRY TILE RAIN WATER LEADER REFERENCE REINFORCE REQUIRED RISER ROOM ROUGH OPENING SANITARY SHEET SIMILAR SERVICE SINK SPECIFICATIONS SQUARE EDGE SQUARE FEET SQUARE INCHES SQUARE YARD STAINLESS STEEL STANDARD STEEL STRUCTURAL SUSPENDED SYSTEM TELEPHONE THICKNESS OR THICK TEMPORARY THRESHOLD TONGUE & GROOVE TO MATCH EXISTING TOP OF_ TOP OF CONCRETE TOP OF SUBFLOOR TREAD TYPICAL VAPOR BARRIER VENT THROUGH ROOF VERIFY IN THE FIELD VERTICAL VINYL COMPOSITION TILE WATER CLOSET WEIGHT WELDED WIRE FABRIC WIDTH OR WIDE WITH WITHOUT A.O.RA.CA.F.FALUM.A/CAVG.BM.BRD.BTM.B.O.FBLDG.CLG.℄CMC.T.C.F.M.F.C.W.COL.C.J.CONC.C.M.U.CONSTR.CONT.DDEMO DET.∅OR DIA.DIM.DNDWG.D.F.EA.ELEC.E.W.C.EQUIP.E.F.EXTG.EXT.FT. OR ( ' )F.C.F.G.FLUOR.F.S.GALV.GA.GYP. BD.HDWDH/C OR H.C.HT.HORIZ.H.W.( " ) OR IN.INSUL.INT.LAV.LVLMFR.M.O.MAT'LMAX.M.D.O.MECH.MMIL.MIN.MISC.MRMTD.NOM.N.I.C.N.T.S.O.S.O.D.OPNG.PART'NPL. LAM.PLYWD.Q.T.RWLREF.REINF.REQ'DRRM.RO.SAN.SHT.SIM.SERV. SINKSPECS.S.E.S.F.S.I.S.Y.S.S.STD.STL.STRUCT.SUSP.SYS.TEL.TH.TEMP.THRESH.T&GT.M.E.T.O.T.O.C.T.O.S.TTYP.V.B.V.T.RV.I.F.VERT.V.C.T.W.C.WT.W.W.F.WW/W/OScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"R.1NOTESDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063No. Description Date SCOPE OF WORKSOURCE:2012 INTERNATIONAL EXISTING BUILDING CODE2012 CT AMENDMENTS2012 INTERNATIONAL FIRE CODE2012 NFPA 101: LIFE SAFETY CODEWHEN REFERRED TO BY THE 2012 IEBC:2012 INTERNATIONAL BUILDING CODE2012 INTERNATIONAL MECHANICAL CODE2012 INTERNATIONAL PLUMBING CODE2012 INTERNATIONAL ENERGY CONSERVATION CODE2014 NFPA 70: NATIONAL ELECTRICAL CODE (NEC)2009 ICC/ ANSI A117.1 ACCESSIBLE & USABLE BUILDINGS & FACILITIESGENERAL BUILDING CODE INFORMATIONTHE SCOPE OF WORK FOR THIS PROJECT INVOLVES THE RENOVATION OF AN EXISTING FACTORY BUILDING COMPLEX. THE BUILDINGS ARE BEING EVALUATED UNDER CHAPTER 10 OF THE 2012 INTERNATIONAL EXISTING BUILDING CODE. COMPLIANCE WITH PORTIONS OF THE 2012 INTERNATIONAL BUILDING CODE AND 2005 CONNECTICUT FIRE SAFETY CODE IS ALSO PROVIDED AS DIRECTED THROUGH THE INTERNATIONAL EXISTING BUILDING CODE. A CHANGE OF USE IS PROPOSED FROM THE ASSUMED EXISTING USE OF FACTORY, LOW HAZARD (F-2) TO RESIDENTIAL (R-2). THE COMPLEX WILL CONTAIN 73 RESIDENTIAL DWELLING UNITS AND ACCESSORY USES.PROVIDED BLDG FGHJKMPROVIDED BLDG EPROVIDED BLDG DPROVIDED BLDG ABCUSE GROUP CLASSIFICATION (IEBC 1012.1, IBC 302)SPRINKLER SYSTEM (IEBC 1012.1)INTERIOR FINISH (IEBC 1012.1, IBC 302 & T803.9)MEANS OF EGRESS (IEBC 1012.1, IBC CH.10)NUMBER OF EXIT (1018.1)COMMON PATH (1013.3)TRAVEL DISTANCE (1015.1)CORRIDOR WIDTH (1016.1)EGRESS STAIR WIDTH (1009.1)HEIGHT AND AREA (IEBC 1012.5, IBC T503)CONSTRUCTION CLASSIFICATIONHEIGHT LIMITAREA LIMITFIRE RESISTANCE RATINGS (IBC T601)LOADBEARING EXTERIOR WALLSNONLOADBEARING EXTERIOR WALLSLOADBEARING INTERIOR WALLSNONLOADBEARING INTERIOR WALLSENCLOSURE OF SHAFTS (IEBC 1012.7, IBC 706)STAIR ENCLOSURES (IEBC 1012.7.2)SHAFT ENCLOSURES (IEBC 1012.7.3)FIRE WALLS (705.4)FIRE BARRIERS (IBC 706)SHAFT ENCLOSURES (706.3.1 & 707.4)EXIT ENCLOSURES (706.3.2 & 1019.1)EXIT PASSAGEWAY (706.3.3 & 1020.1)HORIZONTAL EXIT (706.3.4 & 1021.1)INCIDENTAL USE AREAS (706.3.5 & T302.1.1)SEP. OF MIXED OCCUPANCIES (706.3.6 & 302.3.2)SINGLE OCCUPANCY FIRE AREAS (T706.3.7)FIRE PARTITIONS (708.1)DWELLING UNIT SEPARATION (708.3)EXIT ACCESS CORRIDORS (708.1 & 1016.1)R-2NFPA 13? MEANS PROVIDED?'?'?"?"NFPA 13RR-2? MEANS PROVIDED?'?'?"?"NFPA 13RR-2? MEANS PROVIDED?'?'?"?"NFPA 13RR-2? MEANS PROVIDED?'?'?"?"3B3B3B3B5 STORIES/?' + BASEMENT2 STORIES/?'2 STORIES/?'1 STORY/?' + BASEMENT??? S.F./FLR ON LARGEST FLR??? S.F./FLR??? S.F./FLR??? S.F./FLR ON LARGEST FLR2 HRN/A0 HR0 HRN/AN/AN/AN/AN/AN/AN/AN/A1 HR1 HR2 HRN/A0 HR0 HRN/AN/AN/AN/AN/AN/AN/AN/A1 HR1 HR2 HRN/A0 HR0 HRN/AN/AN/AN/AN/AN/AN/AN/A1 HR1 HR2 HRN/A0 HR0 HRN/AN/AN/AN/AN/AN/AN/AN/A1 HR1 HRF-2 EXISTINGNONE EXISTINGPER OCCUPANT LOAD & TD75'250'44"36"-44"3BALLOWED: 4 STORIES/55'5 STORIES/75' W/NFPA 13 SPRINKLERSALLOWED: 16,000 S.F./FLR 48,000 S.F./FLR W/NFPA 13 SPRINKLERSREQUIRED: 2 HRREQUIRED: 0 HRREQUIRED: 0 HRREQUIRED: 0 HR2 STORIES: 0 HR3 STORIES: 1 HR4+ STORIES: 2 HR2-5 STORIES W/SPRINKLERS: 0 HR6+ STORIES: 2 HRN/AN/A, SEE SHAFT ENCLOSURES ABOVEN/A, SEE SHAFT ENCLOSURES ABOVEN/AN/AANY LAUNDRY OR STORAGE RMS OVER 100 SF? ANY FURNACE RM EQUIPMENT OVER 400,000 BTU?ANY ASSEMBLY AREAS OVER 750 SF?N/A1 HR OR 1/2 HR W/NFPA 131 HR OR 1/2 HR W/NFPA 13 OR 13ROCCUPANT LOAD (AS NOTED ON PLANS)ASSEMBLY = ?STORAGE/ MECHANICAL = ?ACCESSORY (OFFICE, RESTRMS, SEC., MAINT., LAUNDRIES.,)=?RESIDENTIAL = ?TOTAL BUILDING OCCUPANT LOAD = ?HANDICAPPED ACCESS PROVIDED, REFER TO PLANSScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"R.2NOTESDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063TYPICAL PROJECT-WIDE EXTERIOR RENOVATION NOTES:1. LOW SLOPED ROOFING ASSEMBLY:A. REPLACE EXISTING ROOFING SYSTEM WITH NEW SINGLE PLY MEMBRANE ROOFING OVER 8" POLYISOCYANURATE RIGID INSUATION (R40).B. REBUILD EXISTING FASCIAS & SOFFITS.NOTE, TEST EXISTING EXTERIOR WOOD FOR LEAD BASED PAINT.IF LEAD IS FOUND, THEN ALL EXISTING WOOD SHALL BE RESTORED IN CONFORMANCE WITH EPA STANDARDS.C. INSTALL NEW 0.032" PREFIN ALUM 6" BOX GUTTERS AND 0.027" PREFIN ALUM 6" SQ DOWNSPOUTS.REFER TO SPECIFIC COMMENTS FOR EACH BUILDING ON THE ELEVATIONS.2. SLOPED ROOFING (>4:12):A. REMOVE EXISTING ROOFING, INCLUDING ALL SHEATHINGB. INSTALL NEW 3/4" EXTERIOR PLYWD SHEATHINGC. INSTALL (2) LAYERS 15# ASPHALT FELT PAPERD. INSTALL NEW ASPHALT SHINGLESE. PROVIDE 36" WIDE STRIP OF ICE & WATER SHIELD ALONG ALL EAVES, VALLEYS AND RIDGESF. PROVIDE NEW 0,032" PREFIN ALUM DRIP EDGEG. PROVIDE NEW 0.032 6" DIA HALF ROUND PREFIN ALUM GUTTERS AND 0.027" DOWNSPOUTS.PROVIDE PRECAST CONC SPLASHBLOCKS AT BASE OF ALL DOWNSPOUTS (PREFIN ALUM TO DIVERT WATER AWAY FROM BLDG)H. PROVIDE MIN 8" OPEN CELL SPARY ICYNENE INSULATION BELOW THE SHEATHING (MIN R40)I. PROVIDE CEILING FINISH, SEE FINISH SCHEDULE.ICYENE MUST NOT BE EXPOSED TO VIEW.IF NOT FINISHED CLG IS SPEC'D, THEN -INSTALL FSK PAPER OR SPRAY APPLIED FIRE RETARDANT3. EXTERIOR MASONRY WALLS:a. REPOINT THE UNDERSIDE OF EVERY SILLb. ALL EXTERIOR WALLS TO BE RESTORED.EACH BLDG HAS SPECIFIC RESTORATION NEEDS AS NOTED ON THE DRAWINGS.c. CONTRACTOR TO SUBMIT UNIT COSTS FOR REPOINTING, BRICK REPLACEMENT AND STONE REPLACEMENT.d. EACH BLDG REQUIRES DIFFERENT LEVELS OF MASONRY REPLACEMENT AND REPOINTING.SEE DRAWINGS.e. COORDINATE ALL MASONRY REPAIRS WITH STRUCTURAL ENGINEER PRIOR TO COMMENCEMENT OF WORK.STRUCTURAL ENGINEER TO VERIFY ALL ITEMS SCHEDULED TO BE REMOVED AS "NON-STRUCTURAL" PRIOR TO THEIR REMOVAL.ANY ITEMS DEEMED STRUCTURALLY INTEGRAL TO THE BUILDING THAT ARE SCHEDULED FOR REMOVAL MUST BE ADDRESSED BY THE DESIGN TEAM PRIOR TO THEIR REMOVAL.f. MASONRY CONTRACTOR TO RETAIN A MATERIAL SPECIALIST TO TAKE SEVERAL 9" CORE SAMPLES (MIN 3 WYTHES THICK) OF EXISTING BRICK AND MORTAR.EVALUATE CONDITION OF THE EACH.COMFIRM STRUCTURAL INTEGRITY OF THE BRICK AND MORTAR FOR STRENGTH AND COMPOSITION.DETERMINE THE APPROPRIATE MORTAR TYPE FOR REPOINTING PRIOR TO RESTORATION OF PROJECT.g. MASONRY CONTRACTOR TO SUBMIT A MEANS AND METHODS STATEMENT FOR REVIEW AND APPROVALE PRIOR TO COMMENCE OF ANY RESTORATION WORK FOR THIS PROJECT.THE MEANS AND METHODS SUBMITTAL MUST INCLUDE, BUT NOT LIMITED TO, THE GOLLOWING: A. TYPES OF EXISTING BRICK AND MORTAR (NEW BRICKS AND MORTAR TO MATCH AND ALIGN WITH EXISTING) B. SOURCES FOR MATCHING NEW BRICK TO EXISTING C. SAMPLES OF NEW BRICKS AND THEIR RESPECTIVE LOCATIONS D. SCOPE AND QTY OF NEW MASONRY REQUIRED (INCLUDING STONE) E. REPOINTING AND BRICK REPLACEMENT METHODS, INCLUDING INSTALLATION OF CONTROL JOINTS WHERE INDICATE-REMOVE ALL EXISTING DOORS AND WINDOWS.INSTALL NEW WINDOW/DOOR ASSEMBLY W/ PERIMETER SEALANT & BACKER ROD (NEW WINDOW/DOOR ASSEMBLY TO FOLLOW ORIGINAL SETBACK DEPTH FROM FACE OF MASONRY-CLEAN ALL MASONRY AND STONE SURFACES W/ MILD DETERGENT4. REROUTE ALL EXISTING POWER DISTRIBUTION LINES FOR PROJECT SO THERE IS NOTHING ON THE ROOFS OF ANY BUILDING.5. REMOVE ALL SURFACE MOUNTED CONDUIT, PIPING, HVAC EQUIPMENT, MISC NON STRUCTURAL WOOD... FROM ALL EXTERIOR WALLS.6. REMOVE ALL VEGETATION FROM SURFACES OF BUILDING.7. REPLACE ALL WINDOWS AND DOORS THROUGHOUT THE PROJECT, INCLUDING FRAME ASSEMBLIES8. REMOVE ALL APPURTENANCES ON THE EXISTING ROOFS (CHINMEYS, VENTILATORS, CABLE HARNESSES...)No. Description Date WALL TYPE 02 -RATED CORRIDOR WALL5/8" FIRECODE "X" GWB3" MIN. SOUND ATTENUATIONFIRE BLANKET, (SAFB)5/8" FIRECODE "X" GWBWALL TYPE 04 -RATED ELEVATOR CMU WALL1. FIRE CAULK ALL PENETRATIONS.2. FIRE BLOCKING AT AIR SPACE PRE CODE3. EXTEND TO RATED HORIZONTAL ASSEMBLY.4. USE MOLD RESISTANT GWB ON BATHROOM, KITCHEN & LAUNDRY WALL SIDES.FIRE RATING: 3 HR UL # (U914)SOUND RATING: STC ± 56 FOR CMU W/SOLID CORE7 5/8" CMU, MORTAR CORES SOLID1. INCLUDES A BEAD OF ACOUSTICAL SEALANT AROUND PERIMETER OF WALL, SEAL ALL PENETRATIONS AND HOLES.2. USE MOLD RESISTANT GWB ON BATHROOM, KITCHEN & LAUNDRY WALL SIDES.WALL TYPE 01 -RATED UNIT SEPARATION WALLFIRE RATING: 1 HR UL # (U465) SOUND RATING: STC ± 54 (RAL-TL90-344)6" METAL FRAMING @ 16" O.C.5/8" FIRECODE "X" GWB3" MIN. SOUND ATTENUATIONFIRE BLANKET, (SAFB)1/2" 25 GA. RESILIENT CHANNELS@ 16" O.C. VERTICALLY5/8" FIRECODE "X" GWB1. FIRE CAULK ALL PENETRATIONS.2. FIRE BLOCKING AT AIR SPACE PRE CODE3. EXTEND TO RATED HORIZONTAL ASSEMBLY.4. USE MOLD RESISTANT GWB ON BATHROOM, KITCHEN & LAUNDRY WALL SIDES.WALL TYPE 03 -RATED STAIRWELL WALL5/8" GWB1. FIRE CAULK ALL PENETRATIONS.2. FIRE BLOCKING AT AIR SPACE PRE CODE3. EXTEND TO RATED HORIZONTAL ASSEMBLY.4. USE MOLD RESISTANT GWB ON BATHROOM, KITCHEN & LAUNDRY WALL SIDES.WALL TYPE 07 -FURRING WALL6" METAL FRAMING @ 16" O.C.7/8" METAL FURRING@ 16" O.C. VERTICALLY3" MIN. SOUND ATTENUATIONFIRE BLANKET, (SAFB)6" METAL FRAMING @ 16" O.C.4" METAL FRAMING @ 16" O.C.5/8" GLASROC SHEATING TYPE XGYP. PANEL (2 LAYERS)3/8" GWBWALL TYPE 05 -UNRATED INTERIOR ACOUSTIC PARTITION5/8" GWB3" MIN. SOUND ATTENUATIONFIRE BLANKET, (SAFB)4" METAL FRAMING @ 16" O.C.5/8" GWBFIRE RATING: N/ASOUND RATING: STC ± 56WALL TYPE 04A -RATED INFILL CMU WALLFIRE RATING: 1 HR UL # (U914)SOUND RATING: STC ± 56 FOR CMU W/SOLID CORE5 5/8" CMU, MORTAR CORES SOLID1. INCLUDES A BEAD OF ACOUSTICAL SEALANT AROUND PERIMETER OF WALL, SEAL ALL PENETRATIONS AND HOLES.2. USE MOLD RESISTANT GWB ON BATHROOM, KITCHEN & LAUNDRY WALL SIDES.WALL TYPE 05A -UNRATED INTERIOR PARTITION5/8" GWB4" METAL FRAMING @ 16" O.C.5/8" GWBFIRE RATING: N/ASOUND RATING: STC ± 561. USE MOLD RESISTANT GWB ON BATHROOM, KITCHEN & LAUNDRY WALL SIDES.WALL TYPE 06 -UNRATED INTERIOR ACOUSTIC PARTITION5/8" GWB3" MIN. SOUND ATTENUATIONFIRE BLANKET, (SAFB)6" METAL FRAMING @ 16" O.C.5/8" GWB1. INCLUDES A BEAD OF ACOUSTICAL SEALANT AROUND PERIMETER OF WALL, SEAL ALL PENETRATIONS AND HOLES.2. USE MOLD RESISTANT GWB ON BATHROOM, KITCHEN & LAUNDRY WALL SIDES.1. INCLUDES A BEAD OF ACOUSTICAL SEALANT AROUND PERIMETER OF WALL, SEAL ALL PENETRATIONS AND HOLES.2. USE MOLD RESISTANT GWB ON BATHROOM, KITCHEN & LAUNDRY WALL SIDES.WALL TYPE 06A -UNRATED INTERIOR PARTITION5/8" GWB6" METAL FRAMING @ 16" O.C.5/8" GWBFIRE RATING: N/ASOUND RATING: STC ± 561. USE MOLD RESISTANT GWB ON BATHROOM, KITCHEN & LAUNDRY WALL SIDES.FIRE RATING: 1 HR UL # (U465) SOUND RATING: STC ± 54 (RAL-TL90-344)FIRE RATING: 1 HR UL # (U465) SOUND RATING: STC ± 54 (RAL-TL90-344)FIRE RATING: N/A SOUND RATING: STC ± 54 (RAL-TL90-344)WALL TYPE 8 -EXTERIOR WALLEXPOSED FACE OF EXISTING WALL TO REMAIN EXPOSED. GENTLY CLEAN SURFACE.EXTISTING EXTERIOR WALLFIRE RATING: NRSOUND RATING: NR5/8" GWB6" METAL FRAMING @ 16" O.C.FIRE RATING: N/ASOUND RATING: N/A1. INCLUDES A BEAD OF ACOUSTICAL SEALANT AROUND PERIMETER OF WALL, SEAL ALL PENETRATIONS AND HOLES.2. USE MOLD RESISTANT GWB ON BATHROOM, KITCHEN & LAUNDRY WALL SIDES.WALL TYPE 07A -FURRING WALL5/8" GWB4" METAL FRAMING @ 16" O.C.FIRE RATING: N/ASOUND RATING: N/A1. INCLUDES A BEAD OF ACOUSTICAL SEALANT AROUND PERIMETER OF WALL, SEAL ALL PENETRATIONS AND HOLES.2. USE MOLD RESISTANT GWB ON BATHROOM, KITCHEN & LAUNDRY WALL SIDES.WALL TYPE 07B -FURRING WALL5/8" GWB1 5/8" METAL FRAMING @ 16" O.C.FIRE RATING: N/ASOUND RATING: N/A1. INCLUDES A BEAD OF ACOUSTICAL SEALANT AROUND PERIMETER OF WALL, SEAL ALL PENETRATIONS AND HOLES.2. USE MOLD RESISTANT GWB ON BATHROOM, KITCHEN & LAUNDRY WALL SIDES.WALL TYPE 8A -EXTERIOR WALL1" SEMI-PERMEABLE RIGID FOAM EXTRUDED POLYSTYRENE INSULATION (R-5) FRICTION FIT AGAINST WALLVAPOR PERMEABLE AIR AND WATER BARRIER LIQUID-APPLIED MEMBRANEEXTISTING EXTERIOR WALLFIRE RATING: NRSOUND RATING: NRWALL TYPE 8B -EXTERIOR WALL1" SEMI-PERMEABLE RIGID FOAM EXTRUDED POLYSTYRENE INSULATION (R-5) FRICTION FIT AGAINST WALLVAPOR PERMEABLE AIR AND WATER BARRIER LIQUID-APPLIED MEMBRANEEXTISTING EXTERIOR WALLFIRE RATING: NRSOUND RATING: NR1 5/8" METAL FURRING STUD @ 16" O.C.1/2" AIR SPACE5/8" GWBVARIES1" VARIES5/8"1"1/2"1"VARIES3 1/8"WALL TYPE 9 -EXTERIOR BRICK VENEER WALLBRICK VENEER1" AIR SPACEFIRE RATING: 2 HR UL # (U349) SOUND RATING: NR1 1/2" RIGID INSULATIONFIRE-RATED OSB SHEATHING (2-SIDED)6" METAL STUDS2 LAYERS TYPE X 5/8" GWBWALL TYPE 9A -EXTERIOR BRICK VENEER WALLBRICK VENEER1" AIR SPACE1 1/2" RIGID INSULATION8" METAL STUDS3 1/2" MINERAL WOOL BATT INSULATION2 LAYERS TYPE X 5/8" GWB3 1/2" MINERAL WOOL BATT INSULATIONFIRE RATING: 2 HR UL # (U349) SOUND RATING: NRWALL TYPE 10 -EXTERIOR BOARD AND BATTEN WALLVERTICAL WOOD BOARD AND BATTEN1 1/2" RIGID INSULATION6" METAL STUDS2 LAYERS TYPE X 5/8" GWB3 1/2" MINERAL WOOL BATT INSULATIONFIRE RATING: 2 HR UL # (U349) SOUND RATING: NRFIRE-RATED OSB SHEATHING (2-SIDED)FIRE-RATED OSB SHEATHING (2-SIDED)BRICK VENEER1" AIR SPACEFIRE RATING: 2 HR UL # (U349) SOUND RATING: NR1 1/2" RIGID INSULATIONFIRE-RATED OSB SHEATHING (2-SIDED)4" METAL STUDS2 LAYERS TYPE X 5/8" GWB3 1/2" MINERAL WOOL BATT INSULATIONWALL TYPE 9B -EXTERIOR BRICK VENEER WALLWALL TYPE 07C -BEARING WALLSHEATHING (SEE STRUCTURAL DRAWINGS).6" METAL FRAMING @ 16" O.C.(SEE STRUCTURAL DRAWINGS).FIRE RATING: N/ASOUND RATING: N/AWALL TYPE 07D -RATED SHAFT WALL2 LAYERS 5/8" FIRECODE "X" GWB3" MIN. SOUND ATTENUATIONFIRE BLANKET, (SAFB)CONTINUOUS ACOUSTIC SEALANT AT ALL PERIMETERS.1. FIRE CAULK ALL PENETRATIONS.2. FIRE BLOCKING AT AIR SPACE PRE CODE3. EXTEND TO RATED HORIZONTAL ASSEMBLY.4. USE MOLD RESISTANT GWB ON BATHROOM, KITCHEN & LAUNDRY WALL SIDES.4" C-H METAL STUDS @ 16" O.C.1" GYPSUM LINER PANELFIRE RATING: 1 HR UL # (U437) SOUND RATING: STC ± 50 (RAL-OT-04-019)BRICK VENEER1" AIR SPACEFIRE RATING: 2 HR UL # (U349) SOUND RATING: NR1 1/2" RIGID INSULATION8" CMUWALL TYPE 14 -EXTERIOR BRICK VENEER WALLScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1" = 1'-0"R.5WALL TYPESDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063No. Description Date FLOOR TYPE F21CEILING TYPE C2FIRE RATING: 1HRSOUND RATING: NOT KNOWN6" MTL FRAMING@16" O.C.3" MIN SOUNDATTENUATION INSULATION BATTS5/8" GWB.TAPED AND PAINTEDFIRE RATING: NRSOUND RATING: =/-STC 521. PROVIDE CONTINUOUS BEAD OF ACOUSTICAL SEALANT AROUND PERIMETER OF WALL AND SEAL ALL PENETRATIONS AND HOLES.2. USE MOLD RESISTANT GWB AT BATHROOM, KITCHEN AND LAUNDRY WALL SIDES.STRIP, SAND AND REFINISH EXISTING FLOOR. REPLACE ANY DAMAGED MATERIAL. FIRESTOP ALL GAPS AND OPENINGS.REMOVE ALL FLOOR FINISHES DOWN TO ORIGINAL HEAVY TIMBER PLANK FLOOR.STRIP, SAND AND REFINISH EXISTING BEAMS AND UNDERSIDE OF FLOOR PLANKS. REPLACE ANY DAMAGED MATERIAL.REMOVE ALL CEILING FINISHES DOWN TO ORIGINAL HEAVY TIMBER PLANK FLOOR.FLOOR TYPE F22FIRE RATING: 1HRSOUND RATING: NOT KNOWNNEW 1/4" THICK ACOUSTIC MAT.MAXXON ACOUSTI-MAT II HP.REMOVE ALL FLOOR FINISHES DOWN TO ORIGINAL HEAVY TIMBER PLANK FLOOR.STRIP, SAND AND REFINISH EXISTING BEAMS AND UNDERSIDE OF FLOOR PLANKS. REPLACE ANY DAMAGED MATERIAL.REMOVE ALL CEILING FINISHES DOWN TO ORIGINAL HEAVY TIMBER PLANK FLOOR.NEW FLOOR FINISH. SEE FINISH SCHEDULE.1" THICK GYPSUM FLOOR UNDERLAYMENT.FLOOR TYPE F31FIRE RATING: 1HR (UL USOUND RATING: +/-58NEW 1/4" THICK ACOUSTIC MAT.MAXXON ACOUSTI-MAT II HP.NEW FLOOR SUBFLOOR. SEE STRUCTURAL DRAWINGS.NEW TYPE 'C' GYPSUM WALLBOARD. TAPED AND PAINTED.NEW FLOOR FRAMING. SEE STRUCTURAL DRAWINGS.NEW FLOOR FINISH. SEE FINISH SCHEDULE.1" THICK GYPSUM FLOOR UNDERLAYMENT.10 MIL VAPOR BARRIER.NEW FLOOR FINISH. SEE FINISH SCHEDULE.CONCRETE SLAB ON GRADE. SEE STRUCTURAL DRAWINGS.MIN 9" COMPACTED GRANULAR FILL.UNDISTURBED EARTH..FLOOR TYPE F0310 MIL VAPOR BARRIER.NEW FLOOR FINISH. SEE FINISH SCHEDULE.CONCRETE SLAB ON GRADE. SEE STRUCTURAL DRAWINGS.EXISTING CONCRETE SLAB TO REMAIN INTACT.CRUSHED STONE. SEE STRUCTURAL DRAWINGS.FLOOR TYPE F04EXISTING CONCRETE SLAB TO REMAIN INTACT.FLOOR TYPE F01EXISTING CONCRETE SLAB TO REMAIN INTACT.FLOOR TYPE F02NEW FLOOR FINISH. SEE FINISH SCHEDULE.EXISTING CONCRETE SLAB TO REMAIN INTACT.FLOOR TYPE F11NEW CONCRETE SLAB ON METAL DECK. SEE STRUCTURAL DRAWINGS.FLOOR TYPE F12NEW FLOOR FINISH. SEE FINISH SCHEDULE.NEW FLOOR FINISH. SEE FINISH SCHEDULE.NEW 3 1/2" (R-11) SOUND-ATTENUATION FIRE BLANKET BATT INSULATION.FLOOR TYPE F32CEILING TYPE C1FIRE RATING: n/aSOUND RATING: n/aSTRIP, SAND AND REFINISH EXISTING BEAMS AND UNDERSIDE OF FLOOR PLANKS. REPLACE ANY DAMAGED MATERIAL.REMOVE ALL CEILING FINISHES DOWN TO ORIGINAL HEAVY TIMBER PLANK FLOOR.CONCRETE SLAB ON GRADE. SEE STRUCTURAL DRAWINGS.ELEVATOR PIT WATERPROOFING?UNDISTURBED EARTH.FLOOR TYPE F05FIRE RATING: n/aSOUND RATING: n/aNEW 1/4" THICK ACOUSTIC MAT.MAXXON ACOUSTI-MAT II HP.NEW FLOOR SUBFLOOR. SEE STRUCTURAL DRAWINGS.NEW FLOOR FRAMING. SEE STRUCTURAL DRAWINGS.NEW FLOOR FINISH. SEE FINISH SCHEDULE.1" THICK GYPSUM FLOOR UNDERLAYMENT.NEW GYPSUM WALLBOARD. TAPED AND PAINTED.FLOOR TYPE F33FIRE RATING: n/aSOUND RATING: n/aNEW 1/4" THICK ACOUSTIC MAT.MAXXON ACOUSTI-MAT II HP.NEW FLOOR 3/4" PRESSURE-TREATED SUBFLOOR. SEE STRUCTURAL DRAWINGS.NEW PRESSURE-TREATED FLOOR FRAMING. SEE STRUCTURAL DRAWINGS.NEW FLOOR FINISH. SEE FINISH SCHEDULE.1" THICK GYPSUM FLOOR UNDERLAYMENT.FLOOR TYPE F34FIRE RATING: 1HR (UL USOUND RATING: +/-58NEW 1/4" THICK ACOUSTIC MAT.MAXXON ACOUSTI-MAT II HP.NEW FLOOR SUBFLOOR. SEE STRUCTURAL DRAWINGS.NEW FIRE-RATED OSB SHEATHING (BOTH SIDES).NEW FLOOR FRAMING. SEE STRUCTURAL DRAWINGS.NEW FLOOR FINISH. SEE FINISH SCHEDULE.1" THICK GYPSUM FLOOR UNDERLAYMENT.NEW 3 1/2" MINERAL WOOL FIRE BLANKET BATT INSULATION.NEW 1/2" RESILIENT CHANNEL @ 16" O.C.NEW 1x3 WOOD FURRING.NEW 1x8 V-GROOVE PAINTED WOOD SIDING.FLOOR TYPE F23FIRE RATING: 1HRSOUND RATING: NOT KNOWNNEW 1/4" THICK ACOUSTIC MAT.MAXXON ACOUSTI-MAT II HP.REMOVE ALL FLOOR FINISHES DOWN TO EXISTING SUBFLOOR.NEW FLOOR FINISH. SEE FINISH SCHEDULE.1" THICK GYPSUM FLOOR UNDERLAYMENT.EXISTING FLOOR FRAMING TO REMAIN.NEW TYPE 'C' GYPSUM WALLBOARD. TAPED AND PAINTED.NEW 3 1/2" (R-11) SOUND-ATTENUATION FIRE BLANKET BATT INSULATION.NEW 1/2" RESILIENT CHANNEL @ 16" O.C.FLOOR TYPE F24FIRE RATING: 1HRSOUND RATING: NOT KNOWNNEW 1/4" THICK ACOUSTIC MAT.MAXXON ACOUSTI-MAT II HP.REMOVE ALL FLOOR FINISHES DOWN TO ORIGINAL HEAVY TIMBER PLANK FLOOR.NEW FLOOR FINISH. SEE FINISH SCHEDULE.1" THICK GYPSUM FLOOR UNDERLAYMENT.REMOVE ALL FLOOR FINISHES DOWN TO ORIGINAL HEAVY TIMBER PLANK FLOOR.NEW GALVANIZED JOIST HANGERS.NEW PRESSURE-TREATED 2x8 CEILING FRAMING.NEW CONTINUOUS VAPOR BARRIER.NEW PAINTED PRESSURE-TREATED PLYWOOD SHEATHING.NEW CONCRETE SLAB ON METAL DECK. SEE STRUCTURAL DRAWINGS.FLOOR TYPE F13ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1" = 1'-0"R.6FLOOR ANDCEILING TYPESDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063No. Description DateNOT TO SCALE ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18A7.0.1FINISHSCHEDULEDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063Common Area FinishesArea Finish ManufacturerProductNameColorProductNumberColorNumberPhotoNotes/InstallMethodLeasing/Fitness RestroomFloor Tile Daltile Torreon Brino 12X12FieldTileTN98 Running BondPatternLeasing/Fitness RestroomFloor TIleGroutLaticrete NaturalGray24 1/8" Grout LineLeasing/Fitness RestroomWall Tile Daltile ModernDimnsionsArchitectural Gray4 1/4 X12 3/40109 Running BondPatternLeasing/Fitness RestroomWall TileGroutLaticrete NaturalGray24 1/8" Grout LineLeasing/Fitness RestroomWall Paint BenjaminMooreEggshell BrushedAluminium1485 Color Match topreferedmanufacturerStairwells Treads &LandingsJohnsonite Safe T RibHT, SquareNoseMoon Rock 29Stairwells Vinyl Base Johnsonite 4" CoveBaseMoon Rock 29 Unless NotedStairwells Wall Paint BenjaminMooreEggshell BrushedAluminium1485 Color Match topreferedmanufacturerTypical Vinyl Base Johnsonite 4" CoveBaseSnowWhite01 Unless NotedTypical Window &DoorCasingBrosco 3-1/2" FlatCasing8993FJPTypical Trim Paint BenjaminMooreSemi-GlassFinishSimplyWhiteOC-117 Color Match topreferedColor Match topreferedmanufacturerTypical CeilingPaintBenjaminMooreFlat Finish SimplyWhiteOC-117 Color Match topreferedmanufacturerVestibulesand CorridorsVestibuleFlooringShawContractPortbella 5T035 34761 MonolithicInstallVestibulesand CorridorsCorridorFlooringShawContractQuietCoverUrban Ash 0186V DV746-CVestibulesand CorridorsWall Paint BenjaminMooreEggshell BrushedAluminium1485 Color Match topreferedmanufacturerVestibulesand CorridorsAccentPaintBenjaminMooreSemi Gloss WebsterGreenHC-130 Color Match topreferedmanufacturer,unit entry doorsand ends ofcorridorsCommon Area FinishesArea Finish ManufacturerProductNameColorProductNumberColorNumberPhotoNotes/InstallMethodFitnessCenterAccentPaintBenjaminMooreSemi Gloss WebsterGreenHC-130 Color Match topreferedmanufacturerLaundryRoomFloor Tile Daltile Torreon Brino 12X12FieldTileTN98 Running BondPatternLaundryRoomFllor TileGroutLaticrete NaturalGray24 1/8" Grout LineLaundryRoomTile Base Daltile Torreon Brino 4X12BullnoseTN98 Running BondPatternLaundryRoomTile BaseGroutLaticrete NaturalGray24 1/8" Grout LineLaundryRoomFoldingCounterWilsonart StandardLaminateOiledSoapstone4882-38LaundryRoomWall Paint BenjaminMooreEggshell HerbalEscape1487 Color Match topreferedmanufacturerLeasing Office Flooring ShawContractVaporCarpet Tile- 18X36Notion 5T036 MonolithicInstallLeasing Office Wall Paint BenjaminMooreEggshell BrushedAluminium1485 Color Match topreferedmanufacturerLeasing Office Cabinets AdvantaCabinetaNewbury StormLeasing Office Counter/BacksplashWilsonart StandardLaminateOiledSoapstoneLeasing Office CabinetHardwareLibertyHardware3-3/4"SquareBow PullChrome P50413V-CHR-C7Horizontal onCenter ofDrawers:Verical onCenter of DoorRailsLeasing Office HP Sink Elkay Dayton 1Hole (6-1/2" Deep)StainlessSteelD-12521-130" CabinetRequiredLeasing Office Faucet Olympia Elite SingleHandlePull-OutKitchenFaucetPolishedChromeK-5030 Do not installdeck plateLeasing Office RefrigeratorFrigidaire UndercounterBlack FFPH44M4LBLeasing Office Microwave Frigidaire Countertop Black FFCE1439LBLeasing Office GarbageDisposalFrigidaire 1/2 HP FFD1501CMSCommon Area FinishesArea Finish ManufacturerProductNameColorProductNumberColorNumberPhotoNotes/InstallMethodBack ofHouse AreasFlooring Mannington TouchstoneVCTPuttyBack ofHouse AreasWall Paint BenjaminMooreEggshell BrushedAluminium1485CommunityRoom/KitchenFlooring ShawContractQuietCoverUrban Ash 0186V DV746-CCommunityRoom/KitchenWall Paint BenjaminMooreEggshell BrushedAluminium1485 Color Match topreferedmanufacturerCommunityRoom/KitchenElevatorWallsWilsonart Laminate AsianNight7949CommunityRoom/KitchenElevatorFlooringBolon GraphicCollectionHerringbone Black103 230CommunityRoom/KitchenCabinets AdvantaCabinetaNewbury StormCommunityRoom/KitchenCounter/BacksplashWilsonart StandardLaminateOiledSoapstone4882-38CommunityRoom/KitchenCabinetHardwareLibertyHardware3-3/4"SquareBow PullChrome P50413V-CHR-C7Horizontal onCenter ofDrawers:Verical onCenter of DoorRailsCommunityRoom/KitchenHP Sink Elkay Dayton 1Hole (6-1/2" Deep)StainlessSteelD-12521-130" CabinetRequiredCommunityRoom/KitchenFaucet Olympia Elite SingleHandlePull-OutKitchenFaucetPolishedChromeK-5030 Do not installdeck plateCommunityRoom/KitchenRefrigeratorFrigidaire Side bySideStainlessSteelFGHS2631PHCommunityRoom/KitchenMicrowave Sharp StainlessSteelKB-6524PSCommunityRoom/KitchenGarbageDisposalFrigidaire 1/2 HP FFD1501CMSFitnessCenterFlooring ShawContractQuietCoverUrban Ash 0186V DV746-CFitnessCenterWall Paint BenjaminMooreEggshell HerbalEscape1487 Color Match topreferedmanufacturerNo. Description Date ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18A7.0.2FINISHSCHEDULEDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063Apartment FinishesArea Finish Area ManufacturerProductNamecolorProductnumberColorNumberImageNotes/InstallMethodKitchen Sink Elkay Dayton 1hole (8"Deep)StainlessSteelDSE12522-130" CabinetRequiredKitchen Faucet Olympia Elite SingleHandlePull-OutKitchenFaucetPolishedChromeK-5030 Do not installdeck plateKitchen Range Frigidaire SmoothTop RangeBlack FFEF3013LBKitchen Refrigerator Frigidaire Top MountRefrigeratorBlack FFHT1814QBKitchen Dishwasher FrigidaireDishwasher Black FGBD2435NBKitchen Micro/Hood Frigidaire MicrowaveHoodBlack FFMV162LBKitchen GarbageDisposalFrigidaire 1/2 HP FFD1501CMSTypical CeilingPaintBenjaminMooreFlat SimplyWhiteOC-117 Color Matchto preferedmanufacturerTypical Wall Paint BenjaminMooreEggshell Gray Mist OC-30 Color Matchto preferedmanufacturerTypical Trim Paint BenjaminMooreSemi Gloss SimplyWhiteOC-117 Color Matchto preferedmanufacturerTypical Window &DoorCasingBrosco 3-1/2" FlatCasing8993 FJPTypical Base (AddAlt to VinylBase)Brosco 3-1/2" FlatCasing8993 FJPTypical Vinyl Base Johnsonite 4" CoveBaseSnow White 01Typical TransitionStripJohnsonite TransitionStripFawn 80Typical WindowTreatments1" MiniBlindRaw Umber PurchasethroughMariettadraperies.Typical DoorHardwareStyleSchlage LatitudeLeverChrome Leverfunctiondeterminedby doorfunction.Apartment FinishesArea Finish Area ManufacturerProductNamecolorProductnumberColorNumberImageNotes/InstallMethodHP Kitchen Cabinets AdvantaCabinetaNewbury StormHP Kitchen Countertop/BacksplashFormica Wilsonart AutumnCarnival1877K-35HP Kitchen CabinetHardwareLibertyHardware3-3/4"SquareBow PullChrome P50413V-CHR-C7Horizontal onCenter ofDrawers:Verical oncenter ofDoor RailsHP Kitchen HP Sink Elkay Dayton 1hole (6"Deep)StainlessSteelD12521-1 30" CabinetRequiredHP Kitchen Faucet Olympia Elite SingleHandlePull-OutKitchenFaucetPolishedChromeK-5030 Do not installdeck plateHP Kitchen Range Frigidaire 30" CoilTop RangeBlack FFEF3009PBHP Kitchen Refrigerator Frigidaire Side bySideBlack FFHS2313LEHP Kitchen Dishwasher Frigidaire Black FDB2410HIBHP Kitchen RangeHoodFrigidaire Black FHWC3025MBHP Kitchen GarbageDisposalFrigidaire 1/2 HP FFD1501CMSKitchen Cabinets AdvantaCabinetaNewbury StormKitchen Countertop/BacksplashFormica Wilsonart AutumnCarnival1877K-35Kitchen CabinetHardwareLibertyHardware3-3/4"SquareBow PullChrome P50413V-CHR-C7Horizontal onCenter ofDrawers:Verical oncenter ofDoor RailsApartment FinishesArea Finish Area ManufacturerProductNamecolorProductnumberColorNumberImageNotes/InstallMethodBathrooms Cabinets AdvantaCabinetsNewbury StormBathrooms CabinetHardwareLibertyHardware3-3/4"SquareBow PullChrome P50413V-CHR-C7Horizontal onCenter ofDrawers:Verical oncenter ofDoor RailsBathrooms Countertop/BacksplashBertch OasisVanity TopO31 RectangularBowl -Non-RecessedBathrooms Mirror FramelessBeveledEdgevanity width x36" h ( 42"from floor )Bathrooms Lav Faucet Olympia SingleHandle LavFaucetPolishedChromeL-6052B install withoutdeck plateBathrooms Tub/Shower FaucetOlympia SingleHandleTub/Shower Trim SetPolishedChromeP-2300-BB& P-2370-TBathrooms PaperHolderOlympia Dia PaperHolderChrome 7MT032 Mounted at26" from floorBathrooms Towel Bars Olympia Dia 18"Towel BarChrome 7MT031 Mounted at48" from floorBathrooms Towel Bars Olympia Dia 24"Towel BarChrome 7MT030 Mounted at48" from floorBathrooms Towel Ring Olympia Dia TowelRingChrome 7MT034 Mounted at48" from floorBathrooms Robe Hook Olympia Robe Hook Chrome 7MT033 Mounted at66" from floorBathrooms ShowerRod/FlangeKitCreativeSpecialtiesCurvedShowerRodPolishedStainless2102-5PS& 65-F-PSMounted at73" from floorFlooring LivingRooms/Bedrooms/KitchensShawContractQuietCoverMink 0186V 00720Flooring Bathrooms Trakett Fiberfloor -FreashStartStanbridgeStone -Greige01241Flooring Floor Tile(add alt tovinyl sheet)Daltile Torreon Cloud 12X12Field TileTN95 RunningBond PatternFlooring Floor TileGroutLaticrete LightPewter90 1/8" GroutLineNo. Description Date EXTERIOR 51GNAGE SCHEDULE ITEM# 515NA6E DE5C,RIPTION 515NA6E LOC,ATION 6UILDIN6 c; LEVEL I UNIT 516N5 2 2 6UILDIN6 c; LEVEL2 UNIT 516N5 4 4 6UILDIN6 D LEVEL I UNIT 516N5 5 2 6UILDIN6 E LEVEL I 1 FITNESS ROOM 8 OF FICE 6UILDIN6 E LEVEL I q FITNESS ROOM UNIT-I UNIT-2 UNIT-:3 UNIT-4 UNIT-I UNIT-2 FITNESS ROOM OF FICE FITNESS ROOM TYPE GTY Al Al Al Al Al Al Al Al Al 2 REMARKS SEE 516NA6 E FLO OR PLA NS 234 OFFICE :·•. :·-:·-. :--. :--:·-. TYPE B 811x6 11 I RESTROOM :--. :·-:·•. TYPE A 6 11x6 11 I TYPE Al 8 11x6 11 I SECURITY FILE ROOM LAUNDRY ROOM COMMON ROOM 9 :·-. :·-:·-. T'!t'PE GI 811x6 11 I EXIT STAIR DOWN :·•. :·-:·•. :--. :--:·-. TYPE G2 811x6 11 I EXl1 STAIR UP ... ...... .•• ...••.. ·•·.. . , .. \__BAAILE PATTERN 5HO� FOR ILLIJ5TRATIVE PURPOSES ONL Yi TYP. CONFIRM WRREC.T TEXT PRIOR TO 516N TY�r;�:"x8" NAME -....•••••••• TYPE D 811xl811 I ¾ APARTMENTS 3A-3E APARTMENTS 3J-3K EMERGENCY EXIT ••• •• _..h •••••• •• n •• • ...... • •••• _..h •••••• •• n •• • SIGNAGE TYPEp SC.ALE, 9" = l'-0" 300 Winding Brook Drive Glastonbury, Connecticut 06033860 652 8227 """"""'AzTECH ENGINEERS, 1Nc. Aztech Engineers, Inc. 901 Wethersfield Avenue Hartford, Ct. 06114 Phone (860)548-9987 Fax (860)549-2572 www.aztecheng.com MOJRJRISSJRY ls:NIIINEIEAINII. LLD 58 Essex Street Deep River, CT 06417 (860)532-0312OXOBOXO LOFTS UNCASVILLE, CT No. 4 Dakota Partners, Inc. Description Date Final CD's 7/13/18 Final CD's 1 lJ/l :l/1 H Project Number 16-063 Date Nov. 1, 2016 Drawn By so Checked By so Scale AS NOTED ALL BUILDINGS SIGNAGE SCHEDULE A? .1.2 WAW1W2W3W4W5W6W7W8W9A-A2.13A-A2.14D-61NEW BEARING WALLS.SEE STRUCTURAL DRAWINGS.NEW SHAFT ABOVE.EXISTING CONCRETE LEDGE TO REMAIN.EXISTING CONCRETE ENCAST CAST IRON COLUMN TO REMAIN (TYPICAL).ScaleDateDrawn ByChecked ByProject Number4FINAL CONST DOCS10/12/18 1/4" = 1'-0"12/5/2018 1:00:08 PMA-A1.0BUILDING A -LEVEL 0 PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063No. Description Date1 Revision 1 Date 1 1/4" = 1'-0"A-A1.01BLDG A - CRAWL SPACE A-A2.14NEW RAIN GUTTER 1A-A4.1A-A2.11A-A2.13NEW RAIN LEADERRAIN LEADERRAIN LEADERRAIN LEADERNEW RAIN GUTTERSLOPESLOPESLOPESLOPESLOPENEW ASPHALT SHINGLE ROOF NEW ASPHALT SHINGLE ROOF NEW LOW-SLOPE MEMBRANE ROOF SYSTEM NEW LOW-SLOPE MEMBRANE ROOF SYSTEM (SEE BLDG B)7B-A5.67B-A5.6ROOF SYSTEM LEGENDNEW ASPHALT SHINGLE ROOF SYSTEMNEW LOW-SLOPE MEMBRANE ROOF SYSTEMScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedA-A1.3BUILDING A -ROOF PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"A-A1.33BUILDING A - ROOF PLANABDECFGHJKLMNORTHSITE KEY PLANABNo. Description Date ACBEB B B B B B BB ECBEXITEXITEXITEXITEXITSDSDSDSDSDSDSDSDSDSDSDBATHROOMBATHROOMBATHROOMBEDROOMCL -7'-6"BEDROOMLIVINGKITCHENCL -7'-6"CL -7'-6"BEDROOMBEDROOMBEDROOMKITCHENKITCHENLIVINGLIVINGCORRIDOREQ EQEQEQ1/32/3EQ7' - 0"EQB B 4' - 9 7/8"EQEQ1/32/3BECBBB B1/32/3EQEQ2/31/3EQEQ5' - 6" 3' - 11 5/8"EQEQEQEQEQ EQEQ EQAAAEQEQEQ 10' - 0" 10' - 0" 10' - 0" EQEQEQEQ EQ B BBB EQEQEQ4' - 10 1/4"3' - 6"EQEQEQEQEQEQEQEQ4' - 9 7/8"B B BEQ EQEQ EQ5' - 0"BB5' - 0 3/8"3' - 6" 6' - 6 3/4" 3' - 5 7/8"1/34' - 5" 4' - 5"AAAAEQEQ4' - 7"EQ EQEQEQEQ EQEQ 'A'EQ 'A'EQ 'B'EQ 'B'EQ EQBCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFCBBB B EEC CABB BBB CECCB B BB EXITEXITEXITEXIT SDSDSDSDSDSDSDSDSDBATHROOMBATHROOMBEDROOMBEDROOMBEDROOMBEDROOMBATHROOMCL -10' 0"CL -10' 0"KITCHENKITCHENKITCHENCORRIDORLIVINGLIVINGLIVINGCL -10' 0"CL -10' 0"CL -10' 0"CL -10' 0"6' - 6"EQEQEQEQ2/31/3EQEQ3' - 0"10' - 0"EQEQEQEQ1/32/3EQEQEQEQ2/31/32/31/3EQ2"EQEQEQAAAAAAA4' - 7 3/8"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"EQEQ EQEQ BEQ BEQ AEQ AEQEQEQ EQEQEQEQ EQEQ EQEQEQEQ AEQ AEQ EQEQ B6' - 0"EQ BEQ EQEQ EQEQEQEQEQEQ EQAAAAEQ EQEQEQEQEQEQ EQEQ 'B'EQ 'B'EQ EQEQ EQEQ 'A'EQ 'A'A.F.F.GWB on Mtl Stud8' - 0"A.F.F.GWB on Mtl Stud8' - 0"A.F.F.GWB on Mtl Stud8' - 0"7B-A5.67B-A5.6REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedA-A1.11BUILDING AREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"A-A1.111BLDG A - LEVEL 1 1/4" = 1'-0"A-A1.112BLDG A - LEVEL 2ABDECFGHJKLMNORTHSITE KEY PLANABNo. Description Date BLDG A - LEVEL 267' - 5"BLDG A - LEVEL 3 attic78' - 1 7/8"BLDG A - LEVEL 1 old50' - 2"BLDG A - LEVEL 155' - 5"REBUILD CORNER OF STONE FOUNDATION. CLEAN AND REPAIR STONE AND BRICK WALL AND FOUNDATION.CORRIDOR TO UNITS A-4, A-5, A-6NEW EXTERIOR DOOR IN EXISTING MASONRY OPENING.NEW WINDOW AND BRICKINFILL AT EXISTING MASONRY OPENINGNEW BRIDGE AND RAILINGS.NEW WALKING BRIDGE.REPAIR AND REPLACE 3 COURSES OF DAMAGED BRICK, WITH BRICK TO MATCH AT CORBELNEW WINDOW AND BRICKINFILL AT EXISTING MASONRY OPENINGBLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG A - LEVEL 267' - 5"BLDG A - LEVEL 3 attic78' - 1 7/8"BLDG A - LEVEL 1 old50' - 2"BLDG A - LEVEL 155' - 5"NEW WINDOW INEXISTING MASONRY OPENING (TYPICAL).NEW ACCESS DOORS TO CRAWL SPACE.NEW BRICK CORBEL TO ALIGN WITH BLDG ANEW EXTERIOR DOOR IN NEW BRICK VENEER WALL.BUILDING AAB CONNECTORBUILDING BNEW BRICK INFILL EXISTING OPENING. EXISTING BRICK INFILL TO REMAIN. NEW WINDOW IN NEW BRICK VENEER WALL.NEW ASPHALT SHINGLE ROOF SYSTEM ON EXISTING DECKING. NEW RAIN GUTTER AND LEADERS. REPAIR AND REPLACE BRICK WALL AT REMOVED SHAFT WALL DEMOLISHED.NEW LOW SLOPE ROOF SYSTEM ON NEW ROOF DECK AND FRAMING. NEW BOARD AND BATTEN EXTERIOR WALL DOGHOUSE DORMER WITH NEW LOW SLOPE ROOF SYSTEM. REPAIR STONE FOUNDATION. REPAIR AND REPOINT STONE FOUNDATION.BLDG F - LEVEL 352' - 6 1/2"BLDG A - LEVEL 267' - 5"BLDG A - LEVEL 3 attic78' - 1 7/8"BLDG A - LEVEL 1 old50' - 2"BLDG A - LEVEL 155' - 5"REPAIR AND REPLACE 4 ROWS OF BRICK AT GABLE END CORBEL.NEW SELF ADHERING ROOF FLASHING WITH SURFACE APPLIED TERMINATION BAR.NEW LOW-SLOPE ROOF SYSTEM OF WOOD DECK AND FRAMING.SEE BUILDING SECTION 2/AB-A3.2BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG A - LEVEL 267' - 5"BLDG A - LEVEL 3 attic78' - 1 7/8"BLDG A - LEVEL 1 old50' - 2"BLDG A - LEVEL 155' - 5"2A-A3.22A-A3.2NEW BRICK VENEER WALL.NEW RAIN GUTTERS AND LEADERS TIED TO STORM WATER SYSTEM.NEW ASPHALT SHINGLE ROOF SYSTEM ON EXISTING DECK.CLEAN AND RESTORE EXISTING STONE SITE WALL.REPLACE 3 COURSES OF DAMAGED BRICK, WITH BRICK TO MATCH AT CORBELCORRIDOR TO UNITS A-1, A-2, A-3NEW EXTERIOR DOOR IN EXISTING MASONRY OPENING.NEW WINDOW IN EXISTING MASONRY OPENING (TYPICAL).NEW SLOPE ROOF SYSTEM ATAB CONNECTORNEW BOARD AND BATTEN SIDED DOGHOUSE DORMER WITH LOWSLOPE ROOF SYSTEM.NEW WALKING BRIDGE AND RAILING.NEW WINDOW IN RESTORED MASONRY OPENING.BUILDING AAB CONNECTORBUILDING B4A-D1.04A-D1.0BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"A-A2.1BUILDING AELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"A-A2.14BLDG A - WEST ELEVATION 1/8" = 1'-0"A-A2.13BLDG A - SOUTH ELEVATION 1/8" = 1'-0"A-A2.12BLDG A - EAST ELEVATION 1/8" = 1'-0"A-A2.11BUILDING A - NORTH ELEVATIONBUILDING 'A' RENOVATION NOTES1. REPOINT MASONRY & STONE PERIMETER (BUDGET 5% NEW MASONRY). 2. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE, INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR.ABDECFGHJKLMNORTHSITE KEY PLANABNo. Description Date BLDG A - LEVEL 267' - 5"BLDG A - LEVEL 3 attic78' - 1 7/8"W1W2W3W4W5W6W7W8W9BLDG A - LEVEL 1 old50' - 2"BLDG A - LEVEL 155' - 5"2A-A3.22A-A3.25' - 3"12' - 0"10' - 8 7/8"CONNECTOR BETWEENBLDG A AND B1AB-A3.21AB-A3.210' - 8"PART OF BUILDING BNEW UNIT SEPARATION WALLS EXTEND TO UNDERSIDE OF ROOF DECK.1/AB-A3.31AB-A3.11AB-A3.12AB-A3.22AB-A3.22AB-A3.32AB-A3.39' - 6"F11F31F01BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"A-A3.1BUILDING ASECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"A-A3.11BUILDING A - LONGITUDINAL SECTIONABDECFGHJKLMNORTHSITE KEY PLANABNo. Description Date BLDG A - LEVEL 267' - 5"BLDG A - LEVEL 3 attic78' - 1 7/8"WABLDG A - LEVEL 1 old50' - 2"BLDG A - LEVEL 155' - 5"10' - 8 7/8"12' - 0"5' - 3"1A10.1F01F11F31RATED CORRIDOR WALL EXTENDED UP TO UNDERSIDE OF ROOF DECK.6' - 11"BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"A-A3.2BUILDING ASECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"A-A3.22BUILDING A - CROSS SECTIONABDECFGHJKLMNORTHSITE KEY PLANABNo. Description Date W1W26' - 8 3/8"2 7/8"3' - 0"A-A6.13645A-A6.1710982' - 9 3/4"8' - 0"5' - 2 1/4"5' - 2 1/4"2' - 9 3/4"8' - 0"5' - 9"2' - 6"5' - 0"3' - 0"3"5' - 0 7/8"2' - 9 1/8"8' - 3"A-A6.1121413152' - 7"8' - 0"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedA-A6.1BUILDING ATOILET PLANS &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"A-A6.11TOILET PLAN ( TYPE-1 ) 1/4" = 1'-0"A-A6.12TOILET PLAN ( TYPE-2 ) 1/4" = 1'-0"A-A6.13ELEVATION 3 1/4" = 1'-0"A-A6.14ELEVATION 4 1/4" = 1'-0"A-A6.15ELEVATION 5 1/4" = 1'-0"A-A6.16ELEVATION 6 1/4" = 1'-0"A-A6.17ELEVATION 7 1/4" = 1'-0"A-A6.18ELEVATION 8 1/4" = 1'-0"A-A6.19ELEVATION 9 1/4" = 1'-0"A-A6.110ELEVATION 10 1/4" = 1'-0"A-A6.111TOILET PLAN ( TYPE-3 ) 1/4" = 1'-0"A-A6.112ELEVATION 12 1/4" = 1'-0"A-A6.113ELEVATION 13 1/4" = 1'-0"A-A6.114ELEVATION 14 1/4" = 1'-0"A-A6.115ELEVATION15BLDG A - LEVEL 1, UNITS A-1 (2-BEDS), & A-2 (1 BED)BLDG A - LEVEL 2, UNIT A-5 (1-BED)BLDG A - LEVEL 1, UNIT A-3 (2 BEDS)BLDG A - LEVEL 2, UNIT A-4 (1-BED)BLDG A - LEVEL 2, UNIT A-6 (1-BED) OPPOSITE HANDTYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYTYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYNo. Description Date A-A6.2233' - 9 3/4"6' - 9 1/8"3' - 0 7/8"12' - 3"W1536W2736 W3318REF.B27B15AS REQ'DFILLER1' - 6"3' - 0"1' - 8"2' - 10"7' - 6"AS REQ'DFILLERAS REQ'DFILLERDEPTH24"W1836W/ HOODW3018 W1536DW B30S B18 RANGEAS REQ'DFILLERAS REQ'DFILLERDEPTH24"B15A-A6.2515' - 0 7/8"2' - 0"2' - 11 1/4"4' - 11 1/4"3' - 1"10' - 2 7/8"3' - 1 1/2"2' - 10"1' - 8"3' - 0"W1236W/ HOODW3036 W2436 W2436 W24366' - 0"1' - 6"B12 RANGEW3618 W1536AS REQ'DFILLERB15REF.AS REQ'DFILLERAS REQ'DFILLERAS REQ'DFILLERDEPTH24"AS REQ'DFILLERB24DWAS REQ'DFILLERAS REQ'DFILLERA-A6.278AS REQ'DFILLERW15362' - 6"W2418W3318AS REQ'DFILLER1' - 6"3' - 0"1' - 8"2' - 10"7' - 6"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedA-A6.2BUILDING AKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063BLDG A - LEVEL 1, UNIT A-1 (2-BEDS) 1/4" = 1'-0"A-A6.21KITCHEN PLAN ( TYPE 1 ) 1/4" = 1'-0"A-A6.22ELEVATION 2 1/4" = 1'-0"A-A6.23ELEVATION 3 1/4" = 1'-0"A-A6.24KITCHEN PLAN ( TYPE 2 ) 1/4" = 1'-0"A-A6.25ELEVATION 5BLDG A - LEVEL 1, UNIT A-2 (1-BED)BLDG A - LEVEL 1, UNIT A-3 (2-BEDS) 1/4" = 1'-0"A-A6.26KITCHEN PLAN ( TYPE 3 ) 1/4" = 1'-0"A-A6.27ELEVATION 7 1/4" = 1'-0"A-A6.28ELEVATION 8No. Description Date A-A6.3237' - 6"3' - 0"2' - 9 7/8"1' - 8 1/8"3' - 0"7' - 6"A-A6.352' - 11 5/8"9' - 9"12' - 8 5/8"2' - 1"2' - 10"1' - 7 7/8"3' - 0"4' - 7 7/8"2' - 10"A-A6.3787' - 10 3/4"2' - 0 1/4"5' - 11"3' - 0 1/4"5' - 9 3/4"10' - 11 7/8"2' - 10"1' - 8"3' - 0"2' - 8"2' - 10"7' - 6"2' - 0"2' - 10"1' - 8"3' - 0"7' - 6"7' - 6"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedA-A6.3BUILDING AKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"A-A6.31KITCHEN PLAN ( TYPE-4 ) 1/4" = 1'-0"A-A6.32ELEVATION 5 1/4" = 1'-0"A-A6.33ELEVATION 6BLDG A - LEVEL 2, UNIT A-4 (1-BED) 1/4" = 1'-0"A-A6.34KITCHEN PLAN ( TYPE-5 ) 1/4" = 1'-0"A-A6.35ELEVATION 5BLDG A - LEVEL 2, UNIT A-5 (1-BED) 1/4" = 1'-0"A-A6.36KITCHEN PLAN ( TYPE-6 ) 1/4" = 1'-0"A-A6.37ELEVATION 7BLDG A - LEVEL 2, UNIT A-6 (2-BEDS) 1/4" = 1'-0"A-A6.38ELEVATION 8No. Description Date WAW1W2W3W4W5W6W7W8W9REMOVE TOP 2'-8" PORTION OF CONCRETE CLADDING AROUND COLUMN WITHOUT HARMING STEEL COLUMN.REMOVE EXISTING DOOR, HARDWARE AND WOOD SURROUND.REMOVE EXISTING WALLS ENTIRELY AT ALL FLOORS.REMOVE EXISTING WALLS ENTIRELY AT ALL FLOORS.STEEL COLUMNS TO REMAIN INTACT (TYPICAL).REMOVE ALL EXISTING WINDOWS AND ASSOCIATED FRAMING AND FASTENERS.REMOVE EXISTING DOORS AND ASSOCIATED FRAMING, HARDWARE AND FASTENERS.4A-D1.04A-D1.07B-A5.67B-A5.6WAW1W2W3W4W5W6W7W8W9REMOVE TOP 2'-8" PORTION OF CONCRETE CLADDING AROUND COLUMN WITHOUT HARMING STEEL COLUMN.REMOVE EXISTING DOOR, HARDWARE AND WOOD SURROUND.REMOVE EXISTING WALLS ENTIRELY AT ALL FLOORS.REMOVE EXISTING WALLS ENTIRELY AT ALL FLOORS.REMOVE EXISTING CONCRETE FLOOR SLAB.REMOVE EXISTING SLIDING FIRE DOOR.WAW1W2W3W4W5W6W7W8W9REMOVE ALL WINDOWS, FASTENERS AND WOOD SURROUNDS (TYPICALLY).REMOVE EXISTING WALLS ENTIRELY AT ALL FLOORS.REMOVE EXISTING WALLS ENTIRELY AT ALL FLOORS.REMOVE EXISTING WOOD FLOOR AND FRAMING.REMOVE EXISTING SLIDING FIRE DOOR.REMOVE EXISTING DOOR, HARDWARE AND WOOD SURROUND.REMOVE EXISTING ATTIC FLOOR PLANKS AND FASTENERS ABOVE. TRUSSES TO REMAIN.BLDG A - LEVEL 267' - 5"BLDG A - LEVEL 3 attic78' - 1 7/8"WABLDG A - LEVEL 1 old50' - 2"BLDG A - LEVEL 155' - 5"REMOVE EXISTING DOOR, HARDWARE AND WOOD FRAME.REMOVE TOP 2'-8" OF CONCRETE COLUMN COVER (TYPICALLY). STEEL COLUMN TO REMIAN INTACT.2' - 8"4' - 0"REMOVE EXISTING WINDOW, HARDWARE AND WOOD FRAME.REMOVE EXISTING DOOR BEYOND, HARDWARE AND WOOD FRAME.REMOVE EXISTING EXTERIOR MASONRY SHAFT WALLS.REMOVE EXISTING DOOR, HARDWARE AND WOOD FRAME. BLDG F - LEVEL 352' - 6 1/2" REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"A-D1.0BUILDING ADEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"A-D1.02BUILDING A - LEVEL 1 DEMOLITION PLAN 1/8" = 1'-0"A-D1.01BUILDING A - CRAWLSPACE 1/8" = 1'-0"A-D1.03BLDG A - LEVEL 2 DEMOLITION PLANABDECFGHJKLMNORTHSITE KEY PLANABNo. Description Date 1/8" = 1'-0"A-D1.04BUILDING A - CROSS SECTION - DEMO UNIT A-1(2 BEDROOM)UNIT A-2(1 BEDROOM)UNIT A-3(2 BEDROOM)NEW RAISED FLOOR AT BUILDING A LEVEL 1OPEN STAIR:8 TREADS @ 11” = 7’-4”9 RISERS @ 7 “ = 5’-3”BORROWED LITE ABOVEBORROWED LITE ABOVEBORROWED LITE ABOVEUNIT A-4(1 BEDROOM)H.C.UNIT A-5(1 BEDROOM)UNIT A-6(2 BEDROOM)H.C.BORROWED LITE ABOVEBORROWED LITE ABOVEScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"A-F1.0BUILDING AFURNITUREPLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"A-F1.01BLDG A - LEVEL 1, FURNITURE PLAN 1/4" = 1'-0"A-F1.02BLDG A - LEVEL 2, FURNITURE PLANABDECFGHJKLMNORTHSITE KEY PLANABNo. Description Date BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL 4 BEAMS88' - 4 7/8"8' - 5 7/8"10' - 0 1/8"9' - 3"10' - 5 7/8"BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG A - LEVEL 267' - 5"BLDG A - LEVEL 3 attic78' - 1 7/8"BLDG B - LEVEL 4 BEAMS88' - 4 7/8"BLDG A - LEVEL 1 old50' - 2"BLDG A - LEVEL 155' - 5"8' - 6"10' - 0"9' - 3"10' - 6"8' - 3"2' - 6"6' - 9"5' - 3"5' - 3"BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject Number4FINAL CONST DOCS10/12/18 1/4" = 1'-0"12/5/2018 1:01:13 PMAB-A3.1BUILDING ABCONNECTORSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"AB-A3.11SECTION OF CONNECTOR LOOKING WEST 1/4" = 1'-0"AB-A3.12SECTION OF CONNECTOR LOOKING NORTHNo. Description Date BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL 4 BEAMS88' - 4 7/8"8' - 5 7/8"10' - 0 1/8"9' - 3"10' - 5 7/8"2' - 0"2' - 0"BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG A - LEVEL 267' - 5"BLDG A - LEVEL 3 attic78' - 1 7/8"BLDG A - LEVEL 155' - 5"10' - 0 1/8"9' - 3"10' - 5 7/8"7' - 0"9' - 0"8' - 0"7' - 6"ENLARGED EXISTING OPENING WITH NEW STEEL LINTEL TO ACCOMMODATE HEADROOM.NEW WOOD DECK AND FRAMING. SEE SCHEDULE FOR FLOOR FINISH.NEW BRICK VENEER WALL. SEE SCHEDULE FOR INFORMATION.OPEN TO BEYOND.REPAIR, RESTORE AND CLEAN BRICK FACADE AT ALL INTERIOR SURFACES.REPAIR, RESTORE, REPOINT AND CLEAN STONE FOUNDATION AT ALL INTERIOR SURFACES.REPAIR, RESTORE AND CLEAN BRICK FACADE AT ALL INTERIOR SURFACES.REPAIR, RESTORE AND CLEAN BRICK FACADE AT ALL INTERIOR SURFACES.SEE BUILDING ELEVATION 2/A-A2.1 FOR EXTEROIR NOTES.BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject Number4FINAL CONST DOCS10/12/18 1/4" = 1'-0"12/5/2018 1:01:17 PMAB-A3.2BUILDING ABCONNECTORSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"AB-A3.21SECTION OF CONNECTOR LOOKING WEST 1/4" = 1'-0"AB-A3.22SECTION OF CONNECTOR LOOKING WESTNo. Description Date BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG A - LEVEL 267' - 5"W9BLDG B - LEVEL 4 BEAMS88' - 4 7/8"BLDG A - LEVEL 155' - 5"BUILDING D LEVEL 253' - 6 59/64"BUILIDING E ROOF65' - 4 59/64"BUILDING B LEVEL 479' - 10 59/64"BUILDING B LEVEL 369' - 10 59/64"BUILDING B LEVEL 260' - 7 59/64"BUILDING B - LEVEL 150' - 1 59/64"BUILDING A LEVEL 267' - 4 59/64"BUILDING A LEVEL 3 ATTIC78' - 1 59/64"BUILDING F LOW ROOF50' - 9 59/64"BUILDING F - HI ROOF62' - 7 59/64"W9BUILDING D ROOF52' - 4 59/64"BUILDING B ROOF BEAMS88' - 4 59/64"BUILDING A - LEVEL 1 -OLD50' - 1 59/64"BUILDING E LEVEL 253' - 6 59/64"BUILDING A - LEVEL 1 -NEW55' - 4 59/64"BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG A - LEVEL 267' - 5"BLDG A - LEVEL 155' - 5"7' - 6"8' - 0"9' - 0"ENLARGED EXISTING OPENING WITH NEW STEEL LINTEL TO ACCOMMODATE HEADROOM.OPEN TO BEYOND.GYPSUM BOARD CEILING AT UNDERSIDE OF STAIR. (TYPICAL).PAINTED METAL HAND RAIL. (TYPICAL).2' - 10"11"1' - 0"BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject Number4FINAL CONST DOCS10/12/18 1/4" = 1'-0"12/5/2018 1:01:21 PMAB-A3.3BUILDING ABCONNECTORSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"AB-A3.31SECTION OF CONNECTOR LOOKING NORTH 1/4" = 1'-0"AB-A3.32SECTION OF CONNECTOR LOOKING WESTNo. Description Date NEW ASPHALT SHINGLE ROOFSLOPENEW ASPHALT SHINGLE ROOFSLOPENEW ASPHALT SHINGLE ROOFSLOPENEW ASPHALT SHINGLE ROOFSLOPEROOF BELOW (SEE BLDG C)LINE OF WALL BELOWNEW GUTTERLINE OF WALL BELOWEDGE OF HIGHER ROOFLINE OF WALL BELOWNEW RAIN GUTTERNEW RAIN GUTTEREDGE OF HIGHER ROOFNEW ASPHALT SHINGLE ROOFSLOPENEW RAIN GUTTEREDGE OF HIGHER ROOFNEW ASPHALT SHINGLE ROOFSLOPENEW RAIN GUTTERNEW RAIN GUTTERNEW LOW-SLOPE MEMBRANE ROOFSLOPENEW LOW-SLOPE ROOF BELOWNEW LOW-SLOPE ROOF AT BRIDGE BETWEEN B AND DLINE OF WALL BELOWEDGE OF HIGHER ROOFLINE OF WALL BELOWLINE OF WALL BELOWROOF SYSTEM LEGENDNEW ASPHALT SHINGLE ROOF SYSTEMNEW LOW-SLOPE MEMBRANE ROOF SYSTEMScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedB-A1.7BUILDING BPLANS - LEVELROOFDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063ABDECFGHJKLMNORTHSITE KEY PLANMATCH LINEMATCH LINE 1/4" = 1'-0"B-A1.71BUILDING B - ROOF PLAN 1/4" = 1'-0"B-A1.72BUILDING B - ROOF PLANNo. Description Date AAEXITEXITEXITEXITEXITExposed Metal DeckingExposed Metal DeckingAAAAAEQ A EQ AEQ BEQ BEQ BEQ BEQ EQEQ EQEQEQFFFFFF9' - 0"4' - 6"EQ 8' - 0" 8' - 0" EQFFEQ EQ9' - 0"4' - 6"FFFFFFEQ 7' - 0" 7' - 0" EQFFFEQ9' - 0"9' - 0"EQFFFEQEQEQEQEQ 8' - 0" 8' - 0" EQBCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedB-A1.11BUILDING BLEVEL SB -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A1.111BLDG B LEVEL SB, RCPABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BBBBBBB ACCCE EXITSDSDSDSDBATHROOM1/32/3EQEQEQEQEQEQEQEQ6' - 4 5/8"6' - 4 5/8"8' - 0"3' - 6"4' - 0 1/4"4' - 0"EQEQEQEQBEDROOMBEDROOMKITCHENAAAEQEQEQ EQEQ AEQ AEQ EQEQ BEQ BEQEQEQ EQEQEQEQ EQA.F.F.GWB on Mtl Stud7' - 6"BBBBAAAACCCCEXITEXITEXITEXITBSDSDSDSDSDBBSDBATHROOMEQEQ1/32/32/31/3EQEQEQEQ1/32/3EQEQEQEQEQEQEQEQEQEQEQEQ7' - 11 1/8"EQEQEQBEDROOMBEDROOMKITCHENEQEQEQEQEQEQEQEQ EQEQEQEQ2' - 4" 3' - 0" 1' - 6"EA.F.F.GWB on Mtl Stud7' - 6"7B-A5.67B-A5.6BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedB-A1.12BUILDING BLEVEL B -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A1.121BLDG B - LEVEL B, RCP (PART A) 1/4" = 1'-0"B-A1.122BLDG B - LEVEL B, RCP (PART B)MATCH LINEMATCH LINEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date ACEBBBBBBBBBBCCCCB EEXITSDSDSDSDSDSDBATHROOMBATHROOM3' - 6"EQEQ2/31/39' - 0 1/8"EQEQ2/31/3EQEQEQEQ2/31/36' - 5 3/4"6' - 5 3/4"EQ5' - 11 3/4"EQ5' - 0"6' - 0"4' - 0"4' - 11 3/8"8' - 8 1/8"6' - 6 1/8"1/32/3KITCHENBEDROOMBEDROOMBEDROOMKITCHENCH: 7'-0"AAEQ EQEQEQEQEQ EQEQEQEQ EQEQEQEQ EQ1' - 6"3' - 4"2' - 7"A20' - 0"EQ EQA.F.F.GWB on Mtl Stud8' - 0"AECBBB BEC BBBCEB BAEXITEXITEXITSDSDSDSDSDSDSDSDSDBATHROOMBATHROOMBATHROOMEQEQEQEQEQEQ2/31/3EQEQ1/32/3EQEQ2/31/31/32/31/32/35' - 0"EQEQ5' - 6"EQEQEQEQ2/31/3EQEQ1/32/3KITCHENBEDROOMKITCHENKITCHENBEDROOMCH: 7'-0"BEQEQEQEQBEQ EQEQEQAA15' - 0"2' - 2 7/8" EQEQEQEQEQEQ EQEQEQEQEQA.F.F.GWB on Mtl Stud8' - 0"A.F.F.GWB on Mtl Stud7' - 0"7B-A5.67B-A5.6BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedB-A1.13BUILDING BLEVEL ONE -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A1.131BLDG B - LEVEL ONE, RCP (PART A) 1/4" = 1'-0"B-A1.132BLDG B - LEVEL ONE, RCP (PART B)MATCH LINEMATCH LINEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date AACEBBBBBBBBBBCCCEXITSDSDSDSDSDSDEQEQEQ9' - 0"EQ1/32/3EQEQEQEQ2/31/3EQ7' - 0"EQ6' - 5 3/4"4' - 5 5/8"6' - 0"9' - 2 1/2"EQ9' - 0"EQ1/32/3EQEQEQEQEQEQEQEQEQEQ5' - 0"EQBEDROOMBEDROOMBEDROOMKITCHENBATHROOMA.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud8' - 0"BATHROOMAEBCBC AABBB BEC BBBCEB BBEXITSDSDSDSDSDSDSDSDC1BATHROOMBATHROOMBATHROOMEQ14' - 0"EQEQEQ1/32/3EQEQBEDROOMKITCHENEQEQ1/32/3BEDROOMBEDROOMKITCHENKITCHEN1/32/3EQEQ2/31/3EQEQEQ8' - 0"EQEQEQ5' - 6"EQEQEQEQ2/3 1/32/31/3EQEQEQEQEQEQBEQ EQEQEQBEQEQEQEQEQEQEQEQEQ EQEQEQEQ EQAAAEQ EQEQ 'C'EQ 'C'EQ 'B'EQ 'B'EQ 'A'EQ 'A'EQ EQEQ EQEQEQA.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"7B-A5.67B-A5.6BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedB-A1.14BUILDING BLEVEL TWO -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A1.141BLDG B - LEVEL TWO, RCP (PART A) 1/4" = 1'-0"B-A1.142BLDG B - LEVEL TWO, RCP (PART B)MATCH LINEMATCH LINEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date AACEBBBBBBBBBBCCCEXITESDSDSDSDSDSDEQEQEQ8' - 11 7/8"EQ1/32/3EQ EQ1/32/3EQ EQ4' - 6" 6' - 0" 9' - 8 1/8" 6' - 5 3/4"EQ6' - 11 3/4"EQ1/32/3EQ 9' - 0" EQEQEQEQEQEQEQEQEQ EQ1' - 6"3' - 5"2' - 7"EQ EQEQEQBATHROOMA.F.F.GWB on Mtl Stud7' - 6"BEDROOMBEDROOMBEDROOMBATHROOMA.F.F.GWB on Mtl Stud7' - 0"KITCHENKITCHENAEBCBC AABBB BEC BBBCEB BEXITSDSDSDSDSDSDSDSDSDEQ EQ2/31/3EQ EQ2/31/3EQ14' - 0"EQEQ EQEQEQ1/3 2/3EQ EQ2/31/3EQEQEQ 8' - 0" EQ1/3 2/3EQEQEQEQ5' - 6"2/3 1/3 0"EQEQEQEQEQEQBEQ EQEQEQBEQEQEQEQEQEQEQ EQEQEQEQEQEQEQEQEQ EQEQEQ EQAAAAEQEQEQ EQEQ 'C'EQ 'C'EQ EQEQ EQEQ 'A'EQ 'A'EQ EQEQ 'B'EQ 'B'BEDROOMBEDROOMBEDROOMBATHROOMBATHROOMBATHROOMA.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"7B-A5.67B-A5.6BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedB-A1.15BUILDING BLEVEL THREE -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A1.151BLDG B - LEVEL THREE, RCP (PART A) 1/4" = 1'-0"B-A1.152BLDG B - LEVEL THREE, RCP (PART B)MATCH LINEMATCH LINEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date AACEBBBBBBBBBBCCCEXITSDSDSDSDSDSDEQ EQEQ9' - 0"EQ1/32/3EQ EQEQ EQ1/32/3EQ7' - 5 3/4"EQ6' - 0"4' - 6" 6' - 0"EQ 9' - 0 3/8" EQEQEQEQEQEQEQEQ EQEQEQEQ EQEQ EQEQ5' - 0"EQBATHROOMBEDROOMBEDROOMBEDROOMBATHROOMKITCHENA.F.F.GWB on Mtl Stud7' - 6"A.F.F.GWB on Mtl Stud7' - 6"AEBCBC AABBB BEC BBBCEB BEXITSDSDSDSDSDSDSDSDSDEQ EQ2/31/3EQ EQEQ14' - 0"EQEQEQ1/3 2/3EQ EQ2/31/3EQ 8' - 0" EQEQEQ1/3 2/3EQEQ5' - 6"EQEQ2/3 1/3EQEQEQEQEQEQBEQ EQEQEQBEQEQEQ EQEQEQEQEQEQEQ EQEQ EQEQEQEQEQEQ EQAEQEQEQ EQBEDROOMBATHROOMBATHROOMBATHROOMBEDROOMBEDROOM7B-A5.67B-A5.6BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedB-A1.16BUILDING BLEVEL FOUR -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A1.161BLDG B - LEVEL FOUR, RCP (PART A) 1/4" = 1'-0"B-A1.162BLDG B - LEVEL FOUR, RCP (PART B)MATCH LINEMATCH LINEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL SB31' - 1 7/8"BLDG B - LEVEL 4 BEAMS88' - 4 7/8"BLDG B - LEVEL ROOF99' - 11 3/8"BLDG B - AVE GRADE47' - 6"NEW PREFIN ALUM COUNTER FLASHING NEW ALUM GUTTERS & DOWNSPOUTS , TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEMREPLACE ALL CLERESTORY WINDOWS & WOOD JAMBS EXIT FROM EGRESS STAIRSEE BUILDING AB CONNECTOR DRAWINGSBLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"L2.2L2.1BLDG B - LEVEL 4 BEAMS88' - 4 7/8"BLDG B - LEVEL ROOF99' - 11 3/8"3B-A3.33B-A3.3REMOVE OUTRIGGER (CONFIRM IT IS NON-STRUCTURAL BEFORE REMOVING)NEW BOARD AND BATTEN SIDING TO MATCH EXISTINGTYPICAL AT ALL 4 EAVE CORNER CONDITIONS AT BLDG 'B' -REMOVE CANTILEVERED BRICK & REPLACED W/ NEW FLUSH PTD SYNTHETHIC PANEL REMOVE ROOF & MISC STRUCTURAL SUPPORTSREPLACE ROOFING, REBUILD FASCIA & EAVE, INSTALL NEW PREFIN ALUM GUTTER & DOWNSPOUTREBUILD/REPOINT MASONRY JAMBS OF EXISTING OPENINGSAT THESE OPENINGS REBUILD/REPOINT GABLE ENDS1B-A3.11B-A3.1MAIN ENTRY TO BUILDING BNEW FIXED WINDOW IN EXISTING OPENINGBLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"B-A2.1BUILDING BELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"B-A2.16BUILDING B - WEST ELEVATION 1/8" = 1'-0"B-A2.15BUILDING B - NORTH ELEVATIONBUILDING 'B'RENOVATION NOTES:1. REPOINT 50% OF EXISTING STONE WALLS2. REPOINT 5% OF EXISTING BRICK WALLS3. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE, INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR 4. FOR ALL STONE HEADERS THAT ARE CURRENTLY "COATED" REPLACE W/ NEW STONE (MATCH & ALIGN W/ EXISTING)5. FOR ALL " NON-COATED" STONE HEADERS, BUDGET 10% FOR REPLACEMENTABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL SB31' - 1 7/8"L2.2L2.1BLDG B - LEVEL 4 BEAMS88' - 4 7/8"BLDG B - LEVEL ROOF99' - 11 3/8"2B-A3.22B-A3.2REPLACE ROOFING, REBUILD FASCIA & EAVE, INSTALL NEW PREFIN ALUM GUTTER & DOWNSPOUT1B-A3.11B-A3.1BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL SB31' - 1 7/8"BLDG B - LEVEL 4 BEAMS88' - 4 7/8"BLDG B - LEVEL ROOF99' - 11 3/8"ENTRANCE TO MECHANICAL ROOMSCORRIDOR TO UNITS B-1 AND B-2SEE BUILDING C DRAWINGSBLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"B-A2.2BUILDING BELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"B-A2.27BUILDING B - SOUTH ELEVATION 1/8" = 1'-0"B-A2.28BUILDING B - EAST ELEVATIONBUILDING 'B'RENOVATION NOTES:1. REPOINT 50% OF EXISTING STONE WALLS2. REPOINT 5% OF EXISTING BRICK WALLS3. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE, INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR 4. FOR ALL STONE HEADERS THAT ARE CURRENTLY "COATED" REPLACE W/ NEW STONE (MATCH & ALIGN W/ EXISTING)5. FOR ALL " NON-COATED" STONE HEADERS, BUDGET 10% FOR REPLACEMENTABDECFGHJKLMNORTHSITE KEY PLANNEW ASPHALT SHINGLE ROOF ON EXISTING DECKNEW WINDOWS IN EXISTING OPENINGNEW GUTTERS AND LEADERSNo. Description Date BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL SB31' - 1 7/8"L2.AL2.BL2.CL2.DL2.EL2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.LBLDG B - LEVEL 4 BEAMS88' - 4 7/8"BLDG B - LEVEL ROOF99' - 11 3/8"4B-A3.44B-A3.4KEY ENLARGED SECTIONSB-A5.2B-A5.37B-A5.67B-A5.6ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"B-A3.1BUILDING BSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"B-A3.11BUILDING B - KEY ENLARGED LONGITUDINAL SECTIONABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL SB31' - 1 7/8"L2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.LBLDG B - LEVEL 4 BEAMS88' - 4 7/8"BLDG B - LEVEL ROOF99' - 11 3/8"4B-A3.44B-A3.411' - 6 3/8"8' - 5 7/8"10' - 0 1/8"9' - 3"10' - 5 7/8"8' - 11 1/8"10' - 1"FIRE RATED DEMISING WALLFIRE RATED DEMISING WALLFIRE RATED DEMISING WALLF22F22F22F22F11F02F22F31F01F31F31F31F31BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"B-A3.2BUILDING BSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A3.22BUILDING B - LONGITUDINAL SECTION (GL N-F)ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL SB31' - 1 7/8"L2.AL2.BL2.CL2.DL2.EBLDG B - LEVEL 4 BEAMS88' - 4 7/8"BLDG B - LEVEL ROOF99' - 11 3/8"11' - 6 3/8"8' - 5 7/8"10' - 0 1/8"9' - 3"10' - 5 7/8"8' - 11 1/8"10' - 1"FIRE RATED DEMISING WALLFIRE RATED DEMISING WALL7B-A5.67B-A5.6BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"B-A3.3BUILDING BSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A3.33BUILDING B - LONGITUDINAL SECTION (GL E-A)ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL SB31' - 1 7/8"L2.2L2.1BLDG B - LEVEL 4 BEAMS88' - 4 7/8"BLDG B - LEVEL ROOF99' - 11 3/8"10' - 0 5/64"9' - 3"10' - 5 59/64"8' - 11 5/64"10' - 1"11' - 6 55/128"8' - 5 59/64"BLDG B - AVE GRADE47' - 6"2B-A3.22B-A3.23B-A3.33B-A3.3CONNECTOR BUILDING BETWEEN A&BCONNECTOR BUILDING BETWEEN B AND D1B-A3.11B-A3.1REMOVE EXISTING FLOORINGFIRE RATED DEMISING WALLFIRE RATED DEMISING WALLBLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"B-A3.4BUILDING BSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A3.44BUILDING B - CROSS SECTIONABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 3" = 1'-0"B-A4.1BUILDING BDETAIL ROOFEAVE, RAKE,PARAPETDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 3" = 1'-0"B-A4.11ROOF B - SECTIONAL GUTTER DETAILNo. Description Date 31' - 2"STAIR 2L2.ML2.NL2.L2B-A5.42B-A5.4UP1B-A5.51B-A5.52B-A5.52B-A5.51B-A5.41B-A5.4L2.ML2.N2B-A5.42B-A5.41B-A5.51B-A5.52B-A5.52B-A5.51B-A5.41B-A5.441' - 3"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/2" = 1'-0"B-A5.1BUILDING BSTAIR 2DakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/2" = 1'-0"B-A5.11STAIR 2 (BUILDING B - LEVEL SB) 1/2" = 1'-0"B-A5.12STAIR 2 (BUILDING B - LEVEL B)No. Description Date L2.ML2.N2B-A5.42B-A5.4TypeA-5TypeA-5D-91B-A5.51B-A5.52B-A5.52B-A5.51B-A5.41B-A5.4NEW WALLS AT STAIRWELLWOOD FRAMED STAIR LANDINGL2.ML2.N2B-A5.42B-A5.410' - 0 7/8"D-6D-1TypeA-6TypeA-6TypeA-61B-A5.51B-A5.52B-A5.52B-A5.51B-A5.41B-A5.4PAINTED METAL PTD PIPEHANDRAILS ATTACHED TO NEW WALL AT STAIRWELLWOOD FRAMED STAIR LANDINGNEW WINDOW IN EXISTING MASONRY OPENING WITH FROSTED GLASS BEHIND NEW STAIRWALLScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/2" = 1'-0"B-A5.2BUILDING BSTAIR 2DakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/2" = 1'-0"B-A5.21STAIR 2 (BUILDING B - LEVEL ONE) 1/2" = 1'-0"B-A5.23STAIR 2 (BUILDING B - LEVEL TWO)No. Description Date L2.ML2.N2B-A5.42B-A5.4D-6D-11B-A5.51B-A5.52B-A5.52B-A5.51B-A5.41B-A5.4HANDRAILS ATTACHED TO NEW WALL AT STAIRWELLWOOD FRAMED STAIR LANDINGL2.ML2.N2B-A5.42B-A5.42' - 5 7/8"TypeA-5TypeA-5TypeA-5D-6D-1HANDRAILS ATTACHED TO NEW WALL AT STAIRWELLWOOD FRAMED STAIR LANDING1B-A5.51B-A5.52B-A5.52B-A5.51B-A5.41B-A5.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/2" = 1'-0"B-A5.3BUILDING BSTAIR 2DakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/2" = 1'-0"B-A5.32STAIR 2 (BUILDING B - LEVEL FOUR) 1/2" = 1'-0"B-A5.31STAIR 2 (BUILDING B - LEVEL THREE)No. Description Date BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL SB31' - 1 7/8"BLDG B - LEVEL 4 BEAMS88' - 4 7/8"8' - 5 7/8"10' - 0 1/8"9' - 3"10' - 5 7/8"8' - 11 1/8"10' - 1"EXISTING CONCRETE FLOOR TO REMAINNEW WOOD FRAMEDSTAIR FLOORSTAIRWELL WALLEXTENDS TO UNDERSIDE OF ROOFG (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL SB31' - 1 7/8"L2.ML2.LBLDG B - LEVEL 4 BEAMS88' - 4 7/8"NEW WOOD FRAMED STAIRPAINTED METAL PTD PIPEHANDRAILS ATTACHED TO NEW WALL AT STAIRWELLNEW WALL ENDING BELOWLEVEL 4 WINDOWSBLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"B-A5.4BUILDING BSTAIR 2SECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A5.42STAIR 2 SECTION E-W 1/4" = 1'-0"B-A5.41STAIR 2 SECTION N-SNo. Description Date BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL SB31' - 1 7/8"BLDG B - LEVEL 4 BEAMS88' - 4 7/8"NEW STAIRWELLNEW WINDOW IN EXISTING MASONRY OPENING WITH FROSTED GLASSBEHIND NEW STAIRWELLBLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL SB31' - 1 7/8"L2.ML2.NL2.LBLDG B - LEVEL 4 BEAMS88' - 4 7/8"NEW WOOD FRAMED STAIRNEW WINDOW IN EXISTING MASONRY OPENING WITH FROSTED GLASSBEHIND NEW STAIRWELLScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"B-A5.5BUILDING BSTAIR 2SECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A5.51Section E-W 1/4" = 1'-0"B-A5.52STAIR 2 SECTION N-SNo. Description Date 6B-A5.66B-A5.67B-A5.67B-A5.66B-A5.66B-A5.67B-A5.67B-A5.66B-A5.66B-A5.67B-A5.67B-A5.66B-A5.66B-A5.67B-A5.67B-A5.66B-A5.66B-A5.67B-A5.67B-A5.6BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL 4 BEAMS88' - 4 7/8"8' - 5 7/8"10' - 0 1/8"9' - 3"10' - 5 7/8"8' - 11 1/8"7B-A5.67B-A5.6BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 479' - 11"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL 4 BEAMS88' - 4 7/8"BLDG B - LEVEL ROOF99' - 11 3/8"6B-A5.66B-A5.6BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedB-A5.6ELEVATORPLANS ANDSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063No. Description Date 7' - 10 1/2"3' - 0"5"7' - 2 5/8"B-A6.1272425266' - 7 3/4"L2.H4' - 6 7/8"4' - 7 3/8"6' - 10 1/2"2' - 9"4' - 11 5/8"1' - 9 7/8"6' - 9 1/2"B-A6.116171819L2.N7' - 4"11' - 3"B-A6.123212022BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"L2.HBLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.2BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.CL2.D8' - 0"BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.2BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.DBLDG F - LEVEL 352' - 6 1/2"B-A6.1283130296' - 7 3/8"7' - 10 1/2"4' - 7 1/2"BLDG B - LEVEL 479' - 11"L2.2BLDG B - LEVEL 4 BEAMS88' - 4 7/8"BLDG B - LEVEL 479' - 11"L2.DBLDG B - LEVEL 4 BEAMS88' - 4 7/8"BLDG B - LEVEL 479' - 11"L2.2BLDG B - LEVEL 4 BEAMS88' - 4 7/8"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"B-A6.1BUILDING BTOILET PLANS &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A6.15TOILET PLAN ( TYPE-6 ) 1/4" = 1'-0"B-A6.13TOILET PLAN ( TYPE-4 ) 1/4" = 1'-0"B-A6.14TOILET PLAN ( TYPE-5 ) 1/4" = 1'-0"B-A6.116ELEVATION 16 1/4" = 1'-0"B-A6.117ELEVATION 17 1/4" = 1'-0"B-A6.118ELEVATION 18 1/4" = 1'-0"B-A6.119ELEVATION 19 1/4" = 1'-0"B-A6.120ELEVATION 20 1/4" = 1'-0"B-A6.121ELEVATION 21 1/4" = 1'-0"B-A6.122ELEVATION 22 1/4" = 1'-0"B-A6.123ELEVATION 23 1/4" = 1'-0"B-A6.124ELEVATION 24 1/4" = 1'-0"B-A6.125ELEVATION 25 1/4" = 1'-0"B-A6.126ELEVATION 26 1/4" = 1'-0"B-A6.127ELEVATION 27BLDG B - LEVEL B, UNITS B-2 (2-BEDS),BLDG B - LEVEL B, UNITS B-1 (2-BEDS), TYPE-ABLDG B - LEVEL 1, UNIT B-6 (1-BED)BLDG B - LEVEL 2, UNIT B-11 (1-BED)BLDG B - LEVEL 3, UNIT B10 (1-BED)BLDG B - LEVEL 4, UNIT B21 (1-BED) 1/4" = 1'-0"B-A6.11TOILET PLAN ( TYPE-6A ) 1/4" = 1'-0"B-A6.128ELEVATION 28 1/4" = 1'-0"B-A6.129ELEVATION 29 1/4" = 1'-0"B-A6.130ELEVATION 30 1/4" = 1'-0"B-A6.131ELEVATION 31BLDG B - LEVEL 4, UNITS B-21 (2-BEDS)TYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYTYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYNo. Description Date L2.HL2.JL2.1B-A6.24765B-A6.28111094' - 10"L2.AL2.BL2.1B-A6.212151413BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.HL2.J8' - 0"BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.HL2.JBLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.NBLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.1BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.NBLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.1BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.BBLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.1BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.BBLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.1BLDG F - LEVEL 352' - 6 1/2"L2.FL2.12' - 4 3/8"7' - 2 7/8"6' - 6 7/8"3' - 0"5"3' - 10 3/8"1' - 10"5' - 8 3/8"9' - 11 7/8"B-A6.217201918BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.1BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.FBLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.1BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.FBLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"B-A6.2BUILDING BTOILET PLANS &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A6.21TOILET PLAN ( TYPE-8 ) 1/4" = 1'-0"B-A6.22TOILET PLAN ( TYPE-9 ) 1/4" = 1'-0"B-A6.23TOILET PLAN ( TYPE-10 ) 1/4" = 1'-0"B-A6.24ELEVATION 4 1/4" = 1'-0"B-A6.25ELEVATION 5 1/4" = 1'-0"B-A6.26ELEVATION 6 1/4" = 1'-0"B-A6.27ELEVATION 7BLDG B - LEVEL 1, UNIT B-4 (2-BEDS)BLDG B - LEVEL 2, UNIT B-9 (2-BEDS)BLDG B - LEVEL 3, UNIT B-14 (2-BEDS)BLDG B - LEVEL 4, UNIT B-19 (2-BEDS) 1/4" = 1'-0"B-A6.28ELEVATION 8 1/4" = 1'-0"B-A6.29ELEVATION 9 1/4" = 1'-0"B-A6.210ELEVATION 10 1/4" = 1'-0"B-A6.211ELEVATION 11 1/4" = 1'-0"B-A6.212ELEVATION 12 1/4" = 1'-0"B-A6.213ELEVATION 13 1/4" = 1'-0"B-A6.214ELEVATION 14 1/4" = 1'-0"B-A6.215ELEVATION 15BLDG B - LEVEL 2, UNIT B-10 (1-BED)BLDG B - LEVEL 3, UNIT B-13 (1-BED)BLDG B - LEVEL 4, UNIT B-20 (1-BED) 1/4" = 1'-0"B-A6.216TOILET PLAN ( TYPE-7 ) 1/4" = 1'-0"B-A6.217ELEVATION 17 1/4" = 1'-0"B-A6.218ELEVATION 18 1/4" = 1'-0"B-A6.219ELEVATION 19 1/4" = 1'-0"B-A6.220ELEVATION 20BLDG B - LEVEL 1, UNIT B-3 (1-BED) TYPE ABLDG B - LEVEL 2, UNIT B-8 (1-BED) TYPE ABLDG B - LEVEL 3, UNIT B-13 (1-BED) TYPE ABLDG B - LEVEL 4, UNIT B-18 (1-BED)BLDG B - LEVEL 1, UNIT B-7 (STUDIOBLDG B - LEVEL 2, UNIT B-12 (1-BED)BLDG B - LEVEL 3, UNIT B-17 (1-BED)BLDG B - LEVEL 4, UNIT B-22 (1-BED)TYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYTYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYNo. Description Date B-A6.3233' - 4 1/2"10' - 7 3/4"10' - 1"5' - 0"8' - 6 3/4"3' - 0"3' - 4 7/8"9' - 10 1/2"3' - 0"1' - 8"2' - 10"7' - 6"3' - 0"1' - 8"2' - 10"1' - 6"6' - 0"7' - 6"L2.2L2.NB-A6.12022B-A6.3563' - 0"1' - 2 7/8"7' - 6 1/8"2' - 4 3/8"4' - 2"2' - 1"2' - 1"1' - 0"7' - 1"4' - 8 1/2"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"L2.N3' - 0"1' - 8"2' - 10"7' - 6"1' - 6"6' - 0"BLDG B - LEVEL 150' - 2"BLDG B - LEVEL B41' - 2 7/8"L2.N2' - 10"L2.2L2.HL2.JL2.1B-A6.3983' - 11 5/8"2' - 1 3/8"11"2' - 2"9' - 2"9' - 7 7/8"2' - 3 5/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.HL2.J2' - 10"1' - 9"3' - 0"2' - 0"BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.HL2.J2' - 10"1' - 8"3' - 0"1' - 6"6' - 0"7' - 6"BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"B-A6.3BUILDING BKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A6.31KITCHEN PLAN ( TYPE-8 ) 1/4" = 1'-0"B-A6.32ELEVATION 2 1/4" = 1'-0"B-A6.33ELEVATION 3BLDG B - LEVEL B, UNIT B-2 (2-BEDS) 1/4" = 1'-0"B-A6.34KITCHEN PLAN ( TYPE-7 ) 1/4" = 1'-0"B-A6.35ELEVATION 5 1/4" = 1'-0"B-A6.36ELEVATION 6BLDG B - LEVEL B, UNIT B-1 (2-BEDS) TYPE ABLDG B - LEVEL 1, UNIT B-4 (2-BEDS)BLDG B - LEVEL 2, UNIT B-9 (2-BEDS)BLDG B - LEVEL 3, UNIT B-14 (2-BEDS)BLDG B - LEVEL 4, UNIT B-19 (2-BEDS) 1/4" = 1'-0"B-A6.37KITCHEN PLAN ( TYPE 9 ) 1/4" = 1'-0"B-A6.38KITCHEN PLAN 5 1/4" = 1'-0"B-A6.39ELEVATION 6No. Description Date L2.2L2.EL2.FB-A6.4563' - 0 5/8"2' - 6 1/8"2' - 1"8' - 4 3/4"2' - 1"10' - 5 3/4"7' - 7 3/4"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.22' - 10"1' - 8"3' - 0"7' - 6"2' - 0"2' - 8"2' - 10"7' - 6"BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 150' - 2"L2.EL2.F2' - 0"2' - 8"2' - 10"7' - 6"1' - 6"3' - 2"2' - 10"BLDG F - LEVEL 352' - 6 1/2"L2.2L2.BL2.1B-A6.41037' - 3 1/2"2' - 1"9' - 4 1/2"7' - 2 7/8"3' - 0 1/4"4' - 7 1/8"3' - 6 1/4"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.2L2.12' - 10"1' - 8"1' - 6"1' - 6"7' - 6"2' - 0"2' - 8"2' - 10"7' - 6"BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.AL2.B3' - 0"1' - 8"2' - 10"7' - 6"2' - 0"2' - 8"2' - 10"7' - 6"BLDG F - LEVEL 352' - 6 1/2"L2.2L2.ML2.1B-A6.420212' - 10 1/2"6' - 5 5/8"10' - 5 1/8"22BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"L2.2L2.18' - 11 1/4"2' - 10"3' - 2"1' - 6"1' - 8"3' - 0"2' - 10"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"L2.2L2.18' - 11 1/4"34"6' - 1 1/4"2' - 10"L2.2L2.FL2.GB-A6.4788' - 8"5' - 9 5/8"2' - 10 3/8"10' - 5 3/8"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.21' - 8"2' - 10"7' - 6"2' - 0"3' - 0"1' - 8"2' - 10"BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 260' - 7 7/8"BLDG B - LEVEL 150' - 2"L2.FL2.G2' - 10"1' - 8"1' - 6"1' - 6"7' - 6"2' - 10"2' - 8"2' - 0"0"BLDG F - LEVEL 352' - 6 1/2"BLDG B - LEVEL 369' - 10 7/8"BLDG B - LEVEL 260' - 7 7/8"L2.M2' - 10"1' - 8"3' - 0"2' - 0"2' - 8"2' - 10"7' - 6"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"B-A6.4BUILDING BKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"B-A6.44KITCHEN PLAN ( TYPE-12 ) 1/4" = 1'-0"B-A6.45ELEVATION 5 1/4" = 1'-0"B-A6.46ELEVATION 6BLDG B - LEVEL 1, UNIT B-6 (1-BED)BLDG B - LEVEL 2, UNIT B-11 (1-BED)BLDG B - LEVEL 3, UNIT B-16 (1-BED)BLDG B - LEVEL 4, UNIT B-21 (1-BED) 1/4" = 1'-0"B-A6.42KITCHEN PLAN ( TYPE-11 ) 1/4" = 1'-0"B-A6.43ELEVATION 3 1/4" = 1'-0"B-A6.410ELEVATION 10BLDG B - LEVEL 1, UNIT B-7 (STUDIO)BLDG B - LEVEL 2, UNIT B-12 (1-BED)BLDG B - LEVEL 3, UNIT B-17 (1-BED)BLSG B - LEVEL 4, UNIT B-22 (1-BED) 1/4" = 1'-0"B-A6.419KITCHEN PLAN ( TYPE-10 ) 1/4" = 1'-0"B-A6.420ELEVATION 20 1/4" = 1'-0"B-A6.421ELEVATION 21BLDG B - LEVEL 1, UNIT B-3 (1-BED) TYPE A, BLDG B - LEVEL 2, UNIT B-8 (1-BED) TYPE A, BLDG B - LEVEL 3, UNIT B-13 (1-BED) TYPE ABLDG B - LEVEL 4, UNIT B-18 (1-BED)BLDG B - LEVEL 1, UNIT B-5 (1-BED)BLDG B - LEVEL 2, UNIT B-10 (1-BED)BLDG B - LEVEL 3, UNIT B-12 (1-BED)BLDG B - LEVEL 4, UNIT B-20 (1-BED) 1/4" = 1'-0"B-A6.41KITCHEN PLAN ( TYPE-13 ) 1/4" = 1'-0"B-A6.47ELEVATION 7 1/4" = 1'-0"B-A6.48ELEVATION 8 1/4" = 1'-0"B-A6.422ELEVATION 22No. Description Date L2.2L2.EL2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.1L2.LREMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYSHORE STRUCTURE ABOVE. DEMOLISH STRUCTURAL COLUMN. SEE STRUCTURAL DRAWINGS.SEE SITE PLAN FOR EXTERIOR STRUCTURE NOTES.DEMOLISH ELEVATOR, SHAFT AND ALL ASSOCIATED MACHINERY AND EQUIPMENT.L2.2L2.2L2.CL2.DL2.EL2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.1L2.1L2.LREMOVE WOOD FLOOR AND FLOOR FRAMING AT THIS AREA.SHORE STRUCTURE. CUT TIMBER GIRDER AND RESUPPORT. SEE STRUCTURAL DRAWINGS.DEMOLISH COLUMN AND RESUPPORT STRUCTURE.DEMOLISH COLUMN AND RESUPPORT STRUCTURE.DEMOLISH CONCRETE SLAB AT THIS AREA FOR NEW ELEVATOR PIT.REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE CASED DOOR OPENINGREMOVE CASED DOOR OPENINGREMOVE ALL EXISTING WINDOWS ON THIS FLOOR TYPICALLY.SEE SITE PLAN FOR EXTERIOR STRUCTURE NOTES.DEMOLISH ELEVATOR, SHAFT AND ALL ASSOCIATED MACHINERY AND EQUIPMENT. REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.LEGENDDEMOLISHED ELEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedB-D1.0BUILDING BDEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063ABDECFGHJKLMNORTHSITE KEY PLAN 1/8" = 1'-0"B-D1.01BUILDING B - LEVEL SB - DEMOLITION PLAN 1/8" = 1'-0"B-D1.03BUILDING B - LEVEL B - DEMOLITION PLANNo. Description Date L2.2L2.AL2.BL2.CL2.DL2.EL2.FL2.GL2.HL2.JL2.KL2.NL2.1L2.LREMOVE WOOD FLOOR AND FLOOR FRAMING AT THIS AREA.SHORE STRUCTURE. CUT TIMBER GIRDER AND RESUPPORT.SEE STRUCTURAL DRAWINGS.REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE EXISTING WINDOW. TYPICAL ALL WINDOWS THIS FLOOR.DEMOLISH FLOOR AND FLOOR FRAMING IN THIS AREA FOR NEW ELEVATOR SHAFT.SHORE STRUCTURE. CUT TIMBER GIRDER AND RESUPPORT. SEE STRUCTURAL DRAWINGS.SEE SITE DEMO PLANS FOR NOTES ON AB CONNECTOR.SHORE STRUCTURE. DEMOLISH COLUMN AND RESUPPORT FLOOR ABOVE. SEE STRUCTURAL DRAWINGS.DEMOLISH ELEVATOR, SHAFT AND ALL ASSOCIATED MACHINERY AND EQUIPMENT.L2.2L2.AL2.BL2.CL2.DL2.EL2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.1L2.LREMOVE WOOD FLOOR AND FLOOR FRAMING AT THIS AREA.SHORE STRUCTURE. CUT TIMBER GIRDER AND RESUPPORT.SEE STRUCTURAL DRAWINGS.REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE EXISTING WINDOW. TYPICAL ALL WINDOWS THIS FLOOR.DEMOLISH FLOOR AND FLOOR FRAMING IN THIS AREA FOR NEW ELEVATOR SHAFT.SHORE STRUCTURE. CUT TIMBER GIRDER AND RESUPPORT. SEE STRUCTURAL DRAWINGS.SEE SITE DEMO PLANS FOR NOTES ON AB CONNECTOR.SHORE STRUCTURE. DEMOLISH COLUMN AND RESUPPORT FLOOR ABOVE. SEE STRUCTURAL DRAWINGS.DEMOLISH ELEVATOR, SHAFT AND ALL ASSOCIATED MACHINERY AND EQUIPMENT. REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.LEGENDDEMOLISHED ELEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedB-D1.1BUILDING BDEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"B-D1.12BUILDING B - LEVEL 2 - DEMOLITION PLANNo. Description Date 1/8" = 1'-0"B-D1.11BUILDING B - LEVEL 1 - DEMOLITION PLANABDECFGHJKLMNORTHSITE KEY PLAN L2.2L2.AL2.BL2.CL2.DL2.EL2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.1L2.LREMOVE WOOD FLOOR AND FLOOR FRAMING AT THIS AREA.SHORE STRUCTURE. CUT TIMBER GIRDER AND RESUPPORT.SEE STRUCTURAL DRAWINGS.REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE EXISTING WINDOW. TYPICAL ALL WINDOWS THIS FLOOR.DEMOLISH FLOOR AND FLOOR FRAMING IN THIS AREA FOR NEW ELEVATOR SHAFT.SHORE STRUCTURE. CUT TIMBER GIRDER AND RESUPPORT. SEE STRUCTURAL DRAWINGS.SEE SITE DEMO PLANS FOR NOTES ON AB CONNECTOR.SHORE STRUCTURE. DEMOLISH COLUMN AND RESUPPORT FLOOR ABOVE. SEE STRUCTURAL DRAWINGS.DEMOLISH ELEVATOR, SHAFT AND ALL ASSOCIATED MACHINERY AND EQUIPMENT.L2.2L2.AL2.BL2.CL2.DL2.EL2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.1L2.LDEMOLISH ELEVATOR, SHAFT AND ALL ASSOCIATED MACHINERY AND EQUIPMENT.REMOVE WOOD FLOOR AND FLOOR FRAMING AT THIS AREA.SHORE STRUCTURE. CUT TIMBER GIRDER AND RESUPPORT.SEE STRUCTURAL DRAWINGS.REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE EXISTING WINDOW. TYPICAL ALL WINDOWS THIS FLOOR.DEMOLISH FLOOR AND FLOOR FRAMING IN THIS AREA FOR NEW ELEVATOR SHAFT.SHORE STRUCTURE. CUT TIMBER GIRDER AND RESUPPORT. SEE STRUCTURAL DRAWINGS.DEMOLISH PORTION OF ROOF AND ROOF FRAMING TO ACCOMMODATE NEW CONNECTOR.DEMOLISH PORTION OF EXTEROR WALL AND WINDOW TO ACCOMMODATE NEW CONNECTOR. REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.LEGENDDEMOLISHED ELEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedB-D1.2BUILDING BDEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date 1/8" = 1'-0"B-D1.22BUILDING B - LEVEL 3 - DEMOLITION PLAN 1/8" = 1'-0"B-D1.24BUILDING B - LEVEL 4 - DEMOLITION PLAN L2.2L2.AL2.BL2.CL2.DL2.EL2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.1L2.LREMOVE ALL CEILING JOISTS BETWEEN FRAMES AND CEILING PLANKS WHERE THEY OCCUR.REMOVE ALL ELEVATOR EQUIPMENT, MACHINERY AND SHAFT WALLS.REMOVE CEILING JOISTS AT FOURTH FLOOR.REMOVE EXISTING WINDOWS AT ALL FLOORS.REMOVE FLOORING AND FLOOR FRAMING AT ALL FLOORS TO ACCOMMODATE NEW STAIR WELL.REMOVE FLOORING AND FLOOR FRAMING AT ALL FLOORS TO ACCOMMODATE NEW STAIR WELL. REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.LEGENDDEMOLISHED ELEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedB-D1.3BUILDING BDEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063No. Description Date 1/8" = 1'-0"B-D1.31BLDG B - LEVEL 4 BEAMS, DEMOLITION PLANB-D1.32BUILDING B - DEMO CUT-AWAY AXONOMETRICABDECFGHJKLMNORTHSITE KEY PLAN BUILDING BSTAIR 2ELECTRICAL METER ROOMMAINTENANCE ROOMBOILER ROOMSPRINKLER ROOMTo be DemolishedBUILDING BUNIT B-1(2 BEDROOM)TYPE AUNIT B-2(2 BEDROOM)MECHMECHELEVATORBORROW LITE ABOVEBORROW LITE ABOVEScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"B-F1.1BUILDING BFURNITUREPLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerPB/SK10/12/201816-0631 UNIT REVISIONS 9/9/16 1/8" = 1'-0"B-F1.11BUILDING B - LEVEL SB, FURNITURE PLAN 1/8" = 1'-0"B-F1.12BUILDING B - LEVEL B, FURNITURE PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BUILDING BUNIT B-3(1 BEDROOM)TYPE 'A'UNIT B-4(2 BEDROOM)UNIT B-5(1 BEDROOM)UNIT B-6(1 BEDROOM)UNIT B-7(STUDIO)MECHMECHMECHMECHMECHMAILBOXESTYPICAL STRAIGHT RUN EGRESS STAIR IN NEW STAIR ENCLOSURE BETWEEN BUILDINGS, WITH EXPOSED BUILDING FACADES. FLOOR-TO-FLOOR HEIGHT VARIES. HIGHEST RUN IS FIRST TO SECOND FLOOR WITH 19 RISERS AT 6 5/8” +/- = 10’-6” AND 18 TREADS AT 11” = 16’-6”.NOTE:NOT TYPE ‘A’ ON FOURTH FLOOR.To be DemolishedBORROWED LITEABOVEBORROWED LITEABOVEBUILDING BUNIT B-8(1 BEDROOM)TYPE AUNIT B-9(2 BEDROOM)UNIT B-10(1 BEDROOM)UNIT B-11(1 BEDROOM)UNIT B-12(1 BEDROOM)MECHMECHMECHMECHMECHBORROWED LITEABOVEBORROWED LITEABOVEScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"B-F1.2BUILDING BFURNITUREPLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerPB/SK10/12/201816-0631 UNIT REVISIONS 9/9/16 1/8" = 1'-0"B-F1.23BUILDING B - LEVEL ONE, FURNITURE PLAN 1/8" = 1'-0"B-F1.24BUILIDING B - LEVEL TWO, FURNITURE PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BUILDING BUNIT B-13(1 BEDROOM)TYPE AUNIT B-14(2 BEDROOM)UNIT B-15(1 BEDROOM)UNIT B-16(1 BEDROOM)UNIT B-17(1 BEDROOM)MECHMECHMECHMECHMECHBORROWED LITE ABOVEBORROWED LITEABOVEBUILDING BUNIT B-18(1 BEDROOM)UNIT B-19(2 BEDROOM)UNIT B-20(1 BEDROOM)UNIT B-21(1 BEDROOM)UNIT B-22(1 BEDROOM)MECHMECHMECHMECHMECHBORROWED LITE ABOVEBORROWEDLITEABOVEScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"B-F1.3BUILDING BFURNITUREPLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerPB/SK10/12/201816-0631 UNIT REVISIONS 9/9/16 1/8" = 1'-0"B-F1.35BUILDING B - LEVEL THREE, FURNITURE PLAN 1/8" = 1'-0"B-F1.36BUILDING B - LEVEL FOUR, FURNITURE PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BUILDING BUNIT C-1(2 BEDROOM)STAIR 2ELECTRICAL METER ROOMMAINTENANCE ROOMBOILER ROOMSPRINKLER ROOMMATCHLINEMATCHLINEB-A3.3To be DemolishedBUILDING BUNIT B-1(2 BEDROOM)TYPE AUNIT B-2(2 BEDROOM)ELEVATORMATCHLINEMATCHLINEB-A3.4PART APART BB-A3.4BUILDING BUNIT B-3(1 BEDROOM)TYPE 'A'UNIT B-4(2 BEDROOM)UNIT B-5(1 BEDROOM)UNIT B-6(1 BEDROOM)UNIT B-7(STUDIO)MECHMECHMECHMECHMECHMAILBOXESUNIT A-2(2 BEDROOM)B-A3.5MATCHLINEPART APART BMATCHLINEB-A3.5ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/16" = 1'-0"B-KP1.1BUILDING B KEYPLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/16" = 1'-0"B-KP1.11BUILDING B - LEVEL SB, KEY PLAN 1/16" = 1'-0"B-KP1.12BUILDING B - LEVEL B, KEY PLAN 1/16" = 1'-0"B-KP1.13BUILDING B - LEVEL ONE, KEY PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BUILDING ABUILDING BUNIT B-8(1 BEDROOM)TYPE AUNIT B-9(2 BEDROOM)UNIT B-10(1 BEDROOM)UNIT B-11(1 BEDROOM)UNIT B-12(1 BEDROOM)SEE SHEET ABC-A1.1 FOR BUILDING A LEVEL ONE PLANMECHMECHMECHMECHMECHMATCHLINEB-A3.6PART APART BMATCHLINETo be DemolishedB-A3.6BUILDING BUNIT B-13(1 BEDROOM)TYPE AUNIT B-14(2 BEDROOM)UNIT B-15(1 BEDROOM)UNIT B-16(1 BEDROOM)UNIT B-17(1 BEDROOM)MECHMECHMECHMECHMECHMECHMATCHLINEB-A3.7PART APART BMATCHLINEB-A3.7BUILDING BUNIT B-18(1 BEDROOM)UNIT B-19(2 BEDROOM)UNIT B-20(1 BEDROOM)UNIT B-21(1 BEDROOM)UNIT B-22(1 BEDROOM)MECHMECHMECHMECHMATCHLINEB-A3.8PART APART BMATCHLINEB-A3.8B-A3.9PART APART BB-A3.9MATCHLINE MATCHLINEScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/16" = 1'-0"B-KP1.2BUILDING B KEYPLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/16" = 1'-0"B-KP1.24BUILIDING B - LEVEL TWO KEY PLAN 1/16" = 1'-0"B-KP1.25BUILDING B - LEVEL THREE KEY PLAN 1/16" = 1'-0"B-KP1.26BUILDING B - LEVEL FOUR KEY PLAN 1/16" = 1'-0"B-KP1.27BUILDING B - ROOF KEY PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date F-A2.2221C-A3.11C-A3.1C-A2.111C-A2.19C-A2.1102C-A3.12C-A3.1NEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEM NEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEM SLOPESLOPEScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"C-A1.2BUILDING CPLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063MARK Description13 EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPEB EXISTING BRICK WALLEC EXISTING CONCRETE WALLES EXISTING STONE WALLEW EXISTING WOOD WALLW1 UNIT SEPARATION WALLW2 CORRIDOR WALLW3 STAIRWELL WALLW4 8" CMU WALLW4A 6" CMU WALLW5 4" STUD NON-ACOUSTIC INTERIOR PARTITIONW5A 4" STUD ACOUSTIC INTERIOR PARTITIONW6A 6" STUD NON-ACOUSTIC INTERIOR PARTITIONW7 6" FURRING WALLW7A 4" FURRING WALLW7B 1 7/8" FURRING WALLW7C 6" BEARING WALLW7D 4" SHAFT WALLW8B 1-5/8" FURRING WALLW9 EXTERIOR BRICK VENEER WALL WITH 6" STUD BACKUPW9A EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPW9B EXTERIOR BRICK VENEER WALL WITH 4" STUD BACKUPW9X EXTERIOR BRICK VENEER WALL AT FLOOR LINEW10 EXTERIOR BOARD AND BATTEN WALL WITH 6" STUD BACKUPW11 INFILL BRICK WALL-15"W12 3" FURRING AT BATHROOM 1/4" = 1'-0"C-A1.23BLDG C - ROOF PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date CEC BEB BBBB BB BSDSDSDSDSDSD2/31/3EQEQ2/31/3EQEQEQ5' - 5 5/8"EQ2/31/3EQEQ2/31/3EQEQ1/32/3EQEQ8' - 0"5' - 6 1/8"BEQ EQEQ9' - 0"EQEQEQEQ EQEQEQEQ EQ B CE B CBB E B BBBB BB BSDSDSDSDSDSD7' - 0 3/8"4' - 0"1/32/3EQEQEQ7' - 0"EQ1/32/3EQEQ1/32/3EQEQ4' - 9 3/4"5' - 6 5/8"4' - 11 3/8"EQEQEQ8' - 0"EQEQEQEQEQ2/31/3EQEQ2/31/3EQ EQEQEQEQEQEQ EQBCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedC-A1.11BUILDING CREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"C-A1.111BLDG C - LEVEL ONE, RCP 1/4" = 1'-0"C-A1.112BLDG C - LEVEL TWO, RCPABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMBATHROOMBATHROOMCL -7' 0"CL -7' 0"BEDROOMKITCHENBEDROOMCL -7' 0"CL -7' 0"KITCHENBEDROOMKITCHENKITCHENBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMNo. Description Date BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 131' - 1 7/8"BLDG C - ROOF52' - 4 5/8"NEW LOW SLOPED ROOFING SYSTEMNEW ALUM GUTTERS & DOWNSPOUTS , TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEMFACE OF BLDG 'B'BLDG G - LEVEL 1B NEW30' - 8"ENTRY TO UNIT C-3ENTRY TO UNIT C-4NEW DOOR IN EXISTING/REVISED OPENING NEW WINDOW IN EXISTING/REVISED DOOR OPENING NEW DOOR IN EXISTING/REVISED WINDOW OPENINGNEW WINDOW IN EXISTING WINDOW OPENINGBLDG F - LEVEL 352' - 6 1/2"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 131' - 1 7/8"BLDG C - ROOF52' - 4 5/8"FACE OF BLDG 'B'ENTRY TO UNIT C-2ENTRY TO UNIT C-1NEW GUTTERS AND DOWNSPROUTSNEW WINDOWS IN EXISTING OPENINGSNEW WINDOW IN NEW OPENING IN NEW RECONSTRUCTED BRICK MASONRY TO MATCH TO EXISTINGNEW DOOR IN REVISED MASONRY OPENINGBLDG K - 500 YEAR FLOOD27' - 4"BLDG K - 100 YEAR FLOOD26' - 9 1/2"BLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"BLDG L - 500 YEAR FLOOD27' - 4 5/8"BLDG F - LEVEL 352' - 6 1/2"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 131' - 1 7/8"BLDG C - ROOF52' - 4 5/8"NEW 42" HIGH GUARDRAILNEW ARCHITECTURAL PRECAST COPING OVER NEW S.S THRU-WALL FLASHINGGRADENEW WINDOW IN EXISTING OPENINGREPAINT EXISTING PARGED WALLBLDG K - 500 YEAR FLOOD27' - 4"BLDG K - 100 YEAR FLOOD26' - 9 1/2"BLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"BLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"BLDG L - 500 YEAR FLOOD27' - 4 5/8"BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"C-A2.1BUILDING CELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"C-A2.19BUILDING C - NORTH ELEVATION 1/8" = 1'-0"C-A2.111BUILDING C - SOUTH ELEVATION 1/8" = 1'-0"C-A2.110BUILDING C - EAST ELEVATIONBUILDING 'C' RENOVATION NOTES:1. REPOINT 20% OF EXISTING BRICK WALL. BUDGET 5% FOR NEW EXTERIOR BRICK WALL REPLACEMENT2. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE, INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 131' - 1 7/8"10' - 5"BLDG C - ROOF52' - 4 5/8"1C4.2NEW LOW SLOPE ROOF SYSTEM ON EXISTING FRAMING NEW WINDOW IN EXISTING MASONRY OPENINGNEW CONCRETE SLAB ON GRADE WITH FINISH FLOORING ON TOPGWB CEILING9' - 0"10 1/2"6 1/2"9' - 6 1/2"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 131' - 1 7/8"9' - 0"10' - 5"BLDG C - ROOF52' - 4 5/8"FIRE RATED DEMISING WALLNEW WOOD FRAME FLOOR SYSTEMGWB CEILINGNEW CONCRETE SLAB WITHFINISH FLOORING ON TOPScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"C-A3.1BUILDING CSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"C-A3.11BUILDING C - CROSS SECTION 1/4" = 1'-0"C-A3.12BUILDING C - LONGITUDINAL SECTIONABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date L2.GC-A6.165C-A6.191211105' - 0"1' - 3 3/4"6' - 3 7/8"2' - 9"7' - 2 5/8" 9' - 11 5/8"C-A6.1131415169' - 3"2' - 8 3/4" 11' - 11 7/8"C-A6.1172019185' - 8 5/8"2' - 9"12' - 0 3/4"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 131' - 1 7/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 131' - 1 7/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 131' - 1 7/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 131' - 1 7/8"9' - 0"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 131' - 1 7/8"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 131' - 1 7/8"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"C-A6.1BUILDING CTOILET PLANS &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"C-A6.11TOILET PLAN ( TYPE-11 ) 1/4" = 1'-0"C-A6.12TOILET PLAN ( TYPE-12 ) 1/4" = 1'-0"C-A6.13TOILET PLAN ( TYPE-13 ) 1/4" = 1'-0"C-A6.14TOILET PLAN ( TYPE-14 ) 1/4" = 1'-0"C-A6.19ELEVATION 9 1/4" = 1'-0"C-A6.110ELEVATION 10 1/4" = 1'-0"C-A6.111ELEVATION 11 1/4" = 1'-0"C-A6.112ELEVATION 12 1/4" = 1'-0"C-A6.113ELEVATION 13 1/4" = 1'-0"C-A6.114ELEVATION 14 1/4" = 1'-0"C-A6.115ELEVATION 15 1/4" = 1'-0"C-A6.116ELEVATION 16 1/4" = 1'-0"C-A6.117ELEVATION 17 1/4" = 1'-0"C-A6.118ELEVATION 18 1/4" = 1'-0"C-A6.119ELEVATION 19 1/4" = 1'-0"C-A6.120ELEVATION 20BLDG C - LEVEL 1, UNITS C-1 (2-BEDS)BLDG C - LEVEL 2, UNITS C-2 (2-BEDS)BLDG C - LEVEL 3, UNITS C-3 (2-BEDS) TYPE ABLDG C - LEVEL 4, UNITS C-4 (2-BEDS) TYPE ATYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYTYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYTYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYTYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLY 1/4" = 1'-0"C-A6.15ELEVATION 5 1/4" = 1'-0"C-A6.16ELEVATION 6No. Description Date C-A6.28910' - 1 3/8"2' - 1"3' - 4"2' - 11 3/4"8' - 5 3/4"5' - 4"2' - 0"7' - 4"2' - 9"3' - 0 3/4"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 131' - 1 7/8"2' - 10"1' - 8"1' - 6"1' - 6"2' - 10"1' - 8"3' - 0"7' - 6"BLDG G - LEVEL 1B NEW30' - 8"BLDG C - LEVEL 241' - 6 7/8"BLDG C - LEVEL 131' - 1 7/8"2' - 10"1' - 8"3' - 0"7' - 6"BLDG G - LEVEL 1B NEW30' - 8"C-A6.212112' - 5 1/8"6' - 2"3' - 0"8' - 1 1/8" 11' - 1"6' - 6 1/8"BLDG C - LEVEL 241' - 6 7/8"2' - 10"1' - 8"3' - 0"2' - 10"BLDG C - LEVEL 241' - 6 7/8"2' - 10"1' - 8"3' - 0"7' - 6"1' - 6"3' - 2"2' - 10"L2.GL2.HC-A6.2659' - 3 3/4"5' - 2 3/4"10' - 1" 3' - 0"7' - 1"3' - 0"2' - 0"5' - 0"BLDG C - LEVEL 241' - 6 7/8"2' - 10"1' - 8"3' - 0"BLDG C - LEVEL 241' - 6 7/8"2' - 10"1' - 8"1' - 6"1' - 6"2' - 10"1' - 8"3' - 0"7' - 6"L2.HC-A6.232BLDG C - LEVEL 131' - 1 7/8"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"C-A6.2BUILDING CKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063BLDG C - LEVEL 1, UNIT C-2 (2-BEDS)BLDG C - LEVEL 2, UNIT C-3 (2-BEDS) TYPE A 1/4" = 1'-0"C-A6.27KITCHEN PLAN ( TYPE-15 ) 1/4" = 1'-0"C-A6.28ELEVATION 8 1/4" = 1'-0"C-A6.29ELEVATION 9BLDG C - LEVEL 2, UNIT C-4 (2-BEDS) 1/4" = 1'-0"C-A6.210KITCHEN PLAN (TYPE - 17) 1/4" = 1'-0"C-A6.211ELEVATION 11 1/4" = 1'-0"C-A6.212ELEVATION 12 1/4" = 1'-0"C-A6.24KITCHEN PLAN ( TYPE-16 ) 1/4" = 1'-0"C-A6.25ELEVATION 5 1/4" = 1'-0"C-A6.26ELEVATION 6 1/4" = 1'-0"C-A6.21KITCHEN PLAN ( TYPE-14 ) 1/4" = 1'-0"C-A6.22ELEVATION 2 1/4" = 1'-0"C-A6.23Elevation 3BLDG C - LEVEL 1, UNIT C-1 (1-BED)No. Description Date REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE EXISTING WINDOW. TYPICAL ALL WINDOWS THIS FLOOR.REMOVE ALL EXISTING EXTERIOR DOORS AT THIS LEVEL. DEMOLISH STAIR TO UPPER LEVEL.DEMOLISH ALL COLUMNS AND UPPER FLOOR SYSTEM.REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS.REMOVE ALL FLOORING, SUBFLOOR AND FLOOR FRAMING AT THIS LEVEL.REMOVE EXISTING WINDOW. TYPICAL ALL WINDOWS THIS FLOOR.REMOVE ALL EXISTING EXTERIOR DOORS AT THIS LEVEL. DEMOLISH SECOND LEVEL FLOOR ENTIRELY (FLOOR, FRAMING AND COLUMNS).DEMOLISH STAIR TO SECOND LEVEL.DEMOLISH EXTERIOR WINDOWS AND DOORS AT BOTH LEVELS ON ALL FACADES. REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.LEGENDDEMOLISHED ELEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedC-D1.1BUILDING CDEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"C-D1.11BUILDING C - LEVEL 1, DEMOLITION PLAN 1/8" = 1'-0"C-D1.12BUILDING C - LEVEL 2 DEMOLITION PLANC-D1.13BUILDING C - DEMO CUT-AWAY AXONOMETRICABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BUILDING CUNIT C-1(2 BEDROOM)UNIT C-2(2 BEDROOM)BUILDING FBORROWED LITE ABOVEBUILDING CBUILDING FUNIT C-3(2 BEDROOM)TYPE AUNIT C-4(2 BEDROOM)TYPE AScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"C-F1.1BUILDING CFURNITUREPLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"C-F1.11BUILDING C - LEVEL ONE, FURNITURE PLAN 1/4" = 1'-0"C-F1.12BUILDING C - LEVEL TWO, FURNITURE PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date OAO1O2O3O4O52D-A3.12D-A3.11D-A3.11D-A3.1D-A2.115D-A2.113D-A2.114NEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEM NEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEM ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"D-A1.2BUILDING DPLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"D-A1.21BUILDING D - ROOF LEVEL , ENLARGED PLANABDECFGHJKLMNORTHSITE KEY PLANMARK Description13 EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPEB EXISTING BRICK WALLEC EXISTING CONCRETE WALLES EXISTING STONE WALLEW EXISTING WOOD WALLW1 UNIT SEPARATION WALLW2 CORRIDOR WALLW3 STAIRWELL WALLW4 8" CMU WALLW4A 6" CMU WALLW5 4" STUD NON-ACOUSTIC INTERIOR PARTITIONW5A 4" STUD ACOUSTIC INTERIOR PARTITIONW6A 6" STUD NON-ACOUSTIC INTERIOR PARTITIONW7 6" FURRING WALLW7A 4" FURRING WALLW7B 1 7/8" FURRING WALLW7C 6" BEARING WALLW7D 4" SHAFT WALLW8B 1-5/8" FURRING WALLW9 EXTERIOR BRICK VENEER WALL WITH 6" STUD BACKUPW9A EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPNo. Description Date ABCEB B B B B B B BCECACCEXITSDSDSDSDSD1/32/3EQ EQ2/3 1/3EQEQ1/32/3EQEQEQEQ2/3 1/3EQEQEQ 9' - 0" EQEQ7' - 0"EQ5' - 0"2/3 1/3EQEQEQ EQEQEQEQ EQEQEQEQ EQEQEQEQ EQEQ EQEQEQEQEQEQEQEQ EQEQEQBBB B B B B B B ACCEEBABSDSDSDSDSD 1/32/3EQ EQ2/3 1/3EQEQ1/32/3EQ EQEQ7' - 0"EQ2/3 1/3EQEQEQ 8' - 0" EQEQ7' - 0"EQ5' - 0"2/3 1/3EQEQEQ EQEQEQEQEQEQ EQEQEQEQ EQEQEQEQ EQBCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedD-A1.11BUILDING DREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"D-A1.111BLDG D - LEVEL ONE, RCP 1/4" = 1'-0"D-A1.112BLDG D - LEVEL TWO, RCPNOTE: CEILINGS IN BLDG 'D', 1ST FLOOR, SHALL BE @ 9'A.F.F. ABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMBATHROOMBATHROOMBEDROOMKITCHENKITCHENBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMCL -8' 0"CL -8' 0"No. Description Date BLDG D - LEVEL 253' - 6 7/8"1BLDG D - LEVEL 142' - 3 3/8"O1O2O3O4O5BLDG D - ROOF66' - 7 7/8"1SP-A2.21SP-A2.2PART OF BUILDING EREMOVE PLANTER BOX AND REPLACE THE MASONRY BELOW THE WINDOW SILLSTYPICAL -REPLACE MIN 7 ROWS OF FACE BRICK ALONG THE WALLREPOINT BANK OF BRICK BETWEEN WINDOWSREMOVE EXISTING WOOD STRUCTURENEW ALUM GUTTERS & DOWNSPOUTS , TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEMNEW LOW SLOPED ROOFING SYSTEMBLDG F - LEVEL 352' - 6 1/2"BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"BLDG D - ROOF66' - 7 7/8"REMOVE DETERIORATED OUTRIGGER AND REBUILD AREA W/ NEW MASONRY THE CORNER OF THIS BLDG IS IN STRUCTURAL DISTRESS AND MUST BE REBUILT IN TOTAL, INCLUDING THE INSTALLATION OF A REINFORCEDFOUNDATION. REFER TO STRUCTURAL DWGS.REMOVE EXISTING STEEL STAIRBLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"O1O2O3O4O5BLDG D - ROOF66' - 7 7/8"REBUILD ARCHED BRICK LINTELS & BRICK ABOVE , INCLUDING ALL ASSOCIATED PORTIONS OF EXISTING CORNICE REPOINT ALL BRICK ABOVE 1ST FLOOR WINDOWSREBUILD PORTION OF WALLTHE CORNER OF THIS BLDG IS IN STRUCTURAL DISTRESS AND MUST BE REBUILT IN TOTAL, INCLUDING THE INSTALLATION OF A REINFORCED FOUNDATION. REFER TO STRUCTURAL DWGS.REPOINT 5 ROWS OF BRICK THIS WALLREPAIR THIS AREA, INCLUDING SECTION OF STONE FOUNDATION WALLREMOVE EXISTING STEEL STAIRBLDG F - LEVEL 352' - 6 1/2"BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"BLDG D - ROOF66' - 7 7/8"BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"D-A2.1BUILDING DELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"D-A2.112BUILDING D - ELEVATION NORTH 1/8" = 1'-0"D-A2.115BUILDING D - ELEVATION EAST 1/8" = 1'-0"D-A2.113BUILDING D - ELEVATION SOUTH 1/8" = 1'-0"D-A2.114BUILDING D - ELEVATION WESTBUILDING 'D' RENOVATION NOTES:1. REPOINT 50% OF EXISTING BRICK WALL. BUDGET 20% FOR NEW EXTERIOR BRICK WALL RECONSTRUCTION. THERE ARE MANY BRICKS ON THIS BLDG THAT HAVE LOST THEIR GLAZING 2. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE , INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR ABDECFGHJKLMNORTHSITE KEY PLANSTAIR TO UNITS D-3 AND D-4ENTRY TO UNIT D-1ENTRY TO UNIT D-2No. Description Date BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"O1O2O3O4O5BLDG D - ROOF66' - 7 7/8"11' - 3 1/2"13' - 1"FIRE RATED DEMISING WALLFIRE RATED DEMISING WALLBLDG F - LEVEL 352' - 6 1/2"BLDG D - LEVEL 253' - 6 7/8"ABBLDG D - LEVEL 142' - 3 3/8"OABLDG D - ROOF66' - 7 7/8"13' - 1"11' - 3 1/2"F02F22F31BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"D-A3.1BUILDING DSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"D-A3.12BUILDING D - LONGITUDINAL SECTION 1/4" = 1'-0"D-A3.11BUILDING D - CROSS SECTIONABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 3" = 1'-0"D-A4.1BUILDING DDETAIL ROOFEAVE, RAKE,PARAPETDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 3" = 1'-0"D-A4.11ROOF D - SECTIONAL GUTTER DETAILNo. Description Date O4D-A6.147656' - 0"2' - 9"8' - 7 7/8"8' - 9"5' - 0"3' - 2 7/8"O3O4D-A6.18111097' - 3 7/8"2' - 9"8' - 8"11' - 5"OAO3O4D-A6.1151214135' - 0"2' - 5 3/8"2' - 9"7' - 0"9' - 9"BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"BLDG F - LEVEL 352' - 6 1/2"BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"O4BLDG F - LEVEL 352' - 6 1/2"BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"BLDG F - LEVEL 352' - 6 1/2"BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"O4BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"O3O4BLDG F - LEVEL 352' - 6 1/2"BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"BLDG F - LEVEL 352' - 6 1/2"BLDG F - LEVEL 352' - 6 1/2"BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"8' - 0"BLDG F - LEVEL 352' - 6 1/2"BLDG D - LEVEL 253' - 6 7/8"O3O4BLDG D - ROOF66' - 7 7/8"8' - 0"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"D-A6.1BUILDING DTOILET PLANS &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"D-A6.11TOILET PLAN ( TYPE-15 ) 1/4" = 1'-0"D-A6.12Toilet Plan ( TYPE-16 ) 1/4" = 1'-0"D-A6.13TOILET PLAN ( TYPE-17 ) 1/4" = 1'-0"D-A6.14ELEVATION 4 1/4" = 1'-0"D-A6.15ELEVATION 5 1/4" = 1'-0"D-A6.16ELEVATION 6 1/4" = 1'-0"D-A6.17ELEVATION 7 1/4" = 1'-0"D-A6.18Elevation 8 1/4" = 1'-0"D-A6.19Elevation 9 1/4" = 1'-0"D-A6.110Elevation 10 1/4" = 1'-0"D-A6.111Elevation 11 1/4" = 1'-0"D-A6.112TOILET PLAN 12 1/4" = 1'-0"D-A6.113TOILET ELEVATION 13 1/4" = 1'-0"D-A6.114TOILET ELEVATION 14 1/4" = 1'-0"D-A6.115TOILET ELEVATION 15BLDG D - LEVEL 1, UNIT D-1 (2-BEDS)BLDG D - LEVEL 1, UNIT D-2 (1-BED)BLDG D - LEVEL 2, UNIT D-3 (2-BEDS)BLDG D - LEVEL 2, UNIT D-4 (1-BED)TYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYTYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYTYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYNo. Description Date OAO5D-A6.267725"65 5/16"65"36"126"90 5/16"BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"O536"20"34"24"32"34"BLDG F - LEVEL 352' - 6 1/2"BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"OA34"20"36"54"18"18"BLDG F - LEVEL 352' - 6 1/2"BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"OA34"20"33"BLDG F - LEVEL 352' - 6 1/2"OAO1D-A6.289100 15/16"25"50 15/16"25"90 5/8"37 15/16"BLDG D - LEVEL 253' - 6 7/8"BLDG D - LEVEL 142' - 3 3/8"OA18"18"20"34"18"72"BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"D-A6.2BUILDING DKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"D-A6.22KITCHEN PLAN ( TYPE 18 ) 1/4" = 1'-0"D-A6.26ELEVATION 6 1/4" = 1'-0"D-A6.28ELEVATION 8 1/4" = 1'-0"D-A6.29ELEVATION 9BLDG D - LEVEL 1, UNIT D-2 (1-BED)BLDG D - LEVEL 2, UNIT D-4 (1-BED)BLDG D - LEVEL 1, UNIT D-1 (2-BEDS)BLDG D - LEVEL 2, UNIT D-3 (2-BEDS) 1/4" = 1'-0"D-A6.23KITCHEN PLAN ( TYPE 17 ) 1/4" = 1'-0"D-A6.27ELEVATION 7No. Description Date OAO1O2O3O4O5REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE ALL EXTERIOR DOORS AT THIS LEVEL.REMOVE ALL EXTERIOR WINDOWS AT THIS LEVEL.SEE SITE DEMOLITION PLAN FOR EXTERIOR STRUCTURES.OAO1O2O3O4O5REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYSHORE STRUCTURE. DEMOLISH FLOOR AND FRAMING TO ACCOMMODATE NEW STAIR WELL.REMOVE ALL WINDOWS ON THIS LEVEL.SEE SITE DEMOLITION DRAWINGS FOR OUTSIDE STRUCTURES.REMOVE ALL EXTERIOR WINDOWS AT ALL LEVELS ON ALL FACADES.REMOVE ALL EXTERIOR DOORS AT ALL LEVELS ON ALL FACADES. REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.LEGENDDEMOLISHED ELEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedD-D1.1BUILDING DDEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"D-D1.11BUILDING D - LEVEL 1, DEMOLITION PLAN 1/8" = 1'-0"D-D1.12BUILDING D - LEVEL 2, DEMOLITION PLAND-D1.13BUILDING D - DEMO AXONOMETRICABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BUILDING DUNIT D-1(2 BEDROOM)UNIT D-2(1 BEDROOM)KITCHENTYPE-17KITCHENTYPE-18BUILDING DUNIT D-3(2 BEDROOM)UNIT D-4(1 BEDROOM)KITCHENTYPE-18KITCHENTYPE-17ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"D-F1.1BUILDING DFURNITUREPLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"D-F1.11BUILDING D - LEVEL ONE, FURNITURE PLAN 1/4" = 1'-0"D-F1.12BUILDING D - LEVEL TWO, FURNITURE PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date 2SP-A2.12SP-A2.1BUILDING DBUILDING E42' - 11"42' - 3 1/2"UNIT D-1(2 BEDROOM)UNIT D-2(1 BEDROOM)1E-A3.11E-A3.1HC LAV.RECEPTIONOFFICEKITCHENOFFICEWAITINGAREAHC LAV.FILECABINETSJAN.MECH'LCONFROOMFITNESS ROOMFITNESS ROOM23' - 11 7/8"LEASING OFFICE33' - 9 3/4"COPYD-A6.222SP-A2.12SP-A2.1BUILDING DBUILDING E53' - 7"UNIT D-3(2 BEDROOM)UNIT D-4(1 BEDROOM)UNIT E-2(2 BEDROOM)UNIT E-3(2 BEDROOM)1E-A3.11E-A3.1 1/8" = 1'-0"DE-A1.11BUILDINGS D,E - LEVEL ONE 1/8" = 1'-0"DE-A1.12BUILDINGS D,E - LEVEL TWOScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"DE-A1.1BUILDINGS D&ELEVELS ONEAND TWODakotaPartners, Inc.OXOBOXOLOFTSCheckerPB/SK10/12/201816-063ABDECFGHJKLMNORTHSITE KEY PLANMARK Description13 EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPEB EXISTING BRICK WALLEC EXISTING CONCRETE WALLES EXISTING STONE WALLEW EXISTING WOOD WALLW1 UNIT SEPARATION WALLW2 CORRIDOR WALLW3 STAIRWELL WALLW4 8" CMU WALLW4A 6" CMU WALLW5 4" STUD NON-ACOUSTIC INTERIOR PARTITIONW5A 4" STUD ACOUSTIC INTERIOR PARTITIONW6A 6" STUD NON-ACOUSTIC INTERIOR PARTITIONW7 6" FURRING WALLW7A 4" FURRING WALLW7B 1 7/8" FURRING WALLW7C 6" BEARING WALLW7D 4" SHAFT WALLW8B 1-5/8" FURRING WALLW9 EXTERIOR BRICK VENEER WALL WITH 6" STUD BACKUPW9A EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPW9B EXTERIOR BRICK VENEER WALL WITH 4" STUD BACKUPW9X EXTERIOR BRICK VENEER WALL AT FLOOR LINENo. Description Date 3E-A3.13E-A3.11E-A3.11E-A3.12E-A3.12E-A3.1EBAAAAAAAAABBBBBBBB B EXITEXITSDSDSDSDSDSDSD1/32/3EQ 6' - 0" EQEQ EQ1/32/3EQEQEQEQEQ 6' - 0" EQEQ EQEQ EQEQ7' - 0"EQEQ A EQ B EQ B EQ AEQ 1EQ 2EQ 2EQ 1EQEQEQ EQEQ EQ4' - 0"EQ3E-A3.13E-A3.11E-A3.11E-A3.12E-A3.12E-A3.1AAABBBBB B B B B BEECCCCCCC SDSDSDSDSDEQEQEQ EQEQ 7' - 0" EQEQEQEQEQ2/3 1/3EQEQ2/3 1/3EQ EQ1/32/31/3 2/3EQ6' - 0"EQEQ EQEQ8' - 0"EQEQEQEQ EQEQ EQEQEQEQ EQEQEQ7' - 11 5/8"8' - 0"BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedE-A1.11BUILDING EREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"E-A1.111BLDG E - LEVEL ONE, RCP 1/4" = 1'-0"E-A1.112BLDG E - LEVEL TWO, RCPNOTE: CEILINGS IN BLDG 'E', 1ST FLOOR, SHALL BE @ 9'A.F.F. ABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMBATHROOMCL: 8' 0"CL: 8' 0"No. Description Date BLDG E - LEVEL 142' - 10 7/8"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"MAIN ENTRY TO LEASING OFFICEBLDG F - LEVEL 352' - 6 1/2"BLDG E - LEVEL 142' - 10 7/8"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"NEW LOW SLOPED ROOFING SYSTEMNEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEMCLEAN AND REPOINT 100% OF THE MASONRY BELOW THE WINDOW SILLS, BUDGET 5% FOR NEW BRICK PART OF BUILDING DBACK ENTRY TO FITNESS ROOM AND OFFICEBLDG E - LEVEL 142' - 10 7/8"1BLDG E - ROOF65' - 4 7/8"2BLDG E - LEVEL 253' - 6 7/8"1SP-A2.21SP-A2.2PART OF BUILDING DTYPICAL RESTORE ALL EXISTING STRUCTURAL TIE-BACKS EXPOSED TO VIEW (ROOF AND FLOORS ), SCRAPE TO BARE METAL, APPLY GALVANIZING PRIMER, APPLY 2 COATS OF OIL BASED ENAMEL RESTORE MASONRY OPENINGS BACK TO THEIR ORIGINAL SIZE TYPICAL REMOVE PAINT REMOVE CROSS-OVER UTILITY PIPE BETWEEN BLDG 'D' & 'E'REMOVE DOGHOUSEREBUILD PORTION OF EXTERIOR FACE BRICK BETWEEN WINDOWSSTAIR TO UNITS E2 AND E3BLDG F - LEVEL 352' - 6 1/2"BLDG E - LEVEL 142' - 10 7/8"ABLDG E - ROOF65' - 4 7/8"BBLDG E - LEVEL 253' - 6 7/8"ENTRY TO FITNESS ROOMBLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"E-A2.1BUILDING EELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"E-A2.119BUILDING E - ELEVATION EAST 1/8" = 1'-0"E-A2.116BUILDING E - ELEVATION NORTH 1/8" = 1'-0"E-A2.117BUILDING E - ELEVATION SOUTH 1/8" = 1'-0"E-A2.118BUILDING E - ELEVATION WESTBUILDING 'E' RENOVATION NOTES:1. REPOINT MASONRY & STONE PERIMETER (BUDGET 10% NEW MASONRY. BUDGET 15% REPOINTING)2. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE, INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG E - LEVEL 142' - 10 7/8"1BLDG E - ROOF65' - 4 7/8"2BLDG E - LEVEL 253' - 6 7/8"11' - 10"FIRE RATED DEMISING WALLFIRE RATED DEMISING WALLBLDG F - LEVEL 352' - 6 1/2"BLDG E - LEVEL 142' - 10 7/8"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"11' - 10"10' - 8"FIRE RATED DEMISING WALLBLDG E - LEVEL 142' - 10 7/8"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"11' - 10"10' - 8"FIRE RATED DEMISING WALLScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"E-A3.1BUILDING ESECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"E-A3.13BUILDING E -LOGITUDINAL SECTION 1/4" = 1'-0"E-A3.11BUILDING E - CROSS SECTION 1 1/4" = 1'-0"E-A3.12BUILDING E - CROSS SECTION 2ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date E-A6.145677' - 6"8' - 11 1/4"5' - 6 5/8"3' - 0"4 5/8"4' - 1"3' - 0"5"E-A6.18910119' - 5 5/8"5"3' - 0"2' - 7 5/8"6' - 8 5/8"2' - 9"6' - 0 5/8"E-A6.1121514132' - 8 5/8"7' - 0"5' - 6"5"2' - 6"6' - 9 5/8"4' - 11 5/8"6 3/8"9' - 8 5/8"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"9' - 0"BLDG F - LEVEL 352' - 6 1/2"BLDG F - LEVEL 352' - 6 1/2"BLDG F - LEVEL 352' - 6 1/2"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"8' - 0"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"E-A6.1BUILDING ETOILET PLANS &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"E-A6.11TOILET PLAN ( TYPE-18 ) 1/4" = 1'-0"E-A6.12TOILET PLAN ( TYPE-19 ) 1/4" = 1'-0"E-A6.13TOILET PLAN ( TYPE-20 ) 1/4" = 1'-0"E-A6.18ELEVATION 8 1/4" = 1'-0"E-A6.19ELEVATION 9 1/4" = 1'-0"E-A6.110ELEVATION 10 1/4" = 1'-0"E-A6.111ELEVATION 11 1/4" = 1'-0"E-A6.14ELEVATION 4 1/4" = 1'-0"E-A6.15ELEVATION 5 1/4" = 1'-0"E-A6.16ELEVATION 6 1/4" = 1'-0"E-A6.17ELEVATION 7 1/4" = 1'-0"E-A6.112ELEVATION 12 1/4" = 1'-0"E-A6.113ELEVATION 13 1/4" = 1'-0"E-A6.114ELEVATION 14 1/4" = 1'-0"E-A6.115ELEVATION 15BLDG E - LEVEL 1 ( OFFICE )BLDG E - LEVEL 2, UNIT E-2 (2-BEDS)BLDG E - LEVEL 2, UNIT E-3 (2-BEDS)TYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYTYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYTYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYNo. Description Date E-A6.247' - 6"3' - 4 5/8"2' - 0 5/8"3' - 1"E-A6.2653' - 0 3/8"6' - 6"4' - 0 3/4"3' - 2"2' - 0 7/8"8' - 2 1/4"2' - 8 3/4"5' - 3"E-A6.2872' - 1"3' - 4"3' - 2"2' - 11 5/8"10' - 5 5/8"8' - 0 3/4"5' - 4 5/8"BLDG E - LEVEL 142' - 10 7/8"BLDG E - LEVEL 253' - 6 7/8"36"20"34"18"72"BLDG F - LEVEL 352' - 6 1/2"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"2' - 10"1' - 8"3' - 0"18"72"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"1' - 8"3' - 6"2' - 10"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"1' - 6"6' - 0"3' - 0"1' - 8"2' - 10"BLDG E - ROOF65' - 4 7/8"BLDG E - LEVEL 253' - 6 7/8"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"E-A6.2BUILDING EKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"E-A6.21KITCHEN PLAN ( TYPE 19 ) 1/4" = 1'-0"E-A6.22KITCHEN PLAN ( TYPE 20 ) 1/4" = 1'-0"E-A6.23KITCHEN PLAN ( TYPE 21 ) 1/4" = 1'-0"E-A6.24ELEVATION 4 1/4" = 1'-0"E-A6.25ELEVATION 5 1/4" = 1'-0"E-A6.26ELEVATION 6 1/4" = 1'-0"E-A6.27ELEVATION 7 1/4" = 1'-0"E-A6.28ELEVATION 8BLDG E - LEVEL 1 ( OFFICE )BLDG E - LEVEL 2, UNIT E-2 (2-BEDS)BLDG E - LEVEL 2, UNIT E-3 (2-BEDS)No. Description Date REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE ALL WINDOWS ON THIS LEVEL.REMOVE ALL EXTERIOR DOORS ON THIS LEVEL.REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYSHORE STRUCTURE. DEMOLISH FLOOR AND FRAMING TO ACCOMMODATE NEW STAIR WELL.REMOVE ALL WINDOWS ON THIS LEVEL.REMOVE ALL EXTERIOR DOORS AND WINDOWS ON BOTH LEVELS AND ALL FACADES. REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.LEGENDDEMOLISHED ELEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedE-D1.1BUILDING EDEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"E-D1.11BUILDING E - LEVEL 1 DEMOLITION PLAN 1/8" = 1'-0"E-D1.12BUILDING E - LEVEL 2 DEMOLITION PLANE-D1.13BUILDING E - DEMOLITION AXONOMETRICABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BUILDING EHC LAV.RECEPTIONOFFICEKITCHENOFFICEWAITINGAREAHC LAV.FILECABINETSJAN.MECH'LCONFROOMFITNESS ROOMCOPYBUILDING EUNIT E-2(2 BEDROOM)UNIT E-3(2 BEDROOM)ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"E-F1.1BUILDING EFURNITUREPLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"E-F1.11BUILDING E - LEVEL ONE, FURNITURE PLAN 1/4" = 1'-0"E-F1.12BUILDING E - LEVEL TWO, FURNITURE PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date 1F-A3.11F-A3.1F-A2.120F-A2.222F-A2.1214F-A3.14F-A3.1F-A2.2233F-A3.13F-A3.11F-A3.21F-A3.22F-A3.12F-A3.12F-A3.22F-A3.2NEW ROOF (SEE SHEET F-A1.4)TYPED-1TYPED-1TYPED-1TYPED-1TYPED-1TYPED-1TYPEA-8ARCTYPED-2TYPED-1TYPED-1TYPED-1OPEN TO BELOWNEW ROOF HATCH.NEW ROOF MEMBERANE AT MECHANICAL AREASLOPE TO DRAINSLOPE TO DRAINSLOPE TO DRAINSLOPE TO DRAINScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"F-A1.3BUILDING F PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063ABDECFGHJKLMNORTHSITE KEY PLANMARK Description13 EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPEB EXISTING BRICK WALLEC EXISTING CONCRETE WALLES EXISTING STONE WALLEW EXISTING WOOD WALLW1 UNIT SEPARATION WALLW2 CORRIDOR WALLW3 STAIRWELL WALLW4 8" CMU WALLW4A 6" CMU WALLW5 4" STUD NON-ACOUSTIC INTERIOR PARTITIONW5A 4" STUD ACOUSTIC INTERIOR PARTITIONW6A 6" STUD NON-ACOUSTIC INTERIOR PARTITIONW7 6" FURRING WALLW7A 4" FURRING WALLW7B 1 7/8" FURRING WALLW7C 6" BEARING WALLW7D 4" SHAFT WALLW8B 1-5/8" FURRING WALLW9 EXTERIOR BRICK VENEER WALL WITH 6" STUD BACKUPW9A EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPW9B EXTERIOR BRICK VENEER WALL WITH 4" STUD BACKUPW9X EXTERIOR BRICK VENEER WALL AT FLOOR LINEW10 EXTERIOR BOARD AND BATTEN WALL WITH 6" STUD BACKUPW11 INFILL BRICK WALL-15"W12 3" FURRING AT BATHROOMNo. Description Date 1/4" = 1'-0"F-A1.31BLDG F - LEVEL 3 1F-A3.11F-A3.1F-A2.120F-A2.222F-A2.1214F-A3.14F-A3.1F-A2.2233F-A3.13F-A3.11F-A3.21F-A3.22F-A3.12F-A3.12F-A3.22F-A3.2OPEN TO BELOW (SEE SHEET FA1.3)SLOPESLOPESLOPESLOPENEW MEMBRANE ROOF SYSTEM OVER EXISTING ROOF DECKNEW MEMBRANE ROOF SYSTEM AT NEW ELEVATOR OVERRIDENEW MEMBRANE ROOF SYSTEM OVER EXISTING ROOF DECKNEW GUTTER AND RAIN LEADERNEW GUTTER AND RAIN LEADERNEW PARAPET COPING AT EXISTING PARAPET WALLScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"F-A1.4BUILDING FROOF PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063No. Description Date 1/4" = 1'-0"F-A1.41BLDG F - ROOF PLAN BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFUnderground to CDrop ChaseNew Enclose for PipeAAAAAAACCCCEQEQEQ EQEQEQEQ EQEQ EQEQEQEQ EQEQEQAAAEQ 2 EQ 1 EQ 1 EQ 1 EQ 2EQ8' - 0"EQEQEQ EQEQEQEQ EQREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedF-A1.11BUILDING FLEVEL 1 -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"F-A1.111BUILDING F - LEVEL ONE, RCPABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMC1CL: 8' 0"CL: 8' 0"No. Description Date BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTF10G-A3.410G-A3.41F-A3.11F-A3.14F-A3.14F-A3.11SP-A2.21SP-A2.22C-A3.12C-A3.13F-A3.13F-A3.11F-A3.21F-A3.22F-A3.12F-A3.12F-A3.22F-A3.2ABBEQ 5' - 11 7/8" EQ2/31/3EQ EQEQEQAAAAAAAAEQ 2EQ 1EQ 1EQ 1EQ 1EQ 1EQ 2EQEQEQ AEQ AEQ B EQ BAAAAAAAAREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedF-A1.12BUILDING FLEVEL 2 -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"F-A1.122BLDG F - LEVEL 2 CEILINGABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG F - LEVEL 127' - 10 7/8"BLDG F LEVEL 241' - 2 7/8"NEW LOW SLOPED ROOFING SYSTEMNEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEMNEW PREFIN ALUM COUNTER FLASHINGNEW BRICK MASONRY AROUND NEW ELEVATOR OVERRUNNEW MASONRY PARAPET WALL BEYONDNEW LOW SLOPED ROOFING SYSTEMRESTORE EXISTING WINDOWRESTORE EXISTING WINDOWSBLDG F - LEVEL 352' - 6 1/2"BLDG F - LEVEL 127' - 10 7/8"4F-A3.14F-A3.1BLDG F LEVEL 241' - 2 7/8"REPLACE EXISTING COPING W/ NEW ARCHITECTURAL PRECAST COPING OVER NEW S.S. THROUGH WALL FLASHING REMOVE EXISTING PAINT3F-A3.13F-A3.11F-A3.21F-A3.2BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"F-A2.1BUILDING FELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"F-A2.120BUILDING F - NORTH ELEVATION 1/4" = 1'-0"F-A2.121BUILDING F - SOUTH ELEVATIONBUILDING 'F' RENOVATION NOTES:1. REPOINT MASONRY & STONE PERIMETER (BUDGET 20% NEW BRICK 50% REPOINT)2. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE, INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG F - LEVEL 127' - 10 7/8"BLDG F LOW ROOF50' - 9 7/8"1F-A3.11F-A3.1BLDG F LEVEL 241' - 2 7/8"REPLACE EXISTING COPING W/ NEW ARCHITECTURAL PRECAST COPING OVER NEW S.S. THROUGH WALL FLASHING REPLACE BRICK THIS AREA2F-A3.12F-A3.12F-A3.22F-A3.2INSTALL 1/2" WIDE SAWCUT VERTICAL CONTROL JOINT W/ BACKER ROD & SEALANT BACK DOOR TO FITNESS/COMMUNITY ROOMRESTORE EXISTING WINDOWBLDG F - LEVEL 352' - 6 1/2"BLDG F - LEVEL 127' - 10 7/8"BLDG F LOW ROOF50' - 9 7/8"BLDG F LEVEL 241' - 2 7/8"INSTALL 1/2" WIDE SAWCUT VERTICAL CONTROL JOINT W/ BACKER ROD & SEALANT REMOVE EXISTING CMU BLDG ADJACENT TO BLDG 'F'COORDINATE RETAINING WALL W/ STRUC DWGS2F-A3.12F-A3.12F-A3.22F-A3.2REPLACE EXISTING COPING W/ NEWARCHITECTURAL PRECAST COPING OVER NEW S.S. THROUGH WALL FLASHING.RESTORE EXISITNG WINDOWMAIN ENTRY TO FITNESS/COMMUNITY ROOMREPLACE DAMAGED BRICK THESE AREAS.NEW WINDOW IN EXISTING RENOVATED OPENIING.NEW ENTRY CANOPY.BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"F-A2.2BUILDING FELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"F-A2.222BUILDING F - WEST ELEVATION 1/4" = 1'-0"F-A2.223BUILDING F - EAST ELEVATIONABDECFGHJKLMNORTHSITE KEY PLANBUILDING 'F' RENOVATION NOTES:1. REPOINT MASONRY & STONE PERIMETER (BUDGET 20% NEW BRICK 50% REPOINT)2. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE, INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR No. Description Date BLDG F - LEVEL 127' - 10 7/8"BLDG F LEVEL 241' - 2 7/8"3F-A3.13F-A3.11F-A3.21F-A3.211' - 3 5/8"13' - 4"NEW TUBE STEEL COLUMNS AND FRAMING AT MEZZANINE (SEE STRUCTURAL DRAWINGS).F13BLDG F - LEVEL 352' - 6 1/2"BLDG F - LEVEL 127' - 10 7/8"4F-A3.14F-A3.1BLDG F LEVEL 241' - 2 7/8"3F-A3.13F-A3.11F-A3.21F-A3.2NEW STEEL AND CONCRETE WALKWAY TO MECHANICAL MEZZANINE.NEW PREFIN ALUM ENTRYSYSTEM W/TRANSOM & SIDELIGHT W/TEMP & INSULATED GLASSNEW SINGLE PLY ROOF MEMBRANE ASSEMBLY ON 4.5" RIGID INSUL OVER EXISTING WOOD DECK2" PTD SQ STL TUBE FRAME W/PTD (OR COATED) WIRE FABRIC W/ PERIMETER FRAMEEXISTING STEEL BEAMS TO REMAIN.NEW ELEVATOR OVERRIDE.BLDG F - LEVEL 127' - 10 7/8"1F-A3.11F-A3.1BLDG F LEVEL 241' - 2 7/8"13' - 4"2F-A3.12F-A3.12F-A3.22F-A3.2NEW CONCRETE AND STEEL MEZZANINE.NEW STRUCTURAL BRACING (SEE STRUCTURAL DRAWINGS).NEW COOLING TOWER ON HOUSEKEEPING SLABNEW 4" WOOD CLAPBOARD WALLSINGLE PLY ROOF MEMBRANE OVER TAPERED RIGID INSUL, MIN 3" T.BRICK PARAPET WITH CLAY TILE ROOF COPINGNEW CONCRETE SLABEXISTING STEEL STRUCTUREDEFLECTION TRACK @ TOP OF WALL W/ FIRE RATED SEALANT EACH SIDE & CONT FIRE SAFING INSULATION5/8" TAPED AND PTD 5/8" GWB OVER REINFORCED 8" CMU ELEVATOR SHAFT2" PTD SQ STL TUBE FRAME W/PTD (OR COATED) WIRE FABRIC W/PERIMETER FRAMENEW PREFIN ALUM BOX GUTTER OVER NEW FASCIA & SOFFIT ASSEMBLYNEW EXTERIOR WINDOW IN EXISTING OPENING.NEW EXTERIOR CONCRETE ROOF DECK.NEW PTD 8" GALV STL TUBE COLUMN (CLOSED TOP)NEW CLAY PARAPET ROOF TILES, MUDSET, OVER S.S. THROUGH-WALL FLASHINGNEW ALUM THRESHOLDBLDG F - LEVEL 352' - 6 1/2"NEW STEEL SHIPS LADDER TO MECHANICAL ROOF ABOVE.NEW LANDING AND STAIR.BLDG F - LEVEL 127' - 10 7/8"1F-A3.11F-A3.1BLDG F LEVEL 241' - 2 7/8"13' - 8"13' - 4"5' - 0"2F-A3.12F-A3.12F-A3.22F-A3.2NEW TUBE STEEL COLUMNS, STEEL FRAMING AND CONCRETE DECK AT MECHANICAL MEZZANINE.NEW EXTERIOR WALL BEYOND.NEW CONCRETE SLABAND ROOFING MEMBRANEEXISTING STRUCTURE BEAM TO REMAIN.NEW MEMBRANE ROOF SYSTEM OVER EXISTING WOOD DECKING.NEW BRICK VENEER CLAD ELEVATOR OVERRIDE.BLDG F - LEVEL 352' - 6 1/2"NEW D.H. WINDOW FIXED AND GLAZED WITH TRANSLUCENT GLASS AT ELEVATOR SHAFT.NEW CONCRETE UNDERPINNING OF EXISTING WALL AT NEW ELEVATOR PIT.PROVIDE WATERPROOFING AROUND NEW CONCRETE ELEVATOR PIT BEYONDScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"F-A3.1BUILDING FSECTIONDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date 1/4" = 1'-0"F-A3.11BUILDING F - CROSS SECTION 1 1/4" = 1'-0"F-A3.12BUILDING F - CROSS SECTION 2 1/4" = 1'-0"F-A3.13BUILDING F - CROSS SECTION 5 1/4" = 1'-0"F-A3.14BUILDING F - CROSS SECTION 4 BLDG F - LEVEL 127' - 10 7/8"1F-A3.11F-A3.1BLDG F LEVEL 241' - 2 7/8"2F-A3.12F-A3.12F-A3.22F-A3.211' - 3 5/8"13' - 4"NEW CLAY PARAPET ROOF TILES, MUDSET, OVER S.S. THROUGH-WALL FLASHINGEXISTING EXTERIOR MASONRY WALLNEW EXTERIOR FIXED WINDOW2" PTD SQ STL TUBE FRAME W/PTD (OR COATED) WIREFABRIC W/ PERIMETER FRAMENEW CONCRETE SLABNEW SINGLE PLY ROOF MEMBRANE ASSEMBLY ON 4.5" RIGID INSUL OVER EXISTING WOOD DECKNEW FASCIA AND ALUM BOX GUTTERNEW EXTERIOR WALL TO REPLACE EXISTING:-PTD VERTICAL WOOD SIDING (MATCH EXISTING)-1/2" EXT PLYWD SHEATHING-4" CFMF @ 16" O.C.-OPEN CELL SPRAY INSUL-10 MIL POLY VAPOR BARRIER-TAPED & PTD 5/8" GWBEXISTING ROOF FRAMING TO REMAINNEW EXTERIOR WINDOWNEW SINGLE PLY ROOF MEMBRANE SYSTEM OVER EXISTING WOOD DECKBLDG F - LEVEL 352' - 6 1/2"BLDG F - LEVEL 127' - 10 7/8"4F-A3.14F-A3.1BLDG F LEVEL 241' - 2 7/8"3F-A3.13F-A3.11F-A3.21F-A3.213' - 8"13' - 4"NEW INTERIOR ROOF ASSEMBLY:-TAPED & PTD 5/8" GWB-3/4" T&G PLYWD-6" MTL FRAMING @ 16" O.C.-TAPED & PTD 5/8" GWBNEW PREFIN ALUM ENTRY DOOR & FRAME ASSEMBLY BEYONDNEW INTERIOR ROOF ASSEMBLY:-NEW 6 1/4" LIGHTWEIGHT CONC SLAB W/ 3" COMP MTL DECK-NEW STEEL STRUCTURE2" PTD SQ STL TUBE FRAME W/PTD (OR COATED) WIREFABRIC W/ PERIMETER FRAMENEW MEMBRANE ROOF SYSTEM OVER NEW ROOF DECK AT NEW ELEVATOR OVERRIDE.NEW BRICK VENEER WALL AT NEW ELEVATOR OVERRIDE.NEW MEMBRANE ROOF SYSTEM OVER EXISTING WOOD ROOF DECKINGREPLACEMENT WINDOW BEYOND WITH TRANSLUCENT GLAZINGScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"F-A3.2BUILDING FSECTIONDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date 1/4" = 1'-0"F-A3.21BUILDING F - CROSS SECTION 6 1/4" = 1'-0"F-A3.22BUILDING F - CROSS SECTION 3 ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 3" = 1'-0"F-A4.2BUILDING FDETAIL ROOFEAVE, RAKE,PARAPETDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 3" = 1'-0"F-A4.21ROOF F - SECTIONAL GUTTER DETAILNo. Description Date F-A6.124535' - 10 3/8"7' - 2 5/8"2' - 10 1/8"2' - 6"6 1/4"8' - 0"F-A6.1783' - 10 5/8"3' - 7 7/8"9' - 11"2' - 0"7' - 11 1/4"15' - 7 7/8"2' - 10"1' - 3"3' - 0"1' - 1"6' - 0"3' - 0"1' - 3"2' - 10"F-A6.1101113125' - 10"7' - 2 5/8"3' - 0 5/8"2' - 6"3 3/8"8' - 0"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"F-A6.1BUILDING FTOILET &KITCHEN PLAN &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"F-A6.11TOILET PLAN ( TYPE-22 ) Accessible Toilet 1/4" = 1'-0"F-A6.12ELEVATION 2 1/4" = 1'-0"F-A6.13ELEVATION 3 1/4" = 1'-0"F-A6.14ELEVATION 4 1/4" = 1'-0"F-A6.15ELEVATION 5 1/4" = 1'-0"F-A6.16KITCHEN PLAN ( TYPE 22 ) 1/4" = 1'-0"F-A6.17ELEVATION 7 1/4" = 1'-0"F-A6.18ELEVATION 8 1/4" = 1'-0"F-A6.19TOILET PLAN ( TYPE-23 ) Accessible Toilet 1/4" = 1'-0"F-A6.110ELEVATION 10 1/4" = 1'-0"F-A6.111ELEVATION 11 1/4" = 1'-0"F-A6.112ELEVATION 12 1/4" = 1'-0"F-A6.113ELEVATION 13BLDG F - LEVEL 1BLDG F - LEVEL 1BLDG F - LEVEL 1ACCESSIBLE AND ADAPTABLE UNITACCESSIBLE AND ADAPTABLE UNITACCESSIBLE AND ADAPTABLE UNITTYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYTYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLYNo. Description Date REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYDEMOLISH SLAB TO ACCOMMODATE NEW ELEVATOR PIT.REMOVE EXTERIOR DOOR.EXISTING EXTERIOR WINDOW TO BE REFURBISHED.REMOVE EXTERIOR DOOR.REMOVE EXISTING EXTERIOR DOORS.SEE SITE DEMOLITION PLAN FOR EXTERIOR STRUCTURE.REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE EXTERIOR WINDOWS AT THIS LEVEL.REMOVE BRICK AT INFILL OF WINDOW.REMOVE LOFT STRUCTURE.REMOVE PORTION OF WALL AT NEW MECHANICAL AREAWAY.REMOVE PORTION OF ROOF AT NEW MECHANICAL AREAWAY.REMOVE PORTION OF EXISTING ROOF TO ACCOMMODATE NEW ELEVATOR OVERRIDE.REMOVE EXISITNG WINDOWS AT THIS FACADE.REMOVE EXISTING DOOR.EXISTING WINDOW TO BE REFURBISHEDEXISTING CHIMNEY TO REMAIN.REMOVE ALL WINDOWS AT THIS LEVEL.REMOVE EXISTING BRICK AT INFILL TO PREVIOUS OPENING.REOMVE WINDOW AND BRICK BELOW SILL TO ACCOMOATE NEW DOOR OPENING.LEGENDDEMOLISHED ELEMENT REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.REMOVE ALL EXISTING WINDOWS AT THIS LEVEL.ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedF-D1.1BUILDING FDEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"F-D1.11BUILDING F - LEVEL 1 DEMOLITION PLAN 1/8" = 1'-0"F-D1.12BUILDING F - LEVEL 2 DEMOLITION PLANF-D1.13BUILDING F - 3D, DEMOLITIONABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date 1/8" = 1'-0"F-D1.14DUILDING F - LEVEL 3 DEMOLITION PLAN 1F-A3.11F-A3.1F-A2.121G-A2.1G-A2.12G-A2.113NEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEM NEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEM ROOF DIVERTER OVER DOORWAYNEW LOW -SLOPE ROOF SYSTEMOVER EXISTING ROOF DECKSLOPESLOPE3K-A3.13K-A3.1ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"G-A1.3BUILDING GROOF PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"G-A1.31BLDG G - ROOF PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONEXITCBB2/3 1/3 EQ7' - 0"EQ BEQEQ 2/31/3B1/32/3EQ 7' - 0"EQC EQ EQ 3/4"EQEQCBB1/32/3EQEQEQ EQ 2/31/3EQEQEQEQEQ EQ EQ EQB3' - 0"EQ EQB1/32/3B3' - 0"EQ7' - 0"EQ EQEQ BB 3' - 0"EQEQ2/31/3EQ6' - 11 7/8"EQ BB6' - 4 1/8"8' - 11 7/8"EQEQEQBEQ EQ EQ EQCB2/31/3EQ EQEQ EQEQEQ B EQEQ 3' - 0 3/8"BBBBBEQ 7' - 0"EQ 2/31/3BBB1/32/3EQ6' - 11 7/8"EQ3' - 0 1/8"EQ EQCCEQEQEQEQEQEQEQEQB2/31/3EQ EQ B EQ EQ 1/32/3B 3' - 0 1/8"EQEQBB EQ7' - 0 1/4"EQ 2/31/3ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedG-A1.11BUILDING GLEVEL 1 -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063ABDECFGHJKLMNORTHSITE KEY PLAN 1/4" = 1'-0"G-A1.111BLDG G - LEVEL 1 OLDBATHROOMCL: 8' 0"CLCLCLCL: 8' 0"BATHROOMCL: 8' 0"BATHROOMBATHROOMCL: 8' 0"BATHROOMCL: 8' 0"BATHROOMCL: 8' 0"No. Description Date BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONCCCEQEQEQ EQEQEQEQEQ EQEQEQEQCEQ EQEQEQ B B2/31/3EQ EQ EQEQ 1/32/3B 1/32/3EQ EQ B EQEQEQ EQ BBEQEQEQ EQ EQ BBEQ 6' - 11 7/8"EQ1/3 2/3 B EQ EQ 3' - 0"B1/3 2/3 EQ EQ 10' - 0"10' - 0"9' - 11 5/8"10' - 0 1/4"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedG-A1.12BUILDING GLEVEL 1 -REFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063ABDECFGHJKLMNORTHSITE KEY PLANBATHROOMCL: 8' 0"BATHROOMCL: 8' 0"BATHROOMCL: 8' 0"No. Description Date BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG G - LEVEL 1 OLD26' - 5 3/8"NEW LOW SLOPED ROOFING SYSTEMNEW ALUM GUTTERS & DOWNSPOUTS , TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEMFACE OF BLDG 'H'CONNECTOR TO EXISTING BLDG 'F'TYPICAL REPLACE 30% OF THE EXISTING WOOD OUTRIGGERSBLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1A NEW29' - 0"CORRIDOR TOUNITS G-1 TO G-9NEW WINDOW WITH TEMPERED GLAZING AT LOWER PANESNEW WINDOW WITHOUT TEMPERED GLAZING NEW BRICK INFILL ATEXISTING WINDOW OPENINGNEW EXIT DOOR IN REVISED WINDOW OPENINGNEW WINDOW WITH GRANITE SILLAND BRICK BELOW IN REVISEDDOOR OPENINGTYPICAL NO BRICK, NEW TIMBER FILL BELOW ARCHESG(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"G(e) 500 YEAR FLOOD26' - 6"G(e) 100 YEAR FLOOD26' - 0"BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG G - LEVEL 1 OLD26' - 5 3/8"TYPICAL REPLACE & REPLACE 30% OF THE EXISTING WOOD OUTRIGGERSBLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1A NEW29' - 0"NEW WINDOW WITH TEMPERED GLAZING AT LOWER PANESNEW WINDOW WITHOUT TEMPERED GLAZINGNEW WINDOW IN ENLARGED WINDOW OPENINGG(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"G(e) 500 YEAR FLOOD26' - 6"G(e) 100 YEAR FLOOD26' - 0"500 YEAR FLOOD ELEV: 28'-6"100 YEAR FLOOD ELEV: 27'-0"BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG G - LEVEL 1B NEW30' - 8"NEW WINDOW WITH TEMPERED GLAZING AT LOWER PANESNEW WINDOW, GRANITE WINDOW SILL AND BRICK INFILL AT EXISTING DOOR OPENINGG(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG L - 500 YEAR FLOOD27' - 4 5/8"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"G-A2.1BUILDING GELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"G-A2.13BUILDING G - ELEVATION NORTH 1/8" = 1'-0"G-A2.11BUILDING G - ELEVATION SOUTH 1/8" = 1'-0"G-A2.12BUILDING G - ELEVATION WESTBUILDING 'G' RENOVATION NOTES:1. REPOINT MASONRY PERIMETER (BUDGET 10% NEW MASONRY. BUDGET 15% REPOINTING)2. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE , INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG H LEVEL 1 OLD26' - 10 3/8"BLDG K - LEVEL 1 NEW29' - 7 7/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1A NEW29' - 0"8' - 0"8' - 0"8' - 0"8' - 0"UNIT G-5UNIT G-6UNIT G-7UNIT G-8UNIT G-9G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"G(e) 500 YEAR FLOOD26' - 6"G(e) 100 YEAR FLOOD26' - 0"BLDG L - 500 YEAR FLOOD27' - 4 5/8"BLDG F - LEVEL 352' - 6 1/2"BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1A NEW29' - 0"3' - 1"5' - 2"6"UNIT G-5CORRIDORUNIT G-4UNIT G-3UNIT G-2G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"G(e) 500 YEAR FLOOD26' - 6"G(e) 100 YEAR FLOOD26' - 0"BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1B NEW30' - 8"4' - 9 3/4"8' - 10 1/8"4' - 2 5/8"1' - 8"2' - 6 5/8"CORRIDORG(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"G(e) 500 YEAR FLOOD26' - 6"G(e) 100 YEAR FLOOD26' - 0"BLDG L - 500 YEAR FLOOD27' - 4 5/8"BLDG F - LEVEL 352' - 6 1/2"BLDG H LEVEL 1 OLD26' - 10 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"UNIT G-1LAUNDRYBLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"BLDG H LEVEL 1 OLD26' - 10 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"1' - 6"BLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"G-A3.1BUILDING GSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063ABDECFGHJKLMNORTHSITE KEY PLAN 1/8" = 1'-0"G-A3.13BLDG G - LONGITUDINAL SECTION 3 1/8" = 1'-0"G-A3.11BLDG G - LONGITUDINAL SECTION 1 1/8" = 1'-0"G-A3.12BLDG G - LONGITUDINAL SECTION 2No. Description Date BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG G ROOF TRUSS44' - 5 7/8"FIRE RATED DEMISING WALLBLDG G - LEVEL 1B NEW30' - 8"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG L - 500 YEAR FLOOD27' - 4 5/8"BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG G ROOF TRUSS44' - 5 7/8"FIRE RATED DEMISING WALLBLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1A NEW29' - 0"G(e) 500 YEAR FLOOD26' - 6"G(e) 100 YEAR FLOOD26' - 0"BLDG L - 500 YEAR FLOOD27' - 4 5/8"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"G-A3.2BUILDING GSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"G-A3.25BLDG G - LONGITUDINAL SECTION 2 (Part 1)Match Line 1/4" = 1'-0"G-A3.22BLDG G - LONGITUDINAL SECTION 2 (Part 2)ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG G - LEVEL 1 OLD26' - 5 3/8"FIRE RATED DEMISING WALLBLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1A NEW29' - 0"BLDG K - 500 YEAR FLOOD27' - 4"BLDG K - 100 YEAR FLOOD26' - 9 1/2"BLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"G(e) 500 YEAR FLOOD26' - 6"G(e) 100 YEAR FLOOD26' - 0"BLDG L - 500 YEAR FLOOD27' - 4 5/8"BLDG F - LEVEL 352' - 6 1/2"BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1A NEW29' - 0"BLDG K - 500 YEAR FLOOD27' - 4"BLDG K - 100 YEAR FLOOD26' - 9 1/2"BLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"G(e) 500 YEAR FLOOD26' - 6"G(e) 100 YEAR FLOOD26' - 0"BLDG L - 500 YEAR FLOOD27' - 4 5/8"BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"G-A3.3BUILDING GSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"G-A3.38BLDG G - LONGITUDINAL SECTION 3 (Part 1) 1/4" = 1'-0"G-A3.39BLDG G - LONGITUDINAL SECTION 3 (Part 2)Match LineABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1A NEW29' - 0"1' - 4 1/4"12' - 7 1/8"1' - 8"2' - 6 5/8"NEW RATED CORRIDOR WALLSBLDG G - LEVEL 1 B21' - 0"BLDG K - 500 YEAR FLOOD27' - 4"BLDG K - 100 YEAR FLOOD26' - 9 1/2"BLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"BLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"BLDG L - 500 YEAR FLOOD27' - 4 5/8"BLDG G - LEVEL 1 OLD26' - 5 3/8"BLDG G ROOF TRUSS44' - 5 7/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1A NEW29' - 0"13' - 11 1/4"1' - 8"2' - 6 5/8"12' - 7 1/8"NEW RATED CORRIDOR WALLSBLDG G - LEVEL 1 B21' - 0"BLDG K - 500 YEAR FLOOD27' - 4"BLDG K - 100 YEAR FLOOD26' - 9 1/2"BLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"BLDG L - 500 YEAR FLOOD27' - 4 5/8"BLDG F - LEVEL 352' - 6 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"G-A3.4BUILDING GSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"G-A3.410BLDG G - CROSS SECTION 1 1/4" = 1'-0"G-A3.411BLDG G - CROSS SECTION 2ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 3" = 1'-0"G-A4.1BUILDING GDETAIL ROOFEAVE, RAKE,PARAPETDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 3" = 1'-0"G-A4.11ROOF G - SECTIONAL GUTTER DETAILNo. Description Date G-A6.1131214155 7/8"5' - 1 1/4"5' - 7 1/8"2' - 9"6' - 10 7/8"2' - 0 5/8" 1' - 4" 3' - 9 5/8"3' - 0" 11' - 8 7/8"3' - 8 1/4"1' - 10"G-A6.1542310' - 0 7/8"7' - 3 7/8"2' - 9"1' - 4"4' - 0"3' - 2 5/8"6' - 2 3/8" 5' - 1 1/4"G-A6.18710910' - 1 3/4"2' - 9 7/8"7' - 3 7/8"1' - 4"3' - 10"3' - 4 5/8"1' - 1 1/8"5' - 1 1/4" 6' - 2 3/8"G-A6.1181719202' - 9 7/8"6' - 11 3/4"2' - 4 3/4"1' - 4"3' - 10"3' - 0 1/2"6' - 2 3/8" 1' - 1 1/8"5' - 1 1/4"12' - 2 3/8"1' - 10"4' - 4 3/8"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedG-A6.1BUILDING GTOILET PLANS &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"G-A6.111TOILET PLAN (TYPE-26 ) 1/4" = 1'-0"G-A6.11TOILET PLAN (TYPE-24 )BLDG G - LEVEL 1, UNIT G-5 (2-BEDROOM)BLDG G - LEVEL 1, UNIT G-3 (1-BEDROOM)BLDG G - LEVEL 1, UNIT G-7 (1-BEDROOM)BLDG G - LEVEL 1, UNIT G-9 (1-BEDROOM)BLDG G - LEVEL 1, UNIT G-2 (1-BEDROOM)BLDG G - LEVEL 1, UNIT G-4 (1-BEDROOM)BLDG G - LEVEL 1, UNIT G-6 (1-BEDROOM)BLDG G - LEVEL 1, UNIT G-8 (1-BEDROOM) 1/4" = 1'-0"G-A6.16TOILET PLAN (TYPE 25) 1/4" = 1'-0"G-A6.116TOILET PLAN (TYPE 27)BLDG G - LEVEL 1, UNIT G-1 (2-BEDROOM) 1/4" = 1'-0"G-A6.14ELEVATION 1/4" = 1'-0"G-A6.12ELEVATION 1/4" = 1'-0"G-A6.13ELEVATION 1/4" = 1'-0"G-A6.15ELEVATION 1/4" = 1'-0"G-A6.17ELEVATION 1/4" = 1'-0"G-A6.18ELEVATION 1/4" = 1'-0"G-A6.19ELEVATION 1/4" = 1'-0"G-A6.110ELEVATION 1/4" = 1'-0"G-A6.112ELEVATION 1/4" = 1'-0"G-A6.113ELEVATION 1/4" = 1'-0"G-A6.114ELEVATION 1/4" = 1'-0"G-A6.115ELEVATION 1/4" = 1'-0"G-A6.117ELEVATION 1/4" = 1'-0"G-A6.118ELEVATION 1/4" = 1'-0"G-A6.119ELEVATION 1/4" = 1'-0"G-A6.120ELEVATIONNo. Description Date G-A6.223G-A6.24G-A6.259' - 11 1/8"7' - 7 1/4"4' - 11"2' - 1 1/2"2' - 1"3' - 4"2' - 1"G-A6.278G-A6.2G-A6.21099' - 10 1/4"7' - 7 1/4"1' - 11 5/8"4' - 11"2' - 1"3' - 4"2' - 1"BLDG G - LEVEL 1B NEW30' - 8"FILLERU30 U30 U19 U36 FILLERFILLER B30 2' - 6" B19 3' - 1"3' - 0"1' - 6"2' - 10"7' - 4"1' - 4"1' - 6"BLDG G - LEVEL 1B NEW30' - 8"FILLERB21SB362' - 0"END PANELFILLERU213' - 0"1' - 8"2' - 10"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G ROOF TRUSS44' - 5 7/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1B NEW30' - 8"G-A6.21213G-A6.2G-A6.2141511' - 1"7' - 7 3/8"4' - 7"2' - 11 1/2"2' - 1"3' - 4"2' - 1"BLDG G ROOF TRUSS44' - 5 7/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1A NEW29' - 0"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG G ROOF TRUSS44' - 5 7/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1A NEW29' - 0"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG G ROOF TRUSS44' - 5 7/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1A NEW29' - 0"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG G ROOF TRUSS44' - 5 7/8"BLDG G - LEVEL 1B NEW30' - 8"BLDG G - LEVEL 1A NEW29' - 0"G (w) - 500 YEAR FLOOD29' - 7 1/4"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"G-A6.2BUILDING GKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"G-A6.21KITCHEN PLAN ( TYPE-23 )BLDG G - LEVEL 2, UNIT G-1 (LOFT)BLDG G - LEVEL 1, UNIT G-3 (1-BEDROOM)BLDG G - LEVEL 1, UNIT G-7 (1-BEDROOM)BLDG G - LEVEL 1, UNIT G-9 (1-BEDROOM)BLDG G - LEVEL 1, UNIT G-2 (1-BEDROOM)BLDG G - LEVEL 1, UNIT G-4 (1-BEDROOM)BLDG G - LEVEL 1, UNIT G-6 (1-BEDROOM)BLDG G - LEVEL 1, UNIT G-8 (1-BEDROOM) 1/4" = 1'-0"G-A6.26KITCHEN (TYPE-24 ) 1/4" = 1'-0"G-A6.22ELEVATION 1/4" = 1'-0"G-A6.23ELEVATION 1/4" = 1'-0"G-A6.24ELEVATION 1/4" = 1'-0"G-A6.25ELEVATION 1/4" = 1'-0"G-A6.27ELEVATION 1/4" = 1'-0"G-A6.28ELEVATION 1/4" = 1'-0"G-A6.29ELEVATION 1/4" = 1'-0"G-A6.210ELEVATION 1/4" = 1'-0"G-A6.211KITCHEN (TYPE-25) 1/4" = 1'-0"G-A6.212ELEVATION 1/4" = 1'-0"G-A6.213ELEVATION 1/4" = 1'-0"G-A6.214ELEVATION 1/4" = 1'-0"G-A6.215ELEVATIONNo. Description Date REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE ALL EXTERIOR WINDOWS AT THIS LEVEL.SEE SITE DEMOLITION PLAN FOR EXTERIOR STRUCTURES.REMOVE LOFT STRUCTURE.REMOVE ALL EXTERIOR WINDOWS AT THIS LEVEL.REMOVE ALL EXTERIOR WINDOWS AT BUILDING G.REMOVE ENTIRE LOFT STRUCTURE AT BUILDING G.SEE SITE DEMOLITION PLAN FOR EXTERIOR STRUCTURES. REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.LEGENDDEMOLISHED ELEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedG-D1.1BUILDING GDEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"G-D1.11BUILDING G - LEVEL 1, DEMOLITION PLANG-D1.12BUILDING G - DEMOLITION CUT-AWAY AXONOMETRICABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date UPScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"G-F1.1BUILDING GFURNITUREPLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"G-F1.11BUILDING G - LEVEL ONE, FURNITURE PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date 10G-A3.410G-A3.4BUILDING GBUILDING H(SEE SHEET HJK-A1.1)BUILDING K(SEE SHEET HJK-A1.1)26' - 5 1/2"29' - 8"UNIT G-9(1 BEDROOM)518 SF26' - 5 1/2"G-A2.1G-A2.12G-A2.113K-A2.1312HJ-A3.12HJ-A3.11HJ-A3.11HJ-A3.111G-A3.411G-A3.43G-A3.13G-A3.11G-A3.1UNIT G-8(1 BEDROOM)508 SFUNIT G-7(1 BEDROOM)507 SFUNIT G-6(1 BEDROOM)513 SFUNIT G-5(2 BEDROOM)853 SFUNIT G-4(1 BEDROOM)516 SFUNIT G-3(1 BEDROOM)508 SFUNIT G-2(1 BEDROOM)508 SFUNIT G-1(2 BEDROOM)843 SFLAUNDRYROOMBOILER AND SPRINKLER ROOMREVISEDUNIT H-1(1 BEDROOM)519 SF30' - 8"29' - 8"3HJ-A3.13HJ-A3.128' - 4 1/2"2G-A3.112' - 5 3/4"1.G-A3.14G-A3.130' - 8"10' - 6 3/4"11' - 5 3/8"13' - 6"SEE SHEET G-A3.1SEE SHEET G-A3.2SEE SHEET G-A3.1SEE SHEET G-A3.21HJ-A3.23K-A3.13K-A3.187 1/8" = 1'-0"G-KP1.11BUILDING G - LEVEL ONEScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"G-KP1.1BUILDING G KEYPLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerPB/SK10/12/201816-063ABDECFGHJKLMNORTHSITE KEY PLANMARK Description13 EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPEB EXISTING BRICK WALLEC EXISTING CONCRETE WALLES EXISTING STONE WALLEW EXISTING WOOD WALLW1 UNIT SEPARATION WALLW2 CORRIDOR WALLW3 STAIRWELL WALLW4 8" CMU WALLW4A 6" CMU WALLW5 4" STUD NON-ACOUSTIC INTERIOR PARTITIONW5A 4" STUD ACOUSTIC INTERIOR PARTITIONW6A 6" STUD NON-ACOUSTIC INTERIOR PARTITIONW7 6" FURRING WALLW7A 4" FURRING WALLW7B 1 7/8" FURRING WALLW7C 6" BEARING WALLW7D 4" SHAFT WALLW8B 1-5/8" FURRING WALLW9 EXTERIOR BRICK VENEER WALL WITH 6" STUD BACKUPW9AEXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPNo. Description Date HJ-A2.127HJ-A2.128HJ-A2.129NEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEMNEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEMNEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEMSLOPESLOPESLOP E SLOPE LOW SLOPE ROOF SYSTEMON EXISTING ROOF DECKREMOVE EXISTING HATCH AND PROVIDE NEW FLUSH ROOF DECKNEW FLASHING ATEXISTING ROOF CURBScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CTCONCEPT PLAN1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/18 1/8" = 1'-0"HJ-A1.4BUILDING HJROOF PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"HJ-A1.42BLDG HJ - ROOF LEVELABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date 2HJ-A3.12HJ-A3.11HJ-A3.11HJ-A3.11K-A3.11K-A3.13G-A3.13G-A3.11G-A3.11G-A3.12G-A3.22G-A3.29G-A3.39G-A3.3AAAAB B B BBBEXIT SDSDSDSDSDSDSD3HJ-A3.13HJ-A3.12G-A3.12G-A3.11.G-A3.11.G-A3.14G-A3.14G-A3.1EQ EQ 1/32/3EQEQEQEQ 5' - 0"EQ EQ 5/8"EQEQ 1/32/3EQ 8' - 11 5/8" EQ EQEQBEQ EQ EQEQBEQEQEQ A EQ A BB5' - 10"10' - 0 1/8"5' - 9 7/8"EQ B EQ BBEQEQEQEQEQEQ8' - 0"10' - 0" 8' - 0" 7' - 0" EQ EQ 6' - 0 1/8"10' - 0"10' - 0"BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedHJ-A1.11BUILDING HREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"HJ-A1.111BLDG H - LEVEL ONE, RCPABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMBATHROOMCLCLCLBATHROOMNo. Description Date 1HJ-A3.11HJ-A3.14HJ-A3.24HJ-A3.22HJ-A3.22HJ-A3.2ACCCCCDB B B B B B B B BBBBB B B B B BBBBBBEEEEEEXITEXI TSD SDSDSDSDSDSDSDSDSDSDSDSDSDEQEQ1/3 2/33' - 0"EQ EQ EQEQ2/3 1/33' - 6 1/4"EQ EQ2/31/3EQ EQ EQ EQ 1/32/3EQEQEQ9' - 11 7/8"EQEQEQEQEQ 6' - 11 5/8" 6' - 11 7/8"5' - 3 1/8"9' - 0"5' - 3 1/8"2/31/3EQ EQ1/32/3EQ EQEQEQEQEQ EQ EQ 2' - 11 3/4"EQ EQ3' - 0"6' - 0"2/31/3EQ EQ 0"1/32/3EQ EQ EQ EQEQEQ EQ10' - 0"EQEQEQ 10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"EQ EQ BEQ EQ3' - 0 1/2"EQEQEQ EQ EQ EQ EQEQBB EQEQ3' - 0 1/8"EQEQEQ EQEQEQEQEQ BEQEQ3' - 0 "B 2' - 11 7/8"EQEQB1HJ-A3.21HJ-A3.2BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedHJ-A1.12BUILDING JREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"HJ-A1.121BLDG J - LEVEL ONE, RCP (PART A)ABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMNo. Description Date 2HJ-A3.22HJ-A3.23HJ-A3.23HJ-A3.2CCCCCCB B B B B B B B B B B B B B BBBBEEEEEEXI T EXITSDSDSDSDSDSDSDSDSDSDSDSDSDSD2JM-A1.12JM-A1.11/32/3EQ EQ EQ A EQ A EQ10' - 0"EQ2/31/3EQ EQ EQEQ 1/32/3EQ EQEQ15' - 0"EQEQ EQEQ EQEQ EQ 2/31/31/32/3EQ EQ EQ EQEQ AEQ AEQ EQ6' - 0"9' - 0 1/8"EQEQ 4' - 5 3/4"EQ EQ EQ 2EQ 2EQ B EQ B EQ8' - 0"EQEQ A EQ A BEQEQE Q EQ EQ EQ EQEQ1/32/3B BEQ4' - 11 5/8"EQ2' - 11 3/4"EQEQEQ EQEQEQEQEQBEQ BEQ BEQEQEQ EQ BB EQ 1EQ 1B EQ B EQ B EQEQB EQEQEQ EQ EQEQEQEQEQ EQ 10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"10' - 0"9' - 11 1/2" 10' - 0" 4' - 5"EQEQEQ EQ 10' - 0"10' - 0"EQEQBEQ EQ2/31/31HJ-A3.21HJ-A3.2BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedHJ-A1.13BUILDING JREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"HJ-A1.131BLDG J - LEVEL ONE, RCP (PART B)ABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMNo. Description Date BLDG H LEVEL 1 OLD26' - 10 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"LOBBY ENTRANCEBUILDING HBUILDING JBLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"BLDG J LEVEL 1 OLD26' - 5 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"4HJ-A3.24HJ-A3.2NEW LOW SLOPED ROOFING SYSTEMNEW ALUM GUTTERS & DOWNSPOUTS , TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEMTYPICAL FOR ALL EAVES OF BLDG 'J' REPLACE EXISTING FASCIA, STRIP LEAD BASED PAINT FROM EXISTING WOOD TRIM & REPLACE 10% OF EXISTING WOOD OUTRIGGERS THAT ARE ROTTEN OR MISSING PROVIDE STRUC REPAIR FOR SHEAR CRACK,COORD W/ STRUC EGR, REPLACE MASONRY AND REPOINT AS REQD INSTALL 1/2" WIDE SAWCUT VERTICAL CONTROL JOINT W/ BACKER ROD & SEALANT REPLACE BRICK ALONG FAULT LINE & REPOINTREPLACE 75% OF BRICK BELOW WINDOW SILLS IN THIS AREANEW GRADECORRIDOR TO UNITS J-1 TO J-8RESTORE EXISTING WINDOWNEW WINDOW IN REVISED DOOR OPENING WITH NEWGRANITE WINDOW SILL AND BRICK INFILLBUILDING HBUILDING JPROVIDE NEW CONCRETE SILL ATRAISED DOORWALL & WATERPROOFINGEXISTING GRADEBLDG J LEVEL 1 OLD26' - 5 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"REFER TO STRUC DWGS FOR REINFORCEMENT OF THE SOUTHEAST CORNER OF BLDG 'J' NEW GRADEEXISTING GRADEEXISTING WATERPROOFINGBLDG G - LEVEL 1 B21' - 0"BLDG J LEVEL 1 OLD26' - 5 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"4HJ-A3.24HJ-A3.2PART OF BUILDING KTYPICAL FOR ALL EAVES OF BLDG 'J' REPLACE EXISTING FASCIA, STRIP LEAD BASED PAINT FROM EXISTING WOOD TRIM & REPLACE 10% OF EXISTING WOOD OUTRIGGERS THAT ARE ROTTEN OR MISSING REFER TO STRUC DWGS FOR REINFORCEMENT OF THE SOUTHEAST CORNER OF BLDG 'J' GRADE RESTORE EXISTING WINDOWEXISTING EXPOSED CONCRETE FOUNDATION ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"HJ-A2.1BUILDING HJELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"HJ-A2.127BUILDING H - ELEVATION NORTH 1/8" = 1'-0"HJ-A2.128BUILDING J - ELEVATION NORTH 1/8" = 1'-0"HJ-A2.130BUILDING J - ELEVATION EAST 1/8" = 1'-0"HJ-A2.129BUILDING J - ELEVATION SOUTHBUILDING 'J' RENOVATION NOTES:1. REPOINT MASONRY PERIMETER (BUDGET 10% NEW MASONRY. BUDGET 15% REPOINTING)2. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE, INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG J LEVEL 1 OLD26' - 5 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"FIRE RATED DEMISING WALLNEW RATED UNIT SEPARATIONWALL UPTO UNDERSIDE OF ROOFNEW CONCRETE SLAB OVERCRUSHED STONE EXISTING CONCRETE SLAB UNTOUCHEDMAILBOXESNEW CONCRETE STEM WALLAT NEW CHANGE IN FLOOR SYSTEMNEW WOOD FRAMED FLOOR SYSTEMSNEW PARTIAL HEIGHT PARTITIONS IN APARTMENT UNITSBLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"BLDG J LEVEL 1 OLD26' - 5 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"FIRE RATED DEMISING WALLNEW STRUCTURAL LINTEL AT NEW OPENING IN EXISTING MASONRYBLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"BLDG J LEVEL 1 OLD26' - 5 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"HJ-A3.1BUILDING HSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"HJ-A3.11BUILDING H - LONGITUDINAL SECTION 1/4" = 1'-0"HJ-A3.12BUILDING H - CROSS SECTIONABDECFGHJKLMNORTHSITE KEY PLAN 1/4" = 1'-0"HJ-A3.13BUILDING H - CROSS SECTION1No. Description Date BLDG J LEVEL 1 OLD26' - 5 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"FIRE RATED DEMISING WALLFIRE RATED DEMISING WALLBLDG J LEVEL 1 OLD26' - 5 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"FIRE RATED DEMISING WALLBLDG J LEVEL 1 OLD26' - 5 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"FIRE RATED DEMISING WALLBLDG J LEVEL 1 OLD26' - 5 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedHJ-A3.2BUILDING JSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"HJ-A3.22BUILDING J - LONGITUDINAL SECTION (PART 1) 1/4" = 1'-0"HJ-A3.24BUILDING J - CROSS SECTION 1/4" = 1'-0"HJ-A3.23BUILDING J - LONGITUDINAL SECTION (PART 2)Match LineABDECFGHJKLMNORTHSITE KEY PLAN 1/8" = 1'-0"HJ-A3.21BUILDING J - KEY ENLARGED LONGITUDINAL SECTIONSEE 3/HJ 3.2SEE 2/HJ 3.2No. Description Date ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 3" = 1'-0"HJ-A4.1BUILDING HJDETAIL ROOFEAVE, RAKE,PARAPETDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 3" = 1'-0"HJ-A4.11ROOF H,J - SECTIONAL GUTTER DETAILNo. Description Date HJ-A6.125346' - 0 7/8"5' - 8 1/8"2' - 9 3/8"1' - 1 1/4"4' - 11 5/8"8' - 5 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"G (w) - 500 YEAR FLOOD29' - 7 1/4"G (w) - 500 YEAR FLOOD29' - 7 1/4"G (w) - 500 YEAR FLOOD29' - 7 1/4"HJ-A6.1710989' - 8 7/8"0"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedHJ-A6.1BUILDING HTOILET PLANS &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"HJ-A6.11TOILET PLAN ( TYPE-31 ) 1/4" = 1'-0"HJ-A6.12ELEVATION 2 1/4" = 1'-0"HJ-A6.13ELEVATION 3 1/4" = 1'-0"HJ-A6.14ELEVATION 4 1/4" = 1'-0"HJ-A6.15ELEVATION 5BLDG H - LEVEL 1, UNIT H-1 (1-BEDROOM) 1/4" = 1'-0"HJ-A6.16TOILET PLAN ( TYPE-32 ) 1/4" = 1'-0"HJ-A6.17ELEVATION 7 1/4" = 1'-0"HJ-A6.18ELEVATION 8 1/4" = 1'-0"HJ-A6.19ELEVATION 9 1/4" = 1'-0"HJ-A6.110ELEVATION 10BLDG H - LEVEL 1, UNIT H-2 (1-BEDROOM)No. Description Date HJ-A6.2586710' - 0"7' - 2 5/8"2' - 9 3/8"6' - 0 7/8" 4' - 11 5/8"1' - 1 1/4"HJ-A6.2910121110' - 0"4' - 11 5/8"1' - 1 1/4"2' - 9"7' - 3"4' - 3 1/8"1' - 9 5/8"HJ-A6.2131614157' - 2 5/8"2' - 9 3/8"1' - 1 1/4"4' - 11 5/8"10' - 0"4' - 2 7/8"1' - 9 7/8"HJ-A6.2171918202' - 9"7' - 3"1' - 1 1/4"4' - 11 5/8"2' - 9"7' - 3"6' - 0 7/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedHJ-A6.2BUILDING JTOILET PLANS &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"HJ-A6.21TOILET PLAN ( TYPE-33 ) 1/4" = 1'-0"HJ-A6.22TOILET PLAN ( TYPE-34 ) 1/4" = 1'-0"HJ-A6.23TOILET PLAN ( TYPE-35 ) 1/4" = 1'-0"HJ-A6.24TOILET PLAN ( TYPE-36 )BLDG J - LEVEL 1, UNIT J-1 (2-BEDROOM)BLDG J - LEVEL 1, UNIT J-3 (2-BEDROOM) 1/4" = 1'-0"HJ-A6.25ELEVATION 5 1/4" = 1'-0"HJ-A6.26ELEVATION 6 1/4" = 1'-0"HJ-A6.27ELEVATION 7 1/4" = 1'-0"HJ-A6.28Elevation 8 1/4" = 1'-0"HJ-A6.29ELEVATION 9 1/4" = 1'-0"HJ-A6.210ELEVATION 10 1/4" = 1'-0"HJ-A6.211ELEVATION 11 1/4" = 1'-0"HJ-A6.212ELEVATION 12 1/4" = 1'-0"HJ-A6.213ELEVATION 13 1/4" = 1'-0"HJ-A6.214ELEVATION 14 1/4" = 1'-0"HJ-A6.215ELEVATION 15 1/4" = 1'-0"HJ-A6.216ELEVATION 16 1/4" = 1'-0"HJ-A6.217ELEVATION 17 1/4" = 1'-0"HJ-A6.218ELEVATION 18 1/4" = 1'-0"HJ-A6.219ELEVATION 19 1/4" = 1'-0"HJ-A6.220ELEVATION 20BLDG J - LEVEL 1, UNIT J-2 (2-BEDROOM)BLDG J - LEVEL 1, UNIT J-4 (2-BEDROOM)BLDG J - LEVEL 1, UNIT J-8 (2-BEDROOM)BLDG J - LEVEL 1, UNIT J-6 (1-BEDROOM)BLDG J - LEVEL 1, UNIT J-7 (1-BEDROOM)No. Description Date HJ-A6.345762' - 9"7' - 3 1/8"1' - 1 1/4"4' - 11 5/8"10' - 0 1/8"6' - 0 7/8"HJ-A6.38911107' - 3 1/8"2' - 9"1' - 1 1/4"4' - 11 5/8"10' - 0 1/8"6' - 0 7/8"HJ-A6.3121513141' - 1 1/4"4' - 11 5/8"2' - 9"7' - 0 5/8" 9' - 9 5/8"6' - 0 7/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedHJ-A6.3BUILDING JTOILET PLANS &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"HJ-A6.31TOILET PLAN ( TYPE-37 ) 1/4" = 1'-0"HJ-A6.32TOILET PLAN ( TYPE-38 ) 1/4" = 1'-0"HJ-A6.33TOILET PLAN ( TYPE-39 ) 1/4" = 1'-0"HJ-A6.34ELEVATION 4 1/4" = 1'-0"HJ-A6.35ELEVATION 5 1/4" = 1'-0"HJ-A6.36ELEVATION 6 1/4" = 1'-0"HJ-A6.37ELEVATION 7 1/4" = 1'-0"HJ-A6.38ELEVATION 8 1/4" = 1'-0"HJ-A6.39ELEVATION 9 1/4" = 1'-0"HJ-A6.310ELEVATION 10 1/4" = 1'-0"HJ-A6.311ELEVATION 11 1/4" = 1'-0"HJ-A6.312ELEVATION 12 1/4" = 1'-0"HJ-A6.313ELEVATION 13 1/4" = 1'-0"HJ-A6.314ELEVATION 14 1/4" = 1'-0"HJ-A6.315ELEVATION 15BLDG J - LEVEL 1, UNIT J-6 (2-BEDROOM)BLDG J - LEVEL 1, UNIT J-5 (2-BEDROOM)BLDG J - LEVEL 1, UNIT J-5 (2-BEDROOM)No. Description Date HJ-A6.4433' - 2"6' - 11"HJ-A6.456871' - 6"6' - 0"4' - 6"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedHJ-A6.4BUILDING HKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"HJ-A6.41Kitchen Plan ( TYPE-26 ) 1/4" = 1'-0"HJ-A6.42Kitchen Plan ( TYPE-27 ) 1/4" = 1'-0"HJ-A6.43Elevation 3 1/4" = 1'-0"HJ-A6.44Elevation 4 1/4" = 1'-0"HJ-A6.45Elevation 5 1/4" = 1'-0"HJ-A6.46Elevation 6BLDG H - LEVEL 1, UNIT H-1 (1-BEDROOM)BLDG H - LEVEL 1, UNIT H-2 (1-BEDROOM)No. Description Date 1/4" = 1'-0"HJ-A6.47Elevation 7 1/4" = 1'-0"HJ-A6.48Elevation 8 HJ-A6.5562' - 1"3' - 4"2' - 1"8' - 1"9' - 0 3/8"2' - 11 3/8"7' - 5 1/4"HJ-A6.5782' - 0 7/8"3' - 4"2' - 1"7' - 4"3' - 2"1' - 6"3' - 11 1/8"8' - 11 1/2"HJ-A6.51097' - 3 7/8"2' - 1"3' - 4"2' - 0 7/8" 3' - 2"1' - 6"3' - 11 1/8"2' - 11 1/2"6' - 0"HJ-A6.511123' - 2"3' - 3 7/8"2' - 1 1/4"7' - 4" 2' - 1 7/8" 2' - 9 7/8"6' - 8"7' - 5 7/8"9' - 5 7/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"3' - 0"1' - 8"2' - 10"2' - 10"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"3' - 0"1' - 8"2' - 10"1' - 6"6' - 0"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"3' - 0"1' - 8"2' - 10"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"3' - 0"1' - 8"2' - 10"6' - 0"1' - 6"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"2' - 10"1' - 8"3' - 0"2' - 10"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"2' - 10"1' - 8"3' - 0"6' - 0"1' - 6"2' - 10"1' - 8"3' - 0"2' - 10"BLDG HJ LEVEL 1 NEW28' - 4 3/8"5' - 11 1/2"1' - 6"2' - 10"1' - 7 1/2"3' - 0"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedHJ-A6.5BUILDING JKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"HJ-A6.51KITCHEN PLAN ( TYPE-28 ) 1/4" = 1'-0"HJ-A6.52KITCHEN PLAN ( TYPE-29 ) 1/4" = 1'-0"HJ-A6.53KITCHEN PLAN ( TYPE-30 ) 1/4" = 1'-0"HJ-A6.54KITCHEN PLAN ( TYPE-31 ) 1/4" = 1'-0"HJ-A6.55ELEVATION 5 1/4" = 1'-0"HJ-A6.56ELEVATION 6 1/4" = 1'-0"HJ-A6.57ELEVATION 7 1/4" = 1'-0"HJ-A6.59ELEVATION 9 1/4" = 1'-0"HJ-A6.510ELEVATION 10 1/4" = 1'-0"HJ-A6.511ELEVATION 11 1/4" = 1'-0"HJ-A6.512ELEVATION 12BLDG J - LEVEL 1, UNIT J-1 (1-BEDROOM)BLDG J - LEVEL 1, UNIT J-2 (2-BEDROOM)BLDG J - LEVEL 1, UNIT J-3 (2-BEDROOM)BLDG J - LEVEL 1, UNIT J-4 (2-BEDROOM) 1/4" = 1'-0"HJ-A6.58ELEVATION 8No. Description Date HJ-A6.6236' - 3 1/4"2' - 10"3' - 2"3' - 3 7/8"2' - 1 1/4"7' - 4"1' - 9 3/8"7' - 5 7/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"6' - 0"1' - 6"2' - 10"1' - 8"3' - 0"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"2' - 10"1' - 8"3' - 0"2' - 10"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"HJ-A6.6566' - 3"2' - 10 1/8"2' - 0 7/8"3' - 4"2' - 1"7' - 3 3/4"1' - 9 3/8"7' - 6"BLDG HJ LEVEL 1 NEW28' - 4 3/8"6' - 0"1' - 6"2' - 10"1' - 8"3' - 0"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"2' - 10"1' - 8"3' - 0"2' - 10"G (w) - 500 YEAR FLOOD29' - 7 1/4"HJ-A6.6987' - 1"2' - 10 3/4"2' - 1"3' - 3 7/8"2' - 1"7' - 4"2' - 7 7/8"3' - 2"3' - 3 7/8"2' - 1"BLDG HJ LEVEL 1 NEW28' - 4 3/8"2' - 10"3' - 2"1' - 6"2' - 10"1' - 8"3' - 0"BLDG K - 500 YEAR FLOOD27' - 4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG HJ LEVEL 1 NEW28' - 4 3/8"2' - 10"1' - 8"3' - 0"2' - 10"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"HJ-A6.611129' - 0 1/8"2' - 11 5/8"3' - 10 3/8"8' - 1"3' - 1"2' - 11 7/8"2' - 5 1/8" 2' - 0 7/8"3' - 4"2' - 1"6' - 0"1' - 6"2' - 10"1' - 8"3' - 0"2' - 10"1' - 8"3' - 0"2' - 10"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedHJ-A6.6BUILDING JKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"HJ-A6.61KITCHEN PLAN ( TYPE-33 ) 1/4" = 1'-0"HJ-A6.62ELEVATION 2 1/4" = 1'-0"HJ-A6.63ELEVATION 3 1/4" = 1'-0"HJ-A6.64KITCHEN PLAN ( TYPE-32 ) 1/4" = 1'-0"HJ-A6.65Elevation 5 1/4" = 1'-0"HJ-A6.66ELEVATION 6 1/4" = 1'-0"HJ-A6.67KITCHEN PLAN ( TYPE-34 ) 1/4" = 1'-0"HJ-A6.68ELEVATION 8 1/4" = 1'-0"HJ-A6.69ELEVATION 9 1/4" = 1'-0"HJ-A6.610KITCHEN PLAN ( TYPE-35 ) 1/4" = 1'-0"HJ-A6.611ELEVATION 11 1/4" = 1'-0"HJ-A6.612ELEVATION 12BLDG J - LEVEL 1, UNIT J-5 (2-BEDROOM)BLDG J - LEVEL 1, UNIT J-6 (1-BEDROOM)BLDG J - LEVEL 1, UNIT J-7 (1-BEDROOM)BLDG J - LEVEL 1, UNIT J-8 (1-BEDROOM)No. Description Date REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE ALL EXTERIOR WINDOWS AT THIS LEVEL.REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE ALL EXTERIOR DOOR.REMOVE ALL EXTERIOR WINDOWS AT THIS LEVEL.REMOVE ALL EXTERIOR DOOR.REMOVE LOFT STRUCTURE ABOVE.DEMOLISH INTERIOR MASONRY WALL.BUILDING JBUILDING HREMOVE PORTION OF MASONRY AND RESUPPORT. SEE STRUCTURAL DRAWING. REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.LEGENDDEMOLISHED ELEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CTCONCEPT PLAN1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/18As indicatedHJ-D1.1BUILDING HJDEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"HJ-D1.11BUILDINGS H, J - LEVEL 1 DEMOLITION PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BUILDING HBUILDING JBUILDING KUNIT K-2(1 BEDROOM)UNIT K-4(1 BEDROOM)UNIT H-1(1 BEDROOM)UNIT H-2(2 BEDROOM)UNIT J-8(2 BEDROOM)UNIT J-7(1 BEDROOM)UNIT J-6(2 BEDROOM)UNIT J-5(2 BEDROOM)UNIT J-4(1 BEDROOM)UNIT J-3(2 BEDROOM)UNIT J-2(2 BEDROOM)UNIT J-1(2 BEDROOM)METERROOMLAUNDRYROOMBOILER AND SPRINKLERROOMJANITORMAILBOXESLOBBYScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT 1/8" = 1'-0"HJ-F1.1BUILDING H & JFURNITUREPLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"HJ-F1.11BUILDINGS H, J - LEVEL ONE, FURNITURE PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date HJ-A2.127HJ-A2.128HJ-A2.130HJ-A2.1292HJ-A3.12HJ-A3.11HJ-A3.11HJ-A3.14HJ-A3.24HJ-A3.23HJ-A3.23HJ-A3.229' - 8"BUILDING HBUILDING JBUILDING KUNIT K-2(1 BEDROOM)UNIT K-4(1 BEDROOM)UNIT H-1(1 BEDROOM)UNIT H-2(2 BEDROOM)UNIT J-8(2 BEDROOM)UNIT J-7(1 BEDROOM)UNIT J-6(2 BEDROOM)UNIT J-5(2 BEDROOM)UNIT J-4(1 BEDROOM)UNIT J-3(2 BEDROOM)UNIT J-2(2 BEDROOM)UNIT J-1(2 BEDROOM)28' - 4 1/2"28' - 4 1/2"METERROOMLAUNDRYROOMBOILER AND SPRINKLERROOMJANITORMAILBOXESFLOOR RAISED TO 28'-4LOBBY34' - 3 7/8"13' - 7 5/8"9' - 10 7/8"12' - 4 3/8"24' - 5 1/4"6' - 3 1/2"10' - 5"13' - 6 5/8"13' - 5 7/8"32' - 4" 32' - 2"REFER TO BUILDING G FOR DIMENSION6' - 7 3/8"6' - 3"8' - 6 5/8"5' - 7 1/8"21' - 6 5/8"17' - 7 3/4" 10' - 5"6' - 2 1/8"8' - 10 1/4"2' - 0 7/8"2' - 0 7/8"4' - 3 5/8"4' - 2 3/4"10' - 7 1/8"10' - 7 3/8"8' - 11" 1' - 8 3/8"3' - 1 1/4"9' - 9 1/2"9' - 8 1/8"9' - 6 7/8"3' - 7 3/8" 5' - 3 7/8"19' - 6 3/8"9' - 10 1/8"4' - 8 1/2"10' - 0 7/8"2' - 6 5/8" 10' - 2 7/8"19' - 7 1/2"20' - 7 1/8"4' - 0 5/8"9' - 10 1/8"1' - 9 7/8"7' - 8 1/4"9' - 10 1/8"11' - 2 1/8" 11' - 9 1/4"REFER TO BUILDING J FOR DIMENSIONREFER TO BUILDING J FOR DIMENSION6' - 2 3/8"9' - 9 5/8"12' - 1 3/8" 7' - 2"18' - 4 1/8"15' - 11"12' - 1 1/4" 4' - 5 1/4"K-A6.278K-A6.21112G-A6.2121328' - 4 1/2"3HJ-A3.13HJ-A3.11.G-A3.11.G-A3.1G-A6.2G-A6.214151HJ-A3.21HJ-A3.23K-A3.13K-A3.187ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CTCONCEPT PLAN1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/18 1/8" = 1'-0"HJ-KP2.1BUILDING HJ KEYPLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063MARK Description13 EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPEB EXISTING BRICK WALLEC EXISTING CONCRETE WALLES EXISTING STONE WALLEW EXISTING WOOD WALLW1 UNIT SEPARATION WALLW2 CORRIDOR WALLW3 STAIRWELL WALLW4 8" CMU WALLW4A 6" CMU WALLW5 4" STUD NON-ACOUSTIC INTERIOR PARTITIONW5A 4" STUD ACOUSTIC INTERIOR PARTITIONW6A 6" STUD NON-ACOUSTIC INTERIOR PARTITIONW7 6" FURRING WALLW7A 4" FURRING WALLW7B 1 7/8" FURRING WALLW7C 6" BEARING WALLW7D 4" SHAFT WALLW8B 1-5/8" FURRING WALLW9 EXTERIOR BRICK VENEER WALL WITH 6" STUD BACKUPW9A EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPW9BEXTERIOR BRICK VENEER WALL WITH 4" STUD BACKUP 1/8" = 1'-0"HJ-KP2.11BUILDINGS H, J - LEVEL ONEABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date M-A2.141M-A2.1402JM-A1.12JM-A1.1TYPEE-1ARCTYPEE-1ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCNEW WOOD FRAMED FLOORTYPEE-1ARCBLDG M - LEVEL 129' - 7 7/8"BLDG J LEVEL 1 OLD26' - 5 3/8"BLDG HJ LEVEL 1 NEW28' - 4 3/8"12' - 9"14' - 4"F31F02NEW WINDOW AND INFILL WALL AT EXISTING DOOR OPENING.AAAAAEQEQEQEQAAAALIGHT FIXTURES LOCATED CENTERED IN RAFTER BAYS TYPICALLYScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"JM-A1.1BUILDING JMBRIDGEDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063No. Description Date 1/4" = 1'-0"JM-A1.11BLDG JM BRIDGE - LEVEL 1 1/4" = 1'-0"JM-A1.12BLDG JM BRIDGE - SECTION 1/4" = 1'-0"JM-A1.13BLDG JM BRIDGE - CEILING PLAN K-A2.132K-A2.131M-A2.1371K-A3.11K-A3.12K-A3.12K-A3.1OXOBOXO CREEKTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARC3K-A3.13K-A3.1ACCESS TO BUILDING M BASEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"K-A1.0BUILDING K PLAN- BASEMENTDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"K-A1.01BLDG K - BASEMENTABDECFGHJKLMNORTHSITE KEY PLANMATCH LINE TO BUILDING GMATCH LINE TO BUILDING HMATCH LINE TO BUILDING MEXISTING EXTERIOR MASONRY WALLSAND PIERSNEW MASONRY INFILL AT EXISTING OPENINGS AND WOOD FRAMED WALLS TO BE REMOVEDEXISTING MASONRY ARCH OVEROXOBOXO BROOKEXISTING TIMBER BEAMS ABOVENEW MASONRY WALLS BETWEEN EXISTING MASONRY PIERS TOREPLACE WOOD FRAMED WALLSNo. Description DateMARK Description13 EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPEB EXISTING BRICK WALLEC EXISTING CONCRETE WALLES EXISTING STONE WALLEW EXISTING WOOD WALLW1 UNIT SEPARATION WALLW2 CORRIDOR WALLW3 STAIRWELL WALLW4 8" CMU WALLW4A 6" CMU WALLW5 4" STUD NON-ACOUSTIC INTERIOR PARTITIONW5A 4" STUD ACOUSTIC INTERIOR PARTITIONW6A 6" STUD NON-ACOUSTIC INTERIOR PARTITIONW7 6" FURRING WALLW7A 4" FURRING WALLW7B 1 7/8" FURRING WALLW7C 6" BEARING WALLW7D 4" SHAFT WALLW8B 1-5/8" FURRING WALLW9 EXTERIOR BRICK VENEER WALL WITH 6" STUD BACKUPW9A EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPW9B EXTERIOR BRICK VENEER WALL WITH 4" STUD BACKUPW9X EXTERIOR BRICK VENEER WALL AT FLOOR LINEW10 EXTERIOR BOARD AND BATTEN WALL WITH 6" STUD BACKUPW11 INFILL BRICK WALL-15"W12 3" FURRING AT BATHROOM K-A2.131M-A2.137NEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEM NEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEM BUILDING G ROOFBUILDING H ROOFSLOPESLOPEBUILDING M ROOFBUILDING M ROOFNEW FLASHING OVER EXISTING ROOF CURBBUILDING WALL BELOWNEW SLOPE ROOF SYSTEMOVER EXISTING ROOF DECKScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"K-A1.2BUILDING K -ROOF PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"K-A1.22BLDG K - ROOF PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTF2HJ-A3.11K-A3.11K-A3.12K-A3.12K-A3.11M-A3.1AACCCCCBBBBBBBB BBBBBCB B B E E EEBE EXITEXITSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD3HJ-A3.1EQEQ1/3 2/3 EQ BEQ BEQEQ EQ AEQ AEQ 7' - 0"EQ EQEQ2/3 1/3 EQ AEQ A EQ 9' - 0" EQEQEQ EQEQ1/3 2/3 3' - 9 3/8"7' - 8 1/8"EQEQBEQ 9' - 0" EQ EQEQEQEQEQ A EQ A EQ AEQ AEQEQ EQ 8' - 11 5/8" EQ EQ BEQ B1/3 2/3 EQEQEQEQ2/3 1/3 EQEQEQEQ EQEQ EQEQEQ EQ EQEQEQ EQ EQEQEQEQEQ EQEQEQEQ AAAAEQ EQ EQ EQ EQEQ AEQEQEQEQEQEQ AEQEQ EQEQBEQ B EQ B3' - 5 7/8"EQEQBEQ B EQ B EQ EQ BEQ EQ BEQ EQ 3K-A3.13K-A3.1REFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedK-A1.11BUILDING KREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"K-A1.111BLDG K - LEVEL 1 CEILINGABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMBATHROOMBATHROOMCL: 8'-0"CL: 8'-0"BATHROOMCL: 8'-0"CL: 8'-0"CL: 8'-0"MATCH LINE BUILDING MMATCH LINE BUILDING MNo. Description Date BUILDING K ROOF47' - 4 7/8"BLDG K - LEVEL 1 NEW29' - 7 7/8"2K-A3.12K-A3.1STRUC EGR TO EVALUATE INTERGRITY OF BRIDGE, STRUCTURAL DAMANGE DUE TO SCOURING FROM WATER COURSE AND PROVIDE ASSOCIATED DETAILS FOR RECTIFICATIONNEW FLASHING OVEREXISTING ROOF CURBBRIDGE OVEROXOBOXO BROOK3K-A3.13K-A3.1BLDG K - 500 YEAR FLOOD27' - 4"BLDG K - 100 YEAR FLOOD26' - 9 1/2"BUILDING K ROOF47' - 4 7/8"BLDG K - LEVEL 1 NEW29' - 7 7/8"NEW LOW SLOPED ROOFING SYSTEMNEW ALUM GUTTERS & DOWNSPOUTS , TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEMTYPICAL FOR ALL EAVES OF BLDG 'K' REPLACE EXISTING FASCIA, STRIP LEAD BASED PAINT FROM EXISTING WOOD TRIM & REPLACE 10% OF EXISTING WOOD OUTRIGGERS THAT ARE ROTTEN OR MISSING FACE OF BLDG 'G'FACE OF BLDG 'M'REMOVE WINDOW & BRICK-IN OPENINGREPLACE DETERIORATED BRICK AROUND THIS CORNERNEW FLASHING OVER EXISTING ROOF CURBBRIDGE OVEROXOBOXO BROOKBLDG K - 500 YEAR FLOOD27' - 4"BLDG K - 100 YEAR FLOOD26' - 9 1/2"NEW WINDOW AT EXISTING DOOR OPENINGScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"K-A2.1BUILDING KELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"K-A2.132BUILDING K - ELEVATION EAST 1/8" = 1'-0"K-A2.131BUILDING K - ELEVATION WESTBUILDING 'K' RENOVATION NOTES:1. REPOINT BRICK PERIMETER (BUDGET 50% NEW MASONRY FOR BOTH EAST & WEST ELEVATION) 2. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE, INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR 3. REMOVE ALL SURFACE MOUNTED COUNDUITS AND CABLES SERVING THIS BLDG.4. REPLACE EXISTING FASCIAS AND SOFFITS, REMOVE EXISTING LEAD BASED PAINT. REPAINTABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BUILDING K ROOF47' - 4 7/8"BLDG K - LEVEL 1 NEW29' - 7 7/8"17' - 9"FIRE RATED DEMISING WALLFIRE RATED DEMISING WALLNEW STRUCTURAL STEEL LINTEL AT NEW OPENING, IN EXISTING MASONRY WALLNEW FLASHING OVER EXISTING ROOF CURBNEW PARTIAL HEIGH PARTITION IN APARTMENT UNIT (10'-0" T.O.W.) EXISTING PIERS, WALLS AND FOUNDATION WALLS TO REMAINEXISTING MASONRY ARCH AND WOOD TIMBER FRAMING TO REMAINBLDG K - 500 YEAR FLOOD27' - 4"BLDG K - 100 YEAR FLOOD26' - 9 1/2"BLDG F - LEVEL 352' - 6 1/2"17' - 9"NEW UNIT SEPARATION PARTITION WALLS TO EXTEND TO UNDERSIDEOF ROOF DECK NEW FIRE RATED CORRIDOR WALLS TO EXTEND TO UNDERSIDEOF ROOF DECK EXISTING WOOD FLOOR FRAMINGTO REMAINEXISTING MASONRY PIERSTO REMAINEXISTING CONCRETE SLABTO REMAINBUILDING K ROOF47' - 4 7/8"BLDG K - LEVEL 1 NEW29' - 7 7/8"NEW MASONRY INFILLAT EXISTING MASONRY OPENING EXISTING TIMBER FRAMING OVERCREEK TO REMAINNEW PARTIAL HEIGHT WALLSAT INTERIOR OF APARTMENTS(10' -0" T.O.W.)OXOBOXO CREEKBLDG K - 500 YEAR FLOOD27' - 4"BLDG K - 100 YEAR FLOOD26' - 9 1/2"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"K-A3.1BUILDING KSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"K-A3.11BUILDING K - LONGITUDINAL SECTION 1/4" = 1'-0"K-A3.12BUILDING K - CROSS SECTION 1ABDECFGHJKLMNORTHSITE KEY PLAN 1/4" = 1'-0"K-A3.13BUILDING K - CROSS SECTION 2BUILDING KBUILDING HBUILDING MBUILDING KNo. Description Date ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 3" = 1'-0"K-A4.1BUILDING KDETAIL ROOFEAVE, RAKE,PARAPETDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 3" = 1'-0"K-A4.11ROOF K - SECTIONAL GUTTER DETAILNo. Description Date K-A6.158679' - 8 7/8"4' - 11 5/8"2' - 9 1/4"6' - 11 5/8"K-A6.191011121' - 1 1/4"4' - 11 5/8"7' - 4" 9' - 11 3/8" 2' - 7 3/8"K-A6.1131416159' - 8 7/8"1' - 10"4' - 2 7/8"2' - 9"6' - 11 7/8"4' - 11 5/8"1' - 1 1/4"K-A6.1171819204' - 11 5/8"1' - 1 1/4"10' - 0"6' - 0 7/8"7' - 3" 2' - 9"BLDG K - LEVEL 1 NEW29' - 7 7/8"TYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLY8' - 0"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"BLDG K - LEVEL 1 NEW29' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"TYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLY8' - 0"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedK-A6.1BUILDING KTOILET PLANS &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"K-A6.11TOILET PLAN ( TYPE-40 ) 1/4" = 1'-0"K-A6.12TOILET PLAN ( TYPE-41 ) 1/4" = 1'-0"K-A6.13TOILET PLAN ( TYPE-42 ) 1/4" = 1'-0"K-A6.14TOILET PLAN ( TYPE-43 ) 1/4" = 1'-0"K-A6.15ELEVATION 5 1/4" = 1'-0"K-A6.16ELEVATION 6 1/4" = 1'-0"K-A6.17ELEVATION 7 1/4" = 1'-0"K-A6.18ELEVATION 8 1/4" = 1'-0"K-A6.19ELEVATION 9 1/4" = 1'-0"K-A6.110ELEVATION 10 1/4" = 1'-0"K-A6.111ELEVATION 11 1/4" = 1'-0"K-A6.112ELEVATION 12 1/4" = 1'-0"K-A6.113ELEVATION 13 1/4" = 1'-0"K-A6.114ELEVATION 14 1/4" = 1'-0"K-A6.115ELEVATION 15 1/4" = 1'-0"K-A6.116ELEVATION 16 1/4" = 1'-0"K-A6.117ELEVATION 17 1/4" = 1'-0"K-A6.118ELEVATION 18 1/4" = 1'-0"K-A6.119ELEVATION 19 1/4" = 1'-0"K-A6.120ELEVATION 20BLDG K - LEVEL 1, UNIT K-1 (1-BEDROOM)BLDG K - LEVEL 1, UNIT K-2 (1-BEDROOM)BLDG K - LEVEL 1, UNIT K-3 (1-BEDROOM)BLDG K - LEVEL 1, UNIT K-4 (1-BEDROOM)No. Description Date K-A6.2562' - 1"3' - 4 1/4"2' - 1"5' - 0"2' - 11 7/8"3' - 1 1/2"3' - 4 7/8"2' - 1"5' - 4"2' - 8 1/8" 7' - 11 7/8"7' - 5 7/8"K-A6.2782' - 1"3' - 4"2' - 0 7/8"2' - 6"4' - 10"2' - 7 7/8" 7' - 0" 2' - 11 5/8"3' - 2"1' - 6"3' - 11 1/8"7' - 5 7/8"9' - 11 5/8"K-A6.29102' - 1"3' - 3 7/8"2' - 1 1/4"2' - 6"4' - 10" 2' - 10 5/8" 5' - 1 1/8"3' - 2"3' - 3 5/8"2' - 1 1/8"7' - 11 7/8"7' - 6"K-A6.211123' - 2 1/8"3' - 0"2' - 5 1/8"4' - 11 3/4" 3' - 0 1/8"2' - 1"3' - 3 7/8"3' - 2 3/8"7' - 3 7/8"7 3/4" 7' - 11 7/8"8' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"2' - 10"1' - 8"3' - 0"2' - 10"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"6' - 0"1' - 6"2' - 10"1' - 8"3' - 0"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"2' - 10"1' - 8"3' - 0"2' - 10"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"6' - 0"1' - 6"2' - 10"1' - 8"3' - 0"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"2' - 10"1' - 8"3' - 0"2' - 10"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"6' - 0"1' - 6"2' - 10"1' - 8"3' - 0"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG K - LEVEL 1 NEW29' - 7 7/8"2' - 10"G (w) - 500 YEAR FLOOD29' - 7 1/4"1' - 8"3' - 0"3' - 2"1' - 6"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedK-A6.2BUILDING KKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"K-A6.21KITCHEN PLAN ( TYPE-36 ) 1/4" = 1'-0"K-A6.22KITCHEN TYPE ( TYPE-37 ) 1/4" = 1'-0"K-A6.23KITCHEN PLAN ( TYPE-38 ) 1/4" = 1'-0"K-A6.24KITCHEN PLAN ( TYPE-39 ) 1/4" = 1'-0"K-A6.25ELEVATION 5 1/4" = 1'-0"K-A6.26ELEVATION 6 1/4" = 1'-0"K-A6.27ELEVATION 7 1/4" = 1'-0"K-A6.28ELEVATION 8 1/4" = 1'-0"K-A6.29ELEVATION 9 1/4" = 1'-0"K-A6.210ELEVATION 10 1/4" = 1'-0"K-A6.211ELEVATION 11 1/4" = 1'-0"K-A6.212ELEVATION 12BLDG K - LEVEL 1, UNIT K-1 (1-BEDROOM)BLDG K - LEVEL 1, UNIT K-2 (1-BEDROOM)BLDG K - LEVEL 1, UNIT K-3 (1-BEDROOM)BLDG K - LEVEL 1, UNIT K-4 (1-BEDROOM)No. Description Date REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE EXTERIOR WINDOWS AT THIS LEVEL.REMOVE LOFT STRUCTURE AND PARTITIONS ABOVE.DEMOLISH PORTIONS OF MASONRY WALL AND RESUPPORT.DEMOLISH PORTIONS OF MASONRY WALL AND RESUPPORT.REMOVED RAISED FLOOR.REMOVE EXTERIOR DOOR. REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.LEGENDDEMOLISHED ELEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedK-D1.1BUILDING KDEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"K-D1.11BUILDING K - LEVEL 1 DEMOLITION PLANK-D1.12BUILDING K - DEMOLITION CUT-AWAY AXONOMETRICABDECFGHJKLMNORTHSITE KEY PLANNo. Description DateREMOVE PORTION OF MASONRY WALL AND RESUPPORT. SEE STRUCTURAL DRAWINGS.REMOVE ENTIRE LOFT STRUCTURE AND PARTITIONS.BUILDING HBUILDING KBUILDING MREMOVE ALL WINDOWS ON AT BUILDING KREMOVE EXTERIOR DOOR. UNIT K-2(2 BEDROOM)UNIT K-4(1 BEDROOM)UNIT K-1(1 BEDROOM)UNIT K-3(1 BEDROOM)ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"K-F1.1BUILDING KFURNITUREPLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"K-F1.11BUILDING K - LEVEL ONE, FURNITURE PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG L - LEVEL 129' - 7 7/8"BLDG L - 500 YEAR FLOOD27' - 4 5/8"BLDG L - LEVEL 129' - 7 7/8"REMOVE WOOD AND STONE STEPS AND REPLACE NEW STAIRS RAILINGS AND RAMP2' - 7 7/8"6 3/4"6 1/4"6 1/4"6 1/4"6 1/4"EL: 27'-0"BLDG L - 500 YEAR FLOOD27' - 4 5/8"BLDG L - LEVEL 129' - 7 7/8"REPLACE DETERIORATEDBRICK AND MORTARINSTALL NEW MASONRY IN AREAS DAMAGED BY MORTARED OPENINGSGRADE IS ABOUT 12" BELOW THE WINDOW SILLFLOOD VENT4' - 2 1/2"NEW STAIRS RAILINGS AND RAMPBLDG L - LEVEL 129' - 7 7/8"FLOOD VENTNEW STAIRS RAILINGS AND RAMPBLDG L - 500 YEAR FLOOD27' - 4 5/8"L-A2.1341' - 0"1' - 0"1' - 0"5' - 0"3' - 6" 3' - 6" 14' - 6"4' - 0"29' - 8"29'-1"27'-0"SLOPEScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"L-A2.1BUILDING LELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"L-A2.133BLDG L - ELEVATION NORTH 1/8" = 1'-0"L-A2.134BLDG L - ELEVATION SOUTH 1/8" = 1'-0"L-A2.136BLDG L - ELEVATION EAST 1/8" = 1'-0"L-A2.135BLDG L - ELEVATION WESTBUILDING 'L' RENOVATION NOTES:1. REPOINT BRICK PERIMETER (BUDGET 50% NEW MASONRY FOR BOTH EAST & WEST ELEVATION) 2. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE, INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR 3. REMOVE ALL SURFACE MOUNTED COUNDUITS AND CABLES SERVING THIS BLDG.4. REPLACE EXISTING FASCIAS AND SOFFITS, REMOVE EXISTING LEAD BASED PAINT. REPAINTABDECFGHJKLMNORTHSITE KEY PLAN 1/8" = 1'-0"L-A2.11BLDG L - LEVEL 1 LANDSCAPEEXISTING WOOD STAIRS AND RAILINGS TO BE DEMOLISHEDAREA OF DAMAGED MASONRY TO BE PATCHED AND REPAIREDNo. Description Date BLDG L - LEVEL 129' - 7 7/8"CRAWL SPACEBLDG L - 500 YEAR FLOOD27' - 4 5/8"BLDG L - LEVEL 129' - 7 7/8"CRAWL SPACEBLDG L - 500 YEAR FLOOD27' - 4 5/8"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"L-A3.1BUILDING LSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"L-A3.12BUILDING L - CROSS SECTION 1/4" = 1'-0"L-A3.11BUILDING L - CROSS SECTIONABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 3" = 1'-0"L-A4.1BUILDING LDETAIL ROOFEAVE, RAKE,PARAPETDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 3" = 1'-0"L-A4.11ROOF L - SECTIONAL GUTTER DETAILNo. Description Date L-A6.13245BUILDING M LEVEL 129' - 7 59/64"BUILDING C LEVEL 131' - 1 59/64"BUILDING G LEVEL 235' - 5 27/64"BUILDING L - LEVEL 129' - 7 59/64"BUILDING G LEVEL 1B30' - 6"BUILDING M LEVEL 129' - 7 59/64"BUILDING C LEVEL 131' - 1 59/64"BUILDING G LEVEL 235' - 5 27/64"BUILDING L - LEVEL 129' - 7 59/64"BUILDING G LEVEL 1B30' - 6"BUILDING M LEVEL 129' - 7 59/64"BUILDING C LEVEL 131' - 1 59/64"BUILDING G LEVEL 235' - 5 27/64"BUILDING L - LEVEL 129' - 7 59/64"BUILDING G LEVEL 1B30' - 6"BUILDING M LEVEL 129' - 7 59/64"BUILDING C LEVEL 131' - 1 59/64"BUILDING G LEVEL 235' - 5 27/64"BUILDING L - LEVEL 129' - 7 59/64"BUILDING G LEVEL 1B30' - 6"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedL-A6.1BUILDING LTOILET &KITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063BLDG L - LEVEL 1, UNIT L-1 (2-BEDROOM) 1/4" = 1'-0"L-A6.11TOILET PLAN 1/4" = 1'-0"L-A6.12ELEVATION A 1/4" = 1'-0"L-A6.13ELEVATION B 1/4" = 1'-0"L-A6.14ELEVATION C 1/4" = 1'-0"L-A6.15ELEVATION DNo. Description Date REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE ALL WINDOWS AT BUILDING L.TRANSFORMER PEN AND CHAIN LINK FENCE. SEE SITE DEMOLITION PLAN.REMOVE EXTERIOR DOORS.REMOVE EXTERIOR STOOP. REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.LEGENDDEMOLISHED ELEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedL-D1.1BUILDING LDEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"L-D1.11BLDG L - LEVEL 1 DEMOLITION PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"L-F1.1BUILDING LFURNITUREPLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"L-F1.11BLDG L - LEVEL 1 FURNITURE PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date 31M-A3.11M-A3.13M-A3.23M-A3.24M-A3.24M-A3.2TYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEL-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEL-1ARCTYPEH-1ARCACCESS TO BUILDING K BASEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"M-A1.1BUILDING MPLAN - LEVEL BDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063No. Description DateMARK Description13 EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPEB EXISTING BRICK WALLEC EXISTING CONCRETE WALLES EXISTING STONE WALLEW EXISTING WOOD WALLW1 UNIT SEPARATION WALLW2 CORRIDOR WALLW3 STAIRWELL WALLW4 8" CMU WALLW4A 6" CMU WALLW5 4" STUD NON-ACOUSTIC INTERIOR PARTITIONW5A 4" STUD ACOUSTIC INTERIOR PARTITIONW6A 6" STUD NON-ACOUSTIC INTERIOR PARTITIONW7 6" FURRING WALLW7A 4" FURRING WALLW7B 1 7/8" FURRING WALLW7C 6" BEARING WALLW7D 4" SHAFT WALLW8B 1-5/8" FURRING WALLW9 EXTERIOR BRICK VENEER WALL WITH 6" STUD BACKUPW9A EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPW9B EXTERIOR BRICK VENEER WALL WITH 4" STUD BACKUPW9X EXTERIOR BRICK VENEER WALL AT FLOOR LINEW10 EXTERIOR BOARD AND BATTEN WALL WITH 6" STUD BACKUPW11 INFILL BRICK WALL-15"W12 3" FURRING AT BATHROOMABDECFGHJKLMNORTHSITE KEY PLANM ATC H L INE M ATC H L INE 31M-A3.11M-A3.13M-A3.23M-A3.24M-A3.24M-A3.2TYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEL-1ARCTYPEH-1ARCTYPEL-1ARCTYPEH-1ARCTYPEH-1ARCTYPEL-1ARCTYPEH-1ARCScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"M-A1.2BUILDING MPLAN - LEVEL BDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063No. Description DateMARK Description13 EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPEB EXISTING BRICK WALLEC EXISTING CONCRETE WALLES EXISTING STONE WALLEW EXISTING WOOD WALLW1 UNIT SEPARATION WALLW2 CORRIDOR WALLW3 STAIRWELL WALLW4 8" CMU WALLW4A 6" CMU WALLW5 4" STUD NON-ACOUSTIC INTERIOR PARTITIONW5A 4" STUD ACOUSTIC INTERIOR PARTITIONW6A 6" STUD NON-ACOUSTIC INTERIOR PARTITIONW7 6" FURRING WALLW7A 4" FURRING WALLW7B 1 7/8" FURRING WALLW7C 6" BEARING WALLW7D 4" SHAFT WALLW8B 1-5/8" FURRING WALLW9 EXTERIOR BRICK VENEER WALL WITH 6" STUD BACKUPW9A EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPW9B EXTERIOR BRICK VENEER WALL WITH 4" STUD BACKUPW9X EXTERIOR BRICK VENEER WALL AT FLOOR LINEW10 EXTERIOR BOARD AND BATTEN WALL WITH 6" STUD BACKUPW11 INFILL BRICK WALL-15"W12 3" FURRING AT BATHROOMABDECFGHJKLMNORTHSITE KEY PLANM ATC H L INE M ATC H L INE MATCH LI NE MATCH LI N E 34M-A3.24M-A3.22JM-A1.12JM-A1.1TYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEL-1ARCTYPEH-1ARCTYPEH-1ARCTYPEL-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCTYPEH-1ARCEBScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"M-A1.3BUILDING MPLAN - LEVEL BDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063No. Description Date M ATCH L INE MATCH LI N EMARK Description13 EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPEB EXISTING BRICK WALLEC EXISTING CONCRETE WALLES EXISTING STONE WALLEW EXISTING WOOD WALLW1 UNIT SEPARATION WALLW2 CORRIDOR WALLW3 STAIRWELL WALLW4 8" CMU WALLW4A 6" CMU WALLW5 4" STUD NON-ACOUSTIC INTERIOR PARTITIONW5A 4" STUD ACOUSTIC INTERIOR PARTITIONW6A 6" STUD NON-ACOUSTIC INTERIOR PARTITIONW7 6" FURRING WALLW7A 4" FURRING WALLW7B 1 7/8" FURRING WALLW7C 6" BEARING WALLW7D 4" SHAFT WALLW8B 1-5/8" FURRING WALLW9 EXTERIOR BRICK VENEER WALL WITH 6" STUD BACKUPW9A EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPW9B EXTERIOR BRICK VENEER WALL WITH 4" STUD BACKUPW9X EXTERIOR BRICK VENEER WALL AT FLOOR LINEW10 EXTERIOR BOARD AND BATTEN WALL WITH 6" STUD BACKUPW11 INFILL BRICK WALL-15"W12 3" FURRING AT BATHROOMABDECFGHJKLMNORTHSITE KEY PLAN 3NEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEM NEW ALUM GUTTERS & DOWNSPOUTS, TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEM ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"M-A1.7BUILDING MROOF PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"M-A1.72BLDG M - LEVEL 3 roofABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date 1K-A3.11M-A3.13M-A3.23M-A3.24M-A3.24M-A3.2EAAEEEEB B B BB B B B BBBBBBBBB B BBBBBBBBB CCCCCEXITE XIT E XIT SDSDSDSDSDSDSDSDSDSDSDSDSDEQ EQEQ EQEQ8' - 0"EQ5' - 0" 5' - 0 1/8"EQEQ2/31/3EQ EQ1/32/3EQ EQ EQEQEQ EQ EQ EQ EQ14' - 11 7/8"EQEQEQ5' - 0" 2/3 1/3EQEQ EQEQ1/3 2/3 EQ EQEQEQ EQ1 EQ1 EQ15' - 0"EQEQ EQ EQEQEQ EQ 1/32/35' - 3 1/2"5' - 3 1/2"1/32/3EQ EQ EQ10' - 0"EQEQEQEQ EQ 2/31/3EQ EQ EQEQEQ EQ 5' - 0"EQ EQ EQEQEQEQ EQEQ EQEQEQEQEQ EQEQEQEQ AAAAAAAAEQ EQEQEQEQEQEQAAEQ BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedM-A1.11BUILDING MREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"M-A1.111BLDG M - LEVEL ONE, RCP (PART A)ABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMCL: 8'-0"CL: 8'-0"CL: 8'-0"CL: 8'-0"CL: 8'-0"No. Description Date 1K-A3.11K-A3.11M-A3.11M-A3.13M-A3.23M-A3.24M-A3.24M-A3.25M-A3.25M-A3.2AAAACCCCCCDDDDDDDEEEEESDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDBB B B B B B B B B B B B B BBB BBBBB BBBBB DDDEQ9' - 0"EQEQ EQ EQ EQEQEQ2/31/3EQ EQ1/32/3EQ EQ EQ EQ EQ EQ EQ15' - 0"EQ2/31/3EQ EQ2/31/3EQ EQ EQ6' - 11 5/8"EQ2/3 1/32/31/32/31/31/32/31/32/3EQ EQ EQ EQ EQ EQ EQ EQEQEQEQEQEQ1EQ1EQ 7' - 0"EQEQEQEQEQEQEQEQ7' - 0 1/4"EQ BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedM-A1.12BUILDING MREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"M-A1.121BLDG M - LEVEL ONE, RCP (PART B)ABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMCL: 8'-0"CL: 8'-0"CL: 8'-0"CL: 8'-0"CL: 8'-0"No. Description Date 4M-A3.24M-A3.25M-A3.25M-A3.2AAAAAADDDDCCCCCCEEEEBBBBEXI T SDSDSDSDSDSDSDSDSDSDSDSDSDB B B B B B B B B B B B B 2JM-A1.12JM-A1.1B EQ EQ EQEQEQ EQ EQ6' - 11 3/4"EQ5' - 4 5/8"5' - 4 3/8"2/31/32/31/3EQEQ 2/31/3EQ EQ3' - 2"6' - 4"EQ EQEQEQEQEQ EQ EQ EQ10' - 0"EQEQ EQ 2/31/3BCDAELIGHTING LEGENDBASELITE - WAREHOUSE SHADE 16" - BLACK (FURNISH WITH CORD FOR FIELD ADJUSTED HEIGHT)LITHONIA LIGHTING - LED LAMP STEP BAFFLE TRACK KIT BR20 LED LAMPPHILIPS - SLIMSURFACE 7" LED ROUND 2700KPROGRESS - LED CORD HUNG WAREHOUSE LIGHT-BRUSHED NICKELLITHONIA LIGHTING - CONTEMPORARY SQUARE VANITY - 2" 3000K CHROMEEXITEXIT LIGHTEXTERIOR WALL MOUNTED LIGHT @ 84" A.F.F.HARD WIRED SMOKE/CARBON MONOXIDE DETECTORSDCEILING HATCH FOR MECHANICAL ACCESSUTILITY 4 FOOT FLOURESCENTFREFLECTED CEILING PLAN SYMBOL LEGENDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONAREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OFCEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT, UNLESS OTHERWISE NOTED, IS 8'-0" A.F.F.AREA INDICATES NEW TAPED & PTD 5/8" GWB CEILING SYSTEM, COORDINATE INSTALLATION OF CEILINGS AT UPPER FLOORS WITH THE ROOF TYPES, THE CEILING HEIGHT TO FOLLOW SLOPE OF THE ROOF STRUCTUREAREA INDICATES EXPOSED METAL DECKING AND STEEL STRUCTURE TO BE PRIMED AND PAINTEDAREA INDICATES EXISTING STRUCTURE TO REMAIN EXPOSED (ABATE AS REQUIRED, REMOVE ALL EXISTING PAINT, SAND/PREP, APPLY MIN 3 COATS PAINT), ALL DUCTWORK TO REMAIN EXPOSED (PAINTED), ALL EXPOSED CONDUIT (PAINTED) TO BE COORDINATED W/ ARCHITECT PRIOR TO INSTALLATIONScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedM-A1.13BUILDING MREFLECTEDCEILING PLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"M-A1.131BLDG M - LEVEL ONE, RCP (PART C)ABDECFGHJKLMNORTHSITE KEY PLANBATHROOMBATHROOMBATHROOMBATHROOMCL: 8'-0"No. Description Date BLDG M - LEVEL 129' - 7 7/8"BLDG M - LEVEL B22' - 4 7/8"NEW LOW SLOPED ROOFING SYSTEMNEW ALUM GUTTERS & DOWNSPOUTS , TIE INTO NEW BELOW-GRADE PERIMETER DRAINAGE SYSTEMTYPICAL FOR ALL EAVES OF BLDG 'M' REPLACE EXISTING FASCIA, STRIP LEAD BASED PAINT FROM EXISTING WOOD TRIM & REPLACE 75% OF EXISTING WOOD OUTRIGGERS THAT ARE ROTTEN OR MISSING REMOVE EXISTING PAINT FROM EXISTING BRICKRESTORE EXISTING BASEMENT WINDOWS, TYPICAL.RESTORE EXISTING BASEMENT WINDOWS, TYPICAL.CORRIDOR ENTRANCE TO UNITS M1 THRU M11BLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"BLDG F - LEVEL 352' - 6 1/2"BLDG M - LEVEL 129' - 7 7/8"BLDG M - LEVEL B22' - 4 7/8"RESTORE EXISTING BASEMENT WINDOWS, TYPICAL.RESTORE EXISTING BASEMENT WINDOWS, TYPICAL.RESTORE EXISTING WINDOWS, BLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"BLDG F - LEVEL 352' - 6 1/2"BLDG M - LEVEL 129' - 7 7/8"BLDG M - LEVEL B22' - 4 7/8"REMOVE WOODEN DOGHOUSECOORDINATE STRUC ASSESSMENT OF THIS EXISTING STRUCTURAL REPAIR WITH THE STRUCTURAL ENGRBLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"BLDG M - LEVEL 129' - 7 7/8"BLDG M - LEVEL B22' - 4 7/8"FACE OF BLDG 'J'FACE OF BLDG 'M'BLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"BLDG M - LEVEL 129' - 7 7/8"BLDG M - LEVEL B22' - 4 7/8"FACE OF BLDG 'J'BLDG 'M''BRIDGE' BLDGCORRIDOR ENTRANCE TO UNITS M1 THRU M11BLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"M-A2.1BUILDING MELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"M-A2.137BUILDING M - ELEVATION NORTH 1/8" = 1'-0"M-A2.138BUILDING M - ELEVATION SOUTH 1 1/8" = 1'-0"M-A2.139BUILDING M - ELEVATION WEST 1 1/8" = 1'-0"M-A2.140BUILDING M - ELEVATION WEST 2 1/8" = 1'-0"M-A2.141BUILDING M - ELEVATION EASTBUILDING 'M' & 'BRIDGE' BLDG RENOVATION NOTES:1. REPOINT 5% BRICK PERIMETER 2. TYPICAL REMOVE ALL NONSTRUCTURAL APPURTENANCES ON EXTERIOR FACADE, INFILL EXPOSED OPGS WITH NEW MASONRY OR, IF LESS THAN 2"X2" NEW MORTAR ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG M - LEVEL 129' - 7 7/8"BLDG M - LEVEL B22' - 4 7/8"FIRE RATED DEMISING WALL7' - 3"BLDG M - LEVEL 129' - 7 7/8"BLDG M - LEVEL B22' - 4 7/8"KEY ENLARGED SECTIONSKEY ENLARGED SECTIONSM-A5.2M-A5.2M-A5.2ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedM-A3.1BUILDING MSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"M-A3.11BUILDING M - CROSS SECTION 1/8" = 1'-0"M-A3.12BUILDING M - KEY ENLARGED LONGITUDINAL SECTIONABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date BLDG M - LEVEL 129' - 7 7/8"BLDG M - LEVEL B22' - 4 7/8"FIRE RATED DEMISING WALLFIRE RATED DEMISING WALL7' - 3"BLDG K - 500 YEAR FLOOD27' - 4"BLDG K - 100 YEAR FLOOD26' - 9 1/2"BLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"G(e) 500 YEAR FLOOD26' - 6"G(e) 100 YEAR FLOOD26' - 0"BLDG M - LEVEL 129' - 7 7/8"BLDG M - LEVEL B22' - 4 7/8"FIRE RATED DEMISING WALL7' - 3"BLDG M - LEVEL 129' - 7 7/8"BLDG M - LEVEL B22' - 4 7/8"FIRE RATED DEMISING WALL7' - 3"BLDG K - 500 YEAR FLOOD27' - 4"BLDG K - 100 YEAR FLOOD26' - 9 1/2"BLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG H - 500 YEAR FLOOD27' - 0"BLDG H - 100 YEAR FLOOD25' - 8 3/8"G(e) 500 YEAR FLOOD26' - 6"G(e) 100 YEAR FLOOD26' - 0"BLDG L - 500 YEAR FLOOD27' - 4 5/8"ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/4" = 1'-0"M-A3.2BUILDING MSECTIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"M-A3.24BUILDING M - LONGITUDINAL SECTION (PART 2) 1/4" = 1'-0"M-A3.25BUILDING M - LONGITUDINAL SECTION (PART 3) 1/4" = 1'-0"M-A3.23BUILDING M - LONGITUDINAL SECTION (PART 1)Match LineMatch LineABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 3" = 1'-0"M-A4.1BUILDING MDETAIL ROOFEAVE, RAKE,PARAPETDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 3" = 1'-0"M-A4.11ROOF M - SECTIONAL GUTTER DETAILNo. Description Date M-A6.167982' - 9"7' - 2 5/8"4' - 11 5/8"1' - 1 1/8" 6' - 0 7/8"9' - 11 5/8"M-A6.11213111010' - 0"6' - 0 7/8"2' - 9 3/8"7' - 2 5/8"4' - 11 5/8"1' - 1 1/4"M-A6.1141517169' - 9 7/8"6' - 4"6' - 8 7/8"3' - 1 1/8"4' - 11 7/8"1' - 4 1/4"TYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLY8' - 0"BLDG M - LEVEL 129' - 7 7/8"TYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLY8' - 0"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"TYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLY8' - 0"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedM-A6.1BUILDING MTOILET PLANS &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"M-A6.11TOILET PLAN ( TYPE-45 ) 1/4" = 1'-0"M-A6.12TOILET PLAN ( TYPE-46 ) 1/4" = 1'-0"M-A6.13TOILET PLAN ( TYPE-47 ) 1/4" = 1'-0"M-A6.16ELEVATION 6 1/4" = 1'-0"M-A6.17ELEVATION 7 1/4" = 1'-0"M-A6.18ELEVATION 8 1/4" = 1'-0"M-A6.19ELEVATION 15BLDG M - LEVEL 1, UNIT M-1 (1-BEDROOM)BLDG M - LEVEL 1, UNIT M-3 (2-BEDROOM)BLDG M - LEVEL 1, UNIT M-5 (2-BEDROOM) 1/4" = 1'-0"M-A6.112ELEVATION 12 1/4" = 1'-0"M-A6.113ELEVATION 13 1/4" = 1'-0"M-A6.110ELEVATION 10 1/4" = 1'-0"M-A6.111ELEVATION 11BLDG M - LEVEL 1, UNIT M-2 (2-BEDROOM) 1/4" = 1'-0"M-A6.114ELEVATION 14 1/4" = 1'-0"M-A6.116ELEVATION 16 1/4" = 1'-0"M-A6.117ELEVATION 15BLDG M - LEVEL 1, UNIT M-4 (2-BEDROOM)No. Description Date 1/4" = 1'-0"M-A6.115ELEVATION 15 3M-A6.224359' - 5 7/8"5' - 0"6' - 8 7/8"2' - 9"BLDG M - LEVEL 129' - 7 7/8"TYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLY8' - 0"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"3G (w) - 500 YEAR FLOOD29' - 7 1/4"3M-A6.2791085' - 11 3/8" 5' - 0"2' - 9"9' - 6 7/8"6' - 9 7/8"BLDG M - LEVEL 129' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"TYPICAL -NEW SUSPENDED MR GWB CLG ASSEMBLY8' - 0"G (w) - 500 YEAR FLOOD29' - 7 1/4"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedM-A6.2BUILDING MTOILET PLANS &ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"M-A6.21TOILET PLAN ( TYPE-48 ) 1/4" = 1'-0"M-A6.22ELEVATION 2 1/4" = 1'-0"M-A6.23ELEVATION 3 1/4" = 1'-0"M-A6.24ELEVATION 4 1/4" = 1'-0"M-A6.25Elevation 5BLDG M - LEVEL 1, UNIT M-6 (2-BEDROOM)BLDG M - LEVEL 1, UNIT M-7 (2-BEDROOM)BLDG M - LEVEL 1, UNIT M-9 (2-BEDROOM) 1/4" = 1'-0"M-A6.26TOILET PLAN ( TYPE-49 ) 1/4" = 1'-0"M-A6.27ELEVATION 7 1/4" = 1'-0"M-A6.28ELEVATION 8 1/4" = 1'-0"M-A6.29ELEVATION 9 1/4" = 1'-0"M-A6.210ELEVATION 10BLDG M - LEVEL 1, UNIT M-4 (1-BEDROOM)BLDG M - LEVEL 1, UNIT M-8 (2-BEDROOM)BLDG M - LEVEL 1, UNIT M-10 (2-BEDROOM)BLDG M - LEVEL 1, UNIT M-11 (2-BEDROOM)No. Description Date M-A6.3563' - 2"3' - 3 7/8"2' - 1 1/4"6' - 5 5/8" 3' - 0 1/4"1' - 1"7' - 6"2' - 6"4' - 10"2' - 1 7/8"M-A6.3782' - 1"3' - 4"2' - 1"8' - 0"2' - 11 3/4"2' - 5 1/4"2' - 11 3/4"3' - 1"2' - 6"4' - 10"3' - 7 7/8"7' - 6"10' - 11 3/4"M-A6.39103' - 2"2' - 11 3/4"2' - 5 1/4"8' - 0"2' - 11 7/8"2' - 1"3' - 4"2' - 1"2' - 6"4' - 10"3' - 7 7/8"7' - 6"10' - 11 7/8"M-A6.311122' - 1"3' - 3 7/8"2' - 1"3' - 1"4' - 10 1/8"2' - 5 3/4"2' - 5 1/4"2' - 11 5/8"3' - 2"7' - 5 7/8"2' - 11"7' - 5 7/8"10' - 5 1/8"BLDG M - LEVEL 129' - 7 7/8"6' - 0"1' - 6"2' - 10"1' - 8"3' - 0"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"2' - 10"1' - 8"3' - 0"2' - 10"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"2' - 10"1' - 8"3' - 0"2' - 10"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"BLDG G ROOF TRUSS44' - 5 7/8"2' - 10"1' - 8"3' - 0"6' - 0"1' - 6"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"2' - 10"1' - 8"3' - 0"2' - 10"3' - 2"1' - 6"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"2' - 10"1' - 8"3' - 0"2' - 10"G (w) - 500 YEAR FLOOD29' - 7 1/4"1' - 8"3' - 0"2' - 10"1' - 6"1' - 8"3' - 0"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedM-A6.3BUILDING MKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"M-A6.31KITCHEN PLAN ( TYPE-41 ) 1/4" = 1'-0"M-A6.32KITCHEN PLAN ( TYPE-42 ) 1/4" = 1'-0"M-A6.33KITCHEN PLAN ( TYPE-43 ) 1/4" = 1'-0"M-A6.34KITCHEN PLAN ( TYPE-44 ) 1/4" = 1'-0"M-A6.35ELEVATION 5 1/4" = 1'-0"M-A6.36ELEVATION 6 1/4" = 1'-0"M-A6.37ELEVATION 7 1/4" = 1'-0"M-A6.38ELEVATION 8 1/4" = 1'-0"M-A6.39ELEVATION 9 1/4" = 1'-0"M-A6.310ELEVATION 10 1/4" = 1'-0"M-A6.311ELEVATION 11 1/4" = 1'-0"M-A6.312ELEVATION 12BLDG M - LEVEL 1, UNIT M-1 (1-BEDROOM)BLDG M - LEVEL 1, UNIT M-2 (2-BEDROOM)BLDG M - LEVEL 1, UNIT M-3 (2-BEDROOM)BLDG M - LEVEL 1, UNIT M-4 (2-BEDROOM)No. Description Date M-A6.4232' - 6"4' - 10 1/8"2' - 7"3' - 2"2' - 0 1/4"3' - 4 5/8"7' - 0"2' - 11 1/8"2' - 1"3' - 3 7/8"2' - 1 1/4"9' - 11 1/8"7' - 6"BLDG M - LEVEL 129' - 7 7/8"2' - 10"1' - 8"3' - 0"2' - 10"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"2' - 10"1' - 8"3' - 0"6' - 0"1' - 6"G (w) - 500 YEAR FLOOD29' - 7 1/4"M-A6.4676' - 6"2' - 11 7/8"2' - 1 1/8"3' - 3 7/8"2' - 1"2' - 6"4' - 10"2' - 1 7/8"3' - 2"3' - 4 1/8"2' - 0 7/8"M-A6.4892' - 1 7/8"4' - 11"2' - 6"2' - 1"2' - 1"3' - 3 7/8"6' - 7 3/4"2' - 0 7/8"6' - 5 7/8" 7' - 5 7/8"2' - 11"9' - 6 7/8"BLDG M - LEVEL 129' - 7 7/8"2' - 10"1' - 8"3' - 0"2' - 10"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG M - LEVEL 129' - 7 7/8"2' - 10"G (w) - 500 YEAR FLOOD29' - 7 1/4"1' - 8"3' - 0"INTERIOR ELEVATION GENERAL NOTES1.FOR TYPICAL MOUNTING HEIGHTS AND LOCATION OF WALL MOUNTED ELEMENTS SEE REFERENCE SHEET R.42.FOR MIRROR SIZES AND TYPES SEE REFERENCE SHEET R.43.FOR MEDICINE CABINET HEIGHTS AND LOCATION SEE REFERENCE SHEET R.44.FOR ACCESSIBLITY REQUIREMENTS (COUNTER HEIGHTS AND KICK SPACES) SEE REFERENCE SHEET R.45.(1) 18" AND (1) 24" TOWEL BAR PER BATHROOM UNIT. SEE REFERENCE SHEET R.4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedM-A6.4BUILDING MKITCHEN PLANS& ELEVATIONSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/4" = 1'-0"M-A6.41KITCHEN PLAN ( TYPE-45 ) 1/4" = 1'-0"M-A6.42ELEVATION 2 1/4" = 1'-0"M-A6.43ELEVATION 3 1/4" = 1'-0"M-A6.44KITCHEN PLAN ( TYPE-46 ) 1/4" = 1'-0"M-A6.45KITCHEN PLAN ( TYPE-47 ) 1/4" = 1'-0"M-A6.46ELEVATION 6 1/4" = 1'-0"M-A6.47ELEVATION 7 1/4" = 1'-0"M-A6.48ELEVATION 8 1/4" = 1'-0"M-A6.49ELEVATION 9BLDG M - LEVEL 1, UNIT M-5 (1-BEDROOM)BLDG M - LEVEL 1, UNIT M-6 (2-BEDROOM)BLDG M - LEVEL 1, UNIT M-7 (2-BEDROOM)BLDG M - LEVEL 1, UNIT M-9 (2-BEDROOM)BLDG M - LEVEL 1, UNIT M-11 (2-BEDROOM)BLDG M - LEVEL 1, UNIT M-8 (2-BEDROOM)BLDG M - LEVEL 1, UNIT M-10 (2-BEDROOM)No. Description Date REMOVE ALL NON-STRUCTURAL INTERIOR PARTITIONS AND CEILINGS ENTIRELYREMOVE ALL EXTERIOR WINDOWS AT BUILDING M.SEE SITE DEMOLITION PLAN FOR EXTERIOR STRUCTURES.REMOVE EXTERIOR DOOR.REMOVE EXTERIOR STOOP AND ROOF.SEE SITE DEMOLITION PLAN FOR EXTERIOR STRUCTURES.SEE SITE DEMOLITION PLAN FOR EXTERIOR STRUCTURES.REMOVE ALL WINDOWS AT MJ CONNECTING BRIDGE.REMOVE ALL EXTERIOR WINDOWS AT BUILDING M.REMOVE EXTERIOR DOORS AND STOOP. REMOVE ALL EXISTING CONSTRUCTIONS AND FINISHES NECESSARY FOR THE COMPLETION OF THE WORK AS DEPICTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO, ITEMS SHOWN ON THE PLANS WITH DASHED LINES. NECESSARY DISCONNECTS AND ALTERATIONS TO EXISTING MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE INCLUDED. PATCH AS REQUIRED ALL CONSTRUCTIONS TO REMAIN IN ACCORDANCE WITH THE CONTRACT DRAWINGS. WHERE CONTRACTOR IS DESIGNED TO MAKE REMOVALS, DISPOSITION OF MATERIALS IS THE RESPOSIBILITY OF THE CONTRACTOR. VERIFY WITH OWNER, THE DISPOSITION AND REMOVAL OF ANY COMPONENTS OF SALVAGEABLE VALUE. REMOVE ONLY NON-BEARING CONSTRICTION AND PARTITIONS UNLESS OTHERWISE DESIGNATED. CONTRACTOR TO VERIFY, PRIOR TO REMOVAL,THAT NO STRUCTURAL COMPONENTS, I.E. BEARING WALLS, BEAMS, HEADERS, ETC. SUPPORTING FLOOR, ROOF OR CEILING JOISTS ARE DESIGNATED FOR REMOVAL. CONTACT THE ARCHITECT PRIOR TO REMOVAL OF ANY WORK INDICATES HIS COMPLETE UNDERSTANDING THAT NO LOAD BEARING OR STRUCTURAL WORK IS BEING ALTERED UNDER THIS CONTRACT. ALL STRUCTURAL SYSTEMS SHALL BE MAINTAINED AND SHALL BE SUFFICIENT STRENGTH TO SUPPORT THE DESIGN LOAD AND TO RESIST THE DEFORMATION CAUSED BY SUCH LOADS. WHERE APPLICABLE LEVEL ALL EXISTING FLOORS AS REQUIRED TO RECEIVE NEW FLOOR FINISHES. INSTALL REQUIRED TRANSITION PIECES BETWEEN VARIOUS FLOOR FINISHES SUITABLE FOR CONDITIONS AND ACCEPTABLE TO THE OWNER. MATCH EXISTING WHEREVER POSSIBLE. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. NO DEMOLITION WORK SHALL COMMENCE WITHOUT FIELD VERIFICATION BY THE CONTRACTOR, OWNER AND ARCHITECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND REMOVE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS EQUIPMENT AS REQUIRED TO COMPLETE THE WORK. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR DEMOLITION INFORMATION. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY, SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE CONTRACTOR SHALL COORDINATE AND ARRANGE FOR THE DISCONNECTION OF ALL UTILITIES AND EQUIPMENT WITH THE OWNER AND UTILITY COMPANIES. THE CONTRACTOR SHALL CAP OFF ALL UNUSED UTILITIES. THE CONTRACTOR SHALL REMOVE, DISCONNECT AND SALVAGE ALL MECHANICAL, ELECTRICAL AND MISCELLANEOUS WALL MOUNTED EQUIPMENT FOR RECONNECT AND REINSTALLATION. THE CONSTRUCTOR SHALL ALLOW NO DEBRIS TO ACCUMULATE ON THE SITE. IMMEDIATELY REMOVE ALL DEBRIS AND SALVAGE FROM THE SITE. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY OWNER SHALL BECOME THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE PROMPTLY DISPOSED OF FROM THE SITE. IT IS THE CONTRACTOR'S RESPOSIBILITY TO PROVIDE SECURE, DRY STORAGE WITHIN THE DESIGNATED CONTRACTOR LAY-DOWN AREA OR AN AREA DESIGNATED BY OWNER FOR OWNER RETAINED ITEMS.GENERAL DEMOLITION NOTES:1.2.3.4.5.6.7.8.9.10.11.12.13.LEGENDDEMOLISHED ELEMENTScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18As indicatedM-D1.1BUILDING MDEMO PLANSDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"M-D1.11BUILDING M - LEVEL 1, DEMOLITION PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date UNIT M-1(1 BEDROOM)UNIT M-2(2 BEDROOM)UNIT M-6(2 BEDROOM)UNIT M-7(2 BEDROOM)UNIT M-8(2 BEDROOM)UNIT M-9(2 BEDROOM)UNIT M-3(2 BEDROOM)UNIT M-5(2 BEDROOM)UNIT M-10(2 BEDROOM)UNIT M-11(2 BEDROOM)UNIT M-4(2 BEDROOM)ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"M-F1.1BUILDING MFURNITUREPLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063 1/8" = 1'-0"M-F1.11BUILDING M - LEVEL ONE, FURNITURE PLANABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date 3BUILDING M29' - 8"29' - 8"UNIT M-1(1 BEDROOM)UNIT M-2(2 BEDROOM)UNIT M-6(2 BEDROOM)UNIT M-7(2 BEDROOM)UNIT M-9(2 BEDROOM)UNIT M-8(2 BEDROOM)UNIT M-9(2 BEDROOM)UNIT M-3(2 BEDROOM)UNIT M-5(2 BEDROOM)UNIT M-10(2 BEDROOM)UNIT M-11(2 BEDROOM)UNIT M-4(2 BEDROOM)SPRINKLER ROOMTYPEE-3ARCTYPEE-3ARCTYPEE-3ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-1ARCTYPEE-1ARCTYPEE-1ARCTYPEE-1ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARCTYPEE-2ARC2JM-A1.12JM-A1.1 1/8" = 1'-0"M-KP1.11BUILDING M - LEVEL ONEScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, CT1 90% CONST DOCS 11/1/162 90% CONST DOCS 10/31/173 FINAL CONST DOCS 07/13/184 FINAL CONST DOCS 10/12/18 1/8" = 1'-0"M-KP1.1BUILDING M KEYPLANDakotaPartners, Inc.OXOBOXOLOFTSCheckerAuthor10/12/201816-063MARK Description13 EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPEB EXISTING BRICK WALLEC EXISTING CONCRETE WALLES EXISTING STONE WALLEW EXISTING WOOD WALLW1 UNIT SEPARATION WALLW2 CORRIDOR WALLW3 STAIRWELL WALLW4 8" CMU WALLW4A 6" CMU WALLW5 4" STUD NON-ACOUSTIC INTERIOR PARTITIONW5A 4" STUD ACOUSTIC INTERIOR PARTITIONW6A 6" STUD NON-ACOUSTIC INTERIOR PARTITIONW7 6" FURRING WALLW7A 4" FURRING WALLW7B 1 7/8" FURRING WALLW7C 6" BEARING WALLW7D 4" SHAFT WALLW8B 1-5/8" FURRING WALLW9 EXTERIOR BRICK VENEER WALL WITH 6" STUD BACKUPW9A EXTERIOR BRICK VENEER WALL WITH 8" STUD BACKUPW9B EXTERIOR BRICK VENEER WALL WITH 4" STUD BACKUPW9X EXTERIOR BRICK VENEER WALL AT FLOOR LINEW10 EXTERIOR BOARD AND BATTEN WALL WITH 6" STUD BACKUPW11 INFILL BRICK WALL-15"W12 3" FURRING AT BATHROOMABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date GENERAL STRUCTURAL NOTESCODES AND STANDARDS1. 2016 CONNECTICUT STATE BUILDING CODE.2. AMERICAN INSTITUTE OF STEEL CONSTRUCTION "SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS" − AISC−10 (AISC)3.AMERICAN CONCRETE INSTITUTE "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE" ACI 318−11 (ACI)4. AMERICAN CONCRETE INSTITUTE "BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES" ACI 530−11 (ACI 530)5. AMERICAN IRON AND STEEL INSTITUTE "NORTH AMERICAN SPECIFICATION FOR DESIGN OF COLD−FORMED STEEL STRUCTURAL MEMBERS, WITH SUPPLEMENT 1, DATED 2010 (AISI)6. AMERICAN FOREST & PAPER ASSOCIATION "NATIONAL DESIGN SPECIFICATION (NDS) FOR WOOD CONSTRUCTION WITH 2012 SUPPLEMENT" (AF&PA)GENERAL 1. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY SHORING AND BRACING TO MAINTAIN THE STABILITY, SAFETY, AND LATERAL LOAD RESISTANCE OF THE BUILDING AND ITS INDIVIDUAL COMPONENTS THROUGHOUT CONSTRUCTION.2. DIMENSIONS AND DETAILS SHALL BE CHECKED AGAINST ARCHITECTURAL DRAWINGS. 3. THE CONTRACTOR SHALL VERIFY AND COORDINATE THE SIZE AND LOCATION OF ALL OPENINGS, SLEEVES AND ANCHOR BOLTS AS REQUIRED BY ALL TRADES. OPENINGS NOT SPECIFICALLY SHOWN SHALL BE APPROVED BY THE ARCHITECT AND ENGINEER. 4. DIMENSIONS SHOWN ON THE STRUCTURAL DRAWINGS ARE GENERALLY OBTAINED FROM THE ARCHITECT AND ARE INCLUDED AS INFORMATION COMPLEMENTARY TO THE ARCHITECTURAL DRAWINGS. LAYOUT OF BUILDING FOUNDATIONS OR OTHER ITEMS MAY BY MADE USING THE DIMENSIONS SHOWN ON THE STRUCTURAL DRAWINGS ONLY IF THE CONTRACTOR HAS COMPARED THESE DRAWINGS WITH THE ARCHITECTURAL DRAWING AND HAS RECEIVED CLARIFICATION, FROM THE ARCHITECT, REGARDING ANY ERRORS, INCONSISTENCIES, OR OMISSIONS. 5. DO NOT SCALE DRAWINGS TO OBTAIN INFORMATION.DEFERRED SUBMITTALS:1. STEEL CONNECTION DETAILING AND DESIGN FOR CONNECTIONS BETWEEN BEAMS, COLUMNS AND BRACES.2. CFMF − CONNECTION DESIGN AND DETAILING.BUILDING DESIGN LOADS1. DESIGN LIVE LOADSPUBLIC ROOMS AND CORRIDORS SERVING THEM: 100PSFPRIVATE ROOMS AND CORRIDORS SERVING THEM: 40PSF2. SNOW LOADSGROUND SNOW LOAD: PG = 30IMPORTANCE FACTOR: IS = 1.0FLAT ROOF SNOW LOAD: PF = 30PSF SNOW EXPOSURE FACTOR: CE = 1.0THERMAL FACTOR: CR = 1.03. WIND LOADSNOINAL WIND SPEED, RISK CATII: 105 MPHWIND EXPOSURE CATEGORY: B4. SEISMIC LOADSSPECTRAL RESPONSE ACCELERATION AT SHORT PERIODS: SS=0.165SPECTRAL RESPONSE ACCELERATION AT ONE-SECOND PERIODS: S1=0.059SEISMIC USE GROUP: ISEISMIC DESIGN CATEGORY: BSITE CLASS: CANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE METHODIMPORTANCE FACTOR IE: 1.0SDS: 0.132SD1: 0.067CS: 0.088 (MASONRY) 0.020(LIGHT-FRAME WALLS)S LATERAL LOAD RESISTING SYSTEMS:AT EXISTING BUILDINGS - ORDINARY PLAN MASONRY SHEAR WALLSR=1.5 CD=1.25AT NEW MEZZANINE - LIGHT-FRAME WALLS SHEATHED WITH WOOD STRUCTURAL PANELS RATED FOR SHEAR RESISTANCE R=6.5 CD=4FOUNDATIONS1. FOUNDATIONS HAVE BEEN DESIGNED IN ACCORDANCE WITH ASSUMED VALUES FROM THE BUILDING CODE.2. ALL FOOTINGS SHALL BEAR ON UNDISTURBED NATURAL MATERIAL OR CONTROLLED STRUCTURAL FILL HAVING AN ALLOWABLE BEARING VALUE OF 1.5 KSF.3. ALL FOOTINGS SHALL BEAR AT LEAST 3’−6" BELOW FINISH GRADE. 4. ELEVATIONS OF THE BOTTOM OF FOOTING SHOWN ON PLANS ARE FOR BIDDING PURPOSES AND REPRESENT THE HIGHEST ALLOWABLE ELEVATION. THE BOTTOM OF FOOTING SHALL BE LOWERED AS REQUIRED TO BEAR ON SUITABLE MATERIAL AS DEFINED ABOVE OR UNSUITABLE MATERIAL SHALL BE REMOVED AND REPLACED WITH STRUCTURAL FILL. 5. EXISTING UN−COMPACTED FILLS WITHIN THE BUILDING FOOTPRINT SHALL BE REMEDIATED EITHER BY REMOVAL AND REPLACEMENT, OR GROUND IMPROVEMENT DESIGNED TO ACHIEVE 1.5KSF BEARING CAPACITY.6. FOR SLAB ON GRADE AREAS WITHIN BUILDING PERIMETER, REMOVE ALL SURFACE TOPSOIL, PAVEMENT, AND OTHER UNSUITABLE MATERIALS. REPLACE WITH COMPACTED GRANULAR FILL. 7. FOUNDATION WALLS ARE GENERALLY NOT DESIGNED AS FREESTANDING RETAINING WALLS. AS SUCH THEY MUST BE BACKFILLED ON BOTH SIDES EQUALLY OR TEMPORARILY BRACED UNTIL OTHER STRUCTURAL ELEMENTS WHICH BRACE THESE WALLS ARE IN PLACE. 8. PIPES AND OTHER M.E.P. ELEMENTS SHALL PASS THROUGH FOUNDATION WALL, NOT UNDER FOTTINGS. STEP FOOTINGS AS REQUIRED TO PASS UNDER THESE SYSTEMS. PROVIDE SLEEVES FOR ALL PENETRATIONS IN FOUNDATION WALL. REINFORCED CONCRETE1. ALL CONCRETE SHALL BE NORMAL WEIGHT (UNLESS INDICATED AS LIGHT WEIGHT ON PLANS) WITH A 28 DAY COMPRESSIVE STRENGTH AS FOLLOWS: WALLS AND FOUNDATIONS 3000 PSISLABS ON GRADE 4000 PSICOMPOSITE CONCRETE SLABS 3500 PSI NORMAL WEIGHT CONCRETE TO HAVE A UNIT WEIGHT OF: 150-154PSF(WET)/146-150PSF(DRY)LIGHT WEIGHT CONCRETE TO HAVE A UNIT WEIGHT OF: 120-125PSF(WET)/115-120PSF(DRY)2. ALL CONCRETE EXPOSED TO FREEZE−THAW CYCLES SHALL BE AIR ENTRAINED.3. ALL REINFORCING BARS SHALL BE HIGH STRENGTH DEFORMED BARS CONFORMING TO ASTM A 615 ˘ GRADE 60.4. ALL REINFORCING BARS FOR WELDING TO STRUCTURAL STEEL SHALL CONFORM TO ASTM A706 WELDABLE REINFORCING. 5.ALL REINFORCING BARS SHALL BE DETAILED IN ACCORDANCE WITH ˆACI DETAILING MANUAL.˜ SHOW THE NUMBER AND LOCATION OF ALL BAR SUPPORTS AND ACCESSORIES NECESSARY TO SUPPORT REINFORCEMENT IN POSITIONS INDICATED ON THE PLACING DRAWINGS. 6. MINIMUM CLEAR COVER FOR REINFORCEMENT WHEN NOT OTHERWISE INDICATED SHALL BE: CONCRETE POURED AGAINST EARTH 3"CONCRETE POURED IN FORMS BUT EXPOSED TO EARTH OF WEATHER: A. BARS #5 AND SMALLER 1 ½"B. BARS LARGER THAN #5 2"SLABS, WALLS NOT EXPOSED TO EARTH OR WEATHER ¾" 7. NO SPLICES OF REINFORCEMENT SHALL BE MADE EXCEPT AS DETAILED OR APPROVED BY THE STRUCTURAL ENGINEER. DEVELOPMENT / SPLICE LENGTH SHALL BE AS SHOWN ON THE TABLE IN THE TYPICAL DETAILS UNLESS OTHERWISE NOTED. VALUES SHOWN ARE IN INCHES. MAKE ALL BARS CONTINUOUS AROUND CORNERS. 8.SLABS, BEAMS AND WALLS SHALL HAVE NO JOINTS IN A HORIZONTAL PLANE. ANY STOP IN CONCRETE WORK MUST BE MADE AT CENTER OF SPAN OR AT CENTER OF SUPPORT WITH VERTICAL BULKHEADS, HORIZONTAL KEYS AND REINFORCING CONTINUING THROUGH. ALL CONSTRUCTION JOINTS SHALL BE AS DETAILED OR AS APPROVED BY THE STRUCTURAL ENGINEER. 9. WIRE MESH REINFORCEMENT MUST LAP ONE FULL MESH AT SIDE AND END LAPS, AND SHALL BE WIRED TOGETHER. PROVIDE ADEQUATE SUPPORTS FOR MESH TO INSURE ITS LOCATION AS SHOWN ON DRAWINGS. MASONRY1. ALL MASONRY SHALL DEVELOP 1500 PSI ULTIMATE COMPRESSIVE STRENGTH (FM) IN 28 DAYS.2. ALL MORTAR SHALL BE TYPE S.3. FILL ALL VOIDS AND BLOCK CELLS SOLIDLY WITH GROUT FOR A DISTANCE OF 24˜ BENEATH AND 12˜ EACH SIDE OF ALL BEAM REACTIONS OR OTHER CONCENTRATED LOADS. 4.ALL REINFORCING BARS SHALL CONFORM TO ASTM A615, GRADE 60.5. ALL REINFORCING IN MASONRY SHALL BE FULLY GROUTED IN PLACE USING HIGH LIFT (OR LOW LIFT) GROUTING TECHNIQUES. SEE SPECIFICATIONS FOR DETAILS. CLEANOUTS SHALL BE PROVIDED FOR ALL GROUT POURS OVER 5 FEET IN HEIGHT AND SHALL BE PROVIDED AT THE BOTTOM OF ALL VERTICAL CELLS CONTAINING REINFORCING. 6.NO SPLICES IN REINFORCING BARS SHALL BE MADE EXCEPT AS DETAILED OR APPROVED BY THE STRUCTURAL ENGINEER. WHERE PERMITTED, ALL SPLICES SHALL BE LAPPED AS FOLLOWS#3 BARS - 1-6"#4 BARS - 2-0"#5 BARS - 2-6"#6 BARS - 3-0"#7 BARS - 3-6"7. VERTICAL REINFORCING BARS SHALL BE PLACED USING GALVANIZED OR PLASTIC BAR POSITIONERS.8.HORIZONTAL REINFORCING SHALL BE 9 GAGE WIRE CONFORMING TO ASTM A82 AND SHALL BE PLACED EVERY OTHER COURSE U.N.O.9. ALL MASONRY SHALL BE PLACED IN RUNNING BOND U.N.O.STRUCTURAL STEEL1. ALL STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING UNLESS NOTED OTHERWISE ON THE DRAWINGS:ALL WIDE FLANGE SHAPES: ASTM A572 OR A992, GRADE 50ALL TUBULAR SECTIONS: ASTM A500, GRADE BALL PIPE SECTIONS: ASTM A53, GRADE BANCHOR RODS: ASTM F1554, GRADE 36ALL MISC. PLATES AND ASTM A36CONNECTION MATERIALS:2. STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED IN ACCORDANCE WITH THE AISC SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, ASD OR LRFD AND THE AISC CODE OF STANDARD PRACTICE. 3. WIND/SEISMIC CONNECTIONS: LATERAL LOAD CONNECTIONS INDICATED ON THE DRAWING ARE IN ADDITION TO THE GRAVITY CONNECTIONS REQUIRED.4. ALL HIGH STRENGTH BOLTS SHALL CONFORM TO THE CURRENT SPECIFICATIONS FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS AS ENDORSED BY AISC. ALL BEAM TO COLUMN CONNECTIONS SHALL BE MADE WITH HIGH STRENGTH BOLTS AND SHALL BE FULLY TENSIONED. ALL OTHER HIGH STRENGTH BOLTED CONNECTIONS MAY BE SNUG TIGHT UNLESS NOTED AS SLIP CRITICAL ON DRAWING.5. THE STRUCTURAL STEEL FABRICATOR SHALL SUBMIT CALCULATIONS FOR EACH TYPE OF CONNECTION UTILIZED ON THE PROJECT. 6. CALCULATIONS SHALL BE PREPARED BY A REGISTERED PROFESSIONAL ENGINEER. CONNECTIONS INCLUDE, BUT ARE NOT LIMITED TO, GRAVITY FRAME CONNECTIONS, MOMENT CONNECTIONS, AND BRACED FRAMING CONNECTIONS. 7. UNLESS SPECIFICALLY NOTED, STEEL DETAILS SHOWN ON THE DRAWINGS ARE FOR CONCEPT ONLY AND DO NOT INDICATE THE REQUIRED NUMBER OF BOLTS, SIZE OF WELD, ETC.8. ALL WELDING SHALL CONFORM TO THE REQUIREMENTS OF THE AMERICAN WELDING SOCIETY (AWS) STRUCTURAL WELDING CODE ˘ STEEL D1.1, LATEST EDITION. USE E70XX ELECTRODES UNLESS NOTED OTHERWISE. 9. ALL STEEL DECK SHALL BE DETAILED, ERECTED AND FASTENED IN ACCORDANCE WITH THE MANUFACTURERS SUGGESTED SPECIFICATIONS AND THE CURRENT STEEL DECK INSTITUTE SPECIFICATIONS. 10. PROVIDE ALL PLATES, CLIP ANGLES, CLOSURE PIECES, STRAP ANCHORS, MISCELLANEOUS PIECES, AND HOLES REQUIRED TO COMPLETE THE STRUCTURE. 11. ALL LINTELS SHALL HAVE 6˜ MINIMUM BEARING EACH END UNLESS NOTED OTHERWISE.POST−INSTALLED FASTENERS AND ANCHORS1. ALL HOLES INTO MASONRY OR CONCRETE WALLS FOR PROPRIETARY ANCHORING SYSTEMS SHALL BE DRILLED AND CLEANED IN STRICT ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS.2. ALL PROPRIETARY ANCHORING SYSTEMS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURERS REQUIREMENTS AND USING ALL RECOMMENDED ACCESSORIES AND SUPPLEMENTAL COMPONENTS SUCH AS SCREEN TUBES, WASHERS, ETC.3. ALL HOLES IN HOLLOW MASONRY SHALL BE DRILLED WITH ROTARY DRILLS. HAMMER DRILLS ARE NOT PERMITTED.4. ALL EPOXY ADHESIVE SHALL BE HILTI RE−500, SIMPSON ET OR APPROVED EQUAL. U.N.O.5. ALL ACRYLIC ADHESIVE SHALL BE HILTI HIT (ICE, HY150 ORO HY20), SIMPSON AT OR APPROVED EQUAL. U.N.O.6. ALL CONCRETE/MASONRY SCREW ANCHORS SHALL BE HILTI HUS−H, SIMPSON TITEN, ITW TAP−CON OR APPROVED EQUAL. U.N.O.7. ALL EXPANSION ANCHORS SHALL BE HILTI KWIK−BOLT 3, SIMPSON WEDGE−ALL OR APPROVED EQUAL. U.N.O.LIGHT GAGE FRAMING1. ALL STUDS AND JOISTS SHALL HAVE A MINIMUM YIELD STRENGTH OF 33,000 PSI FOR 18 GAGE AND LIGHTER WEIGHTS AND 50,000 PSI FOR 16 GAGE AND HEAVIER WEIGHTS AND SHALL CONFORM TO AISI ˆSPECIFICATIONS FOR THE DESIGN OF COLD FORMED STEEL STRUCTURAL MEMBERS˜, LATEST EDITION2. ALL STUDS, JOISTS AND ACCESSORIES SHALL HAVE A MINIMUM G−60 GALVANIZED COATING.3. ALL WALL STUDS ARE C SHAPED STRUCTURAL LOAD BEARING STEEL STUDS. PROVIDE RUNNER TRACK TOP AND BOTTOM FOR ALL WALLS USING SAME GAGE AS STUD.4. ALL WALLS ARE TO HAVE HORIZONTAL STRAP BRIDGING WHICH SHALL BE INSTALLED AND PROPERLY ATTACHED TO EACH STUD TO PREVENT MINOR AXIS BENDING AND ROTATION BEFORE WALL STUDS ARE LOADED. BRIDGING SHALL BE DESIGNED FOR MINIMUM ALLOWABLE CONSTRUCTION LOADS AND SHALL NOT EXCEED 4 −3 O.C.5. ALL FLOOR JOISTS ARE "C" SHAPED STEEL JOISTS.6. FASTENING OF LIGHT GAGE MEMBERS SHALL BE WELDED ACCORDING TO AWS D1.3 OR EQUIVALENT SCREWING AS PER MANUFACTURER S RECOMMENDATIONS.WOOD1. ALL FRAMING LUMBER SHALL BE DRY (19% MAXIMUM MOISTURE CONTENT) DOUG−FIR. PRESSURE TREATED SOUTHERN PINE SHALL BE USED FOR GROUND CONTACT, SILL PLATES, OR EXTERIOR USE.2. STUDS SHALL BE STUD GRADE OR BETTER3. ALL OTHER MEMBERS SHALL BE NO. 2 OR BETTER.4. FOR EXPOSED FRAMING SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL REQUIREMENTS.5. ALL MATERIAL LABELLED "LVL" SHALL LAMINATED VENEER LUMBER WITH THE FOLLOWING PROPERTIES:E = 1,9000,000 PSIFB = 2,600 PSI6. ALL MATERIAL LABELLED "LSL" BE LAMINATED STRAND LUMBER WITH THE FOLLOWING PROPERTIES:E = 1,550,000 PSIFB = 2,325 PSI7. PROVIDE 1X4 CROSS−BRIDGING FOR ALL WOOD JOISTS AT 8’−0"O.C. MAXIMUM SPACING AND 2X SOLID BLOCKING BETWEEN JOISTS AT ALL SUPPORTS AND PARTITIONS.8.WHERE FRAMING CLIPS OR JOISTS HANGERS ARE USED, NAILING SHALL BE AS PER MANUFACTURERS RECOMMENDATIONS.9. ALL OPENINGS SHALL BE FRAMED WITH DOUBLE MEMBERS UNLESS OTHERWISE NOTED ON PLANS.10. METAL CONNECTOR HARDWARE SHOWN ON PLANS AND DETAILS ARE SIMPSON STRONG−TIE CONNECTORS AND ARE SELECTED FOR LOAD REQUIREMENTS. SUBSTITUTION IS PERMITTED IF LOAD CAPACITIES OF ALTERNATE ARE OF EQUAL OR GREATER CAPACITY THAN COMPARABLE SIMPSON CONNECTOR. FASTENING SHALL BE PER MANUFACTURERS REQUIREMENTS. 11. NAILING SHALL COMPLY WITH TABLE 2304.9.1 OF THE CONNECTICUT STATE BUILDING CODE EXCEPT AS NOTED ON THESE DRAWINGS. SEE SECTIONS AND DETAILS FOR ADDITIONAL INFORMATION.ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"S1.0GENERAL NOTESDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063No. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 @2x1016"@2x1016"@2x1016"@2x1016"@2x1016"@2x1016"@2x1016"SEE NOTE 11. REMOVE CONCRETE AROUND EXISTING CAST−IRON COLUMNS. DO NOT DAMAGE OR CRACK CAST−IRON COLUMN. CONTRACTOR’S OPTION TO SHORE EXISTING CONSTRUCTION AND REPLACE EXISTING COLUMNS, AS NOTED, WITH HSS4x0.25. SEE SECTION CUT ON PLAN.2. TYPICAL FLOOR CONSTRUCTION IS 3/4" TONGUE AND GROOVE SPAN RATED SHEATHING GLUED AND NAILED AT 6"oc WITH 0.113" X 2.5" RING SHANK NAILS SUPPORTED ON WOOD FRAMING AS SHOWN.3. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.4. WALLS SHOWN ARE INTERIOR BEARING WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.5. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43 STUDS AT 16"oc. STAIR WALLS ARE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS. SHEATHING/STRAP−BRACING REQUIRED TO BRACE WALL BY THIRD PARTY CFMF ENGINEER.6. PROVIDE 1/2" JOINT AROUND NEW AND EXISTING COLUMNS. COLUMNS ARE INTENDED TO BE ATTACHED AT BASE AND 2ND FLOOR AS SHOWN ON DETAILS WITH NO ATTACHMENT AT NEW FIRST FLOOR.LEVEL 1 NOTES:1S3.1(2) 2x10(2) 2x102x10(2) 2x102S3.1WAL2.AL2.BL2.CL2.DL2.EL2.FW1W2W3W4W5W6W7W8W9SEENOTE 6(TYP OF 9)5S3.1TYPEX. CONC. PLATFORM2S3.3SIM2S3.3SIM11S3.311S3.3SIM1. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.LEVEL 2 NOTES:3S3.1WAL2.AL2.BL2.CL2.DL2.EW1W2W3W4W5W6W7W8W910S3.1ATTIC SPACE1. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.2. 3/4" THREADED ROD AND TURNBUCKLE AT EXISTING BOTTOM TRUSS CHORD.ATTIC NOTES:SEE NOTE 2 (TYP)4S3.1WAL2.AL2.BL2.CL2.DL2.EL2.FW1W2W3W4W5W6W7W8W912S3.312S3.3SIM17S3.118S3.1ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"A-S1.1BUILDING AFRAMING PLANSDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063No. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 WAL2.AL2.BL2.CL2.DL2.EW91. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.2. 5" CONCRETE SLAB−ON−GRADE REINFORCED WITH 6X6 W2.9XW2.9 WWF OVER VAPOR BARRIER. SEE TYPICAL DETAIL.3. MATCH EXIST. BFE. IF EXIST BFE IS LESS THAN 3.50’ BELOW FINISHED GRADE, SET NEW BFE AT (−3.50’) AND UNDERPIN EXISTING FOOTINGS. SEE TYP DETAIL.LEVEL 1 NOTES:SEE NOTE 213S3.2(−3.50’)(−3.50’)SEE NOTE 3SEE NOTE 36S3.17S3.1WAL2.AL2.BL2.CL2.DL2.E1. PROVIDE 1" SEISMIC JOINT BETWEEN NEW CONNECTOR AND EXISTING BUILING B.2. TYPICAL FLOOR CONSTRUCTION IS 3/4" TONGUE AND GROOVE SPAN RATED SHEATHING GLUED AND NAILED AT 6"oc WITH 0.113" X 2.5" RING SHANK NAILS SUPPORTED ON WOOD FRAMING AS SHOWN.3. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.4. WALLS SHOWN ARE INTERIOR BEARING WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.5. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43 STUDS AT 16"oc. STAIR WALLS ARE BEARING WALLS. PROVIDE BUILT−UP POST AT ALL BUILT−UP BEAMS. SHEATHING/STRAP−BRACING REQUIRED TO BRACE WALL BY THIRD PARTY CFMF ENGINEER.6. TYPICAL CURTAINWALL FRAMING IS 600S162−43 AT 16"oc. AT NORTH WALL BETWEEN LEVEL 1 AND 3, FRAMING TO BE 800S162−54 AT 12"oc. SHEATHING/STRAP−BRACING REQUIRED TO BRACE WALL BY THIRD PARTY CFMF ENGINEER. 7. BEARING WALL TO BE 600S162−54@ 16"O/C. SEE NOTE 5 FOR ADDITIONAL INFO.8. AT UNBRACED PORTION OF WALL AT STAIR OPENING, PROVUDE A BUILT−UP GIRT. FOR ESTIMATING PURPOSES ONLY, ASSUME (2)800S162−43 WITH A 600T125 (T&B). TOP OF HEADER SHOULD MATCH TOP OF FLOOR FRAMING ELEVATION.LEVEL 2 NOTES:SEE NOTE 1@2x1016"(2) 2x10(2) 2x1010S3.1SIM6S3.1SIMSEE NOTE 7SEE NOTE 8WAL2.AL2.BL2.CL2.DL2.EW91. PROVIDE 1" SEISMIC JOINT BETWEEN NEW CONNECTOR AND EXISTING BUILING B.2. TYPICAL FLOOR CONSTRUCTION IS 3/4" TONGUE AND GROOVE SPAN RATED SHEATHING GLUED AND NAILED AT 6"oc WITH 0.113" X 2.5" RING SHANK NAILS SUPPORTED ON WOOD FRAMING AS SHOWN.3. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.4. WALLS SHOWN ARE INTERIOR BEARING WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.5. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43 STUDS AT 16"oc. STAIR WALLS ARE BEARING WALLS. PROVIDE BUILT−UP POST AT ALL BUILT−UP BEAMS. SHEATHING/STRAP−BRACING REQUIRED TO BRACE WALL BY THIRD PARTY CFMF ENGINEER.6. TYPICAL CURTAINWALL FRAMING IS 600S162−43 AT 16"oc. AT NORTH WALL BETWEEN LEVEL 1 AND 3, FRAMING TO BE 800S162−54 AT 12"oc. SHEATHING/STRAP−BRACING REQUIRED TO BRACE WALL BY THIRD PARTY CFMF ENGINEER. 7. BEARING WALL TO BE 600S162−54@ 16"O/C. SEE NOTE 5 FOR ADDITIONAL INFO.8. AT UNBRACED PORTION OF WALL AT STAIR OPENING, PROVUDE A BUILT−UP GIRT. FOR ESTIMATING PURPOSES ONLY, ASSUME (2)800S162−43 WITH A 600T125 (T&B). TOP OF HEADER SHOULD MATCH TOP OF FLOOR FRAMING ELEVATION.LEVEL 3 NOTES:SEE NOTE 16S3.1SIM7S3.1SIM10S3.1CW − SEE NOTE 6CW − SEE NOTE 610S3.1SIM6S3.1SIM@2x1016"(2) 2x10SEE NOTE 7SEE NOTE 8WAL2.AL2.BL2.CL2.DW91. PROVIDE 1" SEISMIC JOINT BETWEEN NEW CONNECTOR AND EXISTING BUILING B.2. TYPICAL FLOOR CONSTRUCTION IS 3/4" TONGUE AND GROOVE SPAN RATED SHEATHING GLUED AND NAILED AT 6"oc WITH 0.113" X 2.5" RING SHANK NAILS SUPPORTED ON WOOD FRAMING AS SHOWN.3. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.4. WALLS SHOWN ARE INTERIOR BEARING WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.5. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43 STUDS AT 16"oc. STAIR WALLS ARE BEARING WALLS. PROVIDE BUILT−UP POST AT ALL BUILT−UP BEAMS. SHEATHING/STRAP−BRACING REQUIRED TO BRACE WALL BY THIRD PARTY CFMF ENGINEER.6. TYPICAL CURTAINWALL FRAMING IS 600S162−43 AT 16"oc. AT NORTH WALL BETWEEN LEVEL 1 AND 3, FRAMING TO BE 800S162−54 AT 12"oc. SHEATHING/STRAP−BRACING REQUIRED TO BRACE WALL BY THIRD PARTY CFMF ENGINEER. 7. BEARING WALL TO BE 600S162−54@ 16"O/C. SEE NOTE 5 FOR ADDITIONAL INFO.8. AT UNBRACED PORTION OF WALL AT STAIR OPENING, PROVUDE A BUILT−UP GIRT. FOR ESTIMATING PURPOSES ONLY, ASSUME (2)800S162−43 WITH A 600T125 (T&B). TOP OF HEADER SHOULD MATCH TOP OF FLOOR FRAMING ELEVATION.LEVEL 4 NOTES:17S3.118S3.119S3.1@2x1216"@2x1216"@2x1216"(2) 2x12(2) 2x12@2x1216"@2x1016"10S3.1SIM6S3.1SIMSEE NOTE 7SEE NOTE 86S3.31. TYPICAL FLOOR CONSTRUCTION IS 2.5" NORMAL−WEIGHT CONCRETE ABOVE FLUTES OF 2", 18 GAGE COMPOSITE STEEL DECK (4.5" TOTAL THICKNESS) REINFORCED WITH 6X6 W1.4XW1.4 WELDED WIRE FABRIC, SUPPORTED ON STEEL FRAMING AS SHOWN. SEE PLAN FOR SPAN ORIENTATION.2. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.3. (X) INDICATES NUMBER OF 0.75" X 3.5" HEADED SHEAR STUDS4. FOR ALL BEAMS IN AREAS OF COMPOSITE SLABS WITHOUT STUDS SHOWN, PLACE STUDS @ 2’−0" O/C.BRIDGE C/D AND D/E NOTES:W12X26W12X26BUILDING CBUILDING DBUILDING E6S3.3SIM6S3.1SIM6S3.1SIM7S3.1SIM7S3.1SIMW12X26L2.BL2.CL2.DL2.BL2.CL2.DWAL2.BL2.CL2.D1. PROVIDE 1" SEISMIC JOINT BETWEEN NEW CONNECTOR AND EXISTING BUILING B.2. TYPICAL ROOF CONSTRUCTION IS 3/4" TONGUE AND GROOVE SPAN RATED SHEATHING GLUED AND NAILED AT 6"oc WITH 0.113" X 2.5" RING SHANK NAILS SUPPORTED ON WOOD FRAMING AS SHOWN.3. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.4. WALLS SHOWN ARE BEARING WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.5. TYPICAL BEARING WALL CONSTRUCTION IS 600S162−43 STUDS AT 16"oc. STAIR WALLS ARE BEARING WALLS. PROVIDE BUILT−UP POST AT ALL BUILT−UP BEAMS. SHEATHING/STRAP−BRACING REQUIRED TO BRACE WALL BY THIRD PARTY CFMF ENGINEER.6. TYPICAL CURTAINWALL FRAMING IS 600S162−43 AT 16"oc. AT NORTH WALL BETWEEN LEVEL 1 AND 3, FRAMING TO BE 800S162−54 AT 12"oc. SHEATHING/STRAP−BRACING REQUIRED TO BRACE WALL BY THIRD PARTY CFMF ENGINEER. ROOF NOTES:@2x616"CW − SEE NOTE 6CW − SEE NOTE 69S3.18S3.1ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"AB-S1.1AB CONNECTOR& BRIDGE PLANSDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063No. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 UPUPL2.2L2.AL2.BL2.CL2.DL2.EL2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.1L2.L11S3.1BUILDING BF3.0−1.67NOTES:1. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.2. WALLS SHOWN ARE INTERIOR BEARING AND/OR SHEAR WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.3. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43@16"o/c WITH 600T125−43 TOP&BOT. STAIR WALLS TO BE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS.4. SAWCUT, REMOVE AND REPLACE EXISTING SLAB ON GRADE WHERE REQUIRED FOR NEW FOOTING CONSTRUCTION OR AS SHOWN ON STRUCTURAL OR ARCHITECTURAL DRAWINGS. SEE TYPICAL SLAB ON GRADE REPLACEMENT DETAIL.5. FOOTINGS TO BEAR ON COMPACTED STRUCTURAL FILL, SEE GENERAL NOTES ON S0.16. FX.XXINDICATES CONCRETE FOOTING. SEE FOOTING SCHEDULE FOR ADDITIONAL INFO. XX.XXDENOTES BOTTOM OF FOOTING ELEVATION. 7. 5" CONCRETE SLAB−ON−GRADE REINFORCED WITH 6X6 W2.9XW2.9 WWF OVER VAPOR BARRIER PLACED OVER CRUSHED STONE. SEE TYP SLAB ON GRADE DETAIL. SEE TYP SLAB−ON−GRADE REPLACEMENT DETAIL FOR ATTACHMENT TO EX. ADJACENT CONCRETE SLAB−ON−GRADE.SEE NOTE 4 (TYP)F3.0−1.67SEE NOTE 713S3.3ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"B-S1.0 SBBUILDING BLEVEL SBFOUNDATIONPLANDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063ABDECFGHJKLMNORTHSITE KEY PLAN1 UNIT REVISIONS 9/9/16No. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 L2.2L2.AL2.BL2.CL2.DL2.EL2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.1L2.L12S3.1NOTES:1. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.2. WALLS SHOWN ARE INTERIOR BEARING AND/OR SHEAR WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.3. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43@16"o/c WITH 600T125−43 TOP&BOT. STAIR WALLS TO BE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS.4. ELEVATOR SHAFT WALLS SHALL BE 8" CMU, REINFORCED WITH #4 BARS VERTICAL AT CORNERS, 4’oc, AND DOOR JAMBS, AND #4 HORIZONTAL AT FLOORS AND DOOR HEAD ELEVATIONS. ALL CELLS TO BE FULLY GROUTED. SEE TYPICAL DETAIL.5. SAWCUT, REMOVE AND REPLACE EXISTING SLAB ON GRADE WHERE REQUIRED FOR NEW FOOTING CONSTRUCTION OR AS SHOWN ON STRUCTURAL OR ARCHITECTURAL DRAWINGS. SEE TYPICAL SLAB ON GRADE REPLACEMENT DETAIL.6. PROVIDE UNDERPINNING, AS REQUIRED, AT EXIST. FOOTINGS ADJACENT TO ELEVATOR PIT.−5.00PIT EL.15S3.1(2) 2x10@2x616"16S3.1SIM14S3.27S3.3SIM12S3.2SIM15S3.2SIMScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"B-S1.0BBUILDING BLEVEL BFOUNDATION &FRAMING PLANDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 L2.2L2.AL2.BL2.CL2.DL2.EL2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.1L2.L14S3.116S3.113S3.11. TYPICAL FLOOR CONSTRUCTION IS 3/4" TONGUE AND GROOVE SPAN RATED SHEATHING GLUED AND NAILED AT 6"oc WITH 0.113" X 2.5" RING SHANK NAILS SUPPORTED ON WOOD FRAMING AS SHOWN.2. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.3. WALLS SHOWN ARE INTERIOR BEARING AND/OR SHEAR WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.4. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43@16"o/c WITH 600T125−43 TOP&BOT. STAIR WALLS TO BE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS.5. ELEVATOR SHAFT WALLS SHALL BE 8" CMU, REINFORCED WITH #4 BARS VERTICAL AT CORNERS, 4’oc, AND DOOR JAMBS, AND #4 HORIZONTAL AT FLOORS AND DOOR HEAD ELEVATIONS. ALL CELLS TO BE FULLY GROUTED.NOTES:14S3.1SIM15S3.1SIM(2) 2x10@2x616"14S3.2SIM12S3.215S3.27S3.3ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"B-S1.1BUILDING BLEVEL ONEFRAMING PLANDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 L2.2L2.AL2.BL2.CL2.DL2.EL2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.1L2.L1. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.2. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43@16"o/c WITH 600T125−43 TOP&BOT. STAIR WALLS TO BE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS.3. ELEVATOR SHAFT WALLS SHALL BE 8" CMU, REINFORCED WITH #4 BARS VERTICAL AT CORNERS, 4’oc, AND DOOR JAMBS, AND #4 HORIZONTAL AT FLOORS AND DOOR HEAD ELEVATIONS. ALL CELLS TO BE FULLY GROUTED.NOTES:15S3.1SIM@2x616"16S3.1SIM(2) 2x1014S3.2SIM7S3.3SIM12S3.2SIM15S3.2SIM14S3.1SIM14S3.1SIM13S3.1SIMScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"B-S1.2BUILDING BLEVEL TWOFRAMING PLANDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 L2.2L2.AL2.BL2.CL2.DL2.EL2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.1L2.L1. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.2. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43@16"o/c WITH 600T125−43 TOP&BOT. STAIR WALLS TO BE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS.3. ELEVATOR SHAFT WALLS SHALL BE 8" CMU, REINFORCED WITH #4 BARS VERTICAL AT CORNERS, 4’oc, AND DOOR JAMBS, AND #4 HORIZONTAL AT FLOORS AND DOOR HEAD ELEVATIONS. ALL CELLS TO BE FULLY GROUTED.NOTES:15S3.1SIM(2) 2x10@2x616"16S3.1SIM14S3.2SIM7S3.3SIM12S3.2SIM15S3.2SIM14S3.1SIM14S3.1SIM13S3.1SIM10S3.1ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"B-S1.3BUILDING BLEVEL THREEFRAMING PLANDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 L2.2L2.AL2.BL2.CL2.DL2.EL2.FL2.GL2.HL2.JL2.KL2.ML2.NL2.1L2.L1. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.2. ELEVATOR SHAFT WALLS SHALL BE 8" CMU, REINFORCED WITH #4 BARS VERTICAL AT CORNERS, 4’oc, AND DOOR JAMBS, AND #4 HORIZONTAL AT FLOORS AND DOOR HEAD ELEVATIONS. ALL CELLS TO BE FULLY GROUTED.3. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43@16"o/c WITH 600T125−43 TOP&BOT. STAIR WALLS TO BE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS.4. SEE S2.2 FOR TOP OF ELEVATOR SHAFT & HOIST BEAM DETAILS.NOTES:15S3.1SIM@2x616"(2) 2x1016S3.1SIM14S3.2SIM7S3.3SIM12S3.2SIM15S3.2SIM14S3.1SIM14S3.1SIM13S3.1SIM19S3.1SEE NOTE 4ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"B-S1.4BUILDING BLEVEL FOURFRAMING PLANDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 L2.FL2.GL2.HL2.JL2.KL2.L1. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.2. WALLS SHOWN ARE INTERIOR BEARING AND/OR SHEAR WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.3. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 2X6 STUDS AT 16"oc. STAIR WALLS ARE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS.LEVEL 1 NOTES:1S3.2L2.FL2.GL2.HL2.JL2.KL2.L@2x1012"@2x1016"@2x1016"@2x1016"@2x1016"@2x1016"@2x1016"SWSWSWSWLEVEL 2 NOTES:1. TYPICAL FLOOR CONSTRUCTION IS 3/4" TONGUE AND GROOVE SPAN RATED SHEATHING GLUED AND NAILED AT 6"oc WITH 0.113" X 2.5" RING SHANK NAILS SUPPORTED ON WOOD FRAMING AS SHOWN.2. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.3. WALLS SHOWN ARE INTERIOR BEARING AND/OR SHEAR WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.4. "SW" INDICATES INTERIOR SHEAR WALL. TYPICAL INTERIOR SHEAR WALL CONSTRUCTION IS 1/2" SHEATHING ON 2X6 STUDS AT 16"oc NAILED AT 4"oc AT PANEL EDGES WITH 0.131"x2.5" NAILS. NAILS IN FIELD OF PANEL SHALL BE NO MORE THAN 12"oc. PANELS SHALL BE INSTALLED WITH LONG DIMENSION ACROSS STUDS. ALL JOINTS IN SHEATHING SHALL OCCUR OVER FRAMING OR SOLID BLOCKING.5. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 2X6 STUDS AT 16"oc. STAIR WALLS TO BE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS.1S3.1SIM2S3.3SIM2S3.3SIMScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"C-S1.1BUILDING CPLANSDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 UPDNDNDNOAL2.AL2.BL2.CO1O2O3O4O5HSS4x4x3/8F3.0−1.67HSS4x4x3/81. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.2. WALLS SHOWN ARE INTERIOR BEARING AND/OR SHEAR WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.3. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43@16"o/c WITH 600T125−43 TOP&BOT. STAIR WALLS TO BE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS.4. ELEVATOR SHAFT WALLS SHALL BE 8" CMU, REINFORCED WITH #4 BARS VERTICAL AT CORNERS, 4’oc, AND DOOR JAMBS, AND #4 HORIZONTAL AT FLOORS AND DOOR HEAD ELEVATIONS. ALL CELLS TO BE FULLY GROUTED.5. SAWCUT, REMOVE AND REPLACE EXISTING SLAB ON GRADE WHERE REQUIRED FOR NEW FOOTING CONSTRUCTION OR AS SHOWN ON STRUCTURAL OR ARCHITECTURAL DRAWINGS. SEE TYPICAL SLAB ON GRADE REPLACEMENT DETAIL.6. FOOTINGS TO BEAR ON COMPACTED STRUCTURAL FILL, SEE GENERAL NOTES ON S0.17. XX.XXDENOTES BOTTOM OF FOOTING ELEVATION. FX.XXINDICATES CONCRETE FOOTING. SEE FOOTING SCHEDULE FOR ADDITIONAL INFO. 8.HSS COLUMNS NOT RECEIVING A CAP PLATE SHAL RECEIVE A 1/4" STEEL CAP PLATE, SEAL WELDED ALL AROUND.LEVEL 1 NOTES:F3.0−1.67OAO1O2O3O4O53S3.22S3.21. TYPICAL FLOOR CONSTRUCTION IS 3/4" TONGUE AND GROOVE SPAN RATED SHEATHING GLUED AND NAILED AT 6"oc WITH 0.113" X 2.5" RING SHANK NAILS SUPPORTED ON WOOD FRAMING AS SHOWN.2. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.3. WALLS SHOWN ARE INTERIOR BEARING AND/OR SHEAR WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.4. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43@16"o/c WITH 600T125−43 TOP&BOT. STAIR WALLS TO BE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS.5. ELEVATOR SHAFT WALLS SHALL BE 8" CMU, REINFORCED WITH #4 BARS VERTICAL AT CORNERS, 4’oc, AND DOOR JAMBS, AND #4 HORIZONTAL AT FLOORS AND DOOR HEAD ELEVATIONS. ALL CELLS TO BE FULLY GROUTED.6. PROVIDE NEW STEEL LINTELS ABOVE BRICK ARCH AND REBUILD ARCH BELOW (6 WINDOWS TOTAL @ SOUTHEAST CORNER).7. UON, ALL STEEL BEAMS TO BE DESIGNED FOR A MINIMUM VERT. REACTION OF 15KIPS (ASD).LEVEL 2 NOTES:HSS4x4x3/8HSS4x4x3/8POST (TYP OF 3)@2x616"W10X39CANT@2x616"11S3.2SEE NOTE 61 3/4"x11 1/4" LVL1 3/4"x11 1/4" LVL15S3.3ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"D-S1.1BUILDING DPLANSDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 UPDNUPDNUPDN1AB2F3.0HSS4x4x3/8−1.67F3.0−1.67F3.0−1.671. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.2. WALLS SHOWN ARE INTERIOR BEARING AND/OR SHEAR WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.3. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43@16"o/c WITH 600T125−43 TOP&BOT. STAIR WALLS TO BE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS.4. ELEVATOR SHAFT WALLS SHALL BE 8" CMU, REINFORCED WITH #4 BARS VERTICAL AT CORNERS, 4’oc, AND DOOR JAMBS, AND #4 HORIZONTAL AT FLOORS AND DOOR HEAD ELEVATIONS. ALL CELLS TO BE FULLY GROUTED.5. SAWCUT, REMOVE AND REPLACE EXISTING SLAB ON GRADE WHERE REQUIRED FOR NEW FOOTING CONSTRUCTION OR AS SHOWN ON STRUCTURAL OR ARCHITECTURAL DRAWINGS. SEE TYPICAL SLAB ON GRADE REPLACEMENT DETAIL.6. FOOTINGS TO BEAR ON COMPACTED STRUCTURAL FILL, SEE GENERAL NOTES ON S0.17. XX.XXDENOTES BOTTOM OF FOOTING ELEVATION. FX.XXINDICATES CONCRETE FOOTING. SEE FOOTING SCHEDULE FOR ADDITIONAL INFO.LEVEL 1 NOTES:SEE NOTE 5 (TYP)5S3.21AB24S3.21. TYPICAL FLOOR CONSTRUCTION IS 3/4" TONGUE AND GROOVE SPAN RATED SHEATHING GLUED AND NAILED AT 6"oc WITH 0.113" X 2.5" RING SHANK NAILS SUPPORTED ON WOOD FRAMING AS SHOWN.2. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.3. WALLS SHOWN ARE INTERIOR BEARING AND/OR SHEAR WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.4. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43@16"o/c WITH 600T125−43 TOP&BOT. STAIR WALLS TO BE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS.5. ELEVATOR SHAFT WALLS SHALL BE 8" CMU, REINFORCED WITH #4 BARS VERTICAL AT CORNERS, 4’oc, AND DOOR JAMBS, AND #4 HORIZONTAL AT FLOORS AND DOOR HEAD ELEVATIONS. ALL CELLS TO BE FULLY GROUTED.6. UON, ALL STEEL BEAMS TO BE DESIGNED FOR A MINIMUM VERT. REACTION OF 15KIPS (ASD).LEVEL 2 NOTES:@2x616"@2x616"W10X39W8X13HSS4x4x3/8HSS4x4x3/8HSS4x4x3/8HSS4x4x3/8POST (TYP OF 3)2S3.2SIM11S3.2SIM1 3/4"x11 1/4" LVL1 3/4"x11 1/4" LVLScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"E-S1.1BUILDING EPLANSDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 F5.0F5.0F3.0F9’−7"x5’−0"F5.0F3.01. SEE UNDERPINNING DETAIL. UNDERPINNING REQUIRED AT FOOTINGS AT EXTERIOR WALL.2. SAWCUT, REMOVE AND REPLACE EXISTING SLAB ON GRADE WHERE REQUIRED FOR NEW FOOTING CONSTRUCTION OR AS SHOWN ON STRUCTURAL OR ARCHITECTURAL DRAWINGS. SEE TYPICAL SLAB ON GRADE REPLACEMENT DETAIL.3. FOOTINGS TO BEAR ON COMPACTED STRUCTURAL FILL, SEE GENERAL NOTES ON S0.14. ELEVATOR SHAFT WALLS SHALL BE 8" CMU, REINFORCED WITH #4 BARS VERTICAL AT CORNERS, 4’oc, AND DOOR JAMBS, AND #4 HORIZONTAL AT FLOORS AND DOOR HEAD ELEVATIONS. ALL CELLS TO BE FULLY GROUTED. SEE TYPICAL DETAIL.5. P−X XX.XXDENOTES PIER TYPE AND TOP OF PIER ELEVATION WITH RESPECT TO TOP OF SOG.. FX.XX XX.XXDENOTES FOOTING TYPE AND BOTTOM OF FOOTING ELEVATION WITH RESPECT TO TOP OF SOG.SEE FOOTING SCHEDULES AND TYP PIER DETAIL FOR ADDITIONAL INFO.6.UON, ALL STEEL BEAMS TO BE DESIGNED FOR A MINIMUM VERT. REACTION OF 15KIPS (ASD).LEVEL 1 NOTES:9S3.2PIT EL.−5.008S3.2HSS8X8X3/8HSS8X8X3/8HSS8X8X3/8HSS8X8X3/8HSS8X8X3/8HSS8X8X3/8HSS8X8X3/8TYP@ EXTERIOR COLP−1−4.00(MATCH EXIST)EX. BFE=−4.00’VIF−4.00−4.00−2.33−1.67−2.00P−1−0.67−0.67P−1P−1−0.67−0.67SEE NOTE 4(MATCH EXIST)(MATCH EXIST)12S3.1SIMW16X26W16X26W12X16W12X16 W12X16W18X46 W12X16 W12X16 W12X16 W12X16 W12X16W12X16 W12X16 1. DENOTES TYPICAL FLOOR CONSTRUCTION IS 3.5" LIGHT−WEIGHT CONCRETE ABOVE FLUTES OF 3", 18 GAGE COMPOSITE STEEL DECK (6.5" TOTAL THICKNESS) REINFORCED WITH 6X6 W1.4XW1.4 WELDED WIRE FABRIC, SUPPORTED ON STEEL FRAMING AS SHOWN. SEE PLAN FOR SPAN ORIENTATION.2. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.3. (X) INDICATES NUMBER OF 0.75" X 3.5" HEADED SHEAR STUDS4. FOR ALL BEAMS IN AREAS OF COMPOSITE SLABS WITHOUT STUDS SHOWN, PLACE STUDS @ 2’−0" O/C.5. UON, ALL STEEL BEAM CONNECTIONS TO BE DESIGNED FOR A MINIMUM VERT. REACTION OF 15KIPS (ASD).LEVEL 2 NOTES:10S3.26S3.21. ROOF CONSTRUCTION IS 3" LIGHT−WEIGHT CONCRETE ABOVE FLUTES OF 3", 18 GAGE COMPOSITE STEEL DECK (6" TOTAL THICKNESS) REINFORCED WITH 6X6 W1.4XW1.4 WELDED WIRE FABRIC, SUPPORTED ON EXISTING STEEL FRAMING AS SHOWN. SEE PLAN FOR SPAN ORIENTATION.2. SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND ELEVATIONS.3. UON, ALL STEEL BEAMS TO BE DESIGNED FOR A MINIMUM VERT. REACTION OF 15KIPS (ASD).LOW ROOF NOTES:SEE NOTE 1HSS8X4X1/4 HSS8X4X1/4HSS8X4X1/4HSS8X4X1/4 HSS8X4X1/4HSS8X4X1/41. SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND ELEVATIONS.2. CONNECTION FROM WIND GIRT TO COLUMN TO BE DESIGNED FOR A HORIZONTAL LOAD OF 5.0KIPS.3. WIND GIRTS, COLUMNS AND CONNECTIONS TO BE HOT DIP GALVANIZED. ANY FIELD WELDS SHALL BE PAINTED WITH A ZINC−RICH PRIMER. PROVIDE VENT HOLE @ BASE OF COLUMN.4. COLUMNS TO RECEIVE A 1/4" CAP PLATE, SEAM WELDED TO HSS.5. UON, ALL STEEL BEAMS TO BE DESIGNED FOR A MINIMUM VERT. REACTION OF 15KIPS (ASD).6. SEE S2.2 FOR TOP OF ELEVATOR SHAFT & HOIST BEAM DETAILS.HIGH ROOF NOTES:7S3.2SEE NOTES 2& 3 (TYP)SEE NOTE 6ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"F-S1.1BUILDING FPLANSDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 L2.ML2.L1S3.34S3.33S3.3@2x8 16" @2x8 16" @2x8 16" @2x8 16" @2x8 16" @2x8 16" @2x8 16" @2x8 16" @2x8 16" @2x8 16" @2x8 16" @2x8 16"@2x8 16" @2x8 16" @2x8 16" @2x8 16" @2x8 16" @2x8 16"@2x8 16" @2x8 16" @2x8 16" @2x8 16"@2x8 16"1. TYPICAL FLOOR CONSTRUCTION IS 3/4" TONGUE AND GROOVE SPAN RATED SHEATHING GLUED AND NAILED AT 6"oc WITH 0.113" X 2.5" RING SHANK NAILS SUPPORTED ON WOOD FRAMING AS SHOWN.2. SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONS.3. TYPICAL TOP OF SHEATHING ELEVATION IS 30’−6", UON.4. WALLS SHOWN ARE INTERIOR BEARING WALLS. SEE ARCHITECTURAL DRAWINGS FOR NON−BEARING PARTITIONS.5. TYPICAL INTERIOR BEARING WALL CONSTRUCTION IS 600S162−43 STUDS AT 16"oc. STAIR WALLS ARE BEARING WALLS. PROVIDE DOUBLE WALL STUD POST AT ALL BUILT−UP BEAMS. SHEATHING/STRAP−BRACING REQUIRED TO BRACE WALL BY THIRD PARTY CFMF ENGINEER.LEVEL 1B NOTES:TOP OF SHEATHING @ 29’−0"TOP OF SHEATHING @ 29’−0"TOP OF SHEATHING @ 29’−7 7/8"2S3.31S3.1SIMSEE NOTE 1 ON J−S1.1ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"G/H-S1.1BUILDING G/HPLANSDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 NOTES:1. 5" CONCRETE SLAB−ON−GRADE REINFORCED WITH 6X6 W2.9XW2.9 WWF OVER VAPOR BARRIER PLACED OVER CRUSHED STONE. SEE TYP SLAB ON GRADE DETAIL.2. HELICAL PILES WITH UNDERPINNING BRACKETS AT EACH PIER (10’ O/C). SEE CIVIL DRAWINGS FOR FILL AND BANK PROTECTION.3. SEE ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND DIMENSIONS.4. TYPICAL FLOOR CONSTRUCTION IS 3/4", PRESSURE TREATED, TONGUE AND GROOVE SPAN RATED SHEATHING GLUED AND NAILED AT 6"oc WITH 0.113" X 2.5" RING SHANK NAILS SUPPORTED ON WOOD FRAMING AS SHOWN.SEE NOTE 1SEE NOTE 2 (TYP)5S3.34S3.3JM BRIDGE − SEE M−S1.1 FOR MORE INFO.8S3.3SEE NOTE 4PT 2x8 @ 16" o/c14S3.3EL.5" Foundation Slab 0’ − 0"ABDECFGHJKLMNORTHSITE KEY PLANScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"J-S1.1BUILDING JFOUNDATIONPLANDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063No. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 NOTES:1. 5" CONCRETE SLAB−ON−GRADE REINFORCED WITH 6X6 W2.9XW2.9 WWF OVER VAPOR BARRIER PLACED OVER GRAVEL. SEE TYP SLAB ON GRADE DETAIL.2. BRICK PIERS AT COLUMNS TO BE REPOINTED AND REPLACED AS NECESSARY. (TYP OF 27).SEE NOTE 1SEE NOTE 23JM BRIDGE − SEE J−S1.1 FOR MORE INFO9S3.3JM BRIDGE − SEE J−S1.1 FOR MORE INFOGRIND EX. SLAB @ END TO ALLOW FOR PLYWOOD PLACEMENT10S3.3ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 1/8" = 1'-0"M-S1.1BUILDING MFOUNDATIONPLANDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063ABDECFGHJKLMNORTHSITE KEY PLANNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 1’ − 0"8"1’ − 6"1’ − 6"8"7"1’ − 2"ELEVATOR PIT DETAIL#4@12"oc HORZ BARS#4@16"oc VERT BARS20"x2’−0"x6" DEEP SUMPHOOK BARS AT SUMPSEE ARCH AND ELEVATOR DWGS FOR SILL DETAILS2x4 SHEAR KEY (TYP)MASONRY WALL BEYOND−SEE ARCH PLANS#4@12"oc(4)#4 EXTEND 2’−0" PAST DOOR JAMB ON EACH SIDE2’−8"3’−0"CONTINUOUS WATERSTOP FOUR SIDES #4@10"oc EW, TOP & BOT#4x4’−0" DOWELS TO MATCHVERTICAL MASONRYREINFORCEMENT.ANCHOR RODS −(4) 3/4" F1554, Gr. 36, EMBED. 10". (UON)FOOTING, SEE PLANSTEEL COLUMN, SEE PLANBASEPLATE −10"x3/4"x10" (UON)SEE BELOWTYPICAL INTERIOR COLUMN BASEPLATE & FOOTING DETAIL2" NON−SHRINK GROUT1 1/2" (TYP)(UON)SLAB ON GRADE3/8" CRUSHED STONE −DEPTH VARIESEXISTING COPACTED FILLTYPICAL SLAB ON GRADE REPLACEMENT DETAILVAPOR BARRIER1/2"x12" SMOOTH DOWEL @ 4’o/c (2 MIN./SIDE), DRILL AND GROUT INT EXISTING SLAB. EMBED 6"EXISTING SLAB ON GRADEWWFNEW SLAB ON GRADE − MATCH DEPTH OF EXIST. MIN. 5"SAW CUT AS SOON AS CONCRETEWILL NOT RAVEL (24 HRS. MAX)CONCRETE BRICK OR BLOCKSUPPORTS1 1/2"WWFTYPICAL SLAB ON GRADE CONSTRUCTION JOINT3/4"1 1/2" CLEARSTOP MESH AT JOINTVAPOR BARRIERD/3D SLAB DEPTHWWFTYPICAL SLAB ON GRADE CONTROL JOINTFOOTING SCHEDULELENGTHWIDTHTHICKNESSREINFORCINGF3.0 3’−0" 3’−0" 1’−6" (4) #5 EWF4.0F5.0SLAB ON GRADE3/8" CRUSHED STONE −9" DEEPEXISTING COMPACTED FILLTYPICAL SLAB ON GRADE DETAILVAPOR BARRIERWWFNEW SLAB ON GRADE − SEE PLAN FOR DEPTH.EXISTING FOOTINGDRY PACK GROUTUNDERPINNING4’ − 0"4’ − 0"4’ − 0"AABBCCSEQUENCE1. EXCAVATE APPROACH AND UNDERPINNING PITS FOR LOCATIONS "A". PLACE SHEETING AND BRACING AND GROUT AS REQUIRED TO PREVENT COLLAPSE OF ADJACENT SOIL. APPROACH PITS SHALL BE THE SAME WIDTH AS UNDERPINNING PITS. 2. PLACE CONCRETE FOR LOCATIONS "A". DRY−PACK GROUT SOLID BETWEEN TOP OF UNDERPINNING AND BOTTOM OF EXISTING FOUNDATION AS SOON AS POSSIBLE AFTER CONCRETE HAS ACHIEVED 750PSI STRENGTH (ABOUT 12 HOURS).3. AFTER DRY−PACK FOR LOCATIONS "A" HAS BEEN IN PLACE FOR AT LEAST 24 HOURS, REPEAT PROCESS FOR LOCATIONS "B".4. AFTER DRY−PACK FOR LOCATIONS "B" HAS BEEN IN PLACE FOR AT LEAST 24 HOURS, REPEAT PROCESS FOR LOCATIONS "C". OTHER WORK IN AREA MAY START AT THIS TIME.MATERIALS1. CONCRETE SHALL HAVE A 28 DAY COMPRESSIVE STRENGTH f’c=4000psi2. DRY−PACK GROUT SHALL CONSIST OF 1 PART PORTLAND CEMENT MIXED WITH 2 PARTS DAMP SAND3. ALL SHEETING AND BRACING TO REMAIN IN PLACE MUST BE TREATED WOOD OR SOME OTHER MATERIAL RESISTANT TO DECOMPOSITION.TYPICAL WALL UNDERPINNINGF1554 ANCHOR RODS W/ LEVELING NUTS, GR. 36. EMBED 10" (UON).2 TIES @ 3" TOP#3 TIES @ 12" oc@P−1VERTICAL BARS W/ STD HOOKPIERFACE OF WALL BEYONDWALL FOOTING BEYONDCOLUMN FOOTING −SEE SCHEDULEBASEPLATESTEEL COLUMN1’ − 4"1’ − 4"TIES −SEE SECTION FOR SPACING(4)#8 VERTICAL BARSP1TYPICAL COLUMN PIER & FOOTING DETAILScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA SubmissionAs indicatedS2.1TYPICAL DETAILSDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063Structural Foundation ScheduleType Length WidthFoundationThicknessType Comments12" Foundation Slab 1’ − 0"F3.0 3’ − 0" 3’ − 0" 1’ − 0" (4)#5 EWF5.0 5’ − 0" 5’ − 0" 1’ − 4" (6)#6 EWF9’−7"x5’−0" 9’ − 7" 5’ − 0" 1’ − 4" (6)#6 LW, (10)#6 SWRetaining Footing − 2’ x 1’ x 1’ 0’ − 8"No. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 1/4" BENT PLATEELEVATOR SHAFT3/4"x6" HEADED STUD @ 18" O/C1/4 2"@1'-0"TYPEDGE OF SLAB @ ELEVATOR SHAFT3/4"=1’−0"NOTES:1. SEE EDGE OF SLAB/OPENING REINFORCING DETAIL FOR ADDITIONAL INFORMATION.2’ − 0"2’−0"MAXPROVIDE CONTINUOUS SUPPORT FOR WWF @ 36" OC. SHOW ON SHOP DRAWINGS WWFSLAB ON DECK −SEE PLANCELL CLOSURE AND POUR STOP BY DECKING INSTALLER#4 WITH STANDARD HOOK @ 12" OC −SEE NOTES 1&2.#4 CONT −SEE NOTE 1.PROVIDE CFMF POUR STOP WHEN LESS THAN OR EQUAL TO 9". IF GREATER THAN 9", PROVIDE BENT PLATE −SEE WALL SECTION FOR INFO.PROVIDE CONTINUOUS SUPPORT FOR WWF @ 36" OC −SHOW ON SHOP DRAWINGS.SLAB ON DECK −SEE PLANEDGE OF SLAB OR OPENINGWWF#4 WITH STANDARD HOOK @ 12" OC −SEE NOTES 1&2#4 CONT −SEE NOTE 1EDGE OF SLAB/OPENING REINFORCING DETAIL3/4"=1’−0"NOTES:1. PROVIDE HOOKED BARS AND CONTINUOUS #4 AT OPENING EDGES GREATER THAN 2’−0".2. PROVIDE HOOKED BARS IN A RADIAL ARRANGEMENT @ CORNERS.3. PROVIDE #4 BAR x 2’−0" LONG DIAGONAL BAR AT ALL RE−ENTRANT CORNERS AT SLAB EDGES AND OPENINGS GREATER THAN 12"X12".4. REBAR TO BE PLACED AS CLOSE TO THE TOP OF SLABS AS POSSIBLE WHILE MAINTAINING MINIMUM REQUIRED COVER.2’ − 0"TOP PLATE OF WALL AT UNDERSIDE OF FLOOR SHEATHINGFLOOR FRAMING −SEE PLAN2X4 NAILER AT EACH FACE OF WALLSOLID BLOCKING BETWEEN STUDS AT CEILING LEVEL AND ALL JOINTS IN WALL SHEATHING.WALL SHEATHING CONTINUES UP TO UNDERSIDE OF FLOOR SHEATHINGTYPICAL INTERIOR SHEAR WALL DETAILSTEEL FRAMING −SEE PLAN (TYP)DECK OPENING −COORDINATE SIZE WITH MEP CONTRACTORL4x4x5/16T/S TO MATCH ROOF T/S (TYP)L4x4x5/16" LONG (TYP OF 4)NOTE: SEE EDGE OF SLAB/OPENING DETAIL FOR REQUIRED ADDITIONAL SLAB REINFORCEMENT1/41/4TYP1/4TYPAS3.1AS3.1SECTIONNTST/S(+5/16")TYPICAL DECK OPENING FRAME DETAILNTSPOST UP. SEE PLANS FOR SIZE AND LOCATION.BASEPLATE − SEE COL SCHEDULE(4) 3/4" DIA. A325 BOLTS.STEEL BEAM −SEE PLAN3/8" FITTED STIFFENERTYPICAL POST UP DETAILSTEEL COL. SEE PLANS FOR SIZE AND LOCATION.CAPPLATE −SEE PLAN(4) 3/4" DIA. A325 BOLTS.STEEL BEAM −SEE PLAN3/8" FITTED STIFFENERTYPICAL CAP PLATE DETAIL @ STEEL GIRDERSTEEL COL. SEE PLANS FOR SIZE AND LOCATION.CAPPLATE −SEE PLANWOOD BEAM −SEE PLANTYPICAL CAP PLATE DETAIL @ WOOD BEAM(4) 1/4" x 2.5"SDS SCREWS @ 5", CENTERED ON PLATE. PRE−DRILL STEEL PLATE. SHIM AS REQUIREDD/5 MAXNO HOLES OR NOTCHES ARE PERMITTED IN SHEAR WALL CHORDSBORED HOLE AND NOTCH LOCATIONS IN WALLS18" MIN.0.35D MAX1 1/2" MIN.’D’’D’IF EXISTING CONSTRUCTION DOES NOT MEET THE REQUIREMENTS OF THIS DETAIL, NOTIFY ENGINEER IMMEDIATELY.JOISTMAX HOLE DIA. D/3 ACTUALDJOIST/RAFTER HOLE LIMITATIONSUSE THIS DETAIL FOR SAWN LUMBER. FOR ENGINEERED WOOD PRODUCTS, CONSULT WITH MANUFACTURER’S LIMITATIONS.IF EXISTING CONSTRUCTION DOES NOT MEET THE REQUIREMENTS OF THIS DETAIL, NOTIFY ENGINEER IMMEDIATELY.DIA.<D/6 IN THIS REA1.2*DLARGER DIA.MIN. 4X(TYP T&B)2 1/2" MIN.EX. 2X FRAMINGDAMAGE/ROT @ EX FRAMINGSISTERED LVL −MATCH DEPTH OF EX. FRAMINGSIMPSON SDS SCREWS −3 1/2" LONG @ 12" O/C T&B’d’5*d (MIN)3/4"=1’−0"TYP WOOD JOIST REPAIR/SISTER DETAILEX WOOD STUD WALL. CONTRACTOR TO PROVIDE SHORING AS REQUIRED.REPLACE ROTTED/DAMAGED SILL PLATE WITH PT MEMBER. MATCH EXISTING DIMENSIONS. FASTEN TO FOUNDATION WALL ACRYLIC ADHESIVE WITH 3/4" DIA THREADED ROD, EMBED 6" @ 48" O/C.EX MASONRY FOUNDATION WALL3/4"=1’−0"TYPICAL SILL REPAIR DETAILMAX 1’−4"2x BLOCKING EACH SIDETYPICAL FRAMING AT FLOOR AND ROOF OPENINGS UP TO 16" WIDETYPICAL FRAMING AT FLOOR AND ROOF OPENINGS UP TO 32" WIDEDOUBLE 2x HEADER EACH EDGEDOUBLE 2x HEADER EACH SIDESHEATHING − COORD WITH ARCHITECTURAL DRAWINGS.2x8@16"o/c, SPAN SHORT DIRECTION2X8 RIM BOARDPT PLATE. FASTEN TO TOW W 1/4"x6" MASONRY SCREW @ 16"o/cCMU SHAFTTYPICAL ELEVATOR SHAFT −TOP OF WALL NTS3/8" END PLATEHOIST BEAM − GROUT SOLID AROUND BEAM AFTER INSTALLATION. SEE NOTE.3/4" NON−SHRINK GROUTCMU SHAFTTYPICAL ELEVATOR HOIST BEAM DETAILNTS1/4"1/4"HOIST BEAM TO BE PROVIDED BY ELEVATOR MANUFACTURER. CONFIRM WITH SELECTED ELEVATOR.SEE ELEVATOR CUT SHEETS FOR HOIST BEAM ORIENTATION AND ELEVATION.ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 3/4" = 1'-0"S2.2TYPICAL DETAILSDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063No. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 BUILDING A - LEVEL 1 -OLD50' - 1 7/8"BUILDING A - LEVEL 1 -NEW55' - 4 7/8"SEE ARCH DWGS FOR WALL LOCATIONS.SHEATHING −SEE PLANFRAMING −SEE PLANSOLID BLOCKINGTOP TRACK −600T125−43. FASTEN (FROM UNDERSIDE) TO EACH JOIST AND PIECE OF BLOCKING WITH (2) #10 x 2" SELF−DRILLING, TAPPING SCREWS.BEARING/SHEAR WALL −SEE PLANFRAMING ELEVATIONS SHOWN APPLY AT BUILDING A ONLY. FOR OTHER BUILDINGS, SEE PLANS AND ARCHITECTURAL DRAWINGS FOR ELEVATIONS.BOTTOM TRACK −600T125−43 (MIN) FASTEN TO CONCRETE WITH 3/16" x1" TITEN SCREW. THIRD PARTY CFMF ENGINEER MAY SUBSTIUTE ANCHOR.LAP BEAMS. FASTEN TOGETHER WITH (6) 3" SDS SCREWS. CENTER OVERLAPPING FACES OVER WEB OF CFMF WALL STUD. EXISTING SOGELEVATIONS (VIF)AT SIM SECTIONS:BUILDING C LEVEL 1 31’−1 7/8" BUILDING G LEVEL 1 26’−5 3/8"W3BUILDING A - LEVEL 1 -OLD50' - 1 7/8"BUILDING A - LEVEL 1 -NEW55' - 4 7/8"W3SHEATHING −SEE PLANFRAMING −SEE PLANSTEEL COL −SEE PLANEXIST. 6" CONC. SLAB ON GRADE.FIELD VERIFY DEPTH.W3JOINT −SEE PLANSEE TYPICAL INTERIOR COLUMN BASEPLATE & FOOTING DETAIL. USE (4) 3/4" POST INSTALLED ADHESIVE ANCHORS. EMBED 4". (TYP)BUILDING A LEVEL 267' - 4 7/8"W3W3EXISTING SHEATHING −SEE PLANEXISTING BEAM −SEE PLANSHIM AS REQUIRED10"x3/4"x10" STEEL PLATE. SEE TYP CAP PLATE DETAIL.STEEL COL −SEE PLANW3BUILDING A LEVEL 3 ATTIC78' - 1 7/8"W3W3EXISTING BOTTOM TRUSS CHORDTHREADED ROD −SEE PLANW3#2 1/2 CLEVIS w/ 3/4" GRIP. PROVIDE PINS THROUGH STEEL PLATE AND (1) TURNBUCKLE @ CENTER OF EA. ROD.1’−4"x1/2" x10" STEEL PLATE(4) 1/4" x 2.5"SDS SCREWS @ 5", CENTERED ON PLATE. PRE−DRILL STEEL PLATE. 1 1/2" (TYP)EXISTING WALLFLOOR SHEATHING −SEE PLANSOLID BLOCKINGFLOOR FRAMING −SEE PLANWALL FRAMING −SEE PLAN1" SEISMIC JOINTTOP TRACK −600T125−43. FASTEN (FROM UNDERSIDE) TO EACH JOIST AND PICE OF BLOCKING WITH (2)#10X2" SELF−DRILLING, TAPPING SCREWS.BUILDING B LEVEL 260' - 7 7/8"EXISTING WALLFLOOR SHEATHING −SEE PLANFLOOR FRAMING −SEE PLANLEDGER1/4" MASONRY SCREWS (EMBED 1.5") @ 4" O/CLUS28. FASTEN TO LEDGER W (6) X 0.148"x1 1/2" FASTENERS AND TO JOIST W/ (4) 0.148"X1 1/2" FASTENERS. 1/4" MASONRY SCREWS (EMBED 1.5") @ 16" O/CBUILDING B LEVEL SB31' - 1 7/8"STEEL POST −SEE PLAN (TYP)EXIST. 6" CONC. SOG.FIELD VERIFY DEPTH.SAWCUT AND REMOVE EXIST SOG. REPLACE. SEE TYP DETAIL.SEE TYP INTERIOR COLUMN AND BASEPLATE DETAILNEW 6" SOG −SEE TYPICAL DETAILBUILDING G - Level 1B30' - 6"BUILDING B - LEVEL 150' - 1 7/8"CMU ELEVATOR SHAFT −SEE PLANEXIST. FRAMING2X6 LEDGER. FASTEN WITH 3/8" TITEN HD (EMBED 1 3/4")@ 32" O/C.BUILDING B - LEVEL 150' - 1 7/8"SHIM AS REQUIRED.CMU ELEVATOR SHAFT −SEE PLANEXISTING TIMBEREXISTING DECK −SUPPORT ON CMU WALL BEYONDEXIST. 12"X12" BEAM. SIZE GIVEN FOR ESTIMATING PURPOSES ONLY. VIF.PORTION OF EXIST. FRAMING TO BE REMOVED. SEE ARCH PLANSWRAP END OF BEAM WITH VAPOR BARRIER. PROVIDE (2) 1/4" SDS SCREW EACH SIDE (4 TOTAL). SDS SCREWS TO PROJECT 3" INTO MASONRY. FILL SPACE BETWEEN MASONRY AND BEAM WITH MORTAR.BUILDING B LEVEL B41' - 2 7/8"5"x3/4"x12" CAP PLATE & BASE PLATE (TYP). SEE TYP DETAILS.POST UP −SEE TYP DETAILEXIST. FRAMINGEXIST. FRAMING TO BE DEMOLISHED −COORD W/ ARCH PLANS5"EXIST. 12"x12" BEAM. SIZE GIVEN FOR ESTIMATING PURPOSES. VIF.BUILDING A - LEVEL 1 -NEW55' - 4 7/8"SHEATHING − SEE PLANRIP FRAMING TO CLEAR CONC. PLATFORMSHIM AS REQ’DEX. CONC. PLATFORMSHEATHING − SEE PLANRIP FRAMING TO CLEAR CONC. PLATFORMSHIM AS REQ’DEX. CONC. PLATFORMBUILDING B LEVEL B41' - 2 7/8"L2.CSEE ELEVATOR PIT DETAIL AND PLANMATCH FACE OF EX. FTG4" VIFSEE TYP UNDERPINNING DETAIL.FOR ESTIMATING PURPOSES ONLY, ASSUME 2 VERT FEET OF UNDERPINNING AND PROVIDE A UNIT PRICE FOR UNDERPRINNING FOR OVER/UNDER.EXISTING FOOTING − VIFBUILDING B - LEVEL 150' - 1 7/8"SHEATHING −SEE PLAN2X10 LEDGER. FASTEN WITH 1/4" ANCHOR ROD (EMBED 4 1/2") INSTALLED WITH ACRYLIC ADHESIVE. PROVIDE (1T&B) @ EA SIDE OF (2)2X10S AND (1T&B) @ 32" OC BEYOND.FRAMING − SEE PLANHHUS210−2@(2)2X10. PROVIDE (30)16d @ HEADER & (10)16d @ JOIST. LUS26 @ FRAMING BEYOND. PROVIDE (4)10d NAILS @ LEDGER & (4)10d NAILS @ JOIST.EXISTING WALL − SEE ARCH PLANSCFMF WALL − SEE PLANHU210−TF@(2)2x10HU26−TF@FRAMING BEYOND7S3.3BUILDING B LEVEL 369' - 10 7/8"FLOOR SHEATHING − SEE PLANFLOOR FRAMING − SEE PLAN. FASTEN END MEMBER TO EACH WALL STUD WITH (2) #10 x 2" SELF−DRILLING, TAPPING SCREWS.CURTAIN WALL − SEE PLANROOF FRAMING − SEE PLAN. CENTER BEAM OVER WEB OF CFMF STUD.TOP TRACK −600T125−43. FASTEN (FROM UNDERSIDE) TO EACH JOIST AND PIECE OF BLOCKING WITH (2) #10x2" SELF−DRILLING TAPPING SCREWS.BEARING WALL − SEE PLANBLOCKINGROOF SHEATHING − SEE PLAN.CONT. 2X. EXTEND TO SUPPORT PERPENDICULAR FRAMING AT NORTH & SOUTH ENDS.ROOF FRAMING − FASTEN TO WALL STUD WITH (2) #10x2" SELF−DRILLING, TAPPING SCREWS.BLOCKING @ 16" o/c.ROOF SHEATHING − SEE PLANWALL FRAMING −SEE PLANROOF SHEATHING − SEE PLANROOF FRAMING − SEE PLAN. CENTER FRAMING OVER WEB OF CFMF WALL STUD.TOP TRACK −600T125−43. FASTEN (FROM UNDERSIDE) TO EACH JOIST AND PIECE OF BLOCKING WITH (2)#10x2" SELF−DRILLING, TAPPING SCREWS.SOLID BLOCKINGCONT. 2X.WALL − SEE PLAN. PROVIDE DEFLETION TRACK AT TOP OF WALL. TERMINATE TRACK PRIOR TO END POSTS, SUPPORTING HEADER.BUILT−UP HEADER. FOR ESTIMATING PURPOSES ONLY, USE (2)800S162−43 WITH A 800T125, T&B. DESIGN, DETAILING AND BRACING BY CFMF ENGINEER. PROVIDE BUILT−UP POST @ EA END. ROOF SHEATHING − SEE PLANROOF FRAMING − SEE PLAN. FASTEN END MEMBER TO EX. MASONRY WALL WITH (2) 1/4"X3" KWIK−CON II+SCREWS (1 TOP & 1 BOT) @ 8" O/C. EX. MASONRY WALLEX. MASONRY WALLROOF SHEATHING − SEE PLANROOF FRAMING − SEE PLAN. FASTEN END MEMBER TO WALL STUD WITH (2) #10x2" SELF−DRILLING, TAPPING SCREWS.SEISMIC JT − SEE PLANWALL −SEE PLANSScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA SubmissionAs indicatedS3.1SECTIONSDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063 3/4" = 1'-0"S3.11SECTION 3/4" = 1'-0"S3.12SECTION 3/4" = 1'-0"S3.13SECTION 3/4" = 1'-0"S3.14SECTION 3/4" = 1'-0"S3.16SECTION 3/4" = 1'-0"S3.17SECTION 3/4" = 1'-0"S3.111SECTION 3/4" = 1'-0"S3.113SECTION 3/4" = 1'-0"S3.114SECTION 3/4" = 1'-0"S3.115SECTION 3/4" = 1'-0"S3.15SECTION 1/2" = 1'-0"S3.112SECTION 3/4" = 1'-0"S3.116SECTIONNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 3/4" = 1'-0"S3.110SECTION 3/4" = 1'-0"S3.18SECTION 3/4" = 1'-0"S3.19SECTION 3/4" = 1'-0"S3.117SECTION 3/4" = 1'-0"S3.118SECTION 3/4" = 1'-0"S3.119SECTION BUILDING C LEVEL 241' - 6 7/8"SHEATHING −SEE PLANFRAMING −SEE PLAN1/4" MASONRY SCREWS (EMBED 1.5") @ 32" O/CLEDGER1/4" MASONRY SCREWS (EMBED 1.5") @ 8" O/CHU28DECKING − SEE PLANPOST UP − SEE PLAN AND TYP DETAILHU26−TFWOOD FRAMING − SEE PLANCAP PLATE − SEE TYP DETAILSTEEL BEAM − SEE PLANLEDGER. FASTEN DIRECTLY TO WOOOD STUDS @ 16"o/c W/ (2) 1/4" x3"SDS SCREWSHU26−TF HANGEREX. FRAMINGBUILDING D LEVEL 253' - 6 7/8"O5O3O4O5O3O4O5STEEL COL − SEE PLAN (TYP)SEE TYP CAP PLATE DETAIL (TYP)STEEL FRAMING − SEE PLAN (TYP)SHEATHING − SEE PLAN (TYP)STEEL POST UP −SEE PLAN AND TYP DETAIL (TYP)STEEL CAP PL − SEE TYP DETAILSTEEL CAP PL − SEE TYP DETAILEX. WOOD GIRDER (TYP)NOTE:1. STEEL BASEPLATES AT POSTS ARE 12"X5"X3/4" UON. BASEPLATES TO BE CENTERED ON POST. BOLTS TO BE POSITIONED 1.5" FROM EACH EDGE.SEE NOTE 1SEE NOTE 1SEE NOTE 1EXIST. STEEL BEAM. FOR ESTIMATING PURPOSES ONLY, ASSUME BEAM SIZE IS 11 1/2"x 7 1/2". VIF.(TYP)LVL. EXTEND 12" BEYOND OPENING AND FASTEN TO EX. BEAM WITH (3) 3 1/2"SDS SCREWS. FASTEN TO EX. WALL W/ HU11. USE (6) 0.148"X1 1/2" INTO JOIST AND (22) 1/4"X2 3/4" TITEN 2 INTO EX. MASONRY WALL.SHEATHING − SEE PLAN (TYP)WOOD FRAMING − SEE PLAN (TYP)STEEL FRAMING − SEE PLAN (TYP)STEEL COL − SEE PLAN (TYP)BUILDING E LEVEL 253' - 6 7/8"W11SEE TYP CAP PLATE DETAIL (TYP)STEEL FRAMING − SEE PLAN (TYP)SHEATHING − SEE PLAN (TYP)STEEL POST UP − SEE PLAN AND TYP DETAIL (TYP)STEEL CAP PL − SEE TYP DETAILSTEEL COL − SEE PLAN (TYP)STEEL CAP PL − SEE TYP DETAILSEE 3/S3.2 FOR INFO NOT SHOWN.EXIST. STEEL BEAM. FOR ESTIMATING PURPOSES ONLY, ASSUME BEAM SIZE IS 11 1/2"x 7 1/2". VIF.(TYP)LVL(TYP)BUILDING F LEVEL 241' - 2 7/8"ELEVATOR CMU SHAFT WALL −SEE PLANCONCRETE SLAB ON DECK −SEE PLANCONT. L4X4X3/81/2" HILTI HIT−HY 70 ANCHOR @ 16" O/C. EMBED 4 1/2" MIN.BUILDING F LEVEL 127' - 10 7/8"STEEL COL −SEE PLAN (TYP)EXIST. 4" CONC. SOG.FIELD VERIFY DEPTH.2" NON−SHRINK GROUTNEW 5" SOG −SEE TYPICAL DETAIL3/4" BASEPLATE. SEE DETAILS BELOW @ TYP EXTERIOR OR CORNER BASEPLATE5 1/4"7"3 1/2"TYP BASEPLATE1’ − 2"11"5 1/4"CORNER BASEPLATE1’ − 1"1’ − 1"5 1/4"(TYP)1 1/2"P−1. SEE DETAIL.1 1/2" (TYP UON)4" (TYP)3 1/2" (TYP)ANCHOR RODSSEE TYPICAL COLUMN PIER & FOOTING DETAIL (SIM) FOR ADDITIONAL INFO.BUILDING F LEVEL 127' - 10 7/8"STEEL COL −SEE PLAN (TYP)EXIST. 4" CONC. SOG.FIELD VERIFY DEPTH.SEE TYP INTERIOR COLUMN AND BASEPLATE DETAILNEW 5" SOG −SEE TYPICAL DETAILBASEPLATE −1’−2"x3/4"x1’−2"STEEL WIND GIRT −SEE PLAN(4) HILTI HIT HY 70 −8" SPACING11"x1/2"x11" STEEL PLATEDRYPACK GAP BETWEEN PLATE AND WALL1 1/2"2"@24"2"@24"BUILDING F LEVEL 241' - 2 7/8"ELEVATOR CMU SHAFT WALL −SEE PLANCONCRETE SLAB ON DECK −SEE PLANSTEEL FRAMING −SEE PLANSTEEL BEARING PLATENON−SHRINK GROUTFRAMING − SEE PLANSHEATHING − SEE PLANHU26−TF INSTALLED OVER GYP BOARD. #10−16xBEARING WALL − SEE PLANGYP BOARD TO CONTINUE TO UNDERSIDE OF SHEATHINGBUILDING B - LEVEL 150' - 1 7/8"WALL −SEE ARCH DWGSSLAB ON GRADE − SEE PLAN#4 @ 4’−0" o/cALT HOOK(2) #4 CONT(2) #4 CONT (1T&B)6"6"1’2"@NORTH WALL12"@SOUTH WALL1/2" PREMOLDED JOINT FILLER (TYP)BUILDING B LEVEL B41' - 2 7/8"EXIST. FRAMINGEXIST. FRAMING TO BE DEMOLISHED −COORD W/ ARCH PLANSCFMF WALL −SEE ARCH DWGS600S162−54 @ 16" o/c (MIN)PROVIDE CONT. SHEATHING1.25"X22GAGE STRAP AT 4’−0" WITH 6 −8D NAILS EACH ENDBUILDING B - LEVEL 150' - 1 7/8"EX. GRANITE WALLCFMF WALL − SEE ARCH DWGSJOIST (MATCH WALL STUD SIZE) @ 16" oc. SCREW TO WALL STUDS WITH (2)#10x3/4" SELF−DRILLING SCREW.SHEATHING − SEE PLAN FOR SIZE/ATTACHMENT18 GA TRACK − MATCH JOIST DEPTH. FASTEN TO GRANITE WITH (2) 3/8" WEDGEALL ANCHORS, EMBED 3", @ 48" O/C.BUILDING B - LEVEL 150' - 1 7/8"EX. GRANITE WALLCFMF WALL − SEE ARCH DWGS18 GA (MIN) TRACK. FASTEN TO GRANITE WITH (2) 3/8" WEDGEALL ANCHORS, EMBED 3", @ 48" O/C.ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 3/4" = 1'-0"S3.2SECTIONSDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063 3/4" = 1'-0"S3.21SECTION 3/4" = 1'-0"S3.22SECTION 3/4" = 1'-0"S3.23SECTION 3/4" = 1'-0"S3.24SECTION 3/4" = 1'-0"S3.25SECTION 3/4" = 1'-0"S3.26SECTION 3/4" = 1'-0"S3.28SECTION 3/4" = 1'-0"S3.29SECTION 3/4" = 1'-0"S3.27SECTION 3/4" = 1'-0"S3.210SECTION 3/4" = 1'-0"S3.211SECTION 3/4" = 1'-0"S3.213SECTION 3/4" = 1'-0"S3.214SECTION 3/4" = 1'-0"S3.212SECTION 3/4" = 1'-0"S3.215SECTIONNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 BUILDING J LEVEL 1 - OLD26' - 5 3/8"VAPOR BARRIERCRUSHED STONECONCRETE SLAB ON GRADE −SEE PLANCONC SLAB ON DECK − SEE PLANCONT BENT PLATE − FASTEN TO DECK WITH POST−INSTALLED ANCHORS AND TO CFMF WITH SCREWSSTEEL FRAMING − SEE PLANCFMF WALL − SEE ARCH DWGSBUILDING G - Level 1B30' - 6"FLOOR SHEATHING − SEE PLANFLOOR JOISTS − SEE PLAN2x6 LEDGER. FASTEN TO EX. WALL WITH (2) 1/4"X3" KWIK−CON II+SCREWS (1 TOP & 1 BOT) @ 8" O/C.BLOCKING2x6 LEDGER. FASTEN TO EX. WALL WITH (2) 1/4"X3" KWIK−CON II+SCREWS (1 TOP & 1 BOT) @ 8" O/C.FLOOR SHEATHING − SEE PLANEXISTING MASONRY OR CONCRETE WALLBUILDING G LEVEL 126' - 5 3/8"BUILDING G - Level 1B30' - 6"2x6 LEDGER. FASTEN TO EACH STUD WITH 0.131"x3" NAIL.BLOCKINGDOUBLE TOP PLATERIM JOISTFLOOR JOISTS − SEE PLANFLOOR JOISTS −SEE PLANWALL −ARCH SEE PLANSFLOOR SHEATHING −SEE PLANFLOOR SHEATHING − SEE PLANBUILDING H & J LEVEL 1 -NEW28' - 4 3/8"BLDG K - 500 YEAR FLOOD27' - 4"BLDG K - 100 YEAR FLOOD26' - 9 1/2"BLDG M - 100 YEAR FLOOD26' - 10 3/4"BLDG M - 500 YEAR FLOOD28' - 1 1/4"G(w) - 100 YEAR FLOOD27' - 9 1/2"G (w) - 500 YEAR FLOOD29' - 7 1/4"BLDG H - 500 YEAR FLOOD27' - 0"G(e) 500 YEAR FLOOD26' - 6"HAUNCH @ EDGE OF SLAB ON GRADESEE BUILDING J FOR ADDITIONAL SOG INFO.8"4 5 .0 0 °SHEATHING − SEE PLANFRAMING − SEE PLANRIM JOISTBEARING WALL − SEE PLANDOUBLE TOP PLATEBUILDING B - LEVEL 150' - 1 7/8"HEADER − SEE PLANSHEATHING − SEE PLAN2X6 LEDGER. FASTEN TO EA CFMF STUD WITH (2) #10x1 3/4" SCREWS 2x6 LEDGER − FASTEN TO MASONRY W/ (2) 1/4"x3" TITENS @ 16" o/c. PLACE (1) ON EA SIDE OF JOIST. LU28 −FASTEN TO JOIST W/ (6)0.148"x1 1/2" NAILS AND TO LEDGER W (8)0.162"x1.5" NAILS.JOIST − SEE PLANSHEATHING − SEE PLANBLDG M - 500 YEAR FLOOD28' - 1 1/4"G (w) - 500 YEAR FLOOD29' - 7 1/4"SHEATHING − SEE PLANSLEEPERS −SEE PLAN. TOENAIL TO LEDGER w/ (3) 0.131"x3" NAILSEXISTING SLABLEDGER, RIPPED AS REQUIRED. FASTEN TO MASONRY W/ (2) 1/4"x3" TITENS @ 16" o/c. PLACE (1) ON EA SIDE OF JOIST. SHEATHING − SEE PLANSLEEPERS − FASTEN TO SLAB WITH (3) 1/4"x3" MASONRY SCREWS (ONE EACH END AND ONE CENTER)EXISTING SLABBUILDING A - LEVEL 1 -NEW55' - 4 7/8"SHEATHING −SEE PLANFRAMING −SEE PLANSOLID BLOCKING. FASTEN TO EX. WALL WITH (2) 1/4"X3" KWIK−CON II+SCREWS (1@ EA END).BEARING WALL −SEE PLANSEE 1/S3.1 FOR ADDITIONAL INFO.BUILDING A LEVEL 3 ATTIC78' - 1 7/8"EXISTING BOTTOM TRUSS CHORDTHREADED RODS (1 @ CORNERS & (2) @ CENTER) −SEE PLAN#2 1/2 CLEVIS w/ 3/4" GRIP. PROVIDE PINS THROUGH STEEL PLATE AND (1) TURNBUCKLE @ CENTER OF EA. ROD. PROVIDE (2) @ CENTER PLATE AND (1) @ CORNER PLATES.1’−1"x1/2" x10" STEEL PLATE(4) 1/4" x 2.5"SDS SCREWS @ 5", CENTERED ON PLATE. PRE−DRILL STEEL PLATE. BUILDING B LEVEL SB31' - 1 7/8"HAUNCH @ EDGE OF SLAB ON GRADE4 5 .0 0 °EX. SLAB ON GRADE8"SEE TYP SLAB−ON−GRADE DETAIL FOR ADDITIONAL INFO.EXISTING WALLSTEEL BRACKET − BY HELICAL PILE SUPPLIERHYDRAULICALLY INSTALLED HELICAL PILE DESIGNED TO SUPPORT A VERTICAL LOAD OF 40 KIPS. ADVANCE HELICAL PILE AS REQUIRED TO ACHIEVE CAPACITY. AT A MINIMUM, PILE TO HAVE A DEPTH OF 10’ BELOW ADJACENT STREAM BED.BACKFILL WITH BOULDERS/RIP−RAP. SEE CIVIL DRAWINGS FOR ADDITIONAL INFO.(3)GALV L4x3 1/2"x5/16" (LLV). LOCATE BOTTOM OF ANGLES 5" ABOVE TOP OF EXISTING ARCH. PROVIDE A MINIMUM END BEARING OF 8" AT EACH END.REBUILD EX. ARCH BELOW LINTELS. SEE ARCH DWGS FOR ADDITIONAL INFO.EX. 12"(VIF) MASONRY WALL.ScaleDateDrawn ByChecked ByProject NumberUNCASVILLE, 90% CHFA Submission 3/4" = 1'-0"S3.3SECTIONSDakotaPartners, Inc.OXOBOXOLOFTSDJMEAMOctober 12, 201816-063 3/4" = 1'-0"S3.35SECTION 3/4" = 1'-0"S3.36SECTION 3/4" = 1'-0"S3.31SECTION 3/4" = 1'-0"S3.32SECTION 3/4" = 1'-0"S3.33SECTION 3/4" = 1'-0"S3.34SECTION 3/4" = 1'-0"S3.37SECTION 3/4" = 1'-0"S3.38SECTION 3/4" = 1'-0"S3.39SECTION 3/4" = 1'-0"S3.310SECTIONNo. Description Date90% Const Docs 11/1/1690% Const Docs 10/31/1795% Const Docs 05/01/18Final Const Docs 10/12/18 3/4" = 1'-0"S3.311SECTION 3/4" = 1'-0"S3.312SECTION 3/4" = 1'-0"S3.313Section 3/4" = 1'-0"S3.314SECTION 3/4" = 1'-0"S3.315SECTION UP UP WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 L2.L UNIT C-1 (2 BEDROOM) UNIT C-2 (2 BEDROOM) STAIR 2 ELECTRICAL METER ROOM MAINTENANCE ROOM BOILER ROOM SPRINKLER ROOM BUILDING B BUILDING C BUILDING A (ABOVE) BUILDING D BUILDING G HP HP2 C-175 C-175 B-150 B-150 B-150 B-150 B-150 D-250 D-250 T HP-2 R7-800 T HP2 R7-800 EF-1 EWH-2 EWH-2 4" EA UP(TYPICAL) EF-1 EF-1 EUH-1 EF-1 4" EA TO WEATHERPROOF WALL CAP (TYPICAL FOR 4) DOMESTIC HOT WATER BOILER DHW BOILER 4" FLUE VENT AND CA INTAKETO TERMINATE IN CONCENTRIC VENT KIT AXG AXGAXG AXG B-1 COMBINATION FLUE EXHAUST/ COMBUSTION AIR INTAKE TO CONCENTRIC WALL TERMINALKIT. SIZE, ROUTING, LOCATION ANDINSTALLATION AS PER MANUFACTURE'SRECOMMENDATIONS (TYPICAL) 12X6" AIR TRANFERGRILLE ASSEMBLY(AXG). PROVIDE 12"X3"TRANSFER DUCT INWALL WITH HIGHINLET GRILLE ANDLOW OUTLET GRILLE (TYPICAL FOR ALL) 4 F-MP1.1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-MD1.SB MECHANICAL DUCTWORK PLAN BLDG 'B'-LEVEL SB BLDG 'C' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date OA WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 O1 O2 O3 O4 O5W1W2W3W4W5W6W7W8W9 L2.L UNIT B-1(2 BEDROOM) TYPE A UNIT B-2 (2 BEDROOM) UNIT C-3 (2 BEDROOM)TYPE A UNIT C-4 (2 BEDROOM) TYPE A ELEVATOR BUILDING B BUILDING CBUILDING A BUILDING G BUILDING D BUILDING F HP-2 HP-7 HP-7 C-175 C-175 B-150 B-150 T HP-2 B-150 K-500 T G-150G-150 HP-7 VD 6x4 OA DUCT UPPROVIDE FD AT DECK 4x4 EA DUCT UP PROVIDE FDAT DECK E1-20 VD 6x4OA TO HP-4 J-375 B-125 G-100 G-150 T HP7 4x4 EA DUCT UP 8x6 SADUCT UPPROVIDE FD AT DECK G-160 E1-20 E1-20 E1-20 RA-800 8"DIA. DRYER EXHAUST UP TOBOOSTER FAN IN ATTIC. 4"DIA. DRYER VENT TO EXHAUST MANIFOLD(TYPICAL FOR 4) RA-800 6x4 OA DUCT UP HP-2 B-150 B-150 D-250 R7-800 T HP-2 R7-800 EF-1 6" EA UP, 4" EA DN (TYPICAL FOR 4) EF-1 EF-1 EWH-3 EF-1 ERV-1 EA 0A 6x6 EA DUCT UP 6X6 OA DUCT DN 8" DIAWEATHERPROOF WALL CAP (TYPICAL FOR 2)HP-5 6X6 OA DUCT UP 6X6 EA DUCT UP 10X8 RA DUCT UP 10X8 SA DUCT UP AXG AXG AXG AXG AXGAXG AXG AXG AXG VD VD VD 4" EA TO WEATHERPROOFWALL CAP (TYPICAL FOR 4) 12X6" AIR TRANSFER GRILLE ASSEMBLY (AXG). PROVIDE 12"X3" TRANSFER DUCTIN WALL WITH HIGH INLET GRILLE ANDLOW OUTLET GRILLE (TYPICAL FOR ALL) FD 4 F-MP1.1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-MD1.B MECHANICAL DUCTWORK PLAN BLDG A-CRAWL SPACE BLDG B - LEVEL B BLDG C - LEVEL 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date OA WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 O1 O2 O3 O4 O5W1W2W3W4W5W6W7W8W9 L2.L BUILDING D BUILDING B BUILDING C BUILDING G BUILDING A UNIT A-1 (2 BEDROOM) UNIT A-2 (1 BEDROOM) UNIT B-3 (1 BEDROOM) TYPE 'A' UNIT B-4 (2 BEDROOM) UNIT B-5 (1 BEDROOM) UNIT B-6 (1 BEDROOM) UNIT B-7 (STUDIO) UNIT A-3(2 BEDROOM) HP-6 HP-6 HP-6 HP6 HP-1 HP-1 HP-1 C-175 B-150 R6-600 T HP-1 T C-200 B-150 B-150 A-100 HP-1 R6-600 T HP-1 C-175 R6-600 B-125 B-150 A-125 G-125 F-275 I-250 G-150 12x12 SAPLENUM G-125 B-275 T HP-6 10x10 SAPLENUM T HP6 T HP-6 G-125 T HP-6 J-350 HP-6 10x10 SAPLENUM 12x12 SAPLENUM I-275G-125 H-200 T HP-6 12x12 SA PLENUM E1-20 E1-20 E1-20 E1-20 VD VD 6X6 EA DUCT UP,6X4 EA DN OA TO HP6 (TYP OF 2) OA TO HP4 E1-20 E1-20 E1-20 E1-20 E1-20 VD VD VD VD VD VD A-75 A-75 B-150 R2-290 8X8 RA UP E1-20 6X6 EA DUCT DN & 6X4 EA DUCT UP,PROVIDE FD AT DECKS ABOVE & BELOW 6x6 OA DUCT DN AND 4X6 DUCT UP PROVIDE FD AT DECKS ABOVE & BELOW 6x4 EA DN AND 6X4 EA UP,PROVIDE FD AT DECKS ABOVE & BELOW E1-20E1-20 E1-20 10x10 SA DUCT UP,8x6 SA DUCT DN RA-175 C-200 6X6 OA DUCT UP,4X4 OA DN OA CONNECTIONTO HP6(TYP. FOR 2) RA-600 RA-600 RA-400 RA-400 RA-400 E1-20 E1-20 FD FD FD EWH-1 C-175 B-125 B-125 10X8 SA DUCT DN & 8X8 SA DUCT UP, PROVIDE FD AT DECKS ABOVE & BELOW AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG 12"x6" AIR TRAMSFER GRILLE ASSEMBLY (AXG). PROVIDE 12"X3"TRANFER DUCT IN WALL WITHHIGH INLET GRILLE AND LOWOUTLET GRILLE (TYPICALFOR ALL) 8X8 EA DUCT UP, 4X4 EA DN EI-20 4x4 OA DUCT UP, PROVIDE FDAT DECK ABOVE 12"X6" AIR TRANSFER GRILLE ASSEMBLY (AXG). PROVIDE 12"X3"TRANSFER DUCT IN WALL WITHHIGH INLET GRILLE AND LOWOUTLET GRILLE (TYPICAL FOR ALL) 4 F-MP1.1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-MD1.1 MECHANICAL DUCTWORK PLAN BLDGS 'A', 'B', 'C' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date OA WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 O1 O2 O3 O4 O5W1W2W3W4W5W6W7W8W9 L2.L UNIT B-8 (1 BEDROOM)TYPE A UNIT B-9 (2 BEDROOM) UNIT B-10 (1 BEDROOM) UNIT B-11 (1 BEDROOM) UNIT B-12 (1 BEDROOM) BUILDING B BUILDING C BUILDING A BUILDING G BUILDING D A-75 A-75 B-150 HP-6 G-125 G-125 HP-6 12x12 SA PLENUM I-275G-125 B-200 T HP-6 E1-20 E1-20 8x6 OA DUCT UP,6X6 OA DUCT DN HP-6 G-125 I-275 HP-6 10x10 SAPLENUM E1-20 E1-20 VD VD E1-20 E1-20 E1-20 VD VD VD HP-6 HP-6 I-300 G-150 12x12 SAPLENUM G-12510x10 SA PLENUM T HP-6 E1-20 E1-20 E1-20 VD VD VD R1-290 10x10 RA DUCT UP8x8 RA DUCT DN T 8x6 EA DUCT UP 8x6 EA DUCT DN 8x6 EA DUCT UP6x6 EA DUCT DN 12x12 SA DUCT UP10x10 SA DUCT DN OA CONNECTION TO HP4(TYP OF 2) 8x6 OA DUCT UP6x6 OA DUCT DN RA-600 12x12 SA PLENUM J-350 RA-600 RA-400 RA-400 B-275 RA-600 B-150 FD FD FD FD FD T HP-6 T HP-6 AXG AXGAXG AXG AXG AXG EWH-5 12"X 6" AIR TRNSFER GRILLEASSEMBLY (AXG). PROVIDE12"X3" TRANSFER DUCT INWALL WITH HIGH INLET GRILLE AND LOW OUTLET GRILLE (TYPICAL FOR ALL)4 F-MP1.1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-MD1.2 MECHANICAL DUCTWORK PLAN BLDGS 'A', 'B', 'C' - LEVEL 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date OA WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 O1 O2 O3 O4 O5W1W2W3W4W5W6W7W8W9 L2.L BUILDING G BUILDING D BUILDING B (LEVEL 3)BUILDING C BUILDING A UNIT A-4 (1 BEDROOM) H.C. UNIT A-5 (1 BEDROOM) UNIT A-6 (2 BEDROOM) H.C. UNIT B-13 (1 BEDROOM) TYPE A UNIT B-14 (2 BEDROOM) UNIT B-15 (1 BEDROOM) UNIT B-16 (1 BEDROOM) UNIT B-17 (1 BEDROOM) HP-1 HP-1 HP-1 D-250 D-250 B-150 R6-600 THP- T C-200 B-150 B-150 A-100 HP-1 R-600 T HP-1 C-175 B-125 B-125 C-175 R6-600 A-75 A-75 T T T T HP-6 HP-4 G-150 I-300 12x12 SAPLENUM G-12510x10 SAPLENUM T HP-6 E1-20 E1-20 E1-20 VD VD VD R2-290 10x10 RA DUCT DN 12x12 RA DUCT UP A-75 B-150 HP-6 G-125 I-275 T HP-6 10x10 SAPLENUM E1-20 VD E1-20 E1-20 E1-20 VD VD VD A-75 HP6 G-125 G-125 HP-6 12x12 SAPLENUM I-275G-125 H-200 T E1-20 E1-20 OA TO HP6(TYP OF ALL) HP-6 E1-20 VD VD 8x8 EA DUCT UP8x6 EA DUCT DN 8x10 EA DUCT UP 8x8 EA DUCT DN E1-20 E1-20E1-20 E1-20 E1-20 E1-20 14x12 SA DUCTUP, 12x12 SADUCT DN.PROVIDE FIREDAMPER ATDECK R2-175 B-200 4x4 OA DUCT UP 4x6 OA DUCT DN 6x4 EA DUCT DN 4x6 EADUCT DN 8x8 OA DUCT UP8x6 OA DUCT DN OA CONNECTION TO HP6(TYP. OF 2) RA-600 HP-6 RA-600B-350 RA-400 -275 RA-400 RA-600 B-150 36" LONG ELECTRIC BASEBOARD HEATER FD FD FD FD FD R6-600 T HP-6 8X SA DUCT DN AXG AXGAXG AXG AXG AXG AXG AXG AXGAXG OA TO HP6(TYP OF ALL) 8X8 OA DUCT UP,8X6 OA DN 8X10 EA DUCTUP, 8X6 EA DN EWH-6 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-MD1.3 MECHANICAL DUCTWORK PLAN BLDGS 'A', 'B', 'C' - LEVEL 3 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 W1 W2 W3 W4 W5 W6 W7 W8 W9 L2.L BUILDING B BUILDING A UNIT B-18 (1 BEDROOM) UNIT B-19 (2 BEDROOM) UNIT B-20 (1 BEDROOM) UNIT B-21 (1 BEDROOM) UNIT B-22 (1 BEDROOM) ATTIC SPACE A-75 T T HP-6 HP-6 I-300 G-150 12x12 SAPLENUM G-12510x10 SAPLENUM T HP-6 E1-20 E1-20 E1-20 VD VD VD R10-290 14x14 RA DUCT UP,12x12 RA DUCT DN 8X8 OA DUCT DN 8X10 OA DUCT UP A-75 B-150 HP-6 G-125 B-275 HP-6 10x10 SAPLENUM E1-20 VD VD E1-20 E1-20 E1-20 VD VD VD A-75 HP-6 G-125 G-125 HP-6 12x12 SA PLENUM I-275G-125 H-200 T E1-20 E1-20 OA TO HP4 (TYP OF 5)8x6 OA DUCT DN8X8 OA DUCT UP HP-6 E1-20 VD VD T 10x10 EA DUCT UP8x8 EA DUCT DN HP-6 14x14 SA UP14x12 SA DN,PROVIDE FIREDAMPER AT DECK 8x8 OA DUCT UP8x10 OA DUCT DN FD FD RA-600 RA-400 RA-600 FD FD RA-400 T HP-6 RA-600 B-150 I-275 RA-400 AXG AXG AXG AXG AXG AXG OA TO HP6 (TYP OF 5)8x6 OA DUCT DN8X8 OA DUCT UP J-350 10x10 EA DUCT UP 8x10 EA DUCT DN EWH-7 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-MD1.4 MECHANICAL DUCTWORK PLAN BLDGS 'A', 'B', 'C' - LEVEL 4 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 W1 W2 W3 W4 W5 W6 W7 W8 W9 L2.L VD EA0A ERV-2 14x14 RA DUCT DN HP-414x14 SA DN 10x10 EA DUCT DN 8x8 OADUCT DN 8"DIA. DRYER EXHAUST TO WEATHERPROOF WALL CAP 8" DIA. DRYER EXHAUST DOWNTO BASEMENT DRYER BOOSTER FAN 8x10 EA DUCT DN 8x8 OA DUCT DN SA RA EA0A Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-MD1.5 MECHANICAL DUCTWORK PLAN BLDGS 'A','B','C'' - ATTIC Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date UP UP WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 L2.L UNIT C-1 (2 BEDROOM) UNIT C-2(2 BEDROOM) STAIR 2 ELECTRICAL METER ROOM MAINTENANCE ROOM BOILERROOMSPRINKLERROOM BUILDING B BUILDING C BUILDING A (ABOVE) BUILDING D BUILDING G 1 1/4" SWS&R UP 2 1/2" SWS&R 1 1/4" SWS&R UP 3" SWS&R 1 1/2"SWS&R 1 1/4" SWS&R 1"SWS&R UP HP2 HP2 1 1/2"ø SWS1 1/2"ø SWR3"ø SWR 3"ø SWS 4 F-MP1.1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-MP1.SB MECHANICAL PIPING PLAN BLDGS 'B', 'C' - LEVEL SB Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date OA WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 O1 O2 O3 O4 O5W1W2W3W4W5W6W7W8W9 L2.L UNIT B-1 (2 BEDROOM) TYPE A UNIT B-2(2 BEDROOM) UNIT C-3(2 BEDROOM) TYPE A UNIT C-4(2 BEDROOM) TYPE A ELEVATOR BUILDING B BUILDING CBUILDING A BUILDING G BUILDING D HP-2 HP-7 HP-7 2 1/2" SWS&R 1 1/4"SWS&R UP 2 1/2"SWS&R DN 1 1/4"SWS&R UP&DN 1"SWS&R UP&DN 1 1/4"SWS&R UP 1/2" SWS&R HP-2 HP-5 ERV-1 3/4" SWS & R 3/4" SWS & R UP 4 F-MP1.1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-MP1.B MECHANICAL PIPING PLAN BLDG 'B', 'C' - LEVEL B Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date OA WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 O1 O2 O3 O4 O5W1W2W3W4W5W6W7W8W9 L2.L BUILDING D BUILDING B BUILDING C BUILDING G BUILDING A UNIT A-1(2 BEDROOM)UNIT A-2(1 BEDROOM) UNIT B-3 (1 BEDROOM) TYPE 'A' UNIT B-4(2 BEDROOM) UNIT B-5 (1 BEDROOM) UNIT B-6 (1 BEDROOM) UNIT B-7 (STUDIO) UNIT A-2(2 BEDROOM) HP-6 HP-6 HP-6 HP-6 1" SWS&R UP1 1/4" SWS&R DN HP-1 HP-1 HP-1 HP-6 1" SWS&R 1 1/4" SWS&R 1 1/2" SWS&R 2" SWS&R 2" SWS&R 1" SWS&R UP1 1/4" SWS&R DN 1" SWS&R UP1 1/4" SWS&R DN 1" SWS&R UP1 1/4" SWS&R DN 1" SWS&R UP, 2" SWS&R DN 3/4" SWS & R DOWNTO CRAWL SPACE 4 F-MP1.1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-MP1.1 MECHANICAL PIPING PLAN BLDG 'B', 'C' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date OA WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 O1 O2 O3 O4 O5W1W2W3W4W5W6W7W8W9 L2.L UNIT B-8 (1 BEDROOM) TYPE A UNIT B-9(2 BEDROOM) UNIT B-10 (1 BEDROOM) UNIT B-11 (1 BEDROOM) UNIT B-12 (1 BEDROOM) BUILDING B BUILDING C BUILDING A BUILDING G BUILDING D HP-6 HP-6 HP-6 2"SWS&R HP-6 1" SWS&R UP& DN (TYPICAL OF 4) 1" SWS&R UP& DN(TYPICAL OF 4) 1/2"ø SWR 1/2"ø SWS 1/2"ø SWR 4 F-MP1.1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-MP1.2 MECHANICAL PIPING PLAN BLDGS 'B', 'C' - LEVEL 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date OA WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 O1 O2 O3 O4 O5W1W2W3W4W5W6W7W8W9 L2.L BUILDING G BUILDING D BUILDING B BUILDING C BUILDING A UNIT A-4 (1 BEDROOM) H.C.UNIT A-5 (1 BEDROOM) UNIT A-6 (2 BEDROOM) H.C. UNIT B-13 (1 BEDROOM) TYPE A UNIT B-14 (2 BEDROOM) UNIT B-15 (1 BEDROOM) UNIT B-16 (1 BEDROOM) UNIT B-17 (1 BEDROOM) HP-6 HP-6 HP-6 HP-4 3/4" SWS&R UP,1" SWS&R DN(TYP OF 5) 3/4"SWS&R(TYP OF 3) HP-1 HP-1 HP-1 1/2"ø SWR1/2"ø SWR 1/2"ø SWR1/2"ø SWS 1/2"ø SWR 1/2"ø SWS HP-6 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-MP1.3 MECHANICAL PIPING PLAN BLDGS 'B', 'C' - LEVEL 3 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 W1 W2 W3 W4 W5 W6 W7 W8 W9 L2.L BUILDING B BUILDING A UNIT B-18 (1 BEDROOM) UNIT B-19(2 BEDROOM) UNIT B-20 (1 BEDROOM) UNIT B-21 (1 BEDROOM) UNIT B-22 (1 BEDROOM) ATTIC SPACE HP-6 HP-6 HP-6 HP-6 HP-6 3/4"SWS&R DN 3/4"SWS&R DN 1/2"SWS&R DN 3/4"SWS&R DN Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-MP1.4 MECHANICAL PIPING PLAN BLDGS 'B', 'C' - LEVEL 4 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date UP DNDN DN DNDN DN 1 A B 2 OA O1 O2 O3 O4 O5 BUILDING D LEVEL 1 UNIT D-1(2 BEDROOM) UNIT D-2 (1 BEDROOM) RECEPTION OFFICE KITCHEN OFFICE WAITING AREA HC LAV. JAN. MECH'L CONFROOM FITNESSROOM BUILDING E LEVEL 1 H-P2 HP1 C-175 D-250 D-250 T HP-1 R7-800 R3-175 B-150 A-100 C-200 R7-750 C-175 R5-425 C-175 T B-125 B-125 B-125 B-125 B-125 B-125 A-50 R6-625 B-150 A-100 B-150 A-100A-100 A-100A-50 A-50 RI-50 EF-1 EF-1 HP-2 HP-1 EF-1 T HP-2EF-1 EF-1 A-50 HP-2T HP-2 R2-125 HP-2 EWH-8 EWH-10EWH-9 4" EA TO WEATHERPROOFWALL CAP 4" EA TO WEATHERPROOFWALL CAP (TYPICAL FOR 2) EWH-12 EF-1 4" EA TO WEATHERPROOFWALL CAP AXG 12"x6" AIR TRANSFER ASSEMBLY(AXG). PROVIDE 12"x3" TRANSFERDUCT IN WALL WITH INLET GRILLE AND LOW OUTLET GRILLE (TYPICAL FOR ALL) AXG 12"x6" AIR TRANSFER ASSEMBLY(AXG). PROVIDE 12"x3" TRANSFERDUCT IN WALL WITH INLET GRILLE AND LOW OUTLET GRILLE (TYPICAL FOR ALL) AXG AXG 1 A B 2 OAL2.A L2.B L2.C L2.D O1 O2 O3 O4 O5 BUILDING D LEVEL 2 BUILDING E LEVEL 2 UNIT D-3 (2 BEDROOM) UNIT D-4(1 BEDROOM) UNIT E-2 (1 BEDROOM) UNIT E-3 (2 BEDROOM) HP1 HP2 B-150 B-150 B-150 B-150 T R6-600 C-200 C-200 B-150 B-150 A-100 T R7-800 HP1 R3-175 C-175 D-250 D-250 T HP-2 R7-800 R5-425 C-175 HP-2 EF-1 C-200 B-125 T HP-1 C-150 A-100 EF-1 EF-1 EF-1 EF-1 HP-1 HP-2 4" EA TO WEATHERPROOFWALL CAP 4" EA TO WEATHERPROOFWALL CAP EF-1 EF-1 EF-1 4" EA TO WEATHERPROOFWALL CAP 12"x6" AIR TRANSFER ASSEMBLY(AXG). PROVIDE 12"x3" TRANSFERDUCT IN WALL WITH INLET GRILLEAND LOW OUTLET GRILLE (TYPICALFOR ALL) AXG AXG AXG AXG AXG 4" EA TO WEATHERPROOFWALL CAP 12"x6" AIR TRANSFER ASSEMBLY(AXG). PROVIDE 12"x3" TRANSFER DUCT IN WALL WITH INLET GRILLE AND LOW OUTLET GRILLE (TYPICALFOR ALL) EWH-1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" DE-MD1.1 MECHANICAL DUCTWORK PLAN BLDGS 'D', 'E' - LEVELS 1 & 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN HP2 HP2 No.Description Date UP DNDN DN DNDN DN 1 A B 2 OAL2.A L2.B L2.C L2.D O1 O2 O3 O4 O5 BUILDING D UNIT D-1 (2 BEDROOM) UNIT D-2 (1 BEDROOM) RECEPTION OFFICE KITCHEN OFFICE WAITINGAREA HC LAV. JAN. MECH'L CONF ROOM FITNESS ROOM BUILDING E HP2 HP1 HP1 1"SWS&R UP 1 A B 2 OAL2.A L2.B L2.C L2.D O1 O2 O3 O4 O5 BUILDING D BUILDING E UNIT D-3 (2 BEDROOM) UNIT D-4(1 BEDROOM) UNIT E-2 (2 BEDROOM) UNIT E-3 (2 BEDROOM) HP2 HP1 HP1 HP1 1"SWS&R DN 1 1/4"SWS&R 1 1/2"SWS&R 2"SWS&R HP1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" DE-MP1.1 MECHANICAL PIPING PLAN BLDGS 'D', 'E' - LEVELS 1 & 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date COMMUNITY ROOM (OPEN ABOVE) KITCHENETTE JANTOILET FITNESS ROOM(OPEN ABOVE) TOILET R9-2000 24X14 RA DN TO FLOOR, MOUNTBOTTOM OF GRILLE MAX. 12" AFF.ENCLOSURE BY ARCHITECT HP-8 T EF-1EF-1 UC3/4"UC3/4"LEVEL ONE 6" EA TO WEATHERPROOFWALL CAP BOILER ROOM FITNESS ROOMBELOW COMMUNITY BELOW TOILETSBELOW S-1 COOLING TOWER SUMP HP8 C-200C-200 C-200C-200 C-200C-200 A-100 B-150 A-100 B-150 B-150 B-150 24X14 RA DN8" COMBUSTION AIR INTAKE AND6" AL29-4C(SS) OR PPE FLUEEXHAUST UP THROUGH ROOF(TYPICAL FOR 2) LEVEL TWO CT1 ROOF Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" F-MD1.1 MECHANICAL DUCTWORK PLANS BLDG 'F' - LEVELS 1 & 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date COMMUNITY ROOM(OPEN ABOVE) KITCHENETTE JAN TOILET FITNESS ROOM(OPEN ABOVE) TOILET 3" SWS&R RUNBELOW GRADE 5" SWS&R UP 3" SWS&R LEVEL ONE1/8"=1'-0" BOILER ROOM FITNESS ROOM BELOW COMMUNITYBELOW TOILETS BELOW S-1 P5 P6 ET-1 P1 P2 6"UP TO CTI P4HX1 B1B1 AS1 5"SWS&R DN 6"UP TO CTI 6" INTO S1 COOLING TOWER SUMP LEVEL TWO1/4"=1'-0" 5"ø SWR 6"DN TO SUMP CT1 ROOF1/8"=1'-0" Production 2 T.O.ROOF 140' - 3 17/32" BLDG C - LEVEL 2138' - 0 3/16" BLDG G ROOFTRUSS140' - 11 1/8" BUILDING F LOWROOF147' - 3 3/16" BUILDING F - HI ROOF159' - 1 3/16" BUILDING F LEVEL2 137' - 8 3/16" LEVEL TWOSECTION1/4"=1'-0" Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 As indicated F-MP1.1 MECHANICAL PIPING PLAN BLDG 'F' - LEVELS 1 & 2 AND SECTION Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date BUILDING H BUILDING G R6-600 R6-600 R7-800 3/4" UC HP-1 HP-2 HP-2 UNIT G-5 (2 BEDROOM) UNIT G-6(1 BEDROOM) UNIT G-7 (1 BEDROOM) UNIT G-8 (1 BEDROOM) UNIT G-9 (1 BEDROOM) UNIT G-4 (1 BEDROOM)UNIT G-3 (1 BEDROOM) UNIT G-2 (1 BEDROOM) UNIT G-1(2 BEDROOM) A-125 CFM A-150 CFM HP1 HP1 HP-5 HP-5 HP1 HP1 A-100 CFM A-100 CFM A-100 CFM A-100 CFM EF-1 EF-1 A-100 CFM A-225 CFM EF-1 EF-1 EF-1 4" EA UP TO WEATHERPROOF ROOF CAP(TYPICAL FOR ALL BATH & KITCHEN FANSU.O.N. (TYPICAL) EF-1 EF-1 A-150 CFM EF-1 EF-1 EF-1 EF-1 A-100 CFM EF-1 EF-1 EF-1 EF-1 R6-600 EF-1 EF-1 A-100 CFM A-100 CFM AXG AXG AXG AXG AXG AXG AXG AXG 12"x6" AIR TRANSFER GRILLE ASSEMBLY (AXG). PROVIDE 12"X3" TRANSFER DUCTIN WALL WITH HIGH INLET GRILLE AND LOW OUTLET GRILLE (TYPICAL FOR ALL) 12"x6" AIR TRANSFER GRILLE ASSEMBLY (AXG). PROVIDE 12"X3" TRANSFER DUCTIN WALL WITH HIGH INLET GRILLE AND LOW OUTLET GRILLE (TYPICAL FOR ALL) D-225CFM D-225CFM D-100CFM D-100CFM D-225CFM D-225 CFM B-225CFM D-225CFM B-225 CFM D-225 CFM B-225 CFMR6-225 CFM T HP-1 T HP-1 D-225 R6-225 D-225 CFMD-225 CFM T HP-1 D-225CFM T HP-1 D-225CFM D-225CFM THP-1 R6-600CFM D-225CFM R6-600 CFM B-175 CFM B-175 CFM THP-2 R7-800 CFM B-150 CFM B-175 CFM AXG T HP-2 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" G-MD1.1 MECHANICAL DUCTWORK PLAN BLDG 'G' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date UNIT G-5 (2 BEDROOM) UNIT G-6 (1 BEDROOM) UNIT G-7 (1 BEDROOM) UNIT G-8 (1 BEDROOM) UNIT G-9 (2 BEDROOM ) BUILDING H BUILDING G HP1 HP1 HP1 HP1 HP2 HP1 HP1 HP1 HP2 UNIT G-1(2 BEDROOM ) UNIT G-2 (2 BEDROOM ) UNIT G-3 (1 BEDROOM ) 3" SWS&R1/2"ø SWR 1/2"ø SWS1/2"ø SWR1/2"ø SWS1"ø SWR1"ø SWS1/2"ø SWR1/2"ø SWS1/2"ø SWS1/2"ø SWR1/2"ø SWR1/2"ø SWS1/2"ø SWR1/2"ø SWS1/2"ø SWR1/2"ø SWS1/2"ø SWR1/2"ø SWS3"ø SWS 3"ø SWR3"ø SWR 3"ø SWS 3"ø SWS3"ø SWR1"ø SWS 1"ø SWR Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" G-MP1.1 MECHANICAL PIPING PLAN BLDGS 'G' - level 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date UNIT H-2(2 BEDROOM) METERROOM UNIT H-1 (1 BEDROOM) METERROOM LAUNDRY ROOM BOILERROOM JANITOR LOBBY BUILDING H BUILDING J BUILDING KHP1 HP2 R7-800 T B-175 CFM A-100 C-200 C-200 B-125 R6-600 B-150 D-225 D-225 T HP-1 HP-2 A-100 CFM UNIT K-2 (2 BEDROOM) UNIT K-4 (1 BEDROOM) UNIT K-1 (1 BEDROOM) UNIT K-3 (1 BEDROOM) HP1 HP1 HP1 C-175 -200 D-225 R6-600 T HP-1 -225 B-150 D-225R6-600 T HP-1 C-175 R6-600 C-200 D-225 THP-1 C-150 D-250 D-250 B-150 R7-800 HP2 EF-1 EF-1 4" DRYER EXHAUST UPTO WEATHERPROOF ROOFCAP (TYPICAL FOR 3) T HP-3 T HP-2 EF-1 EF-1 EF-1EF-1 EF-1 EF-1 EF-1 EF-1 EF-1 EF-1 T HP-3 R9-1750 CFM R8-1050CFM B-150 CFM B-150 CFM AXG AXG AXG AXG AXG AXG AXG 12"x6" AIR TRANSFER GRILLE ASSEMBLY(AXG). PROVIDE 12"X3" TRANSFER DUCTIN WALL WITH HIGH INLET GRILLE ANDLOW OUTLET GRILLE (TYPICAL FOR ALL) 12"x6" AIR TRANSFER GRILLE ASSEMBLY(AXG). PROVIDE 12"X3" TRANSFER DUCTIN WALL WITH HIGH INLET GRILLE AND LOW OUTLET GRILLE (TYPICAL FOR ALL) EWH-13 HP3 HP3 4" EA UP TOWEATHERPOOFCAP (TYPICALFOR ALL KITCHENAND BATHROOMFANS) DHW BOILER 4" FLUE VENT AND CA INTAKETO TERMINATE INCONCENTRIC VENT KIT B-1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" HK-MD1.1 MECHANICAL DUCTWORK PLAN BLDGS, "H" & 'K' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date UNIT H-1 (1 BEDROOM) UNIT H-2 (2 BEDROOM) METER ROOMLAUNDRY ROOM BOILER AND SPRINKLERROOM JANITOR BUILDING H BUILDING J BUILDING K HP2 HP1 HP2 3" SWS&R 2" SWS&R 2" SWS&R 2 1/2" SWS&R BUILDING J BUILDINGS L & M 3/4"ø SWR 3/4"ø SWS HP-3 HP -33/4" SWS&R 3/4" SWS&R 3/4" SWS&R HP1 HP1 HP1 3/4" SWS&R Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" HK-MP1.1 MECHANICAL PIPING PLAN BLDGS "H" & 'K' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date BUILDING J UNIT J-8 (2 BEDROOM) UNIT J-7(1 BEDROOM) UNIT J-6 (1 BEDROOM) UNIT J-3 (2 BEDROOM) UNIT J-2 (2 BEDROOM) UNIT J-1 (2 BEDROOM) UNIT J-5 (2 BEDROOM) UNIT J-4 (1 BEDROOM) HP3 HP1HP-2 HP3 R7-800 C-175 D-250 D-250 HP-2 B-125 C-175 D-225 CFM D-225 CFM R6-600 HP-1 R7-800 R7-800 HP-2 HP-2 HP-1 HP-2 C-175 C-175 C-175 B-125 T T C-175 D-250D-250 T HP-2 B-125 B-125 D-250 T HP-2 C-175C-175 D-250 R7-800 T HP-2 R6-600 B-125 B-150 D-225 D-225 T HP-1 C-175 C-175 R8-1000 T HP-3 C-175 C-175 C-175 C-175 C-175 B-125 R8-1000 T HP-3 EF-1 EF-1 D-250 D-250 EF-1 EF-1 EF-1 EF-1 EF-1 EF-1 EF-1EF-1 EF-1 EF-1 EF-1 EF-1 EF-1 EF-1 D-250 EF-1 C-100 A-100 A-100 BUILDING H 4" EA UP TO WEATHE R P R O O F ROOF CAP ( TYPICAL F O R A L L BATH & KITCHEN U.O. N . ) AXG 12"x6" AIR TRANSFER GRILLE ASSEMBLY(AXG). PROVIDE 12"X3" TRANSFER DUCTIN WALL WITH HIGH INLET GRILLE ANDLOW OUTLET GRILLE (TYPICAL FOR ALL) AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG 12"x6" AIR TRANSFER GRILLE ASSEMBLY (AXG). PROVIDE 12"X3" TRANSFER DUCT IN WALL WITH HIGH INLET GRILLE ANDLOW OUTLET GRILLE (TYPICAL FOR ALL) AXG12x3 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" J-MD1.1 MECHANICAL DUCTWORK PLAN BLDG 'J' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date UNIT H-2 (2 BEDROOM) METERROOM BUILDING J BUILDING J UNIT J-8(2 BEDROOM) UNIT J-7 (1 BEDROOM) UNIT J-6 (1 BEDROOM) UNIT J-3(2 BEDROOM) UNIT J-2 (2 BEDROOM) UNIT J-1 (2 BEDROOM) UNIT J-5 (2 BEDROOM) UNIT J-4 (2 BEDROOM) HP-3 HP-1 HP-2 HP-3 1 1/2" SWS&R 1 1/4" SWS&R 1" SWS&R 3/4" SWS&R EF-1 HP-2 HP-1 HP-2 HP-2 2"ø SWR2"ø SWS 2"ø SWS 2"ø SWR HP1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" J-MP1.1 MECHANICAL PIPING PLAN - BLDG 'J' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date MAINTAINANCE OFFICE/ STORAGE BUILDING L FC-1B-150 C-250B-150 A-50 FC-1 EF-1 T R5-350 4" EA UP TO WEATHERPROOFWALL CAP CU-1 RS & RL UPTO FC-1 R4-250 3 HP-1 HP-2 HP-2 HP2 HP-2 E-275E-275B-125 B-125 R7-800 THP-2 HP-1 C-200 A-100 A-100 R6-600 T HP-1 A-100 A-100 R6-600 HP-1 HP-1 HP-1 C-200C-200 A-100 A-100 R6-600 THP-1 C-200 C-200 A-100 R6-600 HP-1 HP-1 A-100 T HP-2 B-150 D-250 D-250 B-150 HP-2T B-125 D-225D-250 R6-600 B-125 D-250 D-250 C-175 D-250 D-250 C-175 THP-1 T HP-2 T HP2 R7-800 R7-800 B-125 B-125 D-250 E-275 B-150 R7-800 T HP-2 HP-1 B-125B-150 B-175 B-150 R6-600 HP -1 T T C-200 C-200 C-200 5" DIA OA UP TO WEATHERPROOF INTAKE CAP ON ROOF R7-800 UNIT M-1(1 BEDROOM) UNIT M-2(2 BEDROOMS) UNIT M-3(2 BEDROOMS) UNIT M-4(2 BEDROOMS) UNIT M-5 (2 BEDROOMS) UNIT M-11 (2 BEDROOMS) UNIT M-10 (2 BEDROOMS)UNIT M-9 (2 BEDROOMS) UNIT M-8(2 BEDROOMS) UNIT M-7(2 BEDROOMS)UNIT M-6(2 BEDROOMS) EF-1EF-1 EF-1EF-1 EF-1 EF-1EF-1 EF-1 EF-1 EF-1EF-1 EF-1 EF-1 EF-1 EF-1 EF-1 EF-1 EF-1 EF-1 EF-1 EF-1EF-1 EF-1 B-150 A-100 A-100 A-100 A-100 A-100 A-100 A-100 HP-3 T 4" OA UP TOWEATHERPROOFINTAKE CAP ON ROOF 4" OA UP TOWEATHERPROOFINTAKE CAP ONROOF 12"x6" AIR TRANSFER GRILLE ASSEMBLY(AXG). PROVIDE 12"X3" TRANSFER DUCTIN WALL WITH HIGH INLET GRILLE AND LOW OUTLET GRILLE (TYPICAL FOR ALL) AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG AXG 12"x6" AIR TRANSFER GRILLE ASSEMBLY(AXG). PROVIDE 12"X3" TRANSFER DUCTIN WALL WITH HIGH INLET GRILLE AND LOW OUTLET GRILLE (TYPICAL FOR ALL) 4" EA UP TO WEQATHERPROOF ROOF CAP (TYPICAL FOR ALL KITCHEN AND BATH FANS U.O.N.) 5" DIA OA UP TOWEATHERPROOFINTAKE CAP ONROOF Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" LM-MD1.1 MECHANICAL DUCTWORK PLANS BLDGS 'L' & 'M' Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date MAINTENANCE OFFICE/ STORAGE CU-1 BUILDING L EWH-2 EWH-3 FC-1 3 HP1 HP1 HP1 HP1 HP1 HP1 HP1 HP1 HP1 HP1 HP1 2"SWS&R 1"SWS&R 1 1/4"SWS&R 1 1/2"SWS&R 1 1/4"SWS&R 1"SWS&R 3/4"SWS&R BUILDING M Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" LM-MP1.1 MECHANICAL PIPING PLAN BUILDINGS 'L' AND 'M' LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN HP-2 No.Description Date MAX BURNER DATA SCHEDULE OF CHEMICAL FEED SYSTEMS MANUFACTURER MODEL NUMBER REMARKSNUMBER CF-1 BOILER ROOM LOCATION SOURCE WATERSYSTEM SERVING VERTICAL TANK DATA 55 GALLONS 120 ELECTRICAL DATA TYPE CAPACITY V POLYETHYLENE MATERIAL 1 PH 60 HZ 1/3 HP PROVIDE LOW LEVEL PUMP CUT-OFF, LOW LEVEL ALARM,REMOTE MONITORING CONTACT WATER TREATMENT/GLYCOL FEED APPLICATION JOHN WOOD JWGP-53-055 COOLING HEAT REJECTION WILL BE MET BY THE ABOVE SELECTIONS. NOTE: COOLING TOWER SELECTIONS BASED ON WATERSIDE ECONOMIZER OPERATION. MECHANICAL VOLT PHWBDB TEMP FAN (HIGH SPEED) HPIN.CFM TOTAL (FT. HD) PD MAX ESPTEMP OUTIN GPM CONDENSER WATER DATA AIR DATA SCHEDULE OF COOLING TOWERS CAP.LOCATIONMANUFACTURER/SYMBOL FAN (LOW SPEED) HP VOLT PHTONSMODEL NUMBER REMARKS CT-1 BAC XES15E-1212-07EN/W BLDG F ROOF 167 420 95 85 -40,230 N/A 91 73 3 208 3 3 208 3 PROVIDE COMBINATION COMBUSTION AIR INTAKEAND FLUE EXHAUST TO CONCENTRICWALL TERMINAL KIT TYPE MODEL NUMBER SCHEDULE OF HEAT EXCHANGERS SYMBOL MANUFACTURER/SERVEDLOCATIONEQUIPMENT FLUID CHILLED FLUID SIDEHEATED FLUID SIDE GPMCAPACITY MBH FLUID TEMP OUTIN OUT GPM IN TEMP REMARKSPD FT HX-1 MECHANICALROOM PLATE &FRAME CT-1 ALFA LAVAL AQ6-FG 2,100 WATER 420 83 93 WATER 420 96 86 4.82 VIBRATION ISOLATION MOUNTING PROVIDE WITH STARTER, DISCONNECT SWITCH, VIBRATION ISOLATION MOUNTING SCHEDULE OF PUMPS HOT WATER BOILERS-BURNERS SCHEDULE SCHEDULE OF EXPANSION TANKS PUMP TYPES: DS=DOUBLE SUCTION, HS=HORIZONTALMSPLIT, ES=BASE MOUNTED CENTRIFUGAL BASE SUCTION, IL=IN LINE MANUFACTURER/MODEL NUMBER RPM NUMBER LOCATION PUMPTYPE P1 MECHANICALROOM B&G E-1510 2.5AC FLUID WATER GPM 350 HEAD(FT) 15 3550 HP VOLT 208 PH 3 REMARKS SOURCE WATER PUMP, LEAD LAG MOTOR DATA P2 MECHANICAL ROOM WATER 350B&G E1510 2.5AC ES ES 3208153550 P3 MECHANICALROOM WATER 160B&G e-80 3X3X7C IL 320811150 P4 MECHANICALROOM WATER 160B&G e-80 3X3X7C IL 320811150 P5 MECHANICALROOM WATER 420B&G e-80 5X5X7B IL 32087.5 1770 P6 MECHANICAL ROOM WATER 420B&G e-80 5X5X7B IL 32087.5 1770 SOURCE WATER PUMP, LEAD LAG BOILER PUMP BOILER PUMP COOLING TOWER PUMP, LEAD LAG COOLING TOWER PUMP, LEAD LAG 125 125 B-1 NUMBER MECHANICAL LOCATION DR1000 MODEL NUMBER REMARKS BOILER DATA TYPE CONDENSING TYPE MODULATING INPUT(MBH) 1,000GAS FUEL ROOM ∅VOLT (5 TO 1)CAMUS MANUFACTURER 940 GROSS OUTPUT (MBH) N/A BOILERH.P. H.P. MOTOR CONTROL ∅VOLT 15 15 40 40 120 3 24 1 NOTES:1.PROVIDE FACTORY MOUNTED CIRCUIT TRANSFORMER FOR STEPPING DOWN LINE VOLTAGE TO CONTROL VOTAGE SYMBOL LOCATION SYSTEM MODEL NO.GPMVOL GAL REMARKSMANUFACTURER/TANK SYSTEMCONNECTION AIR SEPARATOR AS1 MANUFACTURER/ MODEL NO. AIRVENT ET-1 MECHANICAL ROOM AMTROL AX-60V 350SOURCE WATER 33.6 ACCEPTANCE VOL GAL 11.5 1/2"5-ADS REMARKSSYMBOLSAMANUFACTURER / MODEL NUMBER WATER-TO-AIR HEAT PUMP SCHEDULE AREA SERVEDLOCATION HP1 APARTMENTS APARTMENTS TRANE GEHE0181 600 - (CFM) OA *1 (CFM)EFT HEATING CAPEATLAT 65 99 21910 68 (°F)BTUH(FWB)(FWB)HOA(Mbtuh)LFT(°F)COP 77 18120 4.8 EFT COOLING CAPEATLAT 76.6/64 56/55 17730 86 (°F)BTUH(DB/WB)(DB/WB)HOR(Mbtuh)LFT(°F)EER 96 22510 13.3 FLUID 4.2 (GPM) FLUID 9.2 (FT H2O) FLOW RATE PD ELECTRICAL MCA 12.9 MAX CB(AMPS) 20 PH 1 V 208 HP2 APARTMENTS APARTMENTS TRANE GEHE024 800 *1 -65 99 29700 22,900 4.8 76.6/64 56/55 24000 86 96 29600 13.3 5.6 9.2 18 30 1 208 APARTMENTS APARTMENTS TRANE GEH030 1000 -35700 28400 4.8 28200 35600 7.0 19.2 30HP3 HP4 HP5 BLDG B ATTIC CORRIDOR TRANE GEH035 1200 -47600 37300 4.8 37700 456560 8.4 21.23 35 BLDG A ATTIC CORRIDOR TRANE GEH015 400 -18500 14800 4.8 14100 17900 3.5 10.58 15 REMARKSPH FAN TYPES: CRCE=CENTRIFUGAL ROOF CURB MOUNTED EXHAUSTER PRCE=PROPELLER ROOF CURB MOUNTED EXHAUSTER PRCS=PROPELLER ROOF CURB MOUNTED SUPPLY FAN CFC=CENTRIFUGAL FORWARD CURVED CE=CEILING MOUNTED EXHAUSTER NUMBER SERVICEMANUFACTURER / MODEL NUMBER FAN TYPE SCHEDULE OF FANS CRCU=CENTRIFUGAL ROOF CURB UPBLAST CAF=CENTRIFUGAL AIR FOIL CBI=CENTRIFUGAL BACKWARD INCLINED CFMDAMPER TYPE VA=VANE AXIAL DRIVEFAN RPM(IN W.G.)EXT. S.P.MOTOR DATA VOLTHP/W RPMCONTROLAREA SERVEDLOCATION EF-1 CEILING KITCHENS AND BATHROOMS GREENHECK/SP-B110 EXHAUST CE WALL SWITCH 100 0.375 -DIRECT 80W 950 120 1 - 68 77 68 77 68 77 68 77 68 77 68 77 86 96 86 96 86 96 86 96 86 96 86 96 13.3 13.3 13.3 13.3 13.3 13.3 9.2 9.2 5.2 9.2 9.4 9.2 1 208 1 208 1 208 1 208 1 208 1 208 TRANE GET0181 TRANE GEH024 TRANE GEH035 HP6 BLDG B APARTMENTS BLDG B APARTMENTS HP7 BLDG B APARTMENTS BLDG B APARTMENTS HP8 BLDG F MEZZANINE CORRIDOR HP9 BLDG H MECHANICAL CORRIDOR 600 21910 800 26600 2000 400 73600 1000 200 35700 65 99 65 99 65 99 65 99 65 99 65 99 65 99 68 77 68 77 4.8 4.8 4.8 4.8 76.6/64 56/55 76.6/64 56/55 76.6/64 56/55 76.6/64 56/55 76.6/64 56/55 76.6/64 56/55 76.6/64 56/55 18120 22900 59900 28400 17730 23300 59600 28200 22510 29400 75700 35600 4.2 5.6 13.9 7.0 12.9 20 18 30 24.9 40 19.2 30 1 208TRANE GEH030 *1 *1 *1 *1 *1 86 96 13.3 9.2 GRAVITYBACKDRAFT Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" M2.1 MECHANICAL SCHEDULES Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2017 16-063 No.Description Date ------------------------ ELECTRICAL DATA MCALIQUID TYPENUMBERLOCATION VOLT LINE SIZES SUCTION PH REMARKSEQUIPMENT SERVED MANUFACTURER/MODEL NUMBER NOMINAL CAPACITYMBH NO. OFFANS -CU-1 ----------- MODEL NUMBER SCHEDULE OF ENERGY RECOVERY VENTILATORS SYMBOL MANUFACTURER/LOCATION CFM EXHAUST AIROUTSIDE AIR CFM S.P. (IN. WG.) TOTALEXT. REMARKS EPV-1 A ATTIC A BUILDING RENEWAIRE/480 IN 250 0.75 N/A 240 .75 N/A ELECTRICAL VOLTHP PH 11200.6 WINTER 452 S.P. (IN. WG.) TOTALEXT. SUMMER SUMMER EAT DB/WB LAT DB/WB 91/73 80/63 AREASERVED WEIGHT (LBS) 150 EAT DB WINTER LAT EPV-2 B ATTIC B BUILDING RENEWAIRE/HE 1.5X INH 800 0.75 N/A 750 .75 N/A 11201.0 452 91/73 80/63 400 MCA 9 18 MOCP 15 20 CONDENSING UNIT SCHEDULE SCHEDULE OF FAN COIL UNITS REMARKSTHROWINLET SIZENUMBERTYPE DIFFUSERS, REGISTERS & GRILLES SCHEDULE FACE SIZEMANUFACTURER / MODEL NUMBER NOTES:1. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF AIR INLETS AND OUTLETS SO AS TO ACHIEVE COMPATIBILITY WITH SELECTED CEILING, WALL OR DUCT SYSTEM 2. AIR INLETS AND OUTLETS SHALL BE SELECTED BASED ON THE FOLLOWING CRITERIA - MAXIMUM INLET OR OUTLET VELOCITY 500 FPM - MAXIMUM NC RATING NOT TO EXCEED 35 - THROW PATTERN AS PER SCHEDULES AND PLANS - THROWS SHALL NOT INTERSECT OR REACH WALLS AND PARTITIONS3. FINISH SELECTION BY ARCHITECT GALVANIZED STEELALINDAB/RGS-3 DUCT MOUNT 20 X 4 17 X 3 -ADJUSTABLE NECK SIZE DAMPER INTEGRAL GALVANIZED STEELBLINDAB/RGS-3 16 X 7 13 X 6 -ADJUSTABLE INTEGRAL GALVANIZED STEELCLINDAB/RGS-3 20 X 7 17 X 6 -ADJUSTABLE INTEGRAL GALVANIZED STEELDLINDAB/RGS-3 24 X 7 21 X 6 -ADJUSTABLE INTEGRAL GALVANIZED STEELR1LINDAB/RGS-3 -INTEGRAL GALVANIZED STEELR2LINDAB/RGS-3 -INTEGRAL GALVANIZED STEELR3LINDAB/RGS-3 -INTEGRAL GALVANIZED STEELGMETALAIRE/V4004D 12 X 8 10 X 6 -ADJUSTABLE OBD GALVANIZED STEELELINDAB/RGS-3 28 X 7 25 X 6 -ADJUSTABLE INTEGRAL GALVANIZED STEELFLINDAB/RGS-3 24 X 10 21 X 9 -ADJUSTABLE INTEGRAL DUCT MOUNT DUCT MOUNT DUCT MOUNT DUCT MOUNT DUCT MOUNT DUCT MOUNT DUCT MOUNT DUCT MOUNT SIDEWALL MOUNT 20 X 4 17 X 3 16 X 7 13 X 6 20 X 7 17 X 6 - - - GALVANIZED STEELHMETALAIRE/V4004D 14 X 8 12 X 6 -ADJUSTABLESIDEWALL MOUNT GALVANIZED STEELIMETALAIRE/V4004D 20 X 8 18 X 6 -ADJUSTABLESIDEWALL MOUNT GALVANIZED STEELJMETALAIRE/V4004D 18 X 10 16 X 8 -ADJUSTABLESIDEWALL MOUNT GALVANIZED STEELKMETALAIRE/V4004D 22 X 10 20 X 8 -ADJUSTABLESIDEWALL MOUNT OBD OBD OBD OBD GALVANIZED STEELR4METALAIRE/RHD 12 X 8 10 X 6 -SIDEWALL MOUNT OBD- GALVANIZED STEELR5METALAIRE/RHD 20 X 10 18 X 8 -SIDEWALL MOUNT OBD- GALVANIZED STEELR6METALAIRE/RHD 20 X 14 18 X 12 -SIDEWALL MOUNT OBD- GALVANIZED STEELR7METALAIRE/RHD 30 X 14 28 X 12 -SIDEWALL MOUNT OBD- GALVANIZED STEELR8METALAIRE/RHD 26 X 20 24 X 18 -SIDEWALL MOUNT OBD- GALVANIZED STEELR9METALAIRE/RHD 32 X 26 30 X 24 -SIDEWALL MOUNT OBD- GALVANIZED STEELR10METALAIRE/RHD 14 X 14 12 X 12 -CEILING MOUNT OBD- GALVANIZED STEELE1METALAIRE/RHD 10 X 10 8 X 8 -CEILING MOUNT OBD- NUMBER LOCATION GPMTEMP CHILLED WATER DATA GPM ENT TEMP COOLING AIR DATA CFMLVG ENT LVG HEATING AIR DATA LVGLVGENT HOT WATER DATA TEMP CFM ENT TEMP FAN MOTOR DATA VOLTHPRPM PH REMARKS MANUFACTURER/ MODEL NUMBERCOOLING CAPACITY MBH MAX PD FT HEATING CAPACITY MBH MAX PD FT ELECTRIC HEATER SCHEDULE MANUFACTURER/ MODEL NUMBER CAPACITY(MBH)SYMBOL LOCATION EWH-1 BUILDING 'B' SPRINKLER ROOM BERKO / SRA-1212 - CFM -- ENT LVG - TEMP (°F) AIR DATA FAN MOTOR DATA HP OR W -- RPM VOLT PH 120 1 - REMARKS BUILDING 'B' ELECTRIC ROOM BUILDING 'B' SOUTH STAIRS BUILDING 'B' NORTH VESTIBULE EWH-2 EWH-3 EWH-4 UNIT "B" MAINTENANCE ROOMEUH-1 UNIT B-12 BEDROOMEWH-5 UNIT B-17 BEDROOMEWH-6 UNIT B-22 BEDROOMEWH-7 UNIT D-2 BEDROOMEWH-8 UNIT D-1 BEDROOMEWH-9 BUILDING 'D' STAIRSEWH-10 UNIT D-4 BATHROOMEWH-11 BUILDING 'E' STAIRSEWH-12 BUILDING 'H' METERROOMEWH-13 BUILDING "L" MAINTENANCEOFFICEEUH-2 BUILDING "L" MAINTENANCE STORAGEEUH-3 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" M2.2 MECHANICAL SCHEDULES Dakota Partners, Inc. OXOBOXO LOFTS PC RMS 11/01/2017 16-063 No.Description Date S (9'-4" (2.8M) DETAIL B STRUCTURE DETAIL A HANGER ROD EQUIPMENTMECHANICAL SUSPENDED DETAIL B DETAIL A HANGER ROD REQUIRED HANGER IFVIBRATION SUSPENDED EQUIPMENT GALVANIZED AIRCRAFTCABLE ELEVATION VIEW PLAN VIEW CABLE AIRCRAFTGALVANIZED EQUIPMENTMECHANICALSUSPENDED 45°45° 45° 45° CLAMP STRUCTURE DETAIL A HANGER ROD EQUIPMENTMECHANICAL SUSPENDED MAX. LENGTH) 6 N.T.S. PIPE PENETRATION THROUGH WALL DETAIL 4 N.T.S. DUCTWORK CONSTRUCTION DETAILS 3 N.T.S. SEISMIC RESTRAINT FOR SUSPENDED MECHANICAL EQUIPMENT 2 N.T.S. HORIZONTAL FIRE DAMPER DETAIL 8 N.T.S. ROOF MOUNTED EXHAUST FAN DETAIL 9 N.T.S. KITCHEN/TOILET EXHAUST FAN DETAIL 5 N.T.S. VERTICAL FIRE DAMPER DETAIL 7 N.T.S. ROOF PENETRATION DETAIL 1 N.T.S. VERTICAL HEAT PUMP UNIT INSTALLATION DETAIL 10 N.T.S. CONCENTRIC INTAKE/ VENT DETAIL CEILING PROVIDE FLEXIBLE CONNECTIONAT INLET AND OUTLET OF FAN VIBRATION ISOLATOR 6"∅ GALVANIZED EXHAUSTDISCHARGE DUCT TOWEATHERPROOF WALLCAP CEILING CABINET EXHAUST FANWITH INTEGRAL BACKDRAFTDAMPEREXHAUST GRILLE FC 1/4" HANGER RODS FASTENED SECURELY TO STRUCTURE ABOVE SIZE INACCORDANCEWITHMANUFACTURER'SRECOMMENDATIONS "S"CLIP ONCEILING ANGLE MOUNTING LOCATION WHEN GRILLEIS CONFORMANCE TO LATEST NFPA BULLETIN90A FIRE DAMPER CONSTRUCTED & INSTALLIN FLOORSLAB SLEEVE & ANCHORED TOSLAB 2" X 2" X 1/8" L IRON FRAME RIVETED TO FOR LARGERDUCTS 24" DEEP OR 36" WIDE & 14 GAUGE SLEEVE 16 GAUGE SLEEVE FOR DUCTS SMALLER THAN INSULATED DUCT, BUTT INSULATION UP TO ACCESSPANEL FLOOR/CEILINGSLAB SLOPE VD18" MINSTANDARD DUCTCONSTRUCTIONSEAMS WATER TIGHT SPECIFIED DUCT SIZE FLASHING EDGES RIVETED ANDSOLDERED OR WELDED 1/2" BIRD SCREEN PIPE PACK VOID SPACE WITH FIRE STOPPING MATERIAL (3M CAULK CP25 OR EQUIVALENT) STEEL PIPE SLEEVE. SEE NOTES REQUIRED CLEARANCE SEE NOTES FIRE-RATED MASONRY OR FIRE-RATED STUD PARTITION. SEE NOTES ESCUTCHEONS NOTES: 1. PIPE SLEEVES 2. ESCUTCHEONS SEE NOTES BELOW A.PIPE SLEEVES THROUGH FIRE-RATED MASONRY PARTITIONS ORFOUNDATION WALLS SHALL BE SCHEDULE 80 BLACK STEEL WITHMAXIMUM OF 1/2" CLEARANCE BETWEEN SLEEVE AND PIPE.SLEEVE SHALL BE EQUAL IN LENGTH TO DEPTH OF PARTITION ORWALL.B.PIPE SLEEVES THROUGH FIRE-RATED STUD PARTITIONS SHALL BE#18 GAGE GALVANIZED STEEL WITH MAXIMUM OF 1" CLEARANCEBETWEEN SLEEVE AND PIPE. SLEEVE SHALL BE EQUAL INLENGTH TO DEPTH OF PARTITION. A. B. C. ESCUTCHEONS IN FINISHED SPACES SHALL BE ANODIZED ALUMINUM OR CHROME-PLATED BRASS. ESCUTCHEONS IN UNFINISHED SPACES SHALL BE PLAIN BRASS,ALUMINUM, GALVANIZED STEEL OR CAST IRON. ESCUTCHEONS SHALL BE HELD IN PLACE BY INTERNAL SPRINGTENSION OR SET SCREW. S CLIP OR U CLIPIS OPTIONAL ALLSUCH CONNECTIONS TO BE SEALED R2 R1 R 0 00 R W1 H W1 D3 NOTE: BEAD, CROSSBREAK AND REINFORCE FLAT SURFACES AS IN STRAIGHT DUCT. TYPE RE5 DUAL RADIUS ELBOWR1= 3/4+W1R2= R1+W2 TYPE RE6 SQUARE MITERED ELBOW D2 = 4" MIN D3 = 4" MIN D1 TYPE 4B SQUARE THROAT, R/W + 0.5, MAY BE USED, TYPE RE3 RADIUS ELBOW WITH VANES H TYPE RE4 SQUARE THROAT ELBOW WITHOUT VANES1000 FPM (5 MPS) MAXIMUM VELOCITY W UP TO 1000 FPM (5 MPS)W2W H VDD2 TYPE 4A VD W VD CENTER LINE R = 3W/2, UNLESS OTHERWISE TYPE RE1 RADIUS ELBOW SPECIFIED O IS NOT RESTRICTED TO 90°, W H TYPE RE2 SQUARE THROAT ELBOW WITH VANES W H WWTYPE 2 STATIONARY SPLITTER IS OPTIONALW = 4" MIN VD TYPE 1 2W TYPE 3 NOTE: VOLUME CONTROL SHOULD BE BY BRANCH DAMPERS. IF A SPLITTER ISSHOWN IN THE DESIGN ITSLENGTH SHOULD BE 1.5 WOR 1.5 D3 SOURCE WATER PIPINGFROM FACILITY HOUSE LOOP RETURN GRILLE 3. INSTALLATIONS & MATERIALS PER U.L. 555. 2. DEPTH OF DAMPER TO BE COORDINATED WITH WALL THICKNESS. NOTES: SLEEVE DAMPER (SEE NOTE) 1" MINIMUM 4 SIDES 1/2" CLEARANCE,TOP AND 2 SIDES, 4SIDES FORHORIZONTAL INSULATED DUCT, BUTTINSULATION UP TO WALLOR SLEEVE AS SHOWN 1-1/2" X 1-1/2" X1/8" CONTINUOUS STEELANGLE FASTENED TOSLEEVE WITH 4" M.B.AND NUTS 8" ONCENTER, MINIMUM BOLTSEACH SIDE, TOP ANDBOTTOM CONTINUOUS "S" JOINT ACCESSDOOR INDUCT ACCESSDOOR INCEILING FASTEN DAMPER TO SLEEVE WITH BOLTS, SCREWS OR TACK WELDS, MAX. 8" ONCENTER 1.DAMPER STYLE & SLEEVE CONFIGURATION IS GOVERNEDBYMAINTAINING A MAX. 0.06 STATIC PRESSURE @ 2500 F.P.M.FACE VELOCITY NOTES: SIZE STACK TO MATCH REQUIREMENT OF ITEMS TO BE INSTALLED THROUGH 2 X P.T. WOOD BLOCKING .015" STAINLESS STEEL BATT INSULATION STAINLESS STEEL INSECT SCREEN PIPING OR CONDUITAS REQ'D ROOF MEMBRANE MEMBRANE FLASHING RIGID INSULATION TAPERED INSULATION ROOF DECK .015" STAINLESS STEELREMOVABLE COVER OVERLAP2" WITH STACK STAINLESS STEELSCREWS WITH EDPMWASHERS STACK VENT OUTLET AIR INLET EXTERIOR WALL STRAP FIELD SUPPLIED 4"° COAXIAL INTAKE VENT COLLAR-BOLTTO WALL LOUVERED DOOR IN MECHANICAL CLOSET FILTER HP-# HEATING/COOLING COIL SUPPLY AIR PLENUM BLOWER FC SA FCSWSSWRSWSSWR FINISHED FLOOR PROVIDE 6'-0"OF RIGIDEXTERNAL DUCTINSULATION DAMPER ROOF STAINLESS STEELANCHOR BOLTS ATEACH CORNER AND 12"O.C. ACCESS DOOR SIDE OR BOTTOM AS APPROPRIATE CURB & FLASHING COUNTERFLASHING CAULKAND SEAL BETWEEN CURB, FLASHING & COUNTERFLASHING FIRST FLOOR 1" CONDENSATE TO STANDPIPEDRAIINDRIP PAN OUTSIDE AIR DUCT SUPPLY AIR DUCT Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/4" = 1'-0" M3.1 MECHANICAL DETAILS Dakota Partners, Inc. OXOBOXO LOFTS PC RMS 11/01/2017 16-063 No.Description Date CORRIDOR SUPPLY AIR DUCT RISER-BLDG 'B' E F D 2 N.T.S. 1 N.T.S. HORIZONTAL HEAT PUMP UNIT AND DUCTWORK DETAIL DIRECTION OF AIR FLOW (RETURN OR EXHAUST) DIRECTION OF AIR FLOW (SUPPLY OR OUTSIDE AIR) FLEXIBLE CONNECTION 90° ELBOW UP 90° ELBOW DOWN RPM SQ.FT. SYS TEMP. T-STATHD HGT HORIZ HP HR HTG ET-1 EXG EXH °F FLEX FT GA GAL HZ IN. IN.WG. KW KWH LBS LF LVG MAX MBH MIN N.T.S. N/A NIC NO. PH CFM CU.FT. DL DN EF-1 ENT AD AFF AMP APPROX AVG BTU CAP HEAD HEATING HOUR HORSE POWER HORIZONTAL HEIGHT FEET GALLON GAUGE FLEXIBLE DEGREES FAHRENHEIT EXHAUST EXISTING EXPANSION TANK ENTERING EXHAUST FAN DOWN DOOR LOUVER CUBIC FEET CUBIC FEET PER MINUTE APPROXIMATE CAPACITY BRITISH THERMAL UNIT AVERAGE AMPERE (AMP, AMPS) ABOVE FINISHED FLOOR ACCESS DOOR MAXIMUM LEAVING BTU PER HOUR (THOUSAND) FREQUENCY POUNDS LINEAR FEET KILOWATT HOUR KILOWATT INCH INCHES WATER GAUGE PHASE NUMBER NOT IN CONTRACT NOT APPLICABLE NOT TO SCALE MINIMUM SQUARE FEET REVOLUTIONS PER MINUTE TEMPERATURE THERMOSTAT SYSTEM DESCRIPTIONSYMBOLDESCRIPTIONABBREVIATIONDESCRIPTIONABBREVIATION AIR COOLED CONDENSER CD CONDENSATE DRAIN PIPING SUPPLY REGISTER OR DIFFUSER-CEILING SUPPLY REGISTER OR GRILLE RETURN REGISTER OR GRILLE SIDEWALL SIDEWALL RETURN REGISTER OR GRILLE-CEILING EXHAUST FAN: CEILING CABINET FAN DUCT 90° UP DUCT 90° UP DUCT 90° DOWN DUCT 90° DOWN AHU-1 AIR HANDLING UNIT CD CONDENSATE DRAIN CU-1 CONDENSING UNIT DX DIRECT EXPANSION RL REFRIGERANT LIQUID RS REFRIGERANT SUCTION UNDERCUT DOOR 3/4"3/4" UC U.O.N.UNLESS OTHERWISE NOTED FD FIRE DAMPER FC FC ELECTRIC HEATING COILEHC-1 EWH-1 ELECTRICAL WALL HEATER HP-1 HEAT PUMP EF-1 SWR SOURCE WATER RETURN SWS SOURCE WATER SUPPLY OA OUTSIDE AIR DUCTWORK FC-1 FAN COIL UNIT CU-# SWR SOURCE WATER RETURN SWS SOURCE WATER SUPPLY MECHANICAL SYMBOLSMECHANICAL ABBREVIATIONS THERMOSTAT SMOKE DETECTOR, DUCT MOUNTED TEMPERATURE SENSOR, DUCT MOUNTEDTD T 7.PROVIDE COMPLETE AND OPERATIONAL SYSTEM INCLUDING ALL NECESSARY MATERIAL EQUIPMENT ANDLABOR. PROVIDE THE OWNER WITH ALL MANUFACTURERS WARRANTIES FOR EQUIPMENT AND MATERIALSPROVIDED. PROVIDE OWNER WITH BOUND "OPERATIONS & MAINTENANCE" MANUALS FOR SYSTEMS INSTALLED. PROVIDE OWNER WITH WARRANTY, GUARANTYING THAT IMPERFECT SYSTEM OPERATION AND ALLDEFECTS IN MATERIAL AND LABOR OR WORK WILL BE REPAIRED WITHOUT COST TO THE OWNER FORA PERIOD OF ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION OF THE PROJECT. GIVE FULL COOPERATION TO OTHER TRADES, PROVIDING THEM WITH ALL NECESSARY INSTALLATIONDETAILS. 11. 9. 10. 8. GENERAL MECHANICAL NOTES MECHANICAL DRAWINGS, PLANS AND DETAILS ARE DIAGRAMMATIC AND DO NOT SHOW ALLINTERFERENCES AND CONDITIONS VISIBLE OR HIDDEN THAT MAY EXIST. ALL WORK SHALL BE PERFORMED BY LICENSED WORKMEN IN ACCORDANCE WITH ALL APPLICABLESTATE, FEDERAL AND LOCAL CODES AND REGULATIONS THAT MAY APPLY. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND ARRANGE FOR ALL REQUIRED INSPECTIONS IN ACCORDANCE WITH STATE AND LOCAL GOVERNING AUTHORITIES. ALL EQUIPMENT AND MATERIAL SHALL BE LABELED, LISTED AND INSTALLED IN ACCORDANCE WITHMANUFACTURERS INTERACTIONS, RECOMMENDATIONS AND INSTRUCTIONS. THE TERM "PROVIDE" SHALL MEAN FURNISH, INSTALL, CONNECT AND MAKE OPERABLE. THE TERM "INDICATED" SHALL MEAN AS SHOWN ON THE CONTRACT DOCUMENTS (DRAWINGS,SPECIFICATIONS AND RELATED ATTACHMENTS).6. 5. 4. 3. 2. 1. STRUCTURAL FRAMING HANGERS, STEEL RODS WITH NEOPRENEISOLATION ELEMENT. MOUNT AIRHANDLING UNITS TIGHT TO CEILING ASHIGH AS POSSIBLE OUTSIDE AIR DUCTCONNECTIONWHERE SHOWN ON CONTROLLER SUPPLY AIR DUCTWORKDISCHARGE NOTE: REFER TO ARCHITECTURAL DRAWINGS FOR FRAMINGDETAILS AND ACCESS REQUIREMENTS (TYPICAL) SOURCE WATER SUPPLY AND RETURN LINES FROM FACILITY HEAT PUMP LOOP CONDENSATE DRAINTO INDIRECT WASTE AUXILIARY DRIP PANWITH CONDENSATECONNECTION TOINDIRECT DRAIN RETURN AIRGRILLE AND DUCT CEILINGACCESS PANEL SECONDFLOOR THIRDFLOOR FOURTHFLOOR ATTIC FIRSTFLOOR 8"x4" 14"x12" 14"x14" 12"x12" 300 300 300 300 HP-# FD FD FD FD HP-# FCFC SWS SWR CD SUPPLYAIR SHAFT Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/4" = 1'-0" M3.2 MECHANICAL DETAILS, NOTES, SYMBOLS AND ABBREVIATIONS Dakota Partners, Inc. OXOBOXO LOFTS PC RMS 11/01/2017 16-063 No.Description Date 2 N.T.S. WATER SOURCE HEAT PUMP DETAIL 1 N.T.S. COOLING TOWER DETAIL 3 N.T.S. TYPICAL PIPE TRNCH DETAIL 4 N.T.S. COOLING TOWER WATER TRATMENT PIPING 5 N.T.S. BOILER PIPING DETAIL 6 N.T.S. MECHANICAL ROOM HEAT PUMP RISER SCHEMATIC TRENCHING NOTESEXISTING GROUNDLINE SEEEXISTING PAVEMENT, WALK OR PAVEMENT OR CONCRETE1" DEEP SAWCUT OF EXISTING EXISTING THICKNESS. REPLACE WITH CONCRETE TO MATCHCONCRETE WALKS ARE DISTURBEDDIMENSIONS OF EXISTING CURB. IF WITH SAME TYPE OF CURB TO CURB IS DAMAGED OR REMOVED, REPLACEBE REPAIRED WITH SEED. IF EXISTINGGRASS AREA, DISTURBED AREAS SHALL SUBBASE. IF EXCAVATION IS WITHIN TYPE AND THICKNESS OF PAVEMENT ANDREMOVED, REPLACED WITH THE SAMEWHEN EXISTING PAVEMENT HAS BEEN ACCEPTABLE QUANTITIES.ALL DIMENSIONS ARE MINIMAL AS DIRECTED BY THE ENGINEER. SHOWN ON THE CONTRACT DRAWINGS ORLOCATIONS AND TO THE DIMENSIONS ASCONSTRUCTION OF THE WORK AT THE COMPACTION NECESSARY FOR THE UNSUITABLE MATERIAL: BACKFILL ANDDISPOSAL OF ALL SURPLUS ORGOUNDWATER DIVERSION: SATISFACTORY DEWATERING, TEMPORARY STREAM OF EXCAVATION, TRENCH WALL SUPPORTS,THE REMOVAL OF ALL MATERIALS,TRENCH EXCAVATION SHALL CONSIST OF RED PLASTIC WARNING TAPE EXCAVATED MATERIALBACKFILL WITH COMPACTED COMPACTED SAND BEDDING48" MINIMUML L6" C TO C (TYPICAL) MINIMUM1'-0"3" MINIMUM1'-0"MIN.1'-0"MIN. VARIES 3" MINIMUM1'-0" MINIMUM DETAILS. SEE SPECIFIC SITESIZE & DESIGNATIONPIPING, FOR QUANTITY, UNDISTURBED SOIL AIR SEPARATORAND EXPANSIONTANK IN BLDG FMECH ROOM FROM BOILERS AND TOWER IN BLDG FMECH ROOM TO BOILERS AND TOWER INBLDG F MECH ROOM WATER SOURCE HEAT PUMP THROUGHOUT THE COMPLEX (TYPICAL) WATER MU FEED WITH BACKFLOWPREVENTER. SEE PLUMBINGPLANS FOR CONTINUATION UNION (TYP.) FLEX CONNECTION(TYP.) SHUT-OFF VALVE (TYP.)COMBINATION BALANCING/ SENSOR POINTS (TYP.) SWR SWS PRESSURE GAUGE (TYP.) TEMP. GAUGE (TYP.) SOURCEOUT SOURCEIN CONCRETE PAD CONTINUOUSNEOPRENE PAD FLOOR TWO WAY VALVE (TYPICAL) PUMPS IN BLDG F MECH ROOM CONCRETE BOILER PAD BURNER TEMP/PRESSURE RELIEF VALVE PIPED TO WITHIN 12"AFF (TYP.) DOUBLEWALL FLUE PRESSURE GAUGE HHWS HHWR BALL VALVE UNION (TYP.) THERMOMETER GAGE (TYP.) P-1 HWR FROM SYSTEM HWS TO SYSTEM CIRCULATING PUMP FLOOR SLAB AQUASTAT UNION (TYP) MANUAL SHUT OFF VALVE (TYP) CONDENSER WATER RETURN CONDENSER WATER SUPPLY SOLENOID VALVE CONNECT TO FACTORY INSTALLED SUMP WATER LEVEL CONTROL MAKE UP WATER LINE COOLING WATER CIRCULATION PUMP, FACTORY INSTALLED MANUFACTURES RECOMMENDATIONS SUPPORT TOWER AS PER AS INDICATED ON PLANS COOLING TOWER AIR INTAKE LOUVER OVERFLOW LINE MANUAL DRAINLINE TO SANITARY SEWER DRAIN MAKE UP WATER LINE BACK FLOW PREVENTER SUCTION TUBING CHEMICAL TANK CHEMICAL PUMP UNION COOLING TOWER FOR PIPING CONNECTION MANUAL SHUT-OFF VALVE CONDENSER FORPIPING CONNECTION CONDENSER WATER CIRCULATIONPUMPS SUMP Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" M3.3 MECHANICAL DETAILS Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2017 16-063 No.Description Date BOILERBOILER 5" 4" 6" P-3 5" 1" CHEMICALTREATMENTGLYCOL CF-1 CHEMICALSHOT FEEDER 3/4" 3/4" DRAIN VALVEWITH HOSECONNECTION DIFFERENTIALPRESSURE SWITCH P-4 6" COOLING TOWER PIPING DETAIL ASME PRESSURE REGULATOR UNION (TYP) 1" CW MAKE-UP 1 1/2" BYPASS FIN. FLOOR P-1 P-2 1 1/2" SAND FILTER 1 1/2"BACKWASHDRAINPIPING SANDFILTERALARMDICW3/4" 1" CHEMICAL TREATMENT(GLYCOL) CT-1 LIQUID LEVELCONTROLLER NOTE:HEAT TRACE AND INSULATE ALL CONDENSERWATER SUPPLY, RETURN, DRAIN AND OVERFLOWPIPING. INCLUDE ALL VALVES AND OTHERPIPING SUBJECT TO FREEZING. T T WATERTEMPERATURE DFVDO DI BYPAO VIBRATION SWITCH DI CWR 6" 2" NOTES: PROVIDE SAND FILTRATION SYSTEM CONSISTING OF: (2) PEP: MODEL #HMF-18 WITH FLOWRATE OF 35 GPM. (1) 100 GALLON BACKWASH TANK. FILTER CONTROL PANEL WITH CONTROLLER. BACKWASH LOCK OUT. NOTES:1.PROVIDE WITH 3 PROBE ELECTRIC LEVEL CONTROL AND ASSOCIATED MAKE-UP WATER VALVE. 2.PROVIDE WITH INVERTER DUTY MOTOR. 3. SEE SPECIFICATIONS FOR DETAIL INFORMATION. B-1 TT TTTP P T P T T DP B-1 AS-1 VFD VFD AI AI AI T T T T NOTES: ATC CONTRACTOR SHALL PROVIDEADDITIONAL INPUT AND OUTPUT POINTS TOPROVIDE COMPLETE AND OPERATIONALSYSTEM OF THE CONDENSER WATER LOOP.THE FINAL CHECK OUT AND VERIFICTIONAND PROPER SYSTEM OPERATION SHALL BEPERFORMED BY ATCATC CONTRACTOR SHALL REPORTRESULTS OF SYSTEM CHECK OUT INWRITING TO OWNER, ARCHITECT ANDENGINEER. CF-3 P-6 P-5 ET-1 P-16 1" DRAIN LINE WITHSOLENOID CONTROL ANDSHUTOFF VALVE. ROUTE TONEAREST FLOOR DRAIN,SEE PLUMBING PLANS BUTTERFLYVALVE(TYPICAL) FLEXIBLE PIPINGCONNECTION (TYPICAL) 1" DRAIN LINE WITH SOLENOIDCONTROL AND SHUTOFF VALVE.ROUTE TO NEAREST FLOOR DRAIN,SEE PLUMBING PLANS P-12 P-14 1-1/4" CW MAKE-UP TOCOOLING TOWER LOOP. PROVIDESHUT OFF VALVE, REDUCEDPRESSURE BACKFLOW PREVENTERAND SOLENOID CONTROL VALVEWITH MANUAL BYPASS OVERFLOWDRAIN COOLING TOWER SUMP DRAIN PIPED TOCONDENSER WATER SUPPLY FOR DRAININGIN BASEMENT MECHANICAL ROOM 1. 2. 1-1/4" PIPE TO FLOORDRAIN FULL SIZE OFRELIEF VALVEDISCHARGEDIAPHRAGM TYPEEXPANSION TANK HOUSEKEEPING PAD STRAINERBLOW-OFF VALVE& CAP BUTTERFLY VALVE(TYPICAL)FLEXIBLE PIPINGCONNECTION (TYPICAL)CWS4" CONC. PAD GLOBE VALVE WITH GUAGE COCKPRESSURE GUAGE VALVEPRESSURE RELIEF AIR SIDE DRAIN TRIPLE DUTY VALVEB&G. REFER TODWG.UNION(TYPICAL) CHARGING/TEST VALVE (TYPICAL)GATE VALVE 3" 4" 4" TEMPERATUREGAUGE (TYPICAL) TEMPERATURESENSOR (TYPICAL) P T P T T DRAIN VALVE(TYPICAL) 3" 4" HWR S-1REMOTE SUMP INBOILER ROOM 6" 6" 6" T T 5"SWRSWRSWSHX-1 PRESSURE GAUGE(TYPICAL) TEMPERATURESENSOR (TYPICAL) PRESSURE GAUGE(TYPICAL) TEMPERATUREGAUGE (TYPICAL) Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1" = 10'-0" M3.4 MECHANICAL DETAIL Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2017 16-063 No.Description Date R-2 P-6 CS-2 R-1 P-5 CS-1 TS-2 TS-1 FS 6" 6" VLC-# AI VLC-# AI VLC-# DI VLC-# DO VLC-# DO VLC-# DI CT-1 LIQUID LEVEL CONTROLLER WATER TEMPERATURE VIBRATION SWITCH 6" CONTROL R-1 R-4 P-4 CS-2 R-3 P-3 CS-1 PANEL V F D P-2 R-4 V F D P-1 R-4 TS-3 TS-4 TS-1 PS-1 SWS OAS PANELCONTROL R-2 TS-2 OUTDOOR AIR SENSOR VLC-# AI VLC-# DI VLC-# DO VLC-# AO VLC-# AI VLC-# AI VLC-# AI VLC-# AI VLC-# AI VLC-# AO VLC-# AO VLC-# DI VLC-# DI VLC-# DO VLC-# DO VLC-# AO VLC-# DI VLC-# DO VLC-# DO VLC-# DI VLC-# DO VLC-# DI B-1 B-1 CWR 1-1/4" CW MAKE-UP TO COOLINGTOWER LOOP. PROVIDE SHUT OFFVALVE, REDUCED PRESSUREBACKFLOW PREVENTER, ANDSOLENOID CONTROL VALVE WITHMANUAL BYPASS 1-1/4"CWRNOTES: ATC CONTRACTOR SHALL PROVIDE ADDITIONAL INPUT AND OUTPUT POINTS TO PROVIDE COMPLETE AND OPERATIONALSYSTEM OF THE CONDENSER WATER LOOP.THE FINAL CHECK OUT AND VERIFICTION AND PROPER SYSTEM OPERATION SHALL BE PERFORMED BY ATCCONTRACTOR. ATC CONTRACTOR SHALL REPORT RESULTS OF SYSTEM CHECK OUT IN WRITING TO OWNER, ARCHITECT AND ENGINEER. 1. 2. COORDINATE WITH EQUIPMENTS MANUFACTURERFOR EXACT EQUIPMENT CONNECTIONREQUIREMENTS. PIPING AS SHOWN IS DIAGRAMMATIC. ACTUAL LOCATION OF CONNECTIONS TO CHILLER SHALLBE COORDINATED WITH UNIT BEING FURNISHED. SPRING TYPE VIBRATION ELIMINATOR PIPE HANGERS TYPICAL FOR CONDENSER AND CHILLED WATER LINES - LOCATE AS CLOSE TOCEILING AS POSSIBLE. 3. 4. 5. AI BOILER 1 SUPPLY TEMP AI BOILER 2 RETURN TEMP DI PRIMARY BOILER LOOP PUMP P-3 STATUS DI PRIMARY BOILER LOOP PUMP P-4 STATUS DO PRIMARY BOILER LOOP PUMP P-3 START/STOP DO PRIMARY BOILER LOOP PUMP P-4 START/STOP AI SWS LOOP SUPPLY TEMP AI SWS LOOP RETURN TEMP DI SWS LOOP PUMP VFD P-1 STATUS DI SWS LOOP PUMP VFD P-2 STATUS DO SWS LOOP PUMP VFD P-1 START/STOP DO SWS LOOP PUMP VFD P-2 START/STOP AO SWS LOOP PUMP VFD P-1 SPEED CONTROL AO SWS LOOP PUMP VFD P-2 SPEED CONTROL AI SYSTEM SUPPLY DIFFERENTIAL PRESSURE AI SYSTEM RETURN DIFFERENTIAL PRESSURE DI BOILER 1 STATUS AO BOILER 1 RESET DO BOILER 1 ENABLE/DISABLE DI BOILER 2 STATUS AO BOILER 2 RESET DO BOILER 2 ENABLE/DISABLE AI OUTSIDE AIR TEMP AI CONDENSER WATER LOOP SUPPLY TEMP AI CONDENSER WATER LOOP RETURN TEMP DI CONDENSER WATER LOOP PUMP P-5 STATUS DO CONDENSER WATER LOOP PUMP P-5 START/STOP DO CONDENSER WATER LOOP PUMP P-6 START/STOP DI CONDENSER WATER LOOP PUMP P-6 STATUS HX-1 S-1 TS-4 PS-2 VLC-# AI VLC-# AI BOILER 1 BOILER 2 SWS SWS SWS SWS T T DFV DO DI BYPAO DI AI AI AI Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" M3.5 SOURCE WATER CONTROL DIAGRAM Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2017 16-063 No.Description Date UP UP BFP BFP L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.1 L2.L UNIT C-1 (2 BEDROOM)UNIT C-2 (2 BEDROOM) STAIR 2 ELECTRICAL METER ROOM MAINTENANCE ROOM BOILERROOMSPRINKLER ROOM BUILDING B BUILDING C BUILDING A (ABOVE) BUILDING D BUILDING G ET2 AS2 B1 ET1 TMV1P1 P2 (2) 300 GALLON INDIRECT HOT WATER STORAGE TANKS SEE 11/P3.2 FORPIPING DIAGRAM GAS FIRED DOMESTICHOT WATER BOILER FOR DOMESTIC WATER SERVICE INSTALLATIONSEE 7/P3.1 3"CW UP 4"CW SERVICEFROM ABOVE CO 6" SANITARY FROM ABOVE, PROVIDE CLEANOUT AT BASE OF RISER AS1 3"ø 2"ø 6"ø W 4"ø W co 3"ø V 1 1/2"ø 2"ø 1 1/2"ø 4"ø W1 1/2V UP 1 1/2V UP 3"V UP 1/2"DH&CW DNTYP OF BATHTUB 4"ø3/4"ø DHWR 4" SANITARY FROM BUILDING D,SEE DRAWING DE-P1.1 FORCONTINUATION 4"ø WYCO 3"HW UP 1"HWR FROM ABOVE FCO 6"ø W S-1 L-1 WC-1 B-1 B-1 WC-1 L-1 S-1 6"ø YCO 4" SANITARY FROM BUILDING F,SEE DRAWING F-PB1.1 FORCONTINUATION 6" SANITARY AND 2" GAS FROM BUILDING G, SEE DRAWING G-PB1.1 FORCONTINUATION FCO6"ø2"ø DCW 4"ø2" HW AND 3/4" HWR UP 2" CW UP 4" W UP&DN L-1 WC-1 B-1 S-1 L-1WC-1 B-1 1 1/2"ø 1 1/2"ø DCW 1 1/2" CW TO BUILDING F,SEE DRAWING F-PB1.1FOR CONTINUATION B-1 SANITARY PIPING FROMRESPECTIVE FIXTURESABOVE (TYPICAL FOR ALL) 2"ø 2"ø FD-1 2"ø GG G SANITARY PIPING FROMRESPECTIVE FIXTURESABOVE (TYPICAL FOR ALL)GGHP HP 3/4" CONDENSATE DRAINS WITH INDIRECT WASTE CONNECTION TO NEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-PB1.SB PLUMBING PLAN BLDG 'B' - LEVEL SB BLDG 'C' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date OA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 O1 O2 O3 O4 O5W1W2W3W4W5W6W7W8W9 L2.L UNIT B-1 (2 BEDROOM) TYPE A UNIT B-2 (2 BEDROOM) UNIT C-3 (2 BEDROOM) TYPE A UNIT C-4(2 BEDROOM) TYPE A ELEVATOR BUILDING B BUILDING C BUILDING A CRAWL SPACE BUILDING G BUILDING D 1" HWR UP&DN 3" HW UP&DN 3" CW UP&DN 4" CW SERVICE UP&DN L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 S-1 4" W DN 1 1/2"ø 1/2"ø1/2"ø 4"ø1"ø 1/2"ø 1/2"ø 3/4"ø1/2"ø 1/2"ø 1/2"ø 1"ø 1/2"ø 1/2"ø1/2"ø1/2"ø ERV-1 HP-5 HP HP HP HP 1"ø1/2"ø1"ø 1"ø3/4"ø3/4"ø 3/4"ø3/4"ø1/2"ø1/2"ø1/2"ø 1/2"ø 1/2"ø1/2"ø 1/2"ø1/2"ø1/2"ø1/2"ø4"ø 1 1/2"ø1/2"ø 1/2"ø 3/4" CONDENSATE DRAINS WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATION AND ROUTING IN FIELD (TYPICAL) Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-PB1.B PLUMBING PLAN BLDG A-CRAWL SPACE BLDG 'B' - LEVEL B BLDG 'C' - LEVEL 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date OA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.1 O1 O2 O3 O4 O5W1W2W3W4W5W6W7W8W9 L2.L BUILDING D BUILDING B BUILDING C BUILDING G BUILDING A UNIT A-1 (2 BEDROOM) UNIT A-2 (1 BEDROOM) UNIT B-3 (1 BEDROOM) TYPE 'A' UNIT B-4(2 BEDROOM) UNIT B-5 (1 BEDROOM) UNIT B-6 (1 BEDROOM) UNIT B-7 (STUDIO) UNIT A-2 (2 BEDROOM) 4" CW SERVICE IN, SEE SITE UTILITY PLAN FOR CONTINUATION 4"ø WCO 4"ø W FD 2"ø2" W UP& DN 4"ø 3"ø 3"ø3/4"ø 4"ø 4" WUP&DN L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 S-1 4" CW SERVICE DN TOMETER EQUIPMENT, 3" CWUP TO BUILDING SERVICE 3" HW & 1" HWR DN S-1 S-1 L-1 WC-1 B-1 L-1 WC-1 SH-1 L-1 WC-1 B-1 L-1 WC-1 B-1 L-1 WC-1B-1 L-1 WC-1B-1 S-1 S-1 S-1 FCO 2"ø2"ø 1 1/2"ø 1 1/2"ø 1 1/2"ø 2"ø 3" V UP 2"ø 1 1/2"ø 2"ø 2 1/2"ø 3" VUP 2 1/2"ø 2"ø2"ø 1 1/2"ø1 1/2"ø2"ø 3" V UP 1 1/2"ø 2"ø2"ø 1 1/2"ø 2 1/2"ø3" VUP 2"ø 1 1/2"ø 3"ø 2"ø 2 1/2"ø 1 1/2"ø 3" VUP 1 1/2"ø 3" V UP 3" V UP 2"ø2"ø 1 1/2"ø 2 1/2"ø 2"ø 4" W UP 2"ø HP HP HP 1 1/2"ø 3/4" CONDENSATEDRAINS WITH INDIRECT WASTE CONNECTION TO NEAREST SANITARY,VERIFY LOCATION ANDROUTING IN FIELD(TYPICAL) 2"ø 2"ø 3/4" CONDENSATE DRAINS WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATION AND ROUTING IN FIELD (TYPICAL) HP HP HP HP HP 3/4" CONDENSATE DRAINS WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) 3"ø 4"ø4"ø DCW3"ø DCW3"ø DHW1"ø DHWR2"ø DCW2"ø DHW1"ø DHWR1/2"ø1/2"ø 1"ø 2"ø 2"ø A B D E C F G H J K L M NORTH SITE KEY PLAN Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-PB1.1 PLUMBING PLAN BLDG 'A' - LEVEL 1 BLDG 'B' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 No.Description Date OA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 O1 O2 O3 O4 O5W1W2W3W4W5W6W7W8W9 L2.L UNIT B-8 (1 BEDROOM) TYPE A UNIT B-9(2 BEDROOM) UNIT B-10 (1 BEDROOM) UNIT B-11 (1 BEDROOM) UNIT B-12(1 BEDROOM) BUILDING B BUILDING C BUILDING A BUILDING G BUILDING D CW, HW & HWR TO BUILDINGS D & E, SEE DRAWING DE-P1.1 FOR CONTINUATION 1 1/2"ø 1 1/2"ø 2"ø 3" V UP & DN 2"ø 1 1/2"ø 2 1/2"ø 3" V UP & DN 2 1/2"ø 2"ø2"ø 1 1/2"ø1 1/2"ø2"ø 3" V UP& DN 1 1/2"ø 2"ø2"ø 1 1/2"ø 2 1/2"ø 3" V UP& DN 2"ø 1 1/2"ø 3"ø 2"ø 2 1/2"ø 1 1/2"ø 3" V UP& DN 3/4" CONDENSATE DRAINS WITH INDIRECT WASTE CONNECTION TO NEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) HP HP HP HP 3/4" CONDENSATE DRAINS WITHINDIRECT WASTE CONNECTION TO NEAREST SANITARY, VERIFY LOCATION AND ROUTING IN FIELD (TYPICAL) HP L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 S-1 1 1/4"ø DHW 1 1/2"ø DCW 1/2"ø DHWR Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-PB1.2 PLUMBING PLAN BLDG 'B' - LEVEL 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date OA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.1 O1 O2 O3 O4 O5W1W2W3W4W5W6W7W8W9 L2.L BUILDING G BUILDING D BUILDING B BUILDING C BUILDING A UNIT A-4(1 BEDROOM) H.C.UNIT A-5 (1 BEDROOM) UNIT A-6(2 BEDROOM) H.C. UNIT B-13 (1 BEDROOM) TYPE A UNIT B-14(2 BEDROOM) UNIT B-15 (1 BEDROOM) UNIT B-16 (1 BEDROOM) UNIT B-17 (1 BEDROOM) 1/2" C&HW &2" W DN 1" C&HW DN 3/4"ø 3/4"ø 3/4"ø 1"ø 3/4"ø 4" WDN 2"ø2"ø 2" W DN 2" W DN 4" W DN 1 1/2"ø 1 1/2"ø 2"ø 3" V UP & DN 2"ø 1 1/2"ø 2 1/2"ø 3" V UP & DN 2 1/2"ø 2"ø2"ø 1 1/2"ø1 1/2"ø2"ø 3" V UP& DN 1 1/2"ø 2"ø2"ø 1 1/2"ø 2 1/2"ø3" V UP& DN 2"ø 1 1/2"ø 3"ø 2"ø 2 1/2"ø 1 1/2"ø 3" V UP& DN L-1 WC-1B-1 S-1 HP L-1 WC-1 B-1 S-1 HP L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 S-1 HP L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 S-1 HP L-1 WC-1 B-1 S-1 3/4" CONDENSATE DRAINS WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) HP HP HP 3/4" CONDENSATE DRAINS WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) HP B-1 WC-1 3/4" CONDENSATE DRAINS WITH INDIRECT WASTECONNECTION TO NEAREST SANITARY, VERIFYLOCATION AND ROUTING IN FIELD (TYPICAL) 3" VTR 1 1/2"ø 1/2"ø1/2"ø 1 1/2"ø 2 1/2"ø 1/2"ø1/2"ø 1/2"ø1/2"ø1/2"ø 2"ø 2 1/2"ø Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-PB1.3 PLUMBING PLAN BLDG 'A' - LEVEL 2 BLDG 'B' - LEVEL 3 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date WA L2.2 L2.A L2.B L2.C L2.D L2.E L2.F L2.G L2.H L2.J L2.K L2.M L2.N L2.1 W1 W2 W3 W4 W5 W6 W7 W8 W9 L2.L BUILDING B BUILDING A UNIT B-18(1 BEDROOM) UNIT B-19 (2 BEDROOM) UNIT B-20 (1 BEDROOM) UNIT B-21(1 BEDROOM) UNIT B-22(1 BEDROOM) ATTIC SPACE 1 1/2"ø 1 1/2"ø 2"ø 3" V UP & DN 2"ø 1 1/2"ø 2 1/2"ø 3" V UP & DN 2 1/2"ø 2"ø2"ø 1 1/2"ø1 1/2"ø2"ø 3" V UP& DN 1 1/2"ø 2"ø2"ø 1 1/2"ø 2 1/2"ø 3" V UP & DN 2"ø 1 1/2"ø 3"ø 2"ø 2 1/2"ø 1 1/2"ø 3" V UP & DN 3/4" CONDENSATE DRAINS WITH INDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) HP HP HP HP 3/4" CONDENSATE DRAINS WITH INDIRECT WASTE CONNECTION TO NEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) HP L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 S-1 L-1 WC-1B-1 S-1 L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 S-11"ø3/4"ø1"ø3/4"ø1"ø 3/4"ø 1"ø3/4"ø 1/2"ø1/2"ø Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-PB1.4 PLUMBING PLAN BLDG 'A' - ATTIC BLDG 'B' - LEVEL 4 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date UP DNDN DN DN DN 1 A B 2 OA O1 O2 O3 O4 O5 BUILDING D UNIT D-1 (2 BEDROOM) UNIT D-2 (1 BEDROOM) RECEPTION OFFICE KITCHEN OFFICE WAITINGAREA HC LAV. JAN. MECH'L CONFROOM FITNESSROOM BUILDING E 1/2"ø DCW 1/2"ø DCW 1/2"ø DHW 1" C&HW UP 1/2"C&HWUP 1/2" C&HW UP 3/4"ø 3/4"ø1/2"ø1/2"ø 1/2"ø 1/2"ø1/2"ø 1/2"ø1/2"ø1"ø DHW 1"ø DCW 1/2"ø 1/2"ø1/2"ø1/2"ø1/2"ø FCO 2"ø WFCO 1 1/2"ø W 4"ø4"ø W4"ø W 4"ø W UP 4"ø W UP 2"ø W 2"ø 4"ø 1 1/2"ø 4"ø 4"ø W 1 1/2" W UP 4" SANITARY TO BUILDING B,SEE DRAWING ABC-P1.SBFOR CONTINUATION LEVEL 1 1 1/2"ø 1 1/2"ø 1 1/2"ø 2"ø 2"ø 3" V UP 2 1/2"ø 2"ø2"ø 1 1/2"ø 1 1/2"ø 1 1/2"ø 2"ø 2"ø 2 1/2"ø V UP 2 1/2"ø 1 1/2"ø 2"ø 1 A B 2 OA O1 O2 O3 O4 O5 BUILDING D BUILDING E UNIT D-3 (2 BEDROOM) UNIT D-4 (1 BEDROOM) UNIT E-2 (2 BEDROOM)UNIT E-3 (2 BEDROOM) 1 1/2"ø1 1/4"ø1/2"ø 1/2"ø1/2"ø 1 1/2"ø 1/2"ø1/2"ø1/2"ø 1" C&HW DN 3/4"ø1/2"ø1/2"ø 3/4"ø3/4"ø 1/2"ø DHWR 1"ø DHW1"ø DCW 1/2"ø1/2"ø 1/2"ø1/2"ø1/2"ø 1 1/4"ø1"ø1/2"ø1/2"ø1"ø 1 1/4"ø1/2"ø1/2" CW&HW DN 1 1/4"ø 1/2"ø1/2"ø1/2"ø1/2"ø1/2"ø1/2"ø1/2"ø DCW DHWDHWR 1"ø DCW1 1/4"ø DHW1/2"ø DHWR 1 1/2" CW &1 1/4" HW 4"ø W DN 4"ø W DN 1/2"ø 1 1/2"ø W 1 1/2"ø 2"ø4"ø 1 1/2" W DN 4" W DN 2" W DN 1 1/2" W DN LEVEL 2 1 1/2" W DN 4" W DN 3" V DN&UPTO 4" VTR 1 1/2"ø 1 1/2"ø 2"ø2"ø 1 1/2"ø 1 1/2"ø 2"ø 1 1/2"ø 2"ø2"ø2"ø 2 1/2"ø2 1/2"ø 4"ø 4" VENT TO VTR 2 1/2"ø 1 1/2"ø2"ø 2"ø Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" DE-PB1.1 PLUMBING PLAN BLDGS 'D' AND 'E' - LEVEL 1 AND 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date COMMUNITY ROOM (OPEN ABOVE) KITCHENETTE JAN TOILET FITNESS ROOM (OPEN ABOVE) 1 1/2"ø 4" W TO BLDG 'C', SEE DRAWING ABC-PB1.SB FORCONTINUATION 4"ø 3"ø 3"ø 2 1/2"ø 2 1/2" V & 3" W UP 3"ø 3"ø S-1 L-2 WC-2 WH-1 L-2 WC-2 3/4"ø 4"ø 1/2"ø1/2"ø 1/2"ø1/2"ø 1/2"ø3/4"ø 1/2"ø 1 1/2" CW FROM BLDG 'C', SEE DRAWING ABC-PB1.SB FORCONTINUATION 1 1/2" CW DN, 1" CW UPTO BOILER ROOM LEVEL 1 FD-1 3"ø 2"ø 2"ø 2"ø 2 1/2"ø FCO 3" W UP BOILER ROOM FITNESS ROOM BELOW COMMUNITY BELOW TOILETS BELOW 3" W DN, 2" VTR 3" FD 1" CW MAKEUP BOILER LOOP 1" CW FILL FORSUMP TANK LEVEL 2 SUMPTANK 1" CW UP&DN 1"ø1"ø 1"ø 2" V FROM BELOWTO 2" VTR ROOF CT-1 1" CW MAKE UP TOCOOLING TOWER Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" F-PB1.1 PLUMBING PLAN BUILDING 'F' - LEVEL 1, LEVEL 2 AND MEZZANINE Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date BUILDING H BUILDING G 4"ø UNIT G-5(2 BEDROOM)UNIT G-6 (1 BEDROOM)UNIT G-7 (1 BEDROOM) UNIT G-8 (1 BEDROOM)UNIT G-9(2 BEDROOM) UNIT G-4 (1 BEDROOM) UNIT G-3 (1 BEDROOM)UNIT G-2(1 BEDROOM) UNIT G-1(2 BEDROOM) 6"ø 3/4"ø 3/4"ø 1/2"ø 3/4"ø 3/4"ø 1/2"ø1/2"ø1/2"ø 1/2"ø3/4"ø 1"ø 6"ø 3/4"ø 1/2"ø S-1 S-1S-1 S-1 S-1 S-1S-1 S-1 S-1 WC-1 WC-1 WC-1 WC-1 WC-1 WC-1 WC-1 WC-1 WC-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 L-1 B-1 B-1B-1 B-1B-1 B-1 B-1 B-1B-1 1/2"ø1/2"ø 1/2"ø1/2"ø 1/2"ø1/2"ø 1/2"ø1/2"ø 4" VTR BUILDING K 2" GAS & 6" SANITARY FROM BUILDINGS C & F,SEE DRAWING ABC-P1.SB FOR CONTINUATION SAN, CW, HW & HWR TO BUILDINGS H & J, SEE DRAWING HK-PB1.1FOR CONTINUATION FCO 1/2"ø 1/2"ø 1/2"ø 1/2"ø 3/4"ø 1 1/2"ø 2"ø2"ø 3"ø 1 1/2"ø 1 1/2"ø 1 1/2"ø 1"ø 1"ø 3/4"ø3/4"ø 1/2"ø1/2"ø 3/4"ø SIMILAR TOUNIT G-6 SIMILAR TO UNIT G-7 1/2"ø1/2"ø 2"ø4"ø2"ø 3/4"ø3/4"ø 2"ø 2 1/2"ø 3"ø L-1 4" VTR 6"ø 3/4"ø 2"ø2"ø 2"ø2"ø 1 1/2"ø 2"ø HP HP 3/4" CONDENSATE DRAINS WITH INDIRECT WASTECONNECTION TO NEAREST SANITARY, VERIFYLOCATION AND ROUTING IN FIELD (TYPICAL) 3/4"ø HP HP HP HP HP HP HP 2" GAS DN G2"ø 1 1/2"ø 2"ø G 2"ø G 3/4"ø3/4"ø 1/2"ø1/2"ø 1 1/2"ø 2"ø 3/4"ø3/4"ø 1 1/2"ø 2"ø 2"ø 2"ø 1 1/2"ø 1/2"ø1/2"ø 3/4"ø3/4"ø 2"ø 2"ø 1 1/2"ø 2"ø G 3/4"ø3/4"ø 1 1/4"ø 1 1/2"ø 2"ø Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" G-PB1.1 PLUMBING PLAN BUILDING G Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN 1 2 90% CONST DOCS No.Description Date BFPBFP UNIT H-2 (2 BEDROOM) METERROOM LAUNDRY ROOMLOBBY BUILDING H (2) 300 GALLONINDIRECT HOT WATER STORAGE TANKS, SEE 11/P3.2 FORPIPING DIAGRAM GAS FIRED DOMESTICHOT WATER BOILER UNIT H-1(1 BEDROOM) BOILER AND SPRINKLER ROOM JANITOR BUILDING J BUILDING K TMV1 B1 ET1 AS-1 3/4"ø DHWR 1"ø DHW 6"ø W 3/4"ø3/4"ø1 1/2"ø 1 1/4"ø UNIT K-2 (1 BEDROOM)UNIT K-4 (1 BEDROOM) UNIT K-1 (1 BEDROOM)UNIT K-3 (1 BEDROOM) P-1 P-2 3"ø 3/4"ø S-1 L-1 WC-14"ø WFCO1 1/4"ø2"øFD-1 3"ø B-1 L-1 WC-1 B-1 3/4" H&CW TO WASHING MACHINESUPPLY MANIFOLD, PROVIDELAUNDRY MATE CONNECTION FOREACH UNIT AS SCHEDULE WMF-1 WMF-1 WMF-1 3/4"ø3/4"ø 3" STANDPIPE FORWASHING MACHINEINDIRECT DRAIN S-1 L-1 WC-1 B-1 1"ø DCW 2"ø B-1 WC-1 L-1 L-1 L-1WC-1 WC-1 B-1 B-1 S-1 S-1 S-1 S-1 FCO FCO 1 1/2"ø 2"ø 2 1/2"ø 4"ø W3"ø 4"ø2"ø W1 1/2"ø 1 1/2"ø 2"ø 4" VTR 2"ø 4" VTR 2"ø 1 1/2"ø 2"ø SAN, CW, HW & HWR TOBUILDING G, SEE DRAWING G-PB1.1 FOR CONTINUATION V, SAN, CW, HW & HWR TOBUILDING J, SEE DRAWINGJ-PB1.1 FOR CONTINUATION SAN, CW, HW & HWRTO BUILDINGS L & M,SEE DRAWING LM-PB1.1 FOR CONTINUATION GGG3"ø G2"ø GHP HP HP HP HP HPHP HP 3/4" CONDENSATE DRAINS WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATION AND ROUTING IN FIELD (TYPICAL) 1/2"ø1/2"ø 2"ø 3/4"ø 3/4"ø 1/2"ø1/2"ø 3/4"ø3/4"ø Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" HK-PB1.1 PLUMBING PLAN BZELDGS 'H' & 'K' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date BUILDING J UNIT J-8 (2 BEDROOM) UNIT J-7(1 BEDROOM) UNIT J-6 (2 BEDROOM) UNIT J-3 (2 BEDROOM) UNIT J-2 (2 BEDROOM) UNIT J-1 (2 BEDROOM) UNIT J-5 (2 BEDROOM) UNIT J-4 (2 BEDROOM) INV. =-6' 2 27/64" FCO3/4"ø 1"ø 3/4"ø 1"ø 3/4"ø3/4"ø 3/4"ø3/4"ø 3/4"ø3/4"ø 3/4"ø3/4"ø 3/4"ø3/4"ø CONTINUE 1/2"ø 1/2"ø 1/2"ø 1/2"ø L-1 B-1WC-1 HP L-1 B-1 WC-1 HP S-1 S-1 L-1 L-1 HP HP WC-1 WC-1B-1 B-1 BUILDING H S-1 S-1 S-1 S-1 S-1 S-14" VTR 3/4" CONDENSATE DRAINS WITHINDIRECT WASTE CONNECTION TONEAREST SANITARY, VERIFY LOCATIONAND ROUTING IN FIELD (TYPICAL) HP HP HP HP L-1 WC-1B-1 L-1WC-1B-1 B-1 WC-1 WC-1WC-1 WC-1B-1B-1 B-1 L-1 L-1 L-1 L-1 4" VTR 4" VTR 2"ø 2"ø 3 1/2"ø 4" VTR 4" VTR 1/2"ø1/2"ø 1 1/2"ø 3"ø 3/4"ø 3/4"ø3/4"ø 3"ø 1/2"ø1/2"ø 1"ø 3/4"ø 3/4"ø 1/2"ø 1/2"ø1/2"ø 3 1/2"ø 1/2"ø1/2"ø 8"ø 1 1/2"ø 1"ø 1/2"ø 1/2"ø1/2"ø 6"ø 1"ø 3/4"ø 1"ø 6"ø 2"ø 2"ø 3/4"ø 2"ø 2"ø 3 1/2"ø Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" J-PB1.1 PLUMBING PLAN BUILDING 'J' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date MAINTENANCE OFFICE/ STORAGE PROVIDE 1/2" H&CW AND 2" SANITARY CAPPED FOR FUTURE CONNECTION 1" CW AND 4" SANFROM BUILDING M,SEE BELOW FORCONTINUATION 1" CW FROM BELOW,PROVIDE 3/4" H&CWTO WH-1 WH-1 2 1/2"ø 4"ø 4"ø 3/4"ø 3/4"ø FCO 3/4"ø 3/4"ø1"ø L-1 WC-1 HP 1 1/2"ø 2"ø 1 1/2"ø 4"ø 1/2"ø 3" VTR 3 3"ø6"ø 3/4"ø 3/4"ø3/4"ø3/4"ø3/4"ø3/4"ø 3"ø 3"ø 3"ø 2 1/2"ø2"ø2"ø1 1/4"ø1 1/4"ø1"ø 4"ø3/4"ø 1"ø 1"ø 4"ø 6"ø 6"ø 3/4"ø 3/4"ø 3/4"ø3/4"ø3/4"ø3/4"ø3/4"ø 3/4"ø3/4"ø 1"ø 1"ø 3/4"ø 1"ø 6"ø 3"ø 3/4"ø 3/4"ø 3/4"ø B-1 WC-1 L-1 S-1 PLUMBING FIXTURELABEL (TYPICALFOR ALL) 4" SANITARY FROMBUILDING L, SEEABOVE FORCONTINUATION 1" CW TO BUILDING L,SEE ABOVE FORCONTINUATION 4" SANITARY, 1 1/4" HW AND 3/4" HWR FROM BUILDINGK. SEE DRAWINGK-P1.1 FORCONTINUATION 2" CW FROM BUILDING K.SEE DRAWING K-P1.1FOR CONTINUATION 6" SANITARY OUT,SEE SITE UTILITYPLANFOR CONTINUATION 3" CW SERVICE IN,SEE SITE UTILITYPLANFOR CONTINUATION FIRE PROTECTIONSERVICE IN AND BACKFLOW. SEE DRAWING LM-FP1.1 UNIT M-6(2 BEDROOMS) UNIT M-7(2 BEDROOMS) UNIT M-8 (2 BEDROOMS) UNIT M-9(2 BEDROOMS) UNIT M-10(2 BEDROOMS) UNIT M-11 (2 BEDROOMS) UNIT M-5(2 BEDROOMS)UNIT M-4(2 BEDROOMS) UNIT M-3(2 BEDROOMS)UNIT M-2(2 BEDROOMS) UNIT M-1(1 BEDROOM) BUILDING M 3"ø3"ø3"øG G G GG L-1 WC-1B-1B-1WC-1 L-1 S-1S-1L-1 WC-1B-1B-1WC-1L-1 S-1 S-1 L-1 S-1 WC-1B-1 S-1 L-1 WC-1 B-1 S-1 L-1 WC-1 B-1 3" GAS SERVICE ANDMETER BY UTILITYCOMPANY, SEESITE UTILITY PLANFOR CONTINUATION G S-1 S-1 S-1 L-1 L-1 L-1 L-1 B-1 B-1 B-1B-1 WC-1 WC-1 WC-1WC-1HP HP HP HP HP HP HP HP HP 2"ø 3/4"ø 3/4"ø 2"ø 1 1/2"ø4" VTR 4" VTR 1 1/2"ø 1/2"ø1/2"ø 2"ø 3/4"ø3/4"ø 1/2"ø 2"ø 4"ø2"ø 3"ø 2"ø 1/2"ø1/2"ø 1/2"ø1/2"ø 2"ø4"ø 2"ø 2"ø 4"ø2"ø 1"ø HP HP 1/2"ø1/2"ø 1/2"ø1/2"ø 1/2"ø 1/2"ø1/2"ø Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" LM-PB1.1 PLUMBING PLAN BUILDINGS L AND M LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date BURNER DATA CONTROL 1. PROVIDE COMPLETE AND OPERATIONAL PLUMBING SYSTEMS INCLUDING ALL NECESSARY MATERIAL, LABOR, AND EQUIPMENT. 2. THE TERM "PROVIDE" SHALL MEAN FURNISH, INSTALL, CONNECT, AND MAKE OPERABLE. 3. THE TERM "INDICATED" SHALL MEAN AS SHOWN IN CONTRACT DOCUMENTS (DRAWINGS, SPECIFICATIONS AND RELATED ATTACHMENTS). 4. ALL EQUIPMENT AND MATERIAL SHALL BE LABELED, LISTED, AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. 5. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND ARRANGE FOR ALL REQUIRED INSPECTIONS IN ACCORDANCE WITH ALL STATE AND LOCAL GOVERNING AUTHORITIES. 6. ALL WORK SHALL BE PERFORMED BY LICENSED WORKMEN IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS. 7. ALL WORK SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE AND NATIONAL CODES AND REGULATIONS WHICH MAY APPLY. 8. THE CONTRACTOR MAY SUBSTITUTE EQUIPMENT OF ANOTHER MANUFACTURER IF IT IS EQUAL QUALITY AND RATING, SUBJECT TO THE OWNER'S AND ENGINEER'S REVIEW AND ACCEPTANCE. 9. THE CONTRACTOR SHALL VERIFY ALL MANUFACTURER'S CATALOG NUMBERS WITH MANUFACTURERS FOR CURRENT CONFIGURATIONS AND FUNCTIONS. 10. BEFORE SELECTING MATERIALS AND/OR EQUIPMENT AND PROCEEDING WITH THE WORK, INSPECT ALLAREAS TO INSURE SUITABILITY, FIT, CLEARANCES, AND INTERCONNECTIONS. 11. PLUMBING DRAWINGS, PLANS, AND DETAILS ARE DIAGRAMMATIC AND DO NOT SHOW ALL INTERFERENCESAND CONDITIONS VISIBLE AND/OR HIDDEN THAT MAY EXIST. THE CONTRACTOR MUST VISIT THE JOB SITE TOBECOME FAMILIAR WITH CONDITIONS AND ASSUME RESPONSIBILITY FOR CONDITIONS THEREOF, BEFORE BIDDING AND DURING THE CONDUCT OF WORK. 12. PROVIDE THE OWNER WITH ALL MANUFACTURER'S WARRANTIES FOR EQUIPMENT AND MATERIALS PROVIDED. 13. ALL SOIL, WASTE AND DRAIN PIPING SHALL BE BELOW THE FLOOR ON THE PLAN ON WHICH IT ISSHOWN OR BELOW THE SLAB, EXCEPT AS OTHERWISE NOTED. 14. WATER, VENT AND OTHER SERVICE PIPING SHALL BE RUN AT THE CEILING OF THE PLAN ON WHICH IT IS SHOWN, EXCEPT AS OTHERWISE SHOWN. 15. REFER TO ARCHITECTURAL DRAWINGS FOR THE LOCATION AND MOUNTING HEIGHTS OF FIXTURES AND EQUIPMENT. 16. REFER TO ARCHITECTURAL DRAWINGS FOR THE EXACT LOCATIONS OF FIXTURES AND EQUIPMENT. 17. ALL ROOF PENETRATIONS SHALL BE BY OWNER APPROVED ROOF CONTRACTORS. COORDINATE WITHOWNER AND ARCHITECT. CD ST G 1.ALL PIPE SIZES ARE FOR SUPPLY AND DRAINAGE ONLY. PLUMBING CONTRACTOR SHALL INSTALL ALL NECESSARY FITTINGS, ADAPTERS, ECT. TO MAKE FINAL CONNECTION AND COMPLETE THE INSTALLATION. 2.COTRACTOR SHALL SUPPLY CHROME SUPPLIES WITH STOPS, CHROME SEMI-CAST PRAPS, PLUMBING FIXTURE SUPPORTS, AND ANY OTHER REQUIRED TRIM FOR INSTALLATION AND PROPER OPERATION OF THE FIXTURES. TYPE FIXTURE SOIL VENT COLD HOT MOUNT DESCRIPTION REMARKS WC-1 WATER CLOSET 4"2"1/2"-FLOOR L-1 LAVATORY 1 1/2"1/2"1/2"1 1/2" S-1 KITCHEN SINK 1/2"COUNTER1 1/2"1 1/2"1/2" FLOOR1/2"1/2"2"3" BATHTUBB-1 SYMBOLS DESCRIPTION P-TRAP CAP 90° ELBOW UP 90° ELBOW DOWN BALL VALVE CLEANOUT FLOOR CLEANOUT WALL CLEANOUT SOIL OR WASTE ABOVE FLOOR OR GRADE SOIL OR WASTE BELOW FLOOR OR GRADE COLD WATER PIPING VENT CONDENSATE PIPING HOT WATER PIPING COUNTER REMARKS WADE MODEL 6004.1-NH, CAST IRON, 4" NO HUB OUTLET, BRONZE GASKETED PLUG, REVERSIBLE CLAMPING COLLAR, ROUND FRAME, NON SLIP COVER WITH VANDAL PROOF SCREWS FLOOR1/2"1/2"2"3"KOHLER K-193(6,7) SHOWER BASE WITH K-9132 CP SHOWER DRAIN AND WITH DELTA MONITOR 13 SERIES SHOWER TRIM, SHOWER VALVE AND HANSGROHE CROMA C-100 SHOWER HEAD. INSTALL KHOLER LATTIS PIVOTSHOWER DOOR IN BRUSHED NICKEL FINISH (NX) SHOWERSH-1 STORM PIPING GAS PIPING KOHLER CIMARRON K-3828/RA, VITREOUS CHINA, ELONGATED BOWL, CANISTER FLUSH VALVE, 1.28 GAL/FLUSH,CACHET QUIET-CLOSE SEAT, ANGLE SUPPLY WITH STOP, POLISHED CHROME TRIP LEVER. KOHLER CANVAS UNDERMOUNT K28740 WITH K9018CP TRAP AND K15241-7-CP FAUCET WITH LOW FLOW AERATOR TWO BAY STAINLESS STEEL SINK, ELKAY ECTC3322104 WITH DELTA 440-WE-DST FAUCET AND SIDE SPRAY. MINIMUM36" CABINET REQUIRED. KOHLER VILLAGER BATH K-715/716, DELTA INNOVATIONS MONITOR SCALD-GUARD TUB AND SHOWERS SINGLEHANDLE VALVE R10000. INSTALL WITH HANSGROHE CROMA C100 GREEN FLOW RATE SHOWER HEAD. INSTALL CANOPYPEVA HEAVYWEIGHT MILDEW RESISTANT SHOWER CURTAIN LINER WITH HEAVY DUTY ROLLER SHOWER CURTAIN RING ONCURVED MOEN DN2155BN STAINLESS STEEL ROD. PROVIDE WALL BLOCKING AND SUBFLOOR. S-2 SERVICE SINK 1/2"FLOOR2"1 1/2"1/2"FIAT MSB2424 WITH 8300AA FAUCET, 3/4" THREADED OUTLET WITH 5' HOSE, MOP RACK, BUCKET HOLDER HOT WATER RE-CIRCULATION PIPING BACKFLOW PREVENTER CO FCO WCO WASHING MACHINE SUPPLY AND WASTE SYSTEM, SINGLE LEVER SUPPLY CUTOFF, 1/2" H&CW, 2" INDIRECT WASTE SERVING SYMMONS/6-400 35 SYMMONS/TEMPTROL 3.2BATHROOMS 2"/2" 1/2" / 1/2" 15 15 WC-2 WATER CLOSET 4"2"1/2"-FLOOR KOHLER CIMARRON K-3828/RA, VITREOUS CHINA, ELONGATED BOWL, CANISTER FLUSH VALVE, 1.28 GAL/FLUSH,CACHET QUIET-CLOSE SEAT, ANGLE SUPPLY WITH STOP, POLISHED CHROME TRIP LEVER. L-2 LAVATORY 1 1/2"1/2"1/2"1 1/2"WALL AMERICAN STANDARD 0355.012 WITH 2385.049 SINGLE LEVER SUPPLY WITH POPUP AND TAILPIECE, 17 GA.,ADJUSTABLE P-TRAP, FLEX SUPPLIES AND ANGLE STOPS FLOOR CLEANOUT ROOF DRAIN SYMMONS LAUNDRY MATE REMARKS TYPESYMBOL TMV-1 LOCATION FLOWRATE(GPM) INLET/OUTLET SIZE PRESSUREDIFFERENTIAL(PSI) TMV-2 MANUFACTURER/ MODEL NUMBER DOMESTICHOT WATER SHOWER MIXINGVALVE DOMESTIC WATERBOILER ROOMS 1"1240AMTROL/THERM-X-TROLET-1 ACCEPTANCEFACTORMAX TANK VOL GALMANUFACTURER/MODEL NO.SYMBOL SYSTEMCONNECTION ET-2 DOMESTIC COLD WATER PROVIDE MATCHING LINE SIZEAIR SEPARATOR DOMESTIC HOT WATERAMTROL/THERM-X-TROL 1"2680 PROVIDE MATCHING LINE SIZEAIR SEPARATOR SET TEMPERATURE TO PRODUCE MAXIMUM. 110°F ATFARTHEST FIXTURE, BRASS AND BRONZE CONSTRUCTION SET AT MAXIMUM 110°F DISCHARGE REMARKSDESCRIPTIONSYMBOL WOODFORD #B65-CH, FREEZELESS, VACUUM BREAKER HOSE CONNECTION, LOCKABLE CHROME BOXHOSE BIBHB-1 WADE #1103STD6, OUTLET SIZE AS INDICATED ON PLANS, CAST IRON BODY, NICKEL BRONZE STRAINER, 4" DEEP SEAL TRAPFLOOR DRAINFD-1 PROVIDE PROSET TRAP GUARD OR APPROVED EQUAL 4 3 1A 3 4B 2C 2D 2A 1D 4B 4 1B 2B 3 1 2 4 3 1 2 4 4 FCO RD-1 WMF-1 B-1 NUMBER LOCATION TYPE CAMUS/DR1000 MANUFACTURER/MODEL NUMBER REMARKSBOILER DATA 100095.1%940 HEATING CAPACITY (MBH)QTY 1 TYPE (5 TO 1) MODULATINGNATURAL GAS FUEL HP - VOLT 115 1.5 AMP MOTOR ∅ 1 VOLT 115CONDENSING A.F.U.E.INPUT OUTPUT DOMESTIC WATER BOILER ROOMS REFER TO ARCHITECTURAL DRAWINGS PUMP TYPES: DS=DOUBLE SUCTION, HS=HORIZONTALMSPLIT, ES=BASE MOUNTED CENTRIFUGAL BASE SUCTION, IL=IN LINE MODEL NUMBER RPM PUMPTYPE 1641 IL FLUID WATER GPM 115 HEAD(FT) 40 2 1750 HP VOLT 208 PH 3 REMARKS BOILER CIRCULATOR MOTOR DATA 009 IL WATER 6 15 1/8 3250 115 1 HOT WATER RECIRCULATOR MANUFACTURERSYMBOLLOCATION P-1 DOMESTIC WATER BOILER ROOMS TACO P-2 TACO 2 TYPICAL FLOOR MOUNT PLUMBING FIXTURE FIRE STOPPING DETAILS 1 TYPICAL PLUMBING PIPING FIRE STOPPING DETAILS DOMESTIC WATERBOILER ROOMS SECTION A-A A A SECURED TO UNDERSIDE OF FLOOR USING THE ANCHOR HOOKS PROVIDED WITH THE COLLAR. (MINIMUM 2 ANCHOR HOOKS FOR 1-1/2 AND 2 IN. DIAM PIPES AND 3 ANCHOR HOOKS FOR 3 AND 4 IN. DIAM PIPES). THE ANCHOR HOOKS ARE TO BE SYMMETRICALLY INSTALLED AND SECURED TO THE SURFACE OF FLOOR WITH MIN NO. 12 MIN 3/4 IN. LONG WOOD SCREWS AND WASHERS. HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC -- CP 643 50/1.5 "N , CP 643 63/2 "N , CP 643 90/3 "N OR CP 643 110/4 "N FIRESTOP COLLAR *BEARING THE UL CLASSIFICATION MARK 2. CHASE WALL -- THE THROUGH PENETRANT (ITEM 3) SHALL BE ROUTED THROUGH A FIRE-RATED SINGLE, DOUBLE OR STAGGERED WOOD A. STUDS -- NOM 2 BY 6 IN. OR DOUBLE NOM 2 BY 4 IN. LUMBER STUDS. B. SOLE PLATE -- NOM 2 BY 6 IN. OR PARALLEL 2 BY 4 IN. LUMBER PLATES, TIGHTLY BUTTED. C. TOP PLATE -- THE DOUBLE TOP PLATE SHALL CONSIST OF TWO NOM 2 BY 6 IN. OR TWO SETS OF PARALLEL 2 BY 4 IN. LUMBER PLATES, TIGHTLY BUTTED. MAX DIAM OF OPENINGS IS 5 IN. D. GYPSUM BOARD* -- THICKNESS, TYPE, NUMBER OF LAYERS AND FASTENERS SHALL BE AS SPECIFIED IN INDIVIDUAL WALL AND PARTITION DESIGN. 3. THROUGH-PENETRANTS -- ONE NONMETALLIC PIPE, CONDUIT OR TUBING TO BE INSTALLED WITHIN THE FIRESTOP SYSTEM. DIAM OF OPENINGS ASSEMBLIES, THE T RATING IS 2 HR FOR 1-1/2 IN. DIAM (AND SMALLER) PIPES AND 1-1/2 HR FOR PIPES GREATER THAN 1-1/2 IN. DIAM. FOR 1 HR RATED ASSEMBLIES, THE T RATING IS 1 HR FOR 1-1/2 IN. DIAM (AND SMALLER) PIPES, 3/4 HR FOR 2 IN. DIAM PIPES AND 0 HR FOR PIPES GREATER THAN 2 IN. DIAM. THE FOLLOWING TYPES AND SIZES OF NONMETALLIC PIPES MAY BE USED: A. POLYVINYL CHLORIDE (PVC) PIPE -- NOM 4 IN. DIAM (OR SMALLER) SCHEDULE 40 SOLID CORE OR CELLULAR CORE PVC PIPE FOR USE IN CLOSED (PROCESS OR SUPPLY) OR VENTED (DRAIN, WASTE OR VENT) PIPING SYSTEM B. CHLORINATED POLYVINYL CHLORIDE (CPVC) PIPE -- NOM 4 IN. DIAM (OR SMALLER) SDR17 CPVC PIPE FOR USE IN CLOSED (PROCESS OR SUPPLY) OR VENTED (DRAIN, WASTE OR VENT) PIPING SYSTEMS. C. ACRYLONITRILE BUTADIENE STYRENE (ABS) PIPE -- NOM 4 IN. DIAM (OR SMALLER) SCHEDULE 40 SOLID-CORE OR CELLULAR CORE ABS PIPE FOR USE IN CLOSED (PROCESS OR SUPPLY) OR VENTED (DRAIN, WASTE OR VENT) PIPING SYSTEMS. D. FLAME RETARDANT POLYPROPYLENE (FRPP) PIPE -- NOM 4 IN. DIAM (OR SMALLER) SCHEDULE 40 FRPP PIPE FOR USE IN CLOSED (PROCESS OR SUPPLY) OR VENTED (DRAIN, WASTE OR VENT) PIPING SYSTEM. 4. FIRESTOP SYSTEM -- THE DETAILS OF THE FIRESTOP SYSTEM SHALL BE AS FOLLOWS: A. STEEL COLLAR -- COLLAR FABRICATED FROM PRECUT 0.017 IN. THICK (28 MSG) GALV STEEL AVAILABLE FROM SEALANT MANUFACTURER. COLLAR SHALL BE MIN 2 IN. DEEP WITH A MIN 1-1/4 IN. WIDE BY 2 IN. LONG ANCHOR TABS FOR SECUREMENT TO FLOOR SURFACE. RETAINER TABS 1-1/4 IN. WIDE BY 3/4 IN. LONG AND LOCATED OPPOSITE THE ANCHOR TABS ARE FOLDED 90 DEG TOWARDS THE PIPE SURFACE TO MAINTAIN THE ANNULAR SPACE AROUND THE PIPE AND TO RETAIN THE FILL MATERIAL. FOR \ NOM 2 IN. DIAM (OR SMALLER) PVC AND CPVC PIPES IN 1 HR RATED ASSEMBLIES, RETAINER TAB LENGTH MAY BE REDUCED TO 1/2 IN. COLLAR SECURED TO THE SURFACE OF FLOOR WITH WOOD SCREWS AND WASHERS AT EVERY OTHER ANCHOR TAB. A NOM 1/2 IN. WIDE STAINLESS STEEL HOSE CLAMP SHALL BE SECURED TO THE COLLAR AT MID-DEPTH. B. FILL, VOID OR CAVITY MATERIAL* -- SEALANT -- MIN 3/4 IN. THICKNESS OF FILL MATERIAL APPLIED WITHIN THE ANNULUS, FLUSH WITH TOP SURFACE OF THE FLOOR. MIN 1/2 IN. THICKNESS OF FILL MATERIAL APPLIED WITHIN THE ANNULUS FLUSH WITH THE BOTTOM SURFACE OF THE LOWER PLATE. FILL MATERIAL ALSO INSTALLED TO COMPLETELY FILL THE STEEL COLLAR. 1. FLOOR-CEILING ASSEMBLY -- THE 1 OR 2 HR FIRE-RATED SOLID OR TRUSSED LUMBER JOIST FLOOR-CEILING ASSEMBLY SHALL BE CONSTRUCTEDOF THE MATERIALS AND IN THE MANNER SPECIFIED IN THE INDIVIDUAL L500 SERIES FLOOR-CEILING DESIGNS IN THE UL FIRE RESISTANCE DIRECTORY. THE F RATING OF THE FIRESTOP SYSTEM IS EQUAL TO THE RATING OF THE FLOOR-CEILING AND WALL ASSEMBLIES. THE GENERAL CONSTRUCTIONFEATURES OF THE FLOOR-CEILING ASSEMBLY ARE SUMMARIZED BELOW: A. FLOORING SYSTEM -- LUMBER OR PLYWOOD SUBFLOOR WITH FINISH FLOOR OF LUMBER, PLYWOOD OR FLOOR TOPPING MIXTURE* AS SPECIFIED IN THE INDIVIDUAL FLOOR-CEILING DESIGN. MAX DIAM OF FLOOR OPENING IS 5 IN. B. JOISTS -- NOM 10 IN. DEEP (OR DEEPER) LUMBER, STEEL OR COMBINATION LUMBER AND STEEL JOISTS, TRUSSES OR STRUCTURAL WOOD MEMBERS* WITH BRIDGING AS REQUIRED AND WITH END FIRESTOPPED C. FURRING CHANNELS -- (NOT SHOWN) -- (NOT SHOWN) (AS REQUIRED) - RESILIENT GALVANIZED STEEL FURRING INSTALLED IN ACCORDANCE WITH THE MANNER SPECIFIED IN THE INDIVIDUAL L500 SERIES DESIGNS IN THE FIRE RESISTANCE DIRECTORY. D. GYPSUM BOARD* -- THICKNESS, TYPE, NUMBER OF LAYERS AND FASTENERS SHALL BE AS SPECIFIED IN THE INDIVIDUAL FLOOR-CEILING DESIGN, MAX DIAM OF OPENING IS 5 IN. 1.FLOOR-CEILING ASSEMBLY - THE 1 HR FIRE-RATED SOLID OR TRUSSED LUMBER JOIST FLOOR-CEILING ASSEMBLY SHALL BE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER SPECIFIED IN THE INDIVIDUAL L500 SERIES FLOOR-CEILING DESIGNS IN THE UL FIRE RESISTANCE DIRECTORY.THE GENERAL CONSTRUCTION FEATURES OF THE FLOOR-CEILING ASSEMBLY ARE SUMMARIZED BELOW: A.FLOORING SYSTEM - LUMBER OR PLYWOOD SUBFLOOR WITH FINISH FLOOR OF LUMBER, PLYWOOD OR FLOOR TOPPING MIXTURE* ASSPECIFIED IN THE INDIVIDUAL FLOOR-CEILING DESIGN. MAX DIAM OF OPENING SHALL BE 5 IN. B.WOOD JOISTS* - NOM 10 IN. DEEP (OR DEEPER) LUMBER, STEEL OR COMBINATION LUMBER AND STEEL JOISTS, TRUSSES ORSTRUCTURAL WOOD MEMBERS* WITH BRIDGING AS REQUIRED AND WITH ENDS FIRESTOPPED. C.GYPSUM BOARD* - NOM 5/8 IN. THICK, 4 FT WIDE AS SPECIFIED IN THE INDIVIDUAL FLOOR-CEILING DESIGN. 2.CLOSET FLANGE - ACRYLONITRILE BUTADIENE STYRENE (ABS) OR POLYVINYL CHLORIDE (PVC) CLOSET STUB SIZED TO ACCOMMODATE DRAIN PIPE.CLOSET FLANGE INSTALLED OVER DRAIN PIPING WITHIN FLOOR OPENING WITH FLANGE SECURED TO PLYWOOD FLOOR WITH STEEL SCREWS. ANNULAR SPACE BETWEEN CLOSET FLANGE AND PERIPHERY OF OPENING SHALL BE 1/4 IN. 3.DRAIN PIPING - NOM 4 IN. DIAM SCHEDULE 40 ACRYLONITRILE BUTADIENE STYRENE (ABS) OR POLYVINYL CHLORIDE (PVC) DRAIN PIPE AND 90 DEGREE ELBOW FOR USE IN VENTED (DRAIN, WASTE OR VENT) PIPING SYSTEMS. PIPE INSTALLED CONCENTRICALLY WITHIN FIRESTOP SYSTEM. 4.FILL, VOID OR CAVITY MATERIALS* - SEALANT - MIN 3/4 IN. THICKNESS OF FILL MATERIAL APPLIED WITHIN THE ANNULUS,FLUSH WITH THE BOTTOM SURFACE OF FLOOR. HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC - CP 606 FLEXIBLE FIRESTOP SEALANT OR FS-ONE SEALANT 5.WATER CLOSET - (NOT SHOWN) - FLOOR MOUNTED VITREOUS CHINA WATER CLOSET. L53.8597;*BEARING THE UL CLASSIFICATION MARK (MAINTAIN FLOOR SYSTEM FIRE RATING)RUN PIPING IN JOIST AS REQURED IN AREAS ABOVE SOFFITS THROUGH FLOORING SYSTEM MAX 1/2 IN. LARGER THAN THE OUTSIDE DIAM OF THROUGH-PENETRANT. PIPE OR CONDUIT TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF THE FLOOR-CEILING ASSEMBLY. THE T RATING IS DEPENDENT ON THE SIZE OF THE THROUGH-PENETRANT. FOR 2 HR RATED STUD/GYPSUM WALLBOARD CHASE WALL HAVING A FIRE RATING CONSISTENT WITH THAT OF THE FLOOR-CEILING ASSEMBLY. THE CHASE WALL SHALLBE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER SPECIFIED IN THE INDIVIDUAL U300 SERIES WALL AND PARTITION DESIGNS IN THE ULFIRERESISTANCE DIRECTORY AND SHALL INCLUDE THE FOLLOWING CONSTRUCTIONFEATURES: C. FIRESTOP DEVICE* -- FIRESTOP COLLAR -- AS AN ALTERNATE TO ITEM A FILLED WITH B ABOVE. FIRESTOP COLLAR SHALL BE INSTALLED IN ACCORDANCE WITH THE ACCOMPANYING INSTALLATION INSTRUCTIONS. COLLAR TO BE INSTALLED AND LATCHED AROUND THE PIPE AND PLUMBING FIXTURE SCHEDULE PLUMBING PIPING AND SYMBOLS ELECTRICAL DATA KW VOLT PH TYPESYMMANUFACTURERMODEL NUMBER ELECTRIC WATER HEATER SCHEDULE REMARKSLOCATION WH-1 BUILDING 'F'A.O.SMITH ECT 40 ELECTRIC 40 -21 4500 6000 5 240 1 8" DEEP 17 GAUGE WATER TIGHT PAN, WITH 3/4" DRAIN RECOVERY INGPH @ 90°FRISE MAXIMUM STORE INGALS. HEAD(FT) PLUMBING COMPONENTS SCHEDULE WH-2 GENERAL PLUMBING NOTES NOTES:1.PROVIDE FACTORY MOUNTED CONTROL CIRCUIT TRANSFORMER FOR STEPPING DOWN LINE VOLTAGE TO CONTROL VOLTAGE. POWER WIRING BY ELECTRICIAN, CONTROL WIRING BY MECHANICAL CONTRACTOR. DOMESTIC HOT WATER BOILERS-BURNERS SCHEDULE PROVIDE COMBINATION COMBUSTION AIR INTAKE ANDFLUE EXHAUST TO CONCENTRIC WALL TERMINAL KIT THERMOSTATIC TEMPERING VALVE SCHEDULE SCHEDULE OF PUMPS BUILDING 'L'A.O.SMITH ECT 40 ELECTRIC 40 -21 4500 6000 5 240 1 8" DEEP 17 GAUGE WATER TIGHT PAN, WITH 3/4" DRAIN STANDARD ELEMENT WATTAGE SCHEDULE OF EXPANSION TANKS Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/4" = 1'-0" P2.1 PLUMBING SCHEDULES, NOTES, SYMBOLS AND DETAILS Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 No.Description Date 4223 BACKFLOW PREVENTER, SEE DETAIL THIS SHEET GATE VALVE (TYPICAL) UNION (TYPICAL) WATER METER (TYPICAL) PRESSURE GAUGE (TYPICAL) ADJUSTABLE PIPE SUPPORT (TYPICAL) CHECK VALVE (TYPICAL) SHUT OFF VALVE (TYPICAL) EXTERIOR WALL 1" MIN. SCH. 40 GALV. STEEL PIPE SLEEVE (1"∅ LARGER THAN PIPE OUTSIDE DIAMETER) ANCHOR COLLAR RISER CLAMP PLUMBING ABBREVIATIONS 2 N.T.S. TRAP GUARD DETAIL 1 N.T.S. FLOOR DRAIN DETAIL 3 N.T.S. FLOOR CLEANOUT DETAIL 6 N.T.S. TYPICAL PIPE HANGER DETAIL DETAIL 10 N.T.S. WALL PENETRATION DETAIL 5 N.T.S. FLOOR PENETRATION WITH SLEEVE 8 N.T.S. TYPICAL WATER HAMMER ARRESTOR DETAIL 12 N.T.S. VENT THROUGH ROOF DETAIL 7 N.T.S. DOMESTIC WATER SERVICE ENTRY DETAIL 9 N.T.S. REDUCED PRESSURE BACKFLOW PREVENTER 11 N.T.S. GAS SERVICE CONNECTION DETAIL 4 N.T.S. MAKEUP WATER DETAIL COLD WATER BALL VALVE SUPPLY MAIN BRANCH CLOSET OR URINALFLUSH VALVE, WATER FIXTURE.ARE OMITTED AT EACH INDIVIDUALBE INSTALLED WHEN AIR CHAMERS COLD WATERBRANCH SIZE AND LOCATIONMAINS, SEE PLANS FOR MIN.12"HOT WATERBRANCH 2. WATER HAMMER ARRESTORS MUST BE USED WHEN WATER FLOW IS CONTROLLED BY SOLENOID VALVE, FLUSH VALVEOR OTHER QUICK CLOSING DEVICE. AIR CHAMBER HOT OR COLD SUPPLY MAIN SUPPLYBRANCH SINGLE FIXTURE BRANCH BALL VALVE 3. WATER HAMMER ARESTORS MUST WATER HAMMER ARRESTOR AT ALL WATER HAMMER4. PROVIDE AN ACCESS PANEL ARRESTOR LOCATIONS. SUPPLY SHOWER WATER CLOSET WITH TANK NOTES LAVATORY OR SINK 1. PROTECT SYSTEM AGAINST WATERHAMMER WITH MINIMUM 12" LONGFULL SIZE AIR CHAMBERS PLACED ON EACH INDIVIDUAL SUPPLY OF EACH FIXTURE. BRANCH MULTIPLE FIXTURE GROUPING WATER HAMMER ARRESTOR DOMESTIC COLD WATER SERVICE FROM STREET MAIN 12" TO30" AFF 2. ESCUTCHEONS 1. PIPE SLEEVES (REFER TO DETAILS 2 & 3/P3) NOTES: PIPE CENTER LINE 1/2" MIN 6" 6" NEW PIPE INSULATION12" ON EACH SIDEOF NEW HANGER SEESPECIFICATION NEW CLEVIS HANGERSIZE AS REQUIRED PROVIDE ADJUSTINGNUT (NOT SHOWN)JOIN INSULATION ATJOINTS WITH HEAVYDUTY TAPE WRAP. PIPE, SEE PLANSFOR EXACT SIZEAND TYPE SIZE SHIELD 1/2" ABOVE MINIMUM CENTER LINE OF INSULATION TO PREVENT INSULATION FROM COMPRESSING HANGER ROD SIZE AS REQUIRED A. PIPE SLEEVES THROUGH FIRE-RATED MASONRY PARTITIONS OR FOUNDATION WALLS SHALL BE SCHEDULE 80 BLACK STEEL WITH MAXIMUM OF 1/2" CLEARANCE BETWEEN SLEEVE AND PIPE.SLEEVE SHALL BE EQUAL IN LENGTH TO DEPTH OF PARTITION OR WALL. B. PIPE SLEEVES THROUGH FIRE-RATED STUD PARTITIONS SHALL BE #18 GAGE GALVANIZED STEEL WITH MAXIMUM OF 1" CLEARANCE BETWEEN SLEEVE AND PIPE. SLEEVE SHALL BE EQUAL IN LENGTH TO DEPTH OF PARTITION. A. ESCUTCHEONS IN FINISHED SPACES SHALL BE ANODIZED ALUMINUM OR CHROME-PLATED BRASS. B. ESCUTCHEONS IN UNFINISHED SPACES SHALL BE PLAINBRASS, ALUMINUM, GALVANIZED STEEL OR CAST IRON. C. ESCUTCHEONS SHALL BE HELD IN PLACE BY INTERNALSPRING TENSION OR SET SCREW. FIRE-RATED MASONRY ORFIRE-RATED STUDPARTITION. SEE NOTES PACK VOID SPACE WITH FIRE STOPPING MATERIAL (3M CAULK CP25 OR EQUIVALENT) STEEL PIPESLEEVE. SEENOTES REQUIREDCLEARANCE.SEE NOTES ESCUTCHEONS.SEE NOTES THIS DETAIL AIR SEPARATOR, SEEMECHANICAL PLANS 3/4" DRAIN CW STRAINER RPZ BACK FLOW PREVENTOR POINT OF CONNECTION 1" IN OUT FINISH FLOOR DRAIN PIPING CLEAN OUT BOX CLEAN OUT PLUG CLEAN OUT BOX SHALLBE INDEPENDENT OFPIPE TO ALLOWMOVEMENT WITHSETTLEMENT OF GRADEINSTALL COVERFLUSH W/ FINISHFLOOR SHORT LENGTH OF PIPE FURNISHED W/CLEAN OUT BOX UNDERGROUND PIPING INSTALL PROSETTRAPGUARD (ORAPPROVED EQUALAS PER MANUFACTURERS INSTRCTIONS) TYPICAL FLOOR DRAIN. SEE DETAIL 1/P3.1 ~TILE FLOOR CONCRETE FILL STRAINERADJUSTABLENICKLE BRONZE THREADED, CAULKED OR CLAMP WITHWEEP HOLES NO-HUB CONNECTION CEMENT BED AT WEEP HOLESLOOSE GRAVEL FLASHING STRUCTURAL SLAB WATERPROOFMEMBRANE 1. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT CONSTRUCTION AND PITCH OF ROOF NOTES:MIN. 12"12" MIN. VENT STACK OR STACK VENT INCREASER (WHEN REQUIRED) ROOF CONSTRUCTION INSULATION FLEX MF/R FIELD MEMBRNAE HEAT WELDED SEAM FLEX FABRICATED PIPE FLANGEFLEX PLATES AND FASTENERS STAINLESS STEEL CLAMP FLEX APPROVED CAULKING VENT STACK OUTIN DOMESTIC WATER SERVICE TO BUILDING. SEE PLANSFOR SIZE, LOCATION AND ROUTING FIRE PROOFCAULKING TYPE3M "FIRE SEAL"OR APPROVEDEQUAL EXISTING FLOORSTRUCTURE FINISHED FLOOR DESCRIPTIONABBREVIATION ABBREVIATION DESCRIPTION EXISTING HOT WATER EXISTING NATURAL GASEG EHW FCO CO G FLOOR CLEANOUT CLEANOUT NATURAL GAS HW HWR V CW HOT WATER COLD WATER VENT WASTE FINISHED W FIN. D FD CEILING VALVE TYPICAL FLOOR BEHIND ACCESS PANELA.P. BEH FLR TYP. VL. CLG. WHA HB BV GL.VL. VENT THRU ROOF EXISTING BELOW ABOVEABV. BEL. EXIST. V.T.R. CV GV ESD ESS COMBINATION WASTE & VENT DRAIN FLOOR DRAIN WATER HAMMER ARRESTER HOSE BIBB GLOBE VALVE BALL VALVE CW&V CHECK VALVE GATE VALVE EXISTING STORM DRAIN EXISTING SANITARY SEWER BACKFLOW PREVENTERBFP SLEEVE ROOF CONSTRUCTIONAS REQUIRED (PROVIDE FIRERATED CAULKING WHENREQUIRED BY LOCAL CODES) FOR CONNECTIONFLOOR DRAIN. SEE PLANS 1" DRAIN LINE PREVENTERBACKFLOW OUTLETINOUT STRAINER AIR GAP FITTING PIPE DISCHARGE LINE TO APPROVED RECEPTOR OR INLET 3/4" BLOW DOWNBALL VALVE W/ 3/4"HOSE THREADCONNECTION PIPE, SEE PLANS FOR SIZE AND LOCATION BALL VALVE PROVIDE A METALSUPPORT PLATE WHENDRAIN IS INSTALLED IN AN EXISTING FLOOR - CAULK AROUND DRAIN PRIOR TO RE-GROUTING SUPPLYTO TENANT GRADE TEE WITH BUSHING10 PLUG TEE WITHBUSHING AND 10PLUG GAS PRESSURE REGULATOR INSULATING UNION TEE WITH BUSHING AND 10 PLUGGAS COCK (TYPICAL)ANODELESS RISER BUTT WELDEDSERVICE TEE CAST IRON EXTENSION TYPE SERVICE BOX GAS MAIN HOT TAP VALVE SWING JOINT OUTLET (POLY)SERVICESHUT-OFF VALVE WITH50 SQ. OPERATING NUT HOT WATER RECIRCULATION SS-1 SERVICE SINK S-1 SINK L-1 LAVATORY WATER CLOSETWC-1 WATER HEATERWH-1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/4" = 1'-0" P3.1 PLUMBING DETAILS AND ABBREVIATIONS Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 No.Description Date TYPICAL BUILDING 'B' SANITARY RISER DIAGRAM AQ FLOW STRAINER(TYP.) 1. FIXEDSHOWERHEAD 36" 8 L-1 WC-1 B-1 2" 2"2" 2" L-1 2" 2" WC-12" 2" B-1 2" L-1 2" 2" WC-12" B-1 2" L-1 2" 2" WC-12"B-1 2" 2" 4" 4" 4" VTR 2" 2" 2" 4" 4" 4" T SHUT-OFF VALVE (TYP.) THERMOMETER 3" FACE (TYP.) UNION (TYP.) VOLUME CONTROL VALVE UNION (TYP.) HOT WATER SUPPLY THERMOSTATICTEMPERING VALVE INTEGRAL CHECK STOPS (TYP.) WITH REMOVABLE STRAINERCARTRIDGE 140°F WATER TOPOT SINK 120° F TEMPEREDWATER TO FIXTURES COLD WATER SUPPLY TFFO OCLDOHALL BRONZE, IN-LINE CIRCULATOR PUMP WITH FLANGED CONNECTIONSPROVIDED BY PLUMBING CONTRACTOR, WIRED BY ELECTRICALCONTRACTOR. REFER TO PUMP SCHEDULE FOR ADDITIONAL NFORMATION CHECK VALVE (TYP.) TO WATER HEATER FLOW PLUG VALVE (TYP.) PIG TAIL (TYP.) DIAL TYPE PRESSURE GAUGE (O-100 PSIG) TIMECLOCK FOR CONTROL OF PUMP (WHEREREQUIRED BY CODE) PROVIDED BY PLUMBINGCONTRACTOR, WIRED BY ELECTRICALCONTRACTOR. SEE NOTE #1 DIRECT ACTING AQUASTAT FORCONTROL OF PUMP (WHEREREQUIRED BY CODE) PROVIDEDBY PLUMBING CONTRACTOR,WIRED BY ELECTRICALCONTRACTOR. SEENOTE #1. TO WATERHEATER BALL OR LUG BUTTERFLY VALVE (TYP.) REDUCING TEE (OR TEST PLUG FOR INSERTION OF GAUGE) CIRCULATING PUMP GENERAL NOTES: THE DOMESTIC WATER RE- CIRCULATION PUMP SHOULD RUN CONTINUOUSLY TO PREVENT TOGROWTH OF LEGIONELLA BACTERIAIN THE PIPE RUNS. THIS PUMPSHOULD BE EXCLUDED FROMENERGY CONSERVATIONMEASURES. REFER TO OSHATECHNICAL MANUAL, SECTIONSECTION II, CHAPTER 7. AQUASTAT AND TIMECLOCK SHALL NOTBE PROVIDED UNLESS SPECIFIEDBY LOCAL CODEOFFICIAL IN WRITING. 1 N.T.S. DOMESTIC HOT WATER CIRCULATING PUMP DETAIL 1 1/2" VENT UP INWALL FROM DRAIN. 1/2" H & CW, RUN ABOVE CEILING TO SHOWER VALVE. 1 1/2" VENT, RUN ABOVE CEILING TO BRANCH OR MAIN VENT SYSTEM. 40" A.F.F. APPROX. 6" MIN.8" MAX. 1/2" TEMPERED WATERTO SHOWER HEAD AND HAND SPRAY P-TRAP 3" WASTE, BURIED, TO BRANCH OR MAIN WASTE SERVICE. FINISHED SHOWER FLOOR DETAIL NOTE: FLOOR DRAIN SHOWER MIXING VALVE.MOUNT VALVE INSIDEOF SHOWER ENCLOSURE.SET VALVE SET POINTAT 110°F MAXIMUM. TUB / SHOWERENCLOSURE SHOWER HEAD/HAND SPRAYDIVERTER VALVE(IN SHOWER ENCLOSURE) TUB SPOUT WITH DIVERTER TUB SPOUT DIVERTER VALVE (IN SHOWER ENCLOSURE) REFER TO ARCHITECTURAL DRAWINGS AND ADA REQUIREMENTS FOR FIXTURE MOUNTING REQUIREMENTS 4 TYPICAL TUB/SHOWER PIPING INSTALLATION DETAIL - ACCESSIBLE TYPE FLOOR CONSTRUCTION FINISHED FLOOR STORM LEADER SIZEAS PER DWG.CAULKING& HOT POURPJ COMPOUND X.H.C.I. PIPE SIZE AS PER DWG. C.I. TEE BRANCHCLEANOUT SIZEAS REQ. 2 N.T.S. TYPICAL STORM LEADER DETAIL CAST IRON TEEBRANCH CLEANOUT SIZE: AS NOTEDON DRAWING JOSAM 8770(SATIN FINISH)ACCESS DOOR,WITH CASTBRASS CLEANOUTPLUG DOOR TO BEALIGNED BOTHVERTICALLY &HORIZONTALLYWITH MASONRYSCOURS 3 CLEANOUT ACCESS DOOR ON WALL DETAIL MAY EXTEND ASWASTE OR VENT PLUGGED TEEWITH CLEANOUT CHROME WALLPLATE ANDSCREW WALL 1/8 BEND -CI SOIL PIPE BALANCE OFPIPING SAME ASCLEANOUT TOGRADE FLOOR SLAB 5 N.T.S. WALL CLEANOUT DETAIL 2" CW SUPPLY P&T RELIEF VALVEPIPED TO DRAIN PERCODE (TYPICAL) THERMOMETER THERMOSTATIC WATER CONTROLLERSYMMONS TEMPCONTROL 5-1000A-PWVWITH SPARE RC CARTRIDGECOORDINATE / CONFIRM VALVESELECTION WITH OWNER 2" CW THERMOMETER 120° TEMPERED WATER TO SHOWERS, LAVS, ETC. 1" CIRCULATING PUMP 3" HW CW SUPPLY TO FIXTURES 2" CW BACKFLOW PREVENTERS PER LOCAL CODES (TYPICAL) 3" 1" CW DOMESTIC WATEREXPANSION TANK INDIRECT DOMESTIC HOT WATER STORAGE TANK (TYPICAL FOR 2) NOTES : MIN. 30" SQUARE 2 1/2" LB TO 4 LB LEAD FLASHING. SET ON FINISHEDROOFING FELTS IN MASTIC. PRIME TOP SURFACE BEFORE STRIPPING MEMBRANE PLIES METAL FLASHING AND FLASH-IN PILES EXTEND UNDER CLAMPING RING. STRIPPING MEMBRANE EXTENDS 4" BEYOND EDGE OF FLASHING SHEET BUT NOT BEYOND EDGE OF SUMP. ROOF INSULATION(TAPER 24" TODRAIN) LEAD FLASHING DECK CLAMP STRIPPING FELTS CLAMPING RING STRAINER 10 N.T.S. ROOF DRAIN DETAIL 7 N.T.S. THERMOSTATIC MIXING VALVE (TMV-1) PIPING DETAIL 1" B-1 ET-1 RECIRCULATING PUMP DOMESTIC HOT WATER BOILER 11 N.T.S. SCHEMATIC DOMESTIC HOT WATER PIPING DIAGRAM HOT WATER RECIRCULATION ET-2 TMV-1 6 N.T.S. IN-LINE PUMP DETAIL PRESSURE GAUGE (TYPICAL) GATE VALVE STRAINER WITH BLOW DOWN VALVE DIRECTION OF FLOW IN-LINE CIRCULATOR PUMP UNION (TYPICAL) PIPE HANGERS - PROVIDE DOUBLEDEFLECTION NEOPRENE (TYPE HN) FORFIRST TWO ON EACH SIDE OF PUMPSUPPORT PUMP BY PIPING ONLY CHECK VALVE BALANCING VALVE LONGITUDINAL BRACING PIPE HANGEROR SUPPORT ADJUSTABLE HALF HINGE ROD STIFFENERMAY BEREQUIRED ROD STIFFENER ALL THREADED ROD CLEVIS HANGER PIPE SLEEVE ADJUSTABLE HINGE CHANNELTRANSVERSE BRACE(9'-4" (2.8M) MAX. LENGTH) 1 (Min.) 2 MAX 1 MIN CLEVIS HANGER TRANSVERSE BRACING ADJUSTABLE HINGETRANSVERSE BRACE CHANNELTRANSVERSEBRACE(9'-4" (2.8M) MAX. LENGTH) 40 FEET ON CENTER CHANNEL-SIZE AS REQUIRED CHANNEL LONGITUDINAL BRACE (9'-4" (2.8M) MAX. LENGTH) 4"(101mm) APPROVED SPLITSTEEL HANGER PIPE STRAPS TRANSVERSE BRACE(9'-4" (2.8M) MAX. LENGTH) 1 ADJUSTABLE HINGE ROD STIFFENER LONGITUDINAL BRACES(9'-4" (2.8M) MAX. LENGTH) ALL THREADED ROD 6'-0" MAXSUPPORTING STRUCTURE EXPANSION ANCHORSHOWN FOR EXAMPLE 2 MAX1 MIN 1 (Min.) SUPPORTING STRUCTURE 2 MAX 1 MIN 9 N.T.S. SEISMIC RESTRAINT FOR SUSPENDED PIPING Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/4" = 1'-0" P3.2 PLUMBING DETAILS Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 No.Description Date BUILDING D BUILDING B (LEVEL 1)BUILDING C BUILDING G BUILDING A (LEVEL 1) UNIT A-1 (2 BEDROOM) UNIT A-2 (1 BEDROOM) UNIT B-3 (1 BEDROOM)TYPE 'A' UNIT B-4 (2 BEDROOM) UNIT B-5 (1 BEDROOM) UNIT B-6 (1 BEDROOM) UNIT B-7 (STUDIO) UNIT A-2(2 BEDROOM) A B D E C F G H J K L M NORTH SITE KEY PLAN Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-FP1.1 FIRE PROTECTION PLAN BLDGS 'A', 'B', 'C' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 No.Description Date UNIT B-8 (1 BEDROOM) TYPE A UNIT B-9(2 BEDROOM) UNIT B-10 (1 BEDROOM) UNIT B-11 (1 BEDROOM) UNIT B-12(1 BEDROOM) BUILDING B BUILDING C BUILDING A BUILDING G BUILDING D A B D E C F G H J K L M NORTH SITE KEY PLAN Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-FP1.2 FIRE PROTECTION BLDGS 'A', 'B', 'C' - LEVEL 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 No.Description Date BUILDING G BUILDING D BUILDING B (LEVEL 3)BUILDING C BUILDING A UNIT A-4 (1 BEDROOM) H.C. UNIT A-5 (1 BEDROOM) UNIT A-6 (2 BEDROOM) H.C. UNIT B-13 (1 BEDROOM) TYPE A UNIT B-14 (2 BEDROOM) UNIT B-15 (1 BEDROOM) UNIT B-16 (1 BEDROOM) UNIT B-17 (1 BEDROOM) A B D E C F G H J K L M NORTH SITE KEY PLAN Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-FP1.3 FIRE PROTECTION PLAN BLDGS 'A', 'B', 'C' LEVEL 3 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 No.Description Date BUILDING B (LEVEL 3) BUILDING A (ATTIC LEVEL) UNIT B-18 (1 BEDROOM) UNIT B-19 (2 BEDROOM) UNIT B-20 (1 BEDROOM) UNIT B-21 (1 BEDROOM) UNIT B-22 (1 BEDROOM)ATTIC SPACE A B D E C F G H J K L M NORTH SITE KEY PLAN Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-FP1.4 FIRE PROTECTION BLDGS 'A', 'B', 'C' - LEVEL 4 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 SPRINKLER MAIN TO CONNECTWITH MAINBELOW No.Description Date UNIT B-1 (2 BEDROOM)TYPE A UNIT B-2 (2 BEDROOM) UNIT C-3(2 BEDROOM) TYPE A UNIT C-4(2 BEDROOM) TYPE A ELEVATOR BUILDING B (LEVEL B) BUILDING C (LEVEL 2) BUILDING A (CRAWL SPACE) BUILDING G BUILDING D A B D E C F G H J K L M NORTH SITE KEY PLAN Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-FP1.B FIRE PROTECTION PLAN BLDG A-CRAWL SPACE BLDG B - LEVEL B BLDG C - LEVEL 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 No.Description Date UP UP UNIT C-1 (2 BEDROOM)UNIT C-2 (2 BEDROOM) STAIR 2 ELECTRICAL METER ROOM MAINTENANCEROOM BOILER ROOM SPRINKLER ROOM BUILDING B (LEVEL SB) BUILDING C (LEVEL 1) BUILDING A (ABOVE) BUILDING D BUILDING G ET2 AS2 B1 ET1 TMV1 P1 P2 6"ø SPRINKLER BACKFLOWAND RISER VALVES SPRINKLER SERVICE IN A B D E C F G H J K L M NORTH SITE KEY PLAN Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-FP1.SB FIRE PROTECTION PLAN BLDG 'B', 'C' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 No.Description Date UP DNDN DN DNDN DN BUILDING D LEVEL 1 UNIT D-1 (2 BEDROOM) UNIT D-2 (1 BEDROOM) RECEPTION OFFICE KITCHEN OFFICE WAITINGAREA HC LAV. JAN. MECH'L CONFROOM FITNESS ROOM BUILDING E LEVEL 1 SPRINKLER MAINUP FROM 1STLEVEL SPRINKLER MAIN UP FROM 1ST FLOOR BUILDING D LEVEL 2 BUILDING E LEVEL 2 UNIT D-3 (2 BEDROOM) UNIT D-4 (1 BEDROOM) UNIT E-2(2 BEDROOM) UNIT E-3 (2 BEDROOM) SPRINKLER MAIN UP TO 2ND LEVEL SPRINKLERMAIN UP TO 2NDLEVEL A B D E C F G H J K L M NORTH SITE KEY PLAN Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" DE-FP1.1 FIRE PROTECTION PLANS BLDGS 'D', 'E' - LEVEL 1 & 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 No.Description Date COMMUNITY ROOM (OPENABOVE) KITCHENETTE JAN TOILET FITNESS ROOM (OPEN ABOVE) TOILET SPRINKLER MAINUNDERGROUND FROM BUILDING "C" BUILDING F LEVEL 1 SPRINKLER MAINTO 2ND LEVEL 1" VALVE FOR ELEVATOR PIT SPRINKLER 1" VALVE. SIDEWALLSPRINKLER DOWNTO ELEVATORPIT AT 2'-0" FROMABOVE FLOOR BOILER ROOM FITNESS ROOM BELOW COMMUNITY BELOW TOILETS BELOW BUILDING F 2ND LEVEL Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/4" = 1'-0" F-FP1.1 FIRE PROTECTION PLANS BLDG 'F' - LEVELS 1 & 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN SPRINKLER MAIN FROM 1ST LEVEL 1" VALVE UPRIGHT SPRINKLER AT TOP OF ELEVATOR SHAFT No.Description Date UNIT G-5(2 BEDROOM) UNIT G-6 (1 BEDROOM)UNIT G-7 (1 BEDROOM) UNIT G-8 (1 BEDROOM) UNIT G-9(2 BEDROOM) BUILDING K BUILDING H BUILDING G UNIT G-4 (1 BEDROOM) UNIT G-3 (1 BEDROOM)UNIT G-2 (1 BEDROOM) UNIT G-1 (2 BEDROOM) BUILDING G (CRAWL SPACE) SPRINKLER MAINUP TO LEVEL 1 Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" G-FP1.1 FIRE PROTECTION PLANS - BUILDING 'G' - CRAWL SPACE AND LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA Author 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN SPRINKLER MAINDOWN TOCRAWL SPACE No.Description Date UNIT H-1(1 BEDROOM) UNIT H-2(2 BEDROOM) METER ROOMLAUNDRY ROOM BOILER AND SPRINKLER ROOM JANITOR LOBBY BUILDING H BUILDING J BUILDING KUNIT K-2(1 BEDROOM) UNIT K-4(1 BEDROOM) UNIT K-1(1 BEDROOM) UNIT K-3(1 BEDROOM) BUILDING G BUILDING M Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" HK-FP1.1 FIRE PROTECTION PLANS BLDGS 'H' & 'K' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date BUILDING J UNIT J-8(2 BEDROOM) UNIT J-7(1 BEDROOM) UNIT J-6(1 BEDROOM) UNIT J-3(2 BEDROOM) UNIT J-2(2 BEDROOM) UNIT J-1(2 BEDROOM) UNIT J-5(2 BEDROOM) UNIT J-4(2 BEDROOM) Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" J-FP1.1 FIRE PROTECTION PLAN BLDG 'J' - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date MAINTENANCE OFFICE/ STORAGE SPRINKLER MAINFROM M BUILDING UNDERGROUND SPRINKLER MAINTO L BUILDING SPRINKLER SERVICE IN WITH BACKFLOW AND RISER VALVES UNIT M-1 (1 BEDROOM) UNIT M-2 (2 BEDROOM) UNIT M-3(2 BEDROOM) UNIT M-4 (2 BEDROOM) UNIT M-5(2 BEDROOM) UNIT M-11 (2 BEDROOM) UNIT M-10 (2 BEDROOM) UNIT M-9(2 BEDROOM)UNIT M-8(2 BEDROOM) UNIT M-7(2 BEDROOM)UNIT M-6(2 BEDROOM) Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" LM-FP1.1 FIRE PROTECTION PLANS BLDGS 'L' & 'M' Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2017 16-063 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date FS TS FIRE PROTECTION LEGEND OS&Y WITH TAMPER SWITCH UPRIGHT SPRINKLER CONCEALED PENDENT SPRINKLER HEAD FIRE SERVICE WET SYSTEM SPRINKLER PIPING INSPECTOR'S TEST STATION FIRE DEPARTMENT CONNECTION (WALL MOUNTED) CAPPED OR PLUGGED PIPE REDUCER PIPE ELBOW DOWN FLOW SWITCH ALARM TAMPER SWITCH ALARM ELBOW UP CHECK VALVE PRESSURE SWITCH ALARM PENDENT SPRINKLER HEAD SIDEWALL SPRINKLER HEAD HOSE VALVE WET VALVE COMBINATION SPRINKLER PIPING OS&Y WITH TAMPER SWITCH F DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL COMB. SPR. THE CONTRACTOR SHALL RECEIVE APPROVAL OF THE OWNERS INSURANCE CARRIER, LOCAL FIRE MARSHALL AND LOCAL BUILDING OFFICIALPRIOR TO COMMENCING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THEHYDRAULIC CALCULATIONS AND DETAILED LAYOUT OF PIPING, PIPE SIZES AND SPRINKLER HEAD LOCATIONS IN ACCORDANCE WITH THE LATESTEDITION OF NFPA 13 AND ITS INTERPRETATIONS. ADD SEISMIC BRACING TO SPRINKLERSYSTEM AS REQUIRED TO MEET CURRENT NFPA AND BUILDING CODES SPRINKLER SYSTEM HYDRAULICALLY DESIGNED TO PROVIDE 0.10 GPM PER SQUARE FOOTOVER THE MOST REMOTE 1500 SQUARE FOOTAREA WITH A 100 GPM ALLOWANCE FOR ATOTAL COMBINED INSIDE AND OUTSIDE HOSESTREAMS. SPRINKLER HEAD SPACING AT 225SQUARE FEET MAXIMUM. SPRINKLERTEMPERATURE RATING OF 135°F TO 170°FMAXIMUM WITH 1/2" ORIFICE. FIRE PROTECTION ABBREVIATIONS PROVIDE COMPLETE AND OPERATIONAL FIRE PROTECTION SYSTEMS INCLUDING ALL NECESSARY MATERIAL, LABOR, ANDEQUIPMENT. THE TERM "PROVIDE" SHALL MEAN FURNISH, INSTALL, CONNECT, AND MAKE OPERABLE. THE TERM "INDICATED" SHALL MEAN AS SHOWN IN CONTRACT DOCUMENTS (DRAWINGS SPECIFICATIONS AND RELATEDATTACHMENTS). THE TERM "REMOVE" SHALL MEAN TO DISCONNECT, REMOVE AND LEGALLY DISPOSE OF, IN ACCORDANCE WITH LOCAL,STATE, AND FEDERAL REGULATIONS ALL EQUIPMENT AND MATERIAL SHALL BE LABELED, LISTED, AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND ARRANGE FOR ALL REQUIRED INSPECTIONS INACCORDANCE WITH ALL STATE AND LOCAL GOVERNING AUTHORITIES. ALL WORK SHALL BE PERFORMED BY LICENSED WORKMEN IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS. ALL WORK SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL CODES AND REGULATIONS WHICH MAYAPPLY. THE CONTRACTOR MAY SUBSTITUTE EQUIPMENT OF ANOTHER MANUFACTURER IF IT IS OF EQUAL QUALITY AND RATING, SUBJECT TO THE OWNER'S AND ENGINEER'S REVIEW AND ACCEPTANCE. THE CONTRACTOR SHALL VERIFY ALL MANUFACTURER'S CATALOG NUMBERS WITH MANUFACTURERS FOR CURRENT CONFIGURATIONS AND FUNCTIONS. FIRE PROTECTION PLANS, AND DETAILS ARE DIAGRAMMATIC AND DO NOT SHOW ALL INTERFERENCE'S AND CONDITIONSVISIBLE AND/OR HIDDEN THAT MAY EXIST. THE CONTRACTOR MUST VISIT THE JOB SITE TO BECOME FAMILIAR WITHCONDITIONS AND ASSUME RESPONSIBILITY FOR CONDITIONS THEREOF, BEFORE BIDDING AND DURING THE CONDUCT OF WORK. ALL APARTMENTS ARE DESIGNED AS LIGHT HAZARD OCCUPANCY WITH 225 SQ FT. MAX BETWEEN SPRINKLERS. VIKINGVK605 16X20 EXTENDED COVERAGE SIDEWALL SPRINKLERS WERE USED IN APARTMENTS WERE INDICATED. BEFORE SELECTING MATERIALS AND/OR EQUIPMENT AND PROCEEDING WITH THE WORK, INSPECT ALL AREAS TO INSURE SUITABILITY, FIT, CLEARANCES, AND INTERCONNECTIONS. PROVIDE THE OWNER WITH ALL MANUFACTURER'S WARRANTIES FOR EQUIPMENT AND MATERIALS PROVIDED. PROVIDE SHOP DRAWINGS INCLUDING BUT NOT LIMITED TO "AS-BUILT" DRAWING LAYOUTS OF EQUIPMENT & PIPING. SPRINKLER PIPING SIZES INDICATED ARE BASED ON PIPING SCHEDULE METHOD FOR BASIS OF PRICING PURPOSESONLY. CONTRACTOR STILL RESPONSIBLE FOR HYDRAULIC CALCULATIONS. COORDINATE SPRINKLER HEAD LOCATION WITH OWNER, TENANT FIT-UP DRAWINGS & NEW & EXISTING CEILING GRIDS. GENERAL FIRE PROTECTION NOTES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. FS TS P GENERAL LAYOUT REQUIREMENTS: SEISMIC REQUIREMENTS LIGHT HAZARD OCCUPANCY FS FLOW SWITCH ALARM TS TAMPER SWITCH ALARM CV CHECK VALVE FIRE PROTECTION SERVICEFP D DRAIN SPR SPRINKLER PIPING ABBREVATION DESCRIPTION GPH GALLONS PER HOUR GPM GALLONS PER MINUTE ELEVATIONELEV DN DOWN FIRE DEPARTMENT CONNECTIONFDC U.O.N.UNLESS OTHERWISE NOTED HOSE RACK SP STANDPIPE H.R. Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/4" = 1'-0" FP2.1 FIRE PROTECTION LEGENDS, NOTES AND ABBREVIATIONS Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2017 16-063 No.Description Date 1 NOT TOSCALE HANGER DETAIL 2 NOT TOSCALE WALL/FLOOR PENETRATION DETAIL NOT TOSCALE TRENCHING DETAIL6 4 NOT TOSCALE TEST CONNECTION DETAIL NOT TOSCALE FOUNDATION WALL PENETRATION DETAIL3 NOT TOSCALE SIDEWALL SPRINKLER DETAIL9 NOT TOSCALE CONCEALED PENDENT SPRINKLER DETAIL8 5 NOT TOSCALE SEISMIC PIPE HANGING DETAILS NOT TOSCALE FIRE PROTECTION SERVICE ENTRY DETAIL7 NOT TOSCALE UPRIGHT SPRINKLER DETAIL10 11 NOT TOSCALE FLOOR MAIN CONTROL DETAIL 4" 1. PIPE SLEEVES FIRE RATED MASONRY OR FIRE RATED STUD PARTITION. SEE NOTES. PACK VOID SPACE WITH FIRESTOPPING MATERIAL (3MCAULKCP25 OR EQUIV.) STEEL PIPE SLEEVE. SEE NOTES ESCUTCHEONS. SEE NOTES PIPE SLEEVES THROUGH FIRE-RATED MASONRY PARTITIONSSHALL BE SCHEDULE 80 BLACK STEEL PIPE. SLEEVE SHALL BE EQUAL IN LENGTH TO DEPTH OF PARTITION OR WALL. PIPE SLEEVES THROUGH FIRE-RATED STUD PARTITIONS SHALL BE #18 GAGE GALVANIZED STEEL WITH MAXIMUM OF 1" CLEARANCE BETWEEN SLEEVE AND PIPE. SLEEVE SHALLBEEQUAL IN LENGTH TO DEPTH OF PARTITION. A. NOTES: REQUIREDCLEARANCE.SEE NOTES. B. ESCUTCHEONS IN FINISHED SPACES SHALL BE ANODIZEDALUMINUM OR CHROME PLATED BRASS. ESCUTCHEONS IN UNFINISHED SPACES SHALL BE PLAINBRASS, ALUMINUM, GALVANIZED STEEL OR CAST IRON. ESCUTCHEONS SHALL BE HELD IN PLACE BY INTERNAL SPRING OR SET SCREW. C. B. 2. ESCUTCHEONS A. HANGER ROD SIZE AS REQUIRED EXACT SIZE AND TYPEPIPE, SEE PLANS FOR (NOT SHOWN)PROVIDE ADJUSTING NUT AS REQUIREDNEW BAND OR CLEVIS HANGER NOTE: TIE DRAIN LINESTOGETHER WITH CHECK VALVESAS REQUIRED AND ROUTE TODISCHARGE AT FLOOR DRAIN DRAIN TO FLOOR DRAIN ACCESSIBLE LOCATION TEST VALVE IN READILY CONCRETE SPLASH BLOCK GRADE 45° ELL EXTERIOR WALL FIRST FLOOR SECOND FLOOR FINISHED FLOOR PIPE STAND AS REQUIRED AIR GAP FITTING PIPE STAND AS REQUIRED TS TS FS TS FLOW SWITCH ANCHOR COLLAR / 2"WATER STOP/CONTINUOUSLYWELDED ON BOTH SIDES STEEL WALL SLEEVE WALL FOUNDATION WALL PENETRATION (TYPICAL) BASEMENT 4X3 REDUCER CEILING 1" ELBOW 1" ARM OVER AS REQUIRED 1" DROP NIPPLE AS REQUIRED 1" X 1/2" REDUCER ADJUSTABLE HALF HINGEROD STIFFENER ALL THREADED ROD CLEVIS HANGER PIPE SLEEVE ADJUSTABLE HINGE (9'-4" (2.8M) MAX. LENGTH) TRANSVERSE BRACECHANNEL 1 (Min.) 1 MIN2 MAX CLEVIS HANGER TRANSVERSE BRACING TRANSVERSE BRACEADJUSTABLE HINGE (9'-4" (2.8M) MAX. LENGTH)TRANSVERSE BRACECHANNEL CHANNEL-SIZE AS REQUIRED (9'-4" (2.8M) MAX. LENGTH)LONGITUDINAL BRACE CHANNEL (101mm) STEEL HANGERAPPROVED SPLIT PIPE STRAPS (9'-4" (2.8M) MAX. LENGTH)TRANSVERSE BRACE ADJUSTABLE HINGE ROD STIFFENER (9'-4" (2.8M) MAX. LENGTH)LONGITUDINAL BRACES ALL THREADED ROD SUPPORTING STRUCTURE SHOWN FOR EXAMPLEEXPANSION ANCHOR 1 MIN 2 MAX1 (Min.) SUPPORTING STRUCTURE 1 MIN 2 MAX 1 FS TS TO STANDPIPE SYSTEM #B SMOOTH BORE CORROSIONRESISTANT (GALVANIZED PIPING)OUTLET GIVING FLOW EQUIVALENT TO ONE SPRINKLER HEAD FROM END OFREMOTE BRANCH LINE APPROVED TYPE WETPIPE ALARM CHECKVALVE WITH TRIM 4" OUT TO FIRE DEPARTMENT CONNECTION BRANCH LINE OR MAIN NEW CONCEALEDSPRINKLER ROUTE HUB DRAIN TO FLOOR DRAIN O.S.&Y. GATE VALVE WITHMONITOR SWITCH APPROVED TYPEBACKFLOW PREVENTER CHECK VALVE WITH AUTO BALL DRIP FIRE SERVICE WITH TIE RODS UPRIGHT SPRINKLER HEAD SPRINKLER MAIN OUTLET TEE 1" CLOSE NIPPLE TO COMBINATIONSTANDPIPE/WET SYSTEM#A 1 1/4" INDICATING TYPE FLOORMAIN CONTROL VALVE WITHTAMPER SWITCH 6" COMBSPR./STANDPIPERISER 2" DRAIN RISER TO SPRINKLERSYSTEM "TESTMASTER" ALARM TEST MODULE PRESSURE GAUGE WATERFLOW SWITCH SPRINKLER MAIN GREEN - SEWER ORANGE - COMMUNICATIONSYELLOW - GAS, OILRED - ELECTRICAL BLUE - WATER WARNING TAPE (COLOR) COLOR OF TAPE BELOW GRADE SEE NOTES FOR NOTES: BEDDING (TYPICAL) COMPACTED SAND PLASTIC WARNING TAPE 12" GRAVEL BACKFILL PIPE, SEE PLAN FOR SIZE EXISTING GRADE, SEEPLANS FOR TYPE, REFER TO NOTES FOR DETAILS 6" 6" 54" MINIMUM 12"± 18" MIN ALL DIMENSIONS ARE MINIMAL ACCEPTABLE QUANTITIES. 1" DEEP SAWCUTOF EXISTING PAVEMENT OR CONCRETE TRENCH EXCAVATION SHALL CONSIST OF THE REMOVALOF ALL MATERIALS, EXCAVATION, TRENCH WALLSUPPORTS, DEWATERING, TEMPORARY STREAM ORGROUNDWATER DIVERSION: SATISFACTORY DISPOSAL OFALL SURPLUS OR UNSUITABLE MATERIAL: BACKFILL ANDCOMPACTION NECESSARY FOR THE CONSTRUCTION OFTHE WORK AT THE LOCATIONS AND TO THE DIMENSIONSAS SHOWN ON THE CONTRACT DRAWINGS OR ASDIRECTED BY THE ENGINEER. WHEN EXISTING PAVEMENT HAS BEEN REMOVED,REPLACE WITH SAME TYPE AND THICKNESS OFPAVEMENT AND SUBBASE. IF EXCAVATION IS WITHINGRASS AREA, DISTURBED AREAS SHALL BE REPAIREDWITH SEED. IF EXISTING CURB IS DAMAGED ORREMOVED, REPLACE WITH SAME TYPE OF CURB TODIMENSIONS OF EXISTING CURB. IF CONCRETE WALKSARE DISTURBED REPLACE WITH CONCRETE TO MATCHEXISTING THICKNESS. PRESSURE PLATE BOLT ELASTOMERIC SEAL ELEMENT 1" CLOSE NIPPLE (TYPICAL) SPRINKLER BRANCH 1" X 1/2" REDUCER (TYPICAL) SIDEWALL SPRINKLER (TYPICAL) WALL SOFFIT, FOR ADDITIONAL DETAIL REFER TO ARCHITECTURAL PLANS LONGITUDINAL BRACING OR SUPPORTPIPE HANGER ROD STIFFENER MAY BE REQUIRED 40 FEET ON CENTER Scale Date Drawn By Checked By Project Number UNCASVILLE, CT 1 90% CONST DOCS 11/1/16 2 90% CONST DOCS 10/31/17 3 95% CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/4" = 1'-0" FP3.1 FIRE PROTECTION DETAILS Dakota Partners, Inc. OXOBOXO LOFTS DA RMS 11/01/2017 16-063 No.Description Date 33BUILDING D BUILDING B BUILDING C BUILDING G BUILDING A UNIT A-1(2 BEDROOM)UNIT A-2(1 BEDROOM) UNIT B-3(1 BEDROOM) TYPE 'A' UNIT B-4(2 BEDROOM) UNIT B-5(1 BEDROOM) UNIT B-6 (1 BEDROOM) UNIT B-7(STUDIO) UNIT A-2(2 BEDROOM) B BB C C B B B C TPB3 - 3 TPB3 - 10 TPB3 TPB4 TPB5 E BB B B B C C TPB4 - 10 TPB4 - 3 B B B C TPB5 - 10 C C C E B B B TPB6 - 10TPB6 - 3 C E B B B TPB7 C TPB7 - 10 TPB7 - 3 C E TPB5 - 3 TPB6 A A A A AAA C C C C C C C C C E E E B B B B B B B B BB B B B B B B TPA1 TPA2 TPA2 TPA1 - 3 TPA1 - 10 TPA2 - 3 TPA2 - 10 TPA2 - 3 TPA2 - 10 XE XE XE XE XE XE XE XE EM EM EM HPB1 - 26 HPB1 - 26 A A TYP B1 AND A1 CORRIDOR LTG EM XF A XF XF XF Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-EL1.1 ELECTRICAL LIGHTING PLAN BLDGS A-B-C LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date UNIT B-8 (1 BEDROOM)TYPE A UNIT B-9(2 BEDROOM) UNIT B-10(1 BEDROOM) UNIT B-11(1 BEDROOM) UNIT B-12(1 BEDROOM) BUILDING B BUILDING C BUILDING A BUILDING G BUILDING D C C C C C C CBE E E E TPB11 TPB8 TPB9 TPB10 TPB12 A A B B B B B B B B B BB B A B B B B BB C C B C A A B B C C C C TPB12 - 3TPB12 - 10 TPB11 - 10TPB11 - 3 TPB10 - 3 TPB10 - 10 TPB9 - 10TPB9 - 3 C TPB8 - 3 TPB8 - 10 XE XEC EM EM HPB1 - 27 Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-EL1.2 ELECTRICAL LIGHTING PLAN BLDGS A-B-C LEVEL 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date BUILDING G BUILDING D BUILDING B BUILDING C BUILDING A UNIT A-4(1 BEDROOM)H.C. UNIT A-5(1 BEDROOM)UNIT A-6(2 BEDROOM) H.C. UNIT B-13(1 BEDROOM)TYPE A UNIT B-14(2 BEDROOM) UNIT B-15(1 BEDROOM) UNIT B-16(1 BEDROOM) UNIT B-17(1 BEDROOM) C BE B B B C TPB17 - 10 TPB17 C C C E B B B TPB16 - 10TPB16 - 3 TPB16 C B B B C TPB15 - 10 C E TPB15 - 3 TPB14 BB B B C C TPB14 - 3 E B TPB14 - 10 B BB C C B C B B C TPB13 - 3 TPB13 - 10 TPB13 A A AAAAA A C C C C C C E E E B B B B B B B BB B B B B TPA4 TPA6 TPA5C TPA4 - 10 TPA4 - 3 TPA5 - 10 TPA5 - 3 TPA6 - 10 TPA6 - 3 XEXE EM XEC XE EM EM A A HPB1 - 28 HPB1 - 28 CORRIROR LIGHTINGON THIS LEVEL A&B TO HPB1CIRCUIT 28 B C Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-EL1.3 ELECTRICAL LIGHTING PLAN BLDGS A-B-C LEVEL 3 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date BUILDING BUILDING BUILDING BUILDING BUILDING BUILDING UNIT B-18(1 BEDROOM) UNIT B-19(2 BEDROOM) UNIT B-20 (1 BEDROOM) UNIT B-21(1 BEDROOM) UNIT B-22(1 BEDROOM) ATTIC SPACE C BE B B B C TPB22 - 3TPB22 - 10 TPB22 TPB21CC C E B TPB21 - 10TPB21 - 3 B B B TPB20 - 10 C E TPB20 - 3 E TPB19 BB B C C TPB19 - 10 TPB19 - 3 B BB C C B C B B C TPB18 - 3 TPB18 - 10 TPB18 TPB20 CB A A A A A XEC XE EM EM HPB1 - 28 Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-EL1.4 ELECTRICAL LIGHTING PLAN BLDGS A-B-C LEVEL 4 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date UNIT B-1(2 BEDROOM) TYPE A UNIT B-2(2 BEDROOM) UNIT C-3(2 BEDROOM)TYPE A UNIT C-4(2 BEDROOM)TYPE A ELEVATOR BUILDING B BUILDING CBUILDING A BUILDING G BUILDING D A A A A A C C CC C C C C C B B B B B B B B B B B B B B B B B B B B B B B B C TPC4 TPC4 - 10 TPC4 - 3 TPC3 C C TPC3 - 10 TPC3 - 3 TPC4 - 10 TPB1 TPB2 TPB2 - 10 TPB2 - 3 C C C C C TPB1 - 3 TPB1 - 10 XE XE XE XE XEC HPB1 - 25 HPB1 - 25 TYP OF CORRIDOR LIGHTING ON BB Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-EL1.B ELECTRICAL LIGHTING PLAN BUILDINGS B-C LEVEL B Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date UP UP UNIT C-1(2 BEDROOM) UNIT C-2 (2 BEDROOM) STAIR 2 ELECTRICALMETER ROOM MAINTENANCE ROOM BOILER ROOMSPRINKLER ROOM BUILDING B BUILDING C BUILDING A (ABOVE) BUILDING D BUILDING G B TPC1 TPC2 E B B B B E B B B B B TPC4 C B TPC2 - 10 TPC2 - 3 TPC1 - 3 A AAA A A A C C C C C C C C C HPB1 - 24 HPB1 - 24 XE XE XE XE XEXE TPC1 - 10 Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-EL1.SB ELECTRICAL LIGHTING PLAN BUILDINGS B-C LEVEL SB Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date GFIGFIGFI GFI FF GFI GFIGFIGFIFF F J GFIJGFI GFIGFIGFIJGFIS FF S S J S S GFIGFI GFIGFI J GFI J S S GFI GFIGFIGFIGFI JGFI GFIGFI GFIGFIJ GFIGFIGFI GFI GFIJ GFIGFIJ J FFFF GFI J S S S S TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV S S TV TV BUILDING D BUILDING B LEVEL 1 BUILDING C BUILDING G BUILDING A LEVEL 1 UNIT A-1(2 BEDROOM) UNIT A-2(1 BEDROOM) UNIT B-3(1 BEDROOM)TYPE 'A' UNIT B-4 (2 BEDROOM) UNIT B-5(1 BEDROOM) UNIT B-6(1 BEDROOM) UNIT B-7(STUDIO) UNIT A-2(2 BEDROOM) TPB7 TPB7 - 3 TPB4 - 1 TPB4 - 2 TPB4 - 3 TPB4 - 14 TPB4 - 4 TPB4 - 9 TPB4 - 7 11 1 TPA2 - 1 2 2 2 TPA2 - 2 TPA2 - 3 4 TPA2 - 4 5 5 4 TPA2 9 TPA2 - 9 TPA2 - 5 TPA2 - 6,8 TPA2 - 7 TPA2 - 11,13 KEF 2 HP1 TPA2 - 12 HPB1 - 17 HPB1 - 17 HP1 TPA1 - 1 1 1 1 1 TPA1 - 22 2 2 2 TPA1 - 3 4 TPA1 - 4 5 5 TPA1 - 5 TPA1 - 6,8 TPA1 - 7 TPA1 - 9 TPA1 - 11,13 HP1 TPA2 2 2 5 1 1 TPA2 - 1 TPA2 - 2 TPA2 - 3 4 TPA2 - 4 5 TPA2 - 5 TPA2 - 6,8TPA2 - 7 TPA2 - 9 TPA2 - 11,13 14 1414 TPA2 - 14 22 1 1 11 2 TPB7 - 1 TPB7 - 4 4 TPB7 - 5 TPB7 - 6,8 TPB7 - 7 TPB7 - 9 HP6 TPB7 - 11,13 TPB6 1 1 1 TPB6 - 1 22 2 2 TPB6 - 2 TPB6 - 3 HP1 4 4 4 55 TPB6 - 6,8 TPB6 - 7TPB6 - 9 TPB6 - 11,13 55 TPB4 - 5 4 4 11 1 2 2 2 14 14 HP6 TPB5 1 1 1 2 2 2 HP6 TPB5 - 2 TPB5 - 3 4 4 55 TPB5 - 6,8 TPB5 - 7 TPB5 - 9 TPB5 - 11,13 TPB5 - 5 14 TPB4 - 6,8 TPB4 - 11,13 TPB4 TPB3 1 11 1 TPB3 - 1 2 2 22 TPB3 - 2 4 TPB3 - 3 55 5 TPB3 - 5 TPB3 - 6,8 TPB3 - 7 4 TPB3 - 9 1 TPB3 - 4 HP2 TPB3 - 11,13 TPA2 - 12 TPA2 - 15 TPA1 TPA1 - 12 14 14 14 14 TPA1 - 14 TPA1 - 15 EF KEF 1 TPB5 - 1 TPB5 - 4 S/CO S/CO S/CO S/CO S/CO 1A * 1A * 1A * 1A * FAAP HPB-19 EF-1 1A * 1A * HPB1 - 17 1A * S/CO S/CO S/CO 1A * INDICATED CIRCUIT # INASSOC. APARTMENTTENANT. PANEL (TP) TYP 2 Scale Date Drawn By Checked By Project Number UNCASVILLE, CONCEPT 90% CONSTRUCTION DOCUMENTS 1/8" = 1'-0" ABC-EP1.1 ELECTRICAL POWER PLAN BLDGS A-B-C - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date GFI J GFIJ FF S GFI GFI GFIGFIJ GFIGFIGFIGFIGFI J GFIGFIGFI GFI GFI GFIJ S S S S S TV TV TV TV TV TV TV TV TV TV TV UNIT B-8(1 BEDROOM)TYPE A UNIT B-9(2 BEDROOM) UNIT B-10(1 BEDROOM) UNIT B-11(1 BEDROOM) UNIT B-12(1 BEDROOM) BUILDING B LEVEL 2 BUILDING BUILDING A BUILDING BUILDING TPB9 TPB9 - 1 1 1 1 TPB9 - 2 2 2 2 TPB9 - 3 54 4 5 5 TPB9 - 5TPB9 - 6,8 TPB9 - 7 TPB9 - 9 TPB9 - 11,13 HP6 14 14 14 TPB9 - 14 TPB10 1 1 1TPB10 - 1 2 4 TPB10 - 4 5 5 TPB10 - 6,8 TPB10 - 7 2 TPB10 - 2 TPB10 - 4 TPB10 - 11,13 HPB1 - 18 18 2 1 2 2 2 TPB8 - 2 TPB8 - 3 44 5 5 TPB8 - 6,8 TPB8 - 7 TPB8 TPB8 - 4 5 5 2 1 11 1 TPB8 - 9 TPB10 - 5 TPB10 - 9 TPB11 1 1 1 TPB11 - 1 22 2 TPB11 - 2 TPB11 - 3 4 4TPB11 - 4 TPB10 - 3 TPB11 - 5 5 TPB11 - 6,8 TPB11 - 7 TPB11 - 9 TPB11 - 11,13 1 1 1 TPB12 - 1 2 2 2 2 TPB12 - 2 TPB12 - 3 4 TPB12 - 4 5 TPB12 - 5 TPB12 - 6,8 TPB12 - 7 4 TPB12 TPB12 - 95 TPB12 - 11,13 TPB8 - 11,13 1A * 1 1 1 1 1 S/CO S/CO S/CO S/CO S/CO 1A * 1A * HP 1A * HP HP HP 1A * 1A * Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-EP1.2 ELECTRICAL POWER PLAN BLDGS A-B-C - LEVEL 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date GFIGFIGFIJ GFI GFIJ FFGFIGFI GFI GFI GFIGFIS S SJ F GFI GFI GFI GFIGFIGFI J GFIGFIGFIGFIJ GFI GFIGFIGFIS S S S S S S J S GFIGFIGFIGFIGFI J S S SS S GFIGFIGFI GFI GFI GFIS S J GFI GFIGFIGFIS S J TV TV TV TV TV TV TVTV TV TV TV TV TV TV TV TV TV TV BUILDING G BUILDING D BUILDING B LEVEL 3 BUILDING C BUILDING A LEVEL 2 UNIT A-4(1 BEDROOM)H.C. UNIT A-5(1 BEDROOM) UNIT A-6(2 BEDROOM)H.C. UNIT B-13 (1 BEDROOM)TYPE A UNIT B-14(2 BEDROOM) UNIT B-15(1 BEDROOM) UNIT B-16 (1 BEDROOM) UNIT B-17(1 BEDROOM) HP2 TPB14 1 1 1 TPB14 - 1 2 2 2 2 TPB14 - 3 TPB14 - 2 4 TPB14 - 4 5 5 TPB14 - 5 TPB14 - 6,8 TPB14 - 7 TPB14 - 9 TPB14 - 11,13 TPB14 - 14 14 14 14 TPB15 1 11 1 TPB15 - 1 2 2 TPB15 - 3 4 TPB15 - 4 5 5 TPB15 - 5 TPB15 - 6,8 TPB15 - 7 TPB15 - 2 TPB15 - 9 TPB15 - 11,13 HP1 TPA6 TPA6 - 1 1 1 12 2 2 TPA6 - 2 TPA6 - 3 TPA6 - 4 4 5 5 TPA6 - 6,8 TPA6 - 7 TPA6 - 11,13 TPA6 - 9 14 14 14 14 KEF TPA6 - 12 HPB1 - 19 19 HP1 TPA4 TPA4 - 1 1 1 1 2 2 2TPA4 - 2 TPA4 - 3 44 TPA4 - 4 TPA4 - 5 TPA4 - 6,8 TPA4 - 7 TPA4 - 9 TPA4 - 11,13 HP1 TPA5 TPA5 - 1 11 1 TPA5 - 2 2 2 2 TPA5 - 3 4 4 TPA5 - 4 5 TPA5 - 5 TPA5 - 6,8 TPA5 - 7 TPA5 - 9 TPA5 - 11,13 TPB17 <unnamed> 1 1 1 TPB17 - 2 2 2 22 TPB17 - 3 4 TPB17 - 4 TPB17 - 5 4 5 TPB17 - 6,8 TPB17 - 7 HP2 2 TPB17 - 9 TPB17 - 11,13 HP2 TPB16 1 1 1 1 2 2 2 TPB16 - 2 TPB16 - 3 4 4 4 TPB16 - 4 5 TPB16 - 6,8TPB16 - 5 TPB16 - 7 TPB16 - 9 TPB16 - 11,13 TPB13 TPB13 - 1 1 11 1 2 2 2 2 2 TPB13 - 2 TPB13 - 3 TPB13 - 4 44 55TPB13 - 5 5 TPB13 - 6,8 TPB13 - 7 TPB13 - 9 HP2 TPB13 - 11,13 HP2 1 19 1 Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-EP1.3 ELECTRICALPOWER PLAN BLDGS A-B-C - LEVEL 3 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date GFI J GFIGFIGFI GFI GFI GFIS S J GFI GFIGFIGFIS S J GFIS GFIGFIGFIGFIGFI J S S S S S J GFI F F TV TV TV TV TV TV TV TV TV TV TV BUILDING BUILDING BUILDING B LEVEL 4 BUILDING BUILDING A BUILDING UNIT B-18(1 BEDROOM) UNIT B-19 (2 BEDROOM) UNIT B-20(1 BEDROOM) UNIT B-21(1 BEDROOM) UNIT B-22(1 BEDROOM) ATTIC SPACE KEF TPB19 1 1 TPB19 - 11 2 TPB19 - 2 2 2 TPB19 - 3 4 TPB19 - 4 55 TPB19 - 6,8 TPB19 - 7 TPB19 - 5 TPB19 - 9 TPB19 - 12 TPB19 - 11,13 14 14 14 TPB19 - 14 TPB18 - 1 1 11 1 2 2 2 2 2 TPB18 - 3 TPB18 - 2 55 444 TPB18 - 6,8 TPB18 - 9 1 1 1 25 TPB22 - 3 4 TPB22 - 44 5 TPB22 - 6,8 HP6 2 TPB22 - 9 1 11 TPB20 - 1 2 TPB20 - 6,8 TPB20 - 5 TPB21 - 2 TPB21 - 3 2 TPB21 - 4 TPB21 - 6,8 TPB21 - 7 TPB18 - 4 TPB18 - 5 TPB18 - 7 TPB18 TPB18 - 11,13 TPB20 1 2 2 TPB20 - 2 TPB20 - 3 4 4 5 5 TPB20 - 7 TPB20 - 9 TPB20 - 11,13 TPB21 1 11TPB21 - 1 2 2 4 4 5 5 TPB21 - 9 10 TPB21 - 11,13 TPB22 TPB22 - 1 TPB22 - 2 2 2 5 TPB22 - 7 10 TPB22 - 11,13 HPB1 - 20 20 HPB1 - 29 ERV2 IN BATTIC HP IN B ATTIC HPB1 - 30,32 HP6 HP6 HP6 HP6 1 1 1 1 Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-EP1.4 ELECTRICAL POWER PLAN BLDGS A-B-C - LEVEL 4 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date FF FF J GFIGFIGFIGFIGFIGFI GFIGFIGFIGFIGFIGFIGFIGFIGFIGFI GFIGFI GFIJ J J GFI GFIJ J GFIGFIS S S SS S S TV TV TV TV TV TV S S S S S S TV TV TV TV TV TV TV TV TV TV TV MMMMUNIT B-1(2 BEDROOM)TYPE A UNIT B-2(2 BEDROOM) UNIT C-3(2 BEDROOM)TYPE A UNIT C-4(2 BEDROOM)TYPE A ELEVATOR 1 BUILDING B LEVEL B BUILDING C LEVEL 2BUILDING A CRAWL SPACE BUILDING G BUILDING D HPB1 - 5 HPB1 - 6 HPB1 - 7 HPB1 - 8 HPB1 - 9,11 HPB1 - 13,15HPB1 - 10,12 HPB1 - 14,16 TPC4 TPC4 - 1 1 11 TPC4 - 22 2 2 2 TPC4 - 3 44 TPC4 - 4 5 5 TPC4 - 6,8 TPC4 - 7 TPC4 - 9 TPC4 - 11,13 TPC4 - 14 14 14 EF-1 TPB2 TPB1 TPC3 HP-2 2 2 TPB2 - 2 2 2 TPB2 - 1 1 1 114 14 14 TPB2 - 14 TPB2 - 4 TPB2 - 9 TPB2 - 5TPB2 - 7 TPB2 - 6,8 TPB2 - 11,13 554 4 TPB2 - 312 TPB1 - 2 TPB1 - 1 TPB1 - 5 TPB1 - 7 TPB1 - 4 TPB1 - 6,8 TPB1 - 3 2 2 2 2 2 5 5 5 4 4 1 1 114 14 14 TPB1 - 14 TPB1 - 11,13 12 TPC3 - 1 TPC3 - 4 TPC3 - 14 TPC3 - 2 TPC3 - 7 TPC3 - 3 TPC3 - 6,8 TPC3 - 9 TPC3 - 5 2 2 2 2 14 14 14 14 1 1 1 5 TPC3 - 11,134 4 4 4 HPB1 - 4 HPB - 12,14,16 ERV-1 HP-5 HPB1 - 22 HPB1 - 21,23 TPC4 - 12 TPC4 - 15 TPC3 - 12 EF-1 HP EF-1 HP EF 1A * 1A *1A * 1A *1A * 1A * TPB1 - 9 S/CO S/COS/CO S/CO HPB1 - 33 DENOTES CIRCUIT # FOR RECEPTACLEOUTLETS IN ASSOCIATED APARTMENTSTENANT PANEL Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-EP1.B ELECTRICAL POWER PLAN BLDGS B-C - LEVEL B Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date UP UP GFIGFIGFI FF GFIF F FFF F FFFFFFFF FFGFIGFIGFIGFI J GFI GFI GFI GFI GFI GFIJ S S S S J TV TV TV TV TV UNIT C-1(2 BEDROOM) UNIT C-2(2 BEDROOM) STAIR 2 ELECTRICALMETER ROOM MAINTENANCE ROOM BOILER ROOM SPRINKLER ROOM BUILDING B LEVEL SB BUILDING C LEVEL 1 BUILDING A (ABOVE) BUILDING D BUILDING G TPC1 TPC1 - 1 TPC2 TPC2 - 1 TPC2 - 14 TPC2 - 3 TPC1 - 2 TPC1 - 3 TPC1 - 14 HPB1 - 1 HPB1 - 2 HPB1 - 3 AUTOMATIC TRANSFER SWITCH(ATS1)GENERATOR DS(GDS1) MAIN DEVICE W/MCB SQUARE D EZM 31000 CBU 1000 AMP,208V/120V/3D/4W, FED FROMUTILITY TRANSFORMER SEE SHEET E2.2 HPB1 HPB TPC1 - 9 TPC1 - 5 TPC1 - 11,13 TPC1 - 12 TPC1 - 4 TPC1 - 7 TPC2 - 5 TPC2 - 9 TPC2 - 4 TPC2 - 6,8 TPC2 - 7 TPC2 - 12 TPC2 - 11,13 TPC2 - 15 HP EF EF-1 TPC1 - 15 TPC1 - 6,8 HPB1 - 31 HPB - 13,15,17 BRANCH DEVICE, 6 METER SOCKET. RINGLESS WITH HORN BYPASS & 100 AMP CB, MODEL EZMH316(TYP OF 6) PLUS A 3 METER SOCKET COLUMN H1 HPB - 2 SECURITY HEAD END RACK - SEE SECURITYDWGS S/CO S/CO P1 P2 B1 1B TS FS Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" ABC-EP1.SB ELECTRICAL POWER PLAN BLDG B-C - LEVEL SB Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date UP DNDN DN DNDN DN BUILDING D UNIT D-1(2 BEDROOM) UNIT D-2(1 BEDROOM) RECEPTION OFFICE KITCHEN OFFICE WAITINGAREA HC LAV. JAN. MECH'L CONFROOM FITNESSROOM BUILDING E B B B B B B B B B C C C C E E C D TPD1 - 10 TPD1 - 3 TPD2 - 3 TPD2 - 10 HPE - 9 C C E HPE HPE - 11 HPE - 10 XE XE XE XE XE EM C C C C HPE - 9 HPE - 9 XE BUILDING D BUILDING E UNIT D-3(2 BEDROOM) UNIT D-4(1 BEDROOM) UNIT E-2(2 BEDROOM)UNIT E-3(2 BEDROOM) TPD4 C B B CB B C C B B TPD3 TPD3 - 3 TPD3 - 10 C TPD4 - 3 C C B TPD4 - 10 D D B B B B B B B B B B TPE3 C C CC E TPE3 - 3 C CC D TPE2 D D TPE2 - 10TPE2 - 3 TPE3 - 10 HPE - 9HPE - 9 EM EM EM Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" DE-EL1.1 ELECTRICAL LIGHTING PLAN BLDGS D-E - LEVELS 1 AND 2 Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date UP GFIGFIGFIS S S SJS J F F FF FF FF TV TV TV TV TV DNDN DN DNDN DN GFIJGFIJ FFFF GFI J S S S S S S S SS FF GFI J GFI TV TV TV TV TV TV TV TV TV BUILDING D UNIT D-1(2 BEDROOM) UNIT D-2(1 BEDROOM) RECEPTION OFFICE KITCHEN OFFICE WAITINGAREA HC LAV. JAN. MECH'L CONF ROOM FITNESSROOM BUILDING E HPE HPE - 1 1 1 1 1 2 2 2 2 2 HPE - 2 3 HPE - 3 HPE - 4 HPE - 5 5 7 HPE - 7 HPE - 8 HP1 TPD1 TPD2 TPD1 - 11 1 1 2 2 222 TPD1 - 3 4 9 TPD1 - 4 5 TPD1 - 5 TPD1 - 6,8 TPD1 - 7 4 TPD1 - 2 TPD1 - 11,13 14 14 14 TPD1 - 14 11 1 1 TPD2 - 1 2 2 2 TPD2 - 2 TPD2 - 3 TPD2 - 4445 TPD2 - 6,8 TPD2 - 7 TPD2 - 9 5 TPD2 - 5 10TPD2 - 11,13 HPE - 12,14 HPE - 13,15TPD1 - 12 TPD1 - 15 TPD2 - 15 TPD2 - 12 H2 HPE - 16 SECURITY HEADEND RACK HPE - 17 H3 SECURITY HEAD END RACK BUILDING D BUILDING E UNIT D-3 (2 BEDROOM) UNIT D-4(1 BEDROOM) UNIT E-2(2 BEDROOM)UNIT E-3(2 BEDROOM) TPE3 TPE3 - 1 TPE3 - 2 TPE3 - 3 TPE3 - 4 TPE3 - 5TPE3 - 6,8 TPE3 - 7 TPE3 - 9 2 2 2 5 5 5 14 14 14 TPE3 - 14 TPE3 - 11,13 HP1 TPE3 - 12 1 1 1 1 TPD4 - 11,13 TPD4 1 1 1 1 TPD4 - 2 2 2 2 TPD4 - 4 TPD4 - 5 TPD4 - 9 TPD4 - 7 4 5 TPD4 - 3 5TPD4 - 5 TPD4 - 6,8 TPD4 - 12 TPD3 1 1 1 TPD3 - 1 TPD3 - 2 2 2 2 2 TPD3 - 3 4 4 TPD3 - 4 TPD3 - 55 TPD3 - 6,8 TPD3 - 7 TPD3 - 9 TPD3 - 11,13 14 14 14 TPD3 - 14 TPE2 1 1 1 TPE2 - 1 2 2 2 2 TPE2 - 2 TPE2 - 3 44 TPE2 - 6,8 5 5TPE2 - 5 TPE2 - 7 TPE2 - 9 TPE2 - 4 4 TPE2 - 11,13 10 TPD4 - 15 TPD3 - 15TPD3 - 12 TPE2 - 12 TPE2 - 15 TPE3 - 15 Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" DE-EP1.1 ELECTRICAL POWER PLAN BLDGS D-E - LEVELS 1 AND 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date COMMUNITY ROOM (OPEN ABOVE) KITCHENETTE JANTOILET FITNESS ROOM (OPEN ABOVE) TOILET C C CC CC C C E E CC HPF - 31 TO LTG ABOVE TO LTG ABOVE BOILER ROOM FITNESS ROOMBELOW COMMUNITY BELOW TOILETSBELOW A A AA A A AA A A C C C C HPF - 31 HPF TO SWITCH BELOWTO SWITCH BELOW Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" F-EL1.1 ELECTRICAL LIGHTING PLANS BLDG F - LEVELS 1 AND 2 Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date GFIGFI GFI GFI GFI GFIGFIGFIFFF F FFFFCOMMUNITY ROOM(OPEN ABOVE) KITCHENETTE JAN TOILET FITNESS ROOM(OPEN ABOVE) TOILET HPF - 20 HPF - 22 HPF - 23 HPF - 24 HPF - 25 HPF - 21 HPF - 32,34,36 ELEVATOR 2 BOILER ROOM FITNESS ROOMBELOW COMMUNITY BELOW TOILETSBELOW 2' - 3" P6 P5 B1 B2 P1 P2 HPF - 1,3,5 HPF - 2,4,6 VFD VFD HPF - 7,9,11 HPF - 8,10,12 P3 P4 HPF - 14,16,18 HPF - 13,15,17 HPF - 19 HPF HP HPF - 27,29 H4 HPF - 33 SECURITY HEAD END RACK HPF - 26,28,30 CT-1 Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" F-EP1.1 ELECTRICAL POWER PLANS BLDG F - LEVELS 1 AND 2 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 3 333 33BUILDING K BUILDING H BUILDING G B B B B BB BB B C C E CC C B B B B E E E E E E C C C E B B EC B TPG9 TPG9 - 10 TPG9 - 3 TPG8 TPG7 TPG8 - 3 TPG8 - 10 TPG7 - 3 TPG6 - 10 TPG5 - 3 TPG6 TPG5 TPG2 TPG1 TPG3 TPG4 TPG6 - 3 TPG3 - 10 TPG4 - 10 TPG1 - 10TPG2 - 10 TPG3 - 3 XE EM EM UNIT G-5(2 BEDROOM) UNIT G-6(1 BEDROOM) UNIT G-7(1 BEDROOM) UNIT G-8(1 BEDROOM)UNIT G-9(2 BEDROOM) UNIT G-4(1 BEDROOM) UNIT G-3 (1 BEDROOM) UNIT G-2(1 BEDROOM) UNIT G-1(2 BEDROOM)LAUNDRYROOM UNIT G-9 (1 BEDROOM) TPG7 - 10 TPG5 - 10 TPG2 - 3 TPG1 - 3 TPG4 - 3 D B B B1 B BB B DB B B D C B B D B B B B B B1 D B D B B D B BDB B B D B A A A A A A A XEC A XEC A A A A A A B B B B B B TPK2 B B TPK4 BB B A A A HPH1 - 20 G G G G D TPH1D TPH1 - 10 E C C E D C E TPK4 - 10 HPH1 - 20 XF XF XF XF Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" GH-EL1.1 ELECTRICAL LIGHTING PLAN BUILDING 'G' AND 'H' Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date S S GFI F F FFGFIGFIGFIJ GFI J GFIGFIJ GFI GFI GFIGFIJ GFI GFIGFI GFI GFI GFIGFI GFIGFI J J GFIGFI JGFIGFI GFIJ J S S GFI GFIGFIGFI GFI GFIGFIGFIGFIGFIJ GFIFFFF FF GFI GFI GFI GFIGFI S S S S S S S S S S S FFMM TV TV TV TVTV TV TV TV TV MM TV TV M TV MTVTV TV TV MMMMMMTV TV TVMTV TV TV TV TV MM M M TV J M TV BUILDING K BUILDING H BUILDING G TPG6 2 2 14 2 1 TPG6 - 3 4 TPG6 - 4 5 5 TPG6 - 5 TPG6 - 6,8 TPG6 - 7 TPG6 - 11,13 TPG4 2 2 TPG4 - 3TPG4 - 5 TPG4 - 4 TPG4 - 6,8 TPG4 - 7 TPG4 - 9 TPG4 - 11,13 4 4 55 TPG1 2 2 2 TPG1 - 4 4 4 5 TPG1 - 7 TPG2 2 2 TPG2 - 2 TPG2 - 3 4 4 TPG2 - 4 5 TPG2 - 5 TPG2 - 6,8 TPG2 - 7 TPG2 - 11,13 HP HP HP HP TPG7 2TPG7 - 2 4 5 5 5 TPG7 - 6,8 TPG7 - 7TPG7 - 5 TPG7 - 9 TPG7 - 3 TPG7 - 11,13 TPG8 TPG8 - 3 4 TPG8 - 2 5 TPG8 - 6,8 TPG8 - 7 TPG8 - 9 TPG8 - 11,13 2 TPG4 - 2 TPG3 - 3 TPG3 - 44 5TPG3 - 7 TPG3 - 9 TPG3 - 11,13 TPG9 2 2 2 TPG9 - 3 4 TPG9 - 4 5 TPG9 - 6,8 TPG9 - 7 TPG9 - 9 TPG9 - 11,13 TPG5 TPG5 - 1 TPG5 - 3 1 1 2 2 2 4 4 TPG5 - 5 5TPG5 - 6,8 TPG5 - 9 5 TPG5 - 12 TPG5 - 4 TPG5 - 7 TPG5 - 11,13 TPG5 - 2 HP HP HP HP HP KEF KEF KEF KEF EF-1 EF-1 EF EF EF-1 EF EF KEF 12 12 12 TPG3 - 12 TPG9 - 12 TPG7 - 12 TPG8 - 12 TPG7 - 12 TPG2 - 12 TPG2 - 12 12HPH1 - 18 114 14 141 4UNIT G-5 (2 BEDROOM) UNIT G-6(1 BEDROOM) UNIT G-7(1 BEDROOM) UNIT G-8(1 BEDROOM) UNIT G-9(2 BEDROOM) UNIT G-4(1 BEDROOM)UNIT G-3(1 BEDROOM)UNIT G-2(1 BEDROOM) UNIT G-1(2 BEDROOM) LAUNDRYROOM REVISED UNIT G-9(1 BEDROOM)TPG5 - 12 TPG6 - 2 1 1TPG6 - 1 TPG3 1 1 1 TPG4 - 1 22 2 1 1 1 1 2 2 4 5 4 4 TPG9 - 1 1 1 1 TPG9 - 2 5 TPG9 - 5 5 TPG8 - 5 1 1 1 TPG7 - 1 2 2 4 4 TPG9 - 12 EF-1EF EF-1EF HP 2 1 1 1 TPG2 - 1 TPG1 - 11,13 1 1 1 TPG1 - 1 2 2 2 2 14 14 14 TPG1 - 14 TPG1 - 3 5 TPG1 - 6,8 TPG1 - 9 S/COS/COS/CO S/CO S/CO S/CO S/CO S/CO S/CO HPH1 - 18 HPH1 - 18 2 2 24 45 1 1 1 12 TPH1 - 1 TPH1 - 7 TPH1 - 4 TPH1 - 5 TPH1 - 6,8 TPH1 - 9 TPH1 - 2 TPH1 - 3 TPH1 - 13,15 14 14 14 TPH2 - 14 TPH2 - 2 14 14 TPK2 - 14 14 2 2 2 TPK2 - 2 2 2 4 4 TPK2 - 5 5 TPK2 - 6,8 5 TPK2 - 9 TPK4 - 3 1 1 1 TPK4 - 1 2 TPK4 - 4 TPK4 - 9 2 TPK2 - 11,13 TPK2 - 12 TPK2 TPK4 TPH1 TPH1 S/CO S/CO S/CO HPH1 - 1,3 HPH1 - 2,4 HPH1 - 5,7 HPH1 - 6 HPH1 - 8 HPH1 - 9 TPG4 - 12 EF-1 1 1A * 1A * TPG6 - 9 1A * 1 1A * 1 2 2 2 4 TPG3 - 6,8 2 TPG2 - 9 1A * 4 1 1A * 1A *1A * EF-1 EF-1 TPG9 - 12 EF-1 TPH1 - 12 EF-1 1A * 1A * 1A * 1A * TPG1 - 12 TPK2 - 11,13HP EF-1 TPK2 - 12 TPG2 - 12 HPH1 - 26,28 HPH1 - 32,34 HPH1 - 33 HPH1 - 27 HPH1 - 29 P-1 P-2 B-1 1A * BACK BOX AND FOR FUTURE FA ADDRESSABLEMODULE IF APARTMENT IS COVERTED FORHEARING IMPAIRED TENANTS Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" GH-EP1.1 ELECTRICAL POWER PLAN BLDG 'G' AND 'H' Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 33333333333UNIT H-2(2 BEDROOM) METERROOM BUILDING B C A A A A A A A B B BB B B TPJ3 TPJ3 - 10 A A BBB BBB BB BB B B A E C E C E A B DB B B B BB D D D B E ED B EE D D D C C C C C C C C C C C C B B B B B B B E B B E E B B B TPJ4 - 10 TPJ4 - 3 TPJ3 - 3 TPJ5 TPJ5 - 3 TPJ5 - 3 TPJ5 - 10 TPJ6 TPJ6 - 3 TPJ6 - 10 TPJ7 TPJ7 - 3 TPJ7 - 10 TPH2 TPH2 - 3 C TPH2 - 10 TPJ2 - 3 TPJ2 - 10 TPJ1 TPJ2 TPJ1 - 3 TPJ1 - 10 TPJ1 - 10 XE XE XE XE EM EM HPH1 - 20 HPH1 - 20 HPH1 - 20 A A A A A A HPH1 - 23 G G HPH1 - 20 E TPH2 - 3 XE XF HPH1 - 20 Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" J-EL1.1 ELECTRICAL LIGHTING PLAN BUILDING J LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date J S GFISS GFIJ J J F FF GFI JGFI GFIJ GFIS S S GFIJ J S S S S GFIJ GFIS S S S SS S S GFI TV TV TVTVTV TV TV TVTV MMTVTV TV TV MMMMMMMM TVMMTVTV TV TV TV TV TV TVTV MMM MMMUNIT H-2(2 BEDROOM) METERROOM HPH1 HPH1 - 9 HPH1 - 10 TPH2 TPH2 - 1 TPH2 - 2 TPH2 - 3 TPH2 - 4 TPH2 - 5 TPH2 - 6,8 TPH2 - 9 TPH2 - 7 TPH2 - 3,10 TPH2 - 3,10 TPH2 - 11,13 HP1 AUTOMATICTRANSFERSWITCH(ATS2) GENERATOR DS(GDS2) SECONDARYFEEDS FROM UTILITYTRANSFORMER 21B MAIN DEVICE W/MCB SQUARE DEZM 3800 CBU 800 AMP, 208V/120V/3D/4W TENANT METERS IN SQUARE DEZ METER -PAK3D IN-1D OUT EZM316125,800 AMP, 208V/120V HP1 TPJ7 TPJ7 - 1 TPJ7 - 2 TPJ7 - 11,13 TPJ7 - 3 TPJ7 - 5 TPJ7 - 6,8 TPJ7 - 4 TPJ3 TPJ3 - 1 1 1 1TPJ3 - 2 22 2 TPJ3 - 3 4 4 TPJ3 - 4 5 5 TPJ3 - 6,8TPJ3 - 9 TPJ3 - 7 TPJ3 - 11,13 HP1 14 14 14 14 TPJ3 - 14 TPJ7 - 7 TPJ4 1 1 1 TPJ4 - 3 TPJ4 - 11,13 HP1 TPJ4 - 1 2 2 2 2 4 4 4 TPJ4 - 5 TPJ4 - 6,8 TPJ4 - 7 TPJ4 - 4 TPJ4 - 2 75 TPJ5 TPJ5 - 1 1 1 1 2 2 2 2 2 2 4 4 TPJ5 - 3 TPJ5 - 2 TPJ5 - 4 5 5 5 9 TPJ5 - 7 TPJ5 - 9 14 14 14 TPJ5 - 15 TPJ6 11 1 TPJ6 - 1 2 2 2 2 2 4 TPJ6 - 3 4 4 5 5 TPJ6 - 6,8 TPJ6 - 7 14 14 14 TPJ6 - 14 TPJ6 - 15 2 14 1 11 TPH2 - 1 2 2 2 2 2 TPH2 - 3 TPH2 - 2 4 5 5 5 TPH2 - 6,8 TPH2 - 7 TPH2 - 4 TPH2 - 9 TPH2 - 11,13 TPH2 - 14 14 14 14 14 TPH2 - 5 TPJ1 1 1 1 1 TPJ1 - 1 TPJ1 - 2 2 2 2 2 TPJ1 - 3 4 TPJ1 - 4 55 5 TPJ1 - 6,8 TPJ1 - 7 TPJ1 - 5 TPJ1 - 9 10 TPJ1 - 11,13 TPJ1 - 12 14 14 14 TPJ1 - 14 1 1 1 1 1 TPJ2 - 1 2 2 2 2 TPJ2 - 2 TPJ2 TPJ2 - 3 4 TPJ2 - 5 5 5 TPJ2 - 4 TPJ2 - 6,8 TPJ2 - 7 TPJ2 - 9 TPJ2 - 11,13 TPJ1 - 12 2 TPJ5 - 14 14 14 HPH1 - 14 10 TPJ6 - 11,13 TPH1 - 2 2 TPH1 - 12 HPH1 - 17,19 SEWAGE EJECTOR PUMP HPH1 - 24 H5 SECURITY SYSTEMHEAD END RACK 1A * TPJ4 - 12 5 TPJ4 - 9 TPJ5 - 6,8 TPJ5 - 16,18 1A * S/CO 1A * HP1 EF-1 TPJ5 - 17 EF-1 TPJ5 - 5 TPJ5 - 19EF-1 TPJ6 - 12 EF-1 TPJ6 - 16 EF-1 HP-1 TPJ6 - 9 TPJ6 - 17 TPJ6 - 5 EF-1 EF-1 TPJ3 - 15EF-1 TPJ3 - 16 S/CO 5 5 5 4 2 2 2 2 TPJ7 - 9 S/CO S/CO 11 1 1A * 1A * HP-1 HP-1 EF-1 EF-1 EF-1 EF-1 TPJ7 - 12 1 1 1 1 EF-1 HP1 TPH2 - 15 EF-1 TPH2 TPH2 - 16 1515 15 15 DENOTES CIRCUIT IN ASSOCIATED APARTMENT TENANT PANEL TP S/CO S/CO EF-1 Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" J-EP1.1 ELECTRICAL POWER PLAN BLDG J - LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 3 33 3 BUILDING A A A A A A E C D B B B B B B C C C C E E C E E B D B B B B TPK4 - 10 TPK4 - 3TPK2 - 10,<unnamed> B1B B B D D EM XE XE TPK1 HPH1 - 21 HPH1 - 21 Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" K-EL1.1 ELECTRICAL LIGHTING PLAN BLDG K LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date S GFI FF J S S S S S SGFIGFIGFIGFIGFIGFIGFIGFI S MTV TV TV TV MM M TV TV TV TV TV S M TV TV TV TV TV TV MMMM BUILDING K TPK4 TPK4 - 1 TPK4 - 2 TPK4 - 9 TPK4 - 5 TPK4 - 6,8 TPK4 - 4 TPK4 - 3 TPK4 - 7 TPK1 1 1 1 1 TPK1 - 1 TPK1 - 2 2 2 2 2 TPK1 - 3 4 5 5 TPK1 - 6,8 TPK1 - 9 5 10 TPK1 - 11,13 TPK1 - 4 TPK2 1 1 1 1 TPK2 - 1 2 2 2 2 2 2 TPK2 - 2 TPK2 - 3 4 4 TPK2 - 4 5 5 TPK2 - 5 TPK2 - 6,8 TPK2 - 9 TPK2 - 11,1314 14 14 14 TPK3 1 1 1 1 TPK3 - 1 22 2 2 TPK3 - 3 4 TPK3 - 4 5 5 5 TPK3 - 6,8 TPK3 - 9 TPK3 - 11,13 10 1 1 1 TPH1 - 1 TPH1 - 13,15 1 11 2 2 2 2 4 4 TPK2 - 12 EF-1 EF-1 HP TPK2 - 11,13 HP EF-1 TPK3 - 12 EF-1TPK1 - 12 EF-1 EF-1 D-17 TPK2 - 12 1 EF-1 EF-1 HP HP HP S/CO S/CO S/CO S/CO Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" K-EP1.1 ELECTRICAL POWER PLAN BLDG K LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date 33333333 333 C C C B B B B B B B B B B B B B B B B B B BB B BBBB B B B B B BB B B B B B B B B B B B B B B B B B B B B B B B B B B B C E E TPM10 TPM10 - 10 TPM10 - 10 TPM10 - 10 TPM10 - 10 TPM10 - 3 TPM11 TPM11 - 10 TPM11 - 3 TPM11 - 10 TPM11 - 10 TPM11 - 10 TPM5 TPM5 - 3 TPM5 - 10 TPM5 - 10 TPM5 - 10 TPM5 - 10 TPM4 TPM3 E C E C D E C C A TPM4 - 10 TPM4 - 10 TPM4 - 10 TPM4 - 15 TPM4 - 10 TPM4 - 3 E D D TPM3 - 10 TPM3 - 10 TPM9 TPM9 - 10 TPM8 TPM7 - 10 TPM8 - 10 TPM8 - 3 TPM7 TPM7 - 3 TPM6 - 3TPM6 - 10 TPM1 - 3 TPM1 - 10 TPM2 TPM2 - 3 TPM2 - 10 XE XE XEC XEC EM EM A A A A A A A A A A A A A A A HPH1 - 22 HPH1 - 22 HPH1 - 22 UNIT M-11(2 BEDROOM) UNIT M-10(2 BEDROOM) UNIT M-9(2 BEDROOM) UNIT M-8(2 BEDROOM)UNIT M-7(2 BEDROOM) UNIT M-6(2 BEDROOM) UNIT M-1(1 BEDROOM) UNIT M-2(2 BEDROOM) UNIT M-3(2 BEDROOM) UNIT M-4(2 BEDROOM) UNIT M-5(2 BEDROOM) XF XF XF XF XE XF UNIT L-1(2-BEDROOM) C HPL HPL - 6 E F F F F G G G G MAINTENANCEOFFICE/ STORAGE Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" LM-EL1.1 ELECTRICAL LIGHTING PLAN BLDGS L AND M LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date S S S J GFIJFFGFI SS S S J GFIGFIJ GFIGFI GFI GFI GFIGFIGFIGFI GFIGFI GFIGFI GFI GFI GFI GFI J J J GFIGFI GFIGFIGFI GFIGFI GFI GFI GFIGFI GFIJ GFIGFIGFIGFI GFI GFI GFIGFI J J J GFIGFIGFIGFI GFI GFI GFIGFIGFIGFI GFIGFIGFI GFI S S F F S S S S S S S S S S S S TV TV TV MMTV TVTV MMMTV TV MMMTV TVTV MM TV TV TV TV TV TV TV TV MTV TV TV TV TV M MM MM MTV TV TV TV M MMM MTVTV MSGFI TPM9 TPM9 - 1 HP1 EF-1 TPM9 - 7 TPM9 - 5 TPM9 - 2 TPM9 - 14 TPM9 - 6,8 TPM9 - 9 TPM9 - 4 TPM9 - 11,13 TPM9 - 3 TPM9 - 12 TPM1 TPM1 - 2 TPM1 - 1 TPM1 - 4 TPM1 - 5 TPM1 - 6,8 TPM1 - 7 TPM1 - 9 TPM1 - 11,13 EF-1 HP1 HP1 TPM11 11 1 2 22 TPM11 - 2 TPM11 - 1 TPM11 - 3 4 4 4 55 TPM11 - 6,8 TPM11 - 4 TPM11 - 5 TPM11 - 7 TPM11 - 9 TPM11 - 11,13 TPM11 - 14 14 14 14 TPM10 EF-1 11 1 TPM10 - 1 2 22 2 TPM10 - 2 TPM10 - 3 4 4 5 55 TPM10 - 4 TPM10 - 6,8 TPM10 - 7 4 TPM10 - 9 HP1 TPM10 - 11,13 TPM10 - 12 14 14 14 TPM10 - 14 1 1 1 1 3 22 2 2 2 TPM594 5 5 5 4 TPM5 - 11,13 TPM5 - 12 14 14 14 14 14 TPM4 1 1 12 22 2 3 4 4 455 9 14 1414 TPM4 - 11,13 TPM4 - 6,8 TPM4 - 12 TPM4 - 1 TPM3 - 12 TPM3 - 5 TPM3 - 2 TPM3 - 7 TPM3 - 6,8 TPM3 - 9 TPM3 - 11 1 1 222 2 TPM3 TPM3 - 4 4 4 5 TPM3 - 3 2 2 2 2 2 1 1 5 4 4 1 TPM2 TPM2 - 12 TPM2 - 5 TPM2 - 4 TPM2 - 7TPM2 - 11,13 TPM2 - 1 TPM2 - 2 TPM8 TPM7 TPM6 2 1 22 2 1 1 5 5 4 4 2 TPM8 - 5 TPM8 - 1 TPM8 - 14 TPM8 - 12 TPM8 - 11,13 TPM8 - 6,8 TPM8 - 7 TPM8 - 4 TPM8 - 3 TPM8 - 9 14 14 14 TPM7 - 6,8 TPM7 - 5 TPM7 - 4 TPM7 - 3 TPM7 - 11,13 TPM7 - 2 TPM7 - 14 2 2 22 1414 14 14 1 1 1 5 5 4 4 TPM6 - 1 TPM6 - 14 TPM6 - 2 TPM6 - 3 TPM6 - 12 TPM6 - 4 TPM6 - 5 TPM6 - 11,13 TPM6 - 7 TPM6 - 6,81 1 1 2 2 14 14 14 2 2 5 5 4 4 TPM1 - 12 TPM2 - 3 16 16 16 16 16 HPH1 - 16 UNIT M-11(2 BEDROOM) UNIT M-10(2 BEDROOM)UNIT M-9(2 BEDROOM) UNIT M-8(2 BEDROOM)UNIT M-7(2 BEDROOM) UNIT M-6(2 BEDROOM) UNIT M-1(1 BEDRROM) UNIT M-2(2 BEDROOM) UNIT M-3(2 BEDROOM) UNIT M-4(2 BEDROOM) UNIT M-5(2 BEDROOM) HPH1 - 25 H6 SECURITY HEADEND RACK S/CO 1A * EF-1 EF-1 TPM11 - 12 1A * TPM10 - 12 1A * 1A * S/CO EF-1 EF-1 TPM5 - 6,8 EF-1 HP-1 TPM5 - 15 TPM5 - 7 1A * TPM4 - 14 TPM4 - 5 TPM4 - 2 TPM4 - 15 TPM4 - 7 TPM5 - 2 TPM5 - 14 EF-1 EF-1 TPM4 - 12 HP1 14 14 S/CO1A *1A * 1A * 1A * 1A *1A * 1A * S/CO 1 1 1 1S/CO S/CO EF-1 TPM7 - 12 TPM7 - 9 TPM7 - 12 EF-1 EF-1 EF-1 EF-1 EF-1 14 14 14 14 TPM2 - 14 14 14 14 14 TPM3 - 14 S/CO HP1 EF-1 EF-1 TPM2 - 9 TPM1 - 3 TPM1 - 12 S/CO S/CO EF-1 EF-1 HP-1 1A * TPM3 - 11,13 EF-1 DENOTES CIRCUIT # INASSOCIATED TENANT PANEL-TP (TYP) TPM7 - 1 S/CO S/CO DENOTES CIRCUIT # INPANEL HPH1 FORCORRIDOR RECEPTACLES(TYP) TPM5 - 1 HPL 1 1 HPL - 1 HPL - 2 2 2 2 HPL - 4 HPL - 5,7 HPL - 3 FC 1 CU-1 HPL - 8,10 HPL - 9 H7 SECURITY HEAD END RACK BUILDING L DENOTES CIRCUIT # INPANEL HPL (TYP) Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" LM-EP1.1 ELECTRICAL POWER PLAN BLDG L AND M LEVEL 1 Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 A B D E C F G H J K L M NORTH SITE KEY PLAN No.Description Date F F F TSPS IA IAEOL 1 N.T.S. BLDGS G-L ELECTRICAL POWER RISER DIAGRAM 2 N.T.S. FIRE ALARM PANEL DETAIL M M M M M M M M M M GRADE M M M M MMMM M M M M M M TPG1 TPG2 TPK1 TPK2 300 AMPOWNERS METER &MAIN BREAKER BRANCH DEVICE 6 METER SOCKET.RINGLESS WITH HORN BYPASS AND100 AMP CB MODEL EZMH316TYPICAL OF 6 PLUS A 3 METERSOCKET COLUMN NOTE: BRANCH DEVICE METER SETS ARE 3∅ IN 1∅ OUT SO APARTMENT HAVE 1∅ 208 V FEED.BALANCE LOADS BETWEEN 3∅ PHASE LEGS. 14A 300 AMP AUTOMATICTRANSFER SWITCH(ATS) UTILITYTRANSFORMER TPG3 TPM1 TPM2 TPJ1 TPJ2 TPJ3 TPM3 TPM7 TPM8 TPM9 TPJ5 TPJ6 TPG6 TPG7 TPK3 TPK4 21B 300 AMP GENDISCONNECT SWITCH HPH1 14A14A G G-1 PACKAGED GENERATOR SET (100kW, 208Y/120V/3PH/4W) AT EXTERIOR 7A TYPICAL FOR ALL FEEDS TO TENANT'S PANELS, TP TENANT PANEL (TP)(TYPICAL OF 35) LETTER DESIGNATIONINDICATES UNIT TYPE MAIN INCOMING SWITCH (CIRCUITBREAKER.800 AMP,208Y/120V/3PH/4W M M M M MM M M M M MM TPH1 TPH2 TPG4 TPG5 TPG8 TPG9 TPJ4 TPJ7 TPE3 TPM4 TPM10 TPL1 TPM6TPM5 TPM11 FIRE ALARM CONTROL PANEL (FACP) BASEMENT 120V HOTLEGS. METER SETS SECONDARY FEEDER INCOMING UTILITY ELECTRICAL POWER SERVICE H BUILDING G BUILDING K BUILDING M BUILDING J BUILDING L BUILDING 3/4" RACERATE AND WIRING TO TELEPHONE SERVICE. TO CONNECT TO FD * 20A- IPPOWER CONNECTION INITIATION CIRCUITS TYPICAL MANUAL PULLSTATION. REFER TO PLANSFOR QUANTITIES ANDLOCATION TYPICAL HORN STROBE. REFER TO PLANS FOR QUANTITY AND LOCATION TYPICAL END OF THE LINE RESISTOR TYPICAL AUDIO/VISUAL CIRCUIT.PROVIDE MULTIPLE CIRCUITS TOMEET ADA REQUIREMENTS,LOAD CIRCUITS TO A MAXIMUM OF 80% Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" E2.1 POWER RISER DIAGRAM Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 No.Description Date F F F TSPS IA IAEOL 1 N.T.S. BLDGS A-F ELECTRICAL POWER RISER DIAGRAM 2 N.T.S. FIRE ALARM PANEL DETAIL M M M M M M M M M M GRADE M M M M MMMM M M M M M M TPA1 TPA2 TPB1 TPB2 300 AMPOWNERS METER &MAIN BREAKER BRANCH DEVICE 6 METER SOCKET.RINGLESS WITH HORN BYPASS AND100 AMP CB MODEL EZMH316TYPICAL OF 6 PLUS A 3 METERSOCKET COLUMN NOTE: BRANCH DEVICE METER SETS ARE 3∅ IN 1∅ OUT SO APARTMENT HAVE 1∅ 208 V FEED.BALANCE LOADS BETWEEN 3∅ PHASE LEGS. 14B 300 AMP AUTOMATICTRANSFER SWITCH (ATS) UTILITYTRANSFORMER TPA3 TPA4 TPA5 TPB8 TPB9 TPB10 TPA6 TPB14 TPB15 TPB16 TPB12 TPD3 TPD4 TPB5 TPB6 TPB7 TPC3 TPC4 22B 300 AMP GENDISCONNECT SWITCH HPB 14B14B HPF G G-1 PACKAGED GENERATOR SET (100kW, 208Y/120V/3PH/4W) AT EXTERIOR 7A TYPICAL FOR ALL FEEDS TO TENANT'S PANELS, TP TENANT PANEL (TP) (TYPICAL OF 38) LETTER DESIGNATIONINDICATES UNIT TYPE MAIN INCOMING SWITCH (CIRCUITBREAKER. 1000 AMP,208Y/120V/3PH/4W M M M M MM M M M M MM M M TPC1 TPC2 TPB3 TPB4 TPD1 TPD2 TPB11 TPE2 TPE3 TPB13 TPB17 TPB21 TPB22TPB20TPB19TPB18 HPE FIRE ALARM CONTROL PANEL (FACP) BASEMENT 12B 7A HPB1 12B 120V HOTLEGS. METER SETS SECONDARY FEEDER INCOMING UTILITY ELECTRICALPOWER SERVICE LEVEL SB LEVLEL ONE LEVEL B LEVEL THREE LEVEL TWO LEVEL FOUR ROOF 3/4" RACERATE AND WIRING TO TELEPHONE SERVICE. TO CONNECT TO FD * 20A- IPPOWER CONNECTION INITIATION CIRCUITS TYPICAL MANUAL PULLSTATION. REFER TO PLANS FOR QUANTITIES AND LOCATION TYPICAL HORN STROBE. REFER TO PLANS FOR QUANTITY ANDLOCATION TYPICAL END OF THE LINE RESISTOR TYPICAL AUDIO/VISUAL CIRCUIT.PROVIDE MULTIPLE CIRCUITS TO MEET ADA REQUIREMENTS, LOAD CIRCUITS TO A MAXIMUM OF 80% Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" E2.2 POWER RISER DIAGRAM Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 No.Description Date S S S 12 N.T.S. PAD MOUNTED TRANSFORMER WITH NO C/T'S 11 N.T.S. SERVICE EQUIPMENT GROUNDING DETAIL CLASSROOM MOTION SENSOR WIRINGDIAGRAM NOT TO SCALE1 CALL FOR AID NOT TO SCALE2 ELEVATOR SHUNT TRIP NOT TO SCALE5 H H H H TYPICAL CALL FOR AID SYSTEM SCHEMATIC NOT TO SCALE3 T CORRIDOR DOMESTATION WITH BUILT-IN BUZZER 24V AC BY EDWARDS MODEL#7633-2 TRANSFORMER, 120V TO 24V BY EDWARDS MODEL #88-50 EMERGENCY SWITCH 120V BY EDWARDS MODEL #7302AE DETECTOR/RECALL SCHEMATIC NOT TO SCALE6 CONNECTIONS TO GROUNDING ELECTRODE NOT TO SCALE10 SYSTEM INSTALLATION NOT TO SCALE4 AND DETECTION SCHEMATIC NOT TO SCALE8 S ST E E PHOTO EYE DETAIL NOT TO SCALE7 CORRIDOR LIGHTING CONTROL WIRING NOT TO SCALE9 TRANSFORMER SECONDARY TERMINAL(S) HIGH VOLTAGE SIDE OF TRANSFORMER SECONDARY SIDE OF TRANSFORMER WITHTERMINALS FOR SECONDARY FEED CONDUCTORCONNECTION REROUTE EXISTING SECONDARY CONDUCTORSINTO THE KILOWATT HOUR METER. PROVIDECONDUCTORS TO MATCH EXISTING FROM THEKILOWATT HOUR METER TO THE TRANSFORMERTERMINALS OMNIOCCUPANCYSENSOR BLUE BLACK REDRED RED WHITE BLACK WALL SWITCH/ES TO LIGHTSNEUTRAL CONSTANT FEED TO EMERG. BATT. UNITS MP SERIES POWER PACK 20 AMP 120 VOLT SINGLE POLE CIRCUIT 12"WALL SWITCH RESTROOM EMERGENCY PULL CORD 42" TO 48"FINISHED FLOOR CORRIDOR BELL WALL LIGHT CEILING CA 120V AC 3/4" x 10'-0" GROUND ROD #4/O GROUNDING WIRE #4/O BOND BONDING BUSHING GRADE RIGID STEEL CONDUIT #4/O BOND WELDS BONDING BUSHING SOLDERLESS LUGS WATER PIPE NOTE: TO GROUND TERMINAL IN EQUIPMENT AT LEAST 20' OF ONE ORMORE STEEL REINFORCEDBARS OF NOT LESS THAN1/2" DIA CONCRETE ENCASEDAND/OR BURIEDCONNECTIONS MAY BEUSED WHERE NECESSARY 1/4" x 3" x 6'-0" GROUNDING BAR TO SYSTEMGROUND TERMINAL GROUNDCLAMP ONWATER PIPE GROUNDING ELECTRODECONDUCTOR (PLUSCONDUIT IF USED ASPROTECTION) GROUNDING BUSHING JUMPER, AS NEEDEDFOR CONDUIT CONNECTIONS TO INTERIOR METAL WATER PIPE GROUNDING ELECTRODES AND TO GROUNDED METAL FRAME OF BUILDING MUST BEACCESSIBLE GENSET G TYPICAL EMERGENCY POWER OVERCURRENTPROTECTION EMERGENCYLOAD NON-EMERGENCY LOAD TRANSFER SWITCH OVERCURRENTPROTECTION MAINDISCONNECT UTILITY ORNORMALPOWERSOURCE TYP. DWELLING UNIT CALL-FOR-AID TYPICAL UNIT TO NEXT UNIT HALLWAY (BATHROOM) CONNECT AC POWER TERMINALSIN SMOKE DETECTOR TO NEARESTRECEPTACLE CIRCUIT (BEDROOM) EYE TO FACE OUT PIPE TO INTERIOR GROUND LEVEL TO GROUNDFIXTURES W/P BOX 3/4" PVC PIPE EXTERNAL BUILDING GROUND GRID EXOTHERMIC WELDS (TYP.) #4/0 BARE COPPER IN 1"RSC SERVICE EQUIPMENT FRAME TO SUPPLY WATER METER #4/0 BARE COPPER MAIN BOND JUMPER METALLIC CONDUIT GROUND BUS NEUTRAL BUS BUILDING GROUND NEUTRAL INSULATED/ISOLATED GROUND GROUND CLAMP(TYP) M BOND JUMPER BOND GROUNDING BUSHING BOND JUMPER MAIN SERVICE EQUIPMENT EXG ELEVATOR SHAFT FIRST FLOOR 135° EDP** SECOND FLOOR THIRD FLOOR FOURTH FLOOR EXG 135° EXGDS1 135° EXG TOP OF ELEVATOR SHAFT 135° NOTE: REQUIRED ONLY WHEN SPRINKLERS ARE REQUIRED IN SHAFT AT EVERY OTHER FLOOR LEVEL. 135° FIXEDTEMP HEATDETECTOR(TYPICAL) 1/2" EMT,2-#14(TYP) DO NOTRUN IN ELEVATORSHAFT ELEVATORCONTROLLER W/AUTOSAFERETURN SIDEWALL SPRINKLER HEAD ELEV. MACH. ROOM DETECTOR IN THE SHAFT OR MACHINE ROOM SENSE FUNCTION. ** REMOVE EXISTING 150A/3P MCCB AND PROVIDE A SHUNT TRIP 150A/3P MCCB FOR ELEVATOR. WHEN THE HEAT. HEAT IT SHOULD SEND A SIGNAL TO THE SHUNT TRIP TO OPENTHE 150A/3P MCCB WHICH WILL KILL POWER TO THE ELEVATOR.THE ELEVATOR WILL THEN RETURN TO THE LOWEST LEVEL THROUGHTHE AUTOSAFE RETURN. HYDRAULIC ELEVATOR SMOKE BOTTOM FLOOR S M ELEVATOR SHAFT 120 VAC 1/2" EMT, 2-#14 TOP FLOOR 1/2" EMT, 2-#14 1/2" EMT, 2-#14 S ELEVATOR MACHINE ROOM E S E S S E E TOP OF ELEVATOR SHAFT ES DESIGNATED FLOOR: ALTERNATE FLOOR : NOTE: REQUIRED ONLY WHEN HEAT DETECTORSAND SPRINKLERS AREREQUIRED TO TELEPHONE BACKBOARD 1/2" EMT, 4-#14 TOELEVATOR CONTROL PANEL ALLFLOORS (TYPICAL) LIGHTING LOAD BLACK (COMMON) BLUE (CONTROL) RED BLACK BLUE RED RED BLACK WHITE NEUTRAL HOT GROUND RED POWER PACKWATTSTOPPERBZ-150 ULTRASONIC CEILING SENSORWATTSTOPPERWT-2250 NOTES: 1.LIGHTING LOADS A AND B TURN ON WHEN AT LEAST ONE SENSOR DETECTS MOTION. NOTE: CONTRACTOR SHALL INSTALLBYPASS AT EVERY LOCATION WHERE OVERRIDE SWITCHES EXIST. (TYPICAL FOR EACH CORRIDOR WING) Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/8" = 1'-0" E2.3 ELECTRICAL DETAILS Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 No.Description Date Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 E3.1 ELECTRICAL PANELBOARD SCHEDULES Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 Notes: Total Est. Demand:29 A Receptacle 180 VA 80.00%144 VA Total Conn.:27 A Other 2880 VA 100.00%2880 VA Total Est. Demand:5934 VA Motor 2116 VA 112.50%2381 VA Total Conn. Load:5706 VA Lighting - Dwelling Unit 17 VA 100.00%17 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:25 A 29 A Total Load:2615 VA 3091 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 16 13 ------529 VA 14 11 HP1 20 A 2 529 VA 1058 VA 1 20 A KEF 12 9 FRIDGE 20 A 1 180 VA 17 VA 1 20 A Lighting - Dwelling Unit 10 7 STOVE FAN 20 A 1 500 VA 90 VA ------8 5 KITCHEN RECEPTACLES 20 A 1 360 VA 90 VA 2 20 A STOVE 6 3 BATHROOM CIRCUITS 20 A 1 194 VA 720 VA 1 20 A KITCHEN RECEPTACLES 4 1 BEDROOM RECEPTACLES 20 A 1 720 VA 720 VA 1 20 A LIVING ROOM RECEPTACLES 2 CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT Notes: Enclosure:MCB Rating:100 A Mounting:Recessed Wires:3 Mains Rating:100 A Supply From:Phases:1 Mains Type: Location:Volts:120/208 single A.I.C. Rating: Branch Panel:TPJ4 Notes: Total Est. Demand:39 A Receptacle 180 VA 80.00%144 VA Total Conn.:38 A Other 3960 VA 100.00%3960 VA Total Est. Demand:8086 VA Motor 3174 VA 108.33%3439 VA Total Conn. Load:7858 VA Lighting - Dwelling Unit 17 VA 100.00%17 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:38 A 38 A Total Load:3903 VA 3955 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 Motor 20 A 1 2116 VA 180 VA 1 20 A Other 16 13 ------529 VA 1080 VA 1 20 A BEDROOM 2 RECEPTACLES 14 11 HP1 20 A 2 529 VA 0 VA 1 20 A Spare 12 9 FRIDGE 20 A 1 180 VA 44 VA 1 20 A APARTMENT LIGHTING 10 7 STOVE FAN 20 A 1 500 VA 90 VA ------8 5 KITCHEN RECEPTACLE 20 A 1 360 VA 90 VA 2 20 A STOVE 6 3 BATHROOM CIRCUIT 20 A 1 0 VA 540 VA 1 20 A KITCHEN RECEPTACLE 4 1 BEDROOM 1 RECEPTACLES 20 A 1 720 VA 900 VA 1 20 A LIVING ROOM RECEPTACLES 2 CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT Notes: Enclosure:MCB Rating:100 A Mounting:Recessed Wires:3 Mains Rating:100 A Supply From:Phases:1 Mains Type: Location:Volts:120/208 single A.I.C. Rating: Branch Panel:TPJ3 Notes: Total Est. Demand:30 A Total Conn.:29 A Other 3780 VA 100.00%3780 VA Total Est. Demand:6301 VA Motor 2116 VA 112.50%2381 VA Total Conn. Load:6036 VA Lighting - Dwelling Unit 17 VA 100.00%17 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:34 A 22 A Total Load:3718 VA 2318 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 Security Head End Rack 20 A 1 180 VA 18 15 ------529 VA 180 VA 1 20 A H2 SECURITY RACK 16 13 HP 20 A 2 529 VA 529 VA ------14 11 Other 20 A 1 0 VA 529 VA 2 20 A HP 12 9 Lighting 20 A 1 140 VA 0 VA 1 20 A Other 10 7 FITNESS RECEPTACLES 20 A 1 360 VA 360 VA 1 20 A FITNESS RECEPTACLES 8 5 FITNESS RECEPTACLES 20 A 1 360 VA 180 VA 1 20 A SPARE 6 3 KITCHENETTE RECEPTACLES 20 A 1 360 VA 0 VA 1 20 A TOILET ROOMS 4 1 OFFICE RECEPTACLES 20 A 1 900 VA 900 VA 1 20 A OFFICE RECEPTACLES 2 CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT Notes: Enclosure:MCB Rating:100 A Mounting:Recessed Wires:3 Mains Rating:100 A Supply From:HPB Phases:1 Mains Type: Location:Volts:120/208 single A.I.C. Rating: Branch Panel:HPE PANEL TPJ4 IS TYPICAL (AN EXAMPLE) OF ALL ONE BEDROOM ONE BATHROOM APARTMENTSALL CIRCUITS FEEDING RECEPTACLES IN BEDROOMS SHALL BE ARCFAULT PROTECTED (AFC) ANDTHE RECEPTACLES SHALL BE TAMPER PROOF PANEL TPJ5 IS TYPICAL (AN EXAMPLE) OF ALL TWO BEDROOM ONE BATHROOM APARTMENTSALL CIRCUITS FEEDING BEEDROOM SHALL BE ARC FAUTL PROTECTED AND THERECEPTACLES SHALL BE TAMPER PROOF Notes: Total Est. Demand:25 A Total Conn.:24 A Receptacle 180 VA 80.00%144 VA Total Est. Demand:5207 VA Other 3240 VA 100.00%3240 VA Total Conn. Load:4978 VA Motor 1058 VA 125.00%1323 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:31 A 14 A Total Load:3499 VA 1479 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 18 15 16 13 ------529 VA 720 VA 1 20 A BEDROOM 2 RECEPTACLES 14 11 HP 20 A 2 529 VA 12 9 FRIDGE 20 A 1 180 VA 0 VA 1 20 A LIGHTING 10 7 STOVE FAN 20 A 1 500 VA 90 VA ------8 5 KITCHEN CIRCUIT 20 A 1 540 VA 90 VA 2 20 A STOVE 6 3 BATHROOM CIRCUITS 20 A 1 0 VA 360 VA 1 20 A KITCHEN CIRCUIT 4 1 BEDROOM 1 RECEPTACLES 20 A 1 720 VA 720 VA 1 20 A LIVING ROOM RECEPTACLES 2 CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT Notes: Enclosure:MCB Rating:100 A Mounting:Recessed Wires:3 Mains Rating:100 A Supply From:Phases:1 Mains Type: Location:Volts:120/208 single A.I.C. Rating: Branch Panel:TPB9 PANEL TPB9 IS TYPICAL (AN EXAMPLE) OF TWO BEDROOM ONE BATHROOM APARTMENTS IN THE B BUILDINGALL CIRCUITS FEEDING RECEPTACLES IN BEDROOMS SHALL BE ARCFAULT PROTECTED (AFC) AND THERECEPTACLES SHALL BE TAMPER PROOF No.Description Date Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 E3.2 ELECTRICAL PANELBOARD SCHEDULES Dakota Partners, Inc. OXOBOXO LOFTS Checker Author 11/01/2016 16066.01 Notes: Total Est. Demand:57 A Receptacle 540 VA 55.00%297 VA Total Conn.:56 A Other 5580 VA 100.00%5580 VA Total Est. Demand:11755 VA Motor 3274 VA 108.08%3539 VA Total Conn. Load:11733 VA Lighting - Dwelling Unit 1920 VA 100.00%1920 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:53 A 59 A Total Load:5460 VA 6274 VA 41 42 39 40 37 38 35 36 33 Other 20 A 1 720 VA 529 VA ------34 31 529 VA 2 20 A Motor 32 29 Motor 20 A 1 50 VA 30 27 Motor 20 A 1 550 VA 529 VA ------28 25 Security Head End Rack 20 A 1 360 VA 529 VA 2 20 A Motor 26 23 Lighting - Dwelling Unit 20 A 1 192 VA 180 VA 1 20 A Security Head End Rack 24 21 Lighting 20 A 1 192 VA 512 VA 1 20 A Lighting 22 19 ------529 VA 800 VA 1 20 A Lighting 20 17 SEWAGE EJECTOR PUMP 20 A 2 529 VA 540 VA 1 20 A Other 18 15 Lighting 20 A 1 224 VA 1080 VA 1 20 A CORRIDOR RECEPTACLES 16 13 Spare 20 A 1 0 VA 540 VA 1 20 A CORRIDOR RECEPTACLES 14 11 CORRIDOR RECEPTACLES 20 A 1 360 VA 900 VA 1 20 A CORRIDOR RECEPTACLES 12 9 WASHER 20 A 1 180 VA 360 VA 1 20 A CORRIDOR RECEPTACLES 10 7 ------90 VA 180 VA 1 20 A WASHER 8 5 DRYER 20 A 2 90 VA 180 VA 1 20 A WASHER 6 3 ------90 VA 90 VA ------4 1 DRYER 20 A 2 90 VA 90 VA 2 20 A DRYER 2 CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT Notes: Enclosure:MCB Rating:100 A Mounting:Recessed Wires:3 Mains Rating:100 A Supply From:HPB Phases:1 Mains Type: Location:Volts:120/208 single A.I.C. Rating: Branch Panel:HPH1 Notes: Total Est. Demand:278 A Receptacle 1260 VA 40.00%504 VA Total Conn.:271 A Other 16380 VA 100.00%16380 VA Total Est. Demand:100168 VA Motor 75724 VA 104.46%79099 VA Total Conn. Load:97624 VA Lighting - Dwelling Unit 3121 VA 97.48%3042 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:284 A 309 A 234 A Total Load:33314 VA 36256 VA 28055 VA 41 42 39 40 37 38 35 36 33 34 31 32 29 30 27 28 25 26 23 24 21 22 19 20 17 ------987 VA 18 15 ------987 VA 3300...------16 13 Motor 20 A 3 987 VA 3300...------14 11 ------1857...3300...3 80 A ELEVATOR 1 12 9 ------1875...6274...------10 7 HPFA 225 A 3 1931...5460...2 100 A HPH1 8 5 ------2872...2318...------6 3 ------3229...3718...2 100 A HPE 4 1 HPB1A 225 A 3 4082...180 VA 1 20 A Security Head End Rack 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:Type 1 MCB Rating:400 A Mounting:Surface Wires:4 Mains Rating:400 A Supply From:Phases:3 Mains Type: Location:Volts:120/208 Wye A.I.C. Rating: Branch Panel:HPB Notes: Total Est. Demand:28 A Receptacle 720 VA 50.00%360 VA Total Conn.:28 A Other 5400 VA 100.00%5400 VA Total Est. Demand:10088 VA Motor 2266 VA 111.67%2531 VA Total Conn. Load:10183 VA Lighting - Dwelling Unit 1184 VA 100.00%1184 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:34 A 27 A 24 A Total Load:4082 VA 3229 VA 2872 VA 41 42 39 40 37 38 35 36 33 Other 20 A 1 540 VA 34 31 Power 20 A 1 550 VA 529 VA ------32 29 ERV2 20 A 1 50 VA 529 VA 2 20 A HP 30 27 Lighting 20 A 1 160 VA 352 VA 1 20 A Lighting 28 25 Lighting 20 A 1 213 VA 288 VA 1 20 A Lighting 26 23 ------529 VA 331 VA 1 20 A Lighting 24 21 Motor 20 A 2 529 VA 50 VA 1 20 A Motor 22 19 LEVLEL 3 CORRIDOR RECEPTACLES 20 A 1 540 VA 360 VA 1 20 A LEVEL 4 CORRIDOR RECEPTACLES 20 17 LEVEL 1 CORRIDOR RECEPTACLES 20 A 1 540 VA 360 VA 1 20 A LEVEL 2 CORRIDOR RECEPTACLES 18 15 ------90 VA 90 VA ------16 13 DRYER 50 A 2 90 VA 90 VA 2 50 A DRYER 14 11 ------90 VA 90 VA ------12 9 DRYER 50 A 2 90 VA 90 VA 2 50 A DRYER 10 7 WASHER 20 A 1 180 VA 180 VA 1 20 A WASHSER 8 5 WASHER 20 A 1 180 VA 180 VA 1 20 A WASHER 6 3 MAINTENANCE RECEPTACLES 20 A 1 720 VA 540 VA 1 20 A B CORRIDOR RECEPTACLES 4 1 BOILER ROOM RECEPTACLE 20 A 1 540 VA 540 VA 1 20 A SB RECEPTACLES 2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:Type 1 MCB Rating:225 A Mounting:Surface Wires:4 Mains Rating:225 A Supply From:HPB Phases:3 Mains Type: Location:Volts:120/208 Wye A.I.C. Rating: Branch Panel:HPB1 Notes: Total Est. Demand:167 A Total Conn.:157 A Total Est. Demand:60023 VA Other 1440 VA 100.00%1440 VA Total Conn. Load:56648 VA Motor 55208 VA 106.11%58583 VA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals Legend: Total Amps:161 A 157 A 155 A Total Load:19310 VA 18759 VA 18579 VA 41 42 39 40 37 38 35 1590...------36 33 Security Head End Rack 20 A 1 180 VA 1590...------34 31 BLDG F LIGHTING 20 A 1 0 VA 1590...3 40 A ELEVATOR 2 32 29 ------529 VA 987 VA ------30 27 Motor 20 A 2 529 VA 987 VA ------28 25 KITCHENETTE RECEPTACLES 20 A 1 0 VA 987 VA 3 20 A CT-1 26 23 FRIDGE 20 A 1 0 VA 0 VA 1 20 A KITCHENETTE RECEPTACLES 24 21 Other 20 A 1 0 VA 0 VA 1 20 A TOILET ROOM CIRCUIT 22 19 BOILER ROOM RECEPTACLES 20 A 1 720 VA 540 VA 1 20 A Other 20 17 ------2250...2250...------18 15 ------2250...2250...------16 13 P5 50 A 3 2250...2250...3 50 A P6 14 11 ------987 VA 987 VA ------12 9 ------987 VA 987 VA ------10 7 P3 20 A 3 987 VA 987 VA 3 20 A P4 8 5 ------4500...4500...------6 3 ------4500...4500...------4 1 P1 (VFD)80 A 3 4500...4500...3 80 A P2 (VFD)2 CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT Notes: Enclosure:Type 1 MCB Rating:225 A Mounting:Surface Wires:4 Mains Rating:100 A Supply From:HPB Phases:3 Mains Type: Location:BOILER ROOM C-13 Volts:120/208 Wye A.I.C. Rating: Branch Panel:HPF No.Description Date J S S 3,5 3/5 1/3/5 3 HOMERUN CIRCUIT SYMBOLS 120 OR 277 VOLT 120 OR 277 VOLT 208 OR 480 VOLT 208 OR 480 VOLT SINGLE PHASE CIRCUIT PHASE CIRCUITSCONSECUTIVE SINGLE SINGLE PHASE CIRCUIT THREE (3) PHASE CIRCUIT (3 POLE) (2 POLE) S C F S S TS FACP FS IA FAAP S S/CO W F L TV S/CO NOTE: SEE SHEET P-1.0 FOR SITE LIGHTING DRAWINGS AND SITE LIGHTING FIXTURESCHEDULE. SEE BELOW CALCULATIONS. 34.3% OF THE SITE LIGHTING IS PHOTOVOLTAICPOWERED WITH INTEGRAL BATTERY STORAGE SO IT DOES NOT CONNECT AT ALL TO THEBUILDINGS ELECTRICAL POWER DISTRIBUTION SYSTEM. ENERGY USAGE CALCULATIONS PV:(25 FIX)(55 WATT/FIX)(12 HR/DAY)(365 DAY/YEAR)(1 KW/1,000 W) = 6,023KW/YEAR HARDWIRE: POLES - (6 FIX)(55 WATT/FIX)(12 HR/DAY)(365 DAY/YEAR)(1 KW/1,000W) = 1,445 KW/YEARHARDWIRE: BOLLARDS - (43 FIX)(17.1 WATT/FIX)(12 HR/DAY)(365 DAY/YEAR)(1KW/1,000 W) = 3,221 KW/YEARHARDWIRE: HAND RAILS - (820 FIX)(1.9 WATT/FIX)(12 HR/DAY)(365 DAY/YEAR)(1KW/1,000 W) = 6,824 KW/YEAR TOTAL HARDWIRE - 1,445 + 3,221 + 6,824 = 11,490 KW/YEAR % OF SOLAR = [6,023/(6,023 + 11,490)] = 34.4% NOTE: WHEN A FEEDER SUPPLIES AN ISOLATED GROUND PANEL OR SUB PANEL, AN ADDITIONAL GROUND WIRE SHALL BE PROVIDED WITH AND IDENTIFIED BY GREEN INSULATION WITH A YELLOW STRIPE. THE ISOLATED GROUND WIRESHALL BE ROUTED THROUGH PANELS IN ACCORDANCE WITH NEC SECTION 384-20 AND TERMINATE AT THE BUILDING INCOMING SEVICE. STANDARD FEEDER SIZES FOR 75°C THWN/THHN COPPER WIRE IN METAL OR NON-METALLIC CONDUIT HORN UNIT WITH ADA COMPLIANT STROBE WITHREQUIRED CANDELA (cd) RATING. HORN UNIT ONLYIF WITHIN APARTMENT/DWELLING UNIT SPEAKER UNIT WITH ADA COMPLIANT STROBE WITHREQUIRED CANDELA (cd) RATING 1-250MCM3-500MCM(5) 4"26A (7) 4" (11) 4" (8) 4" (6) 4" (14) 4" (16) 4" 30A 31A 32A 28A 29A 27A 3-500MCM 3-500MCM 3-500MCM 3-500MCM 3-500MCM 3-400MCM 1-500MCM 2-350MCM 2-500MCM 1-350MCM 1-400MCM 1-250MCM (4) 4" (5) 4" (5) 4" (2) 4" (2) 3" (2) 3" (2) 3" 23A 24A 25A 22A 21A 20A 19A (2) 3" (2) 2-1/2" 15A 18A 17A 16A 14A 13A 12A 3-1/2" 3-1/2" 3" 3" 2-1/2" 3-350MCM 3-300MCM 3-400MCM 3-400MCM 3-500MCM 3-500MCM 3-350MCM 1-#3/0 1-#4/0 1-#4/0 1-#2/0 1-#1/0 1-#1/0 1-#1 3-500MCM 3-250MCM 3-#4/0 3-500MCM 3-350MCM 3-250MCM 3-#4/0 1-#3 1-#2 1-#2 1-#3 1-#4 1-#4 1-#4 1 OR 3 PHASE, 3WIRE CABLE 1"4A 11A 10A 9A 8A 7A 6A 5A 2" 2" 2" 1-1/2" 1-1/4" 1-1/4" 1" CONDUIT 3A 2A 1A FDR NO. 1" 3/4" 3/4" 1-#103-#8 3-#3/0 3-#2/0 3-#1/0 3-#1 3-#4 3-#3 3-#6 1-#6 1-#6 1-#6 1-#6 1-#8 1-#8 1-#10 3-#12 3-#8 3-#10 1-#10 1-#10 1-#12 GROUND 4-250MCM 4-350MCM 4-500MCM 4-500MCM 4-250MCM 4-350MCM 4-500MCM 4-500MCM 4-400MCM 4-400MCM 4-500MCM 4-300MCM 4-350MCM 4-400MCM 4-500MCM 4-500MCM 4-500MCM 4-500MCM 4-500MCM 1900 (5) 4"1800 26B 2010 3040 2660 5320 6080 4180 6000 4000 5000 2500 3000 2000 32B 30B 31B 28B 29B 27B (16) 4" (14) 4" (11) 4" (8) 4" (7) 4" (6) 4" 620 760 760 1240 1675 1425 1005 1400 1600 1200 1000 800 700 600 24B 25B 23B 22B 21B 20B 19B 510 230 255 310 380 380 460 350 500 450 400 250 300 225 15B 18B 17B 16B 13B 14B 12B (5) 4" (5) 4" (4) 4" (3) 4" (2) 4" (2) 4" (2) 3" 4" (2) 3" (2) 2-1/2" 4" 2-1/2" 3" 3" 4-#4/0 4-#4/0 1800 19001-250MCM 2-500MCM 1-250MCM 1-400MCM 1-350MCM 2-350MCM 1-500MCM 5000 6000 4000 3000 2500 2000 6080 4180 5320 2660 3040 2010 1-#4/0 1-#4/0 1-#3/0 1-#1/0 1-#2/0 1-#1/0 1-#1 1200 1600 1400 1000 800 600 700 1-#3 1-#3 1-#2 1-#3 1-#4 1-#4 1-#4 350 450 500 400 250 300 225 1425 1675 1240 1005 760 620 760 380 460 510 380 255 310 230 3 PHASE, 4 WIRE CABLE 50 4B50 175 200 100 130 150 85 65 200 175 150 125 70 100 60 11B 10B 9B 8B 6B 7B 5B CALC. AMPS 50 30 20 40 30 20 NOM. AMPS 3B 2B 1B FDR NO. 4-#81" 2-1/2" 2" 2" 2" 1-1/4" 1-1/4" 1" 4-#2/0 4-#3/0 4-#1 4-#1/0 4-#4 4-#3 4-#6 3/4" 3/4" 1" CONDUIT 4-#8 4-#10 4-#12 501-#10 1-#6 1-#6 1-#6 1-#6 1-#8 1-#8 1-#10 175 200 125 150 70 100 60 1-#10 1-#12 1-#10 GROUND 40 20 30 NOM. AMPS 50 200 175 150 130 85 100 65 50 20 30 CALC. AMPS MANUFACTURERNUMBER PART/MODEL DESCRIPTION VOLTAGE LAMPS OPTIONS (1) 32W CFL120W516-41-32WABASELINE COEPD MATION 16" WAREHOUSE SHADE B (3)BR20 LED, 8W120LTKSTBF D (2) 1.5W LED3.6ELM2 BAFFLE TRACK KIT CEILING EXIT/EMERGENCY LITHONIA LIGHTING LITHONIA LITHONIA XEC EM LHQM 9.6 (2) 1.5W LED C WAREHOUSE CORD HUNG LEDPROSROSS LIGHTING P5094-0930K9 120 (1) 17W LED E XE (2) 1.5W LED9.6LHQMWALL MOUNTED EXIT/EMERGENCYLITHONIA WALL MOUNTED EMERGENCY 120CONTEMPORARY SQUARE VANITYLITHONIA LIGHTING FMVCSL-24 MVOLT (1) 26W LED (1) 17WLED120S7R827K10PHILIPSSURFACE ROUND CEILING LED 7" XM (2) 1.5W LEDFLOOR PROXIMITY EXIT SIGNLITHONIA S S BRANCH WIRING CONCEALED IN CEILING OR WALL DUPLEX RECEPTACLE OUTLET (+18" AFF - TYPICAL) GROUND FAULT CIRCUIT INTERRUPTER BRANCH WIRING HOME RUN (ARROW INDICATES CIRCUIT NUMBER) SINGLE - POLE SWITCH THREE - WAY SWITCH PANEL- GFCI JUNCTION BOX SURFACE - MOUNTED PANELBOARD SYMBOL DESCRIPTION ELECTRICAL SYMBOL LIST NATIONAL ELECTRICAL NOT APPLICABLE NOT TO SCALE MOLDED CASE CIRCUIT BREAKER LIGHTING PANELBOARD JUNCTION BOX GRD GFCI EQUIP ENCL EMT EM DWG DISC CCT C/B CAB C BR BAT AWG LIGHTING KILOWATT INCHES WP SCHD U/G TYP SW ELECTRICAL ABBREVIATIONS AFF AC RECPT DESCRIPTIONABBREVIATION GROUND-FAULT CIRCUIT-INTERRUPTER DRAWING EMERGENCY ELECTRICAL METALLIC TUBING ENCLOSURE EQUIPMENT GROUND ABOVE COUNTER ABOVE FINISHED FLOOR AMERICAN WIRE GAUGE BATTERY BRANCH CONDUIT CABINET CIRCUIT BREAKER CIRCUIT DISCONNECT KW LTG LP MCCB N.T.S. N/A NEMA IN JB WEATHERPROOF UNDER GROUND TYPICAL SCHEDULE SWITCH RECEPTACLE CEILINGCLG EXG EXISTING MANUALMAN NOT IN CONTRACTNIC DESCRIPTIONABBREVIATION SC SEPARATE CIRCUIT EQUIPMENT AND MATERIAL INDICATED ON THE DRAWING SHALL BE CONSIDERED AS "BASIS OF DESIGN". EQUAL PRODUCTS CAN BE SUBMITTED AND WILL BE CONSIDERED FOR APPROVAL STRICTLY SUBJECT TO OWNERS AND DESIGN PROFESSIONAL'S APPROVAL. SUBMIT SHOP DRAWINGS FOR APPROVAL PRIOR TO ORDERING FIXTURES. PROVIDE OWNER WITH WARRANTY, GUARANTEEING THAT IMPERFECT SYSTEM OPERATION AND ALL DEFECTS IN MATERIAL AND LABOR OF WORK WILL BE REPAIRED WITHOUT COST TO THE OWNER FOR A PERIOD OF ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION OF THE PROJECT. GIVE FULL COOPERATION TO OTHER TRADES, PROVIDING THEM WITH ALL NECESSARY INSTALLATION DETAILS. PROVIDE COMPLETE AND OPERATIONAL SYSTEMS INCLUDING ALL NECESSARY MATERIAL EQUIPMENT AND LABOR. THE TERM 'INDICATE' SHALL MEAN AS SHOWN ON THE CONTRACT DOCUMENTS (DRAWINGS, SPECIFICATIONS AND RELATED ATTACHMENTS). THE TERM 'PROVIDE' SHALL MEAN FURNISH, INSTALL, CONNECT AND MAKE OPERABLE. ALL EQUIPMENT AND MATERIALS SHALL BE LABELED, LISTED AND INSTALLED IN ACCORDANCE WITH MANUFACTURERS INTERACTIONS, RECOMMENDATIONS AND INSTRUCTIONS. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND ARRANGE FOR ALL REQUIRED INSPECTIONS IN ACCORDANCE WITH STATE AND LOCAL GOVERNING AUTHORITIES. ALL WORK SHALL BE PERFORMED BY LICENSED WORKMEN IN ACCORDANCE WITH ALL APPLICABLE STATE, FEDERAL AND LOCAL CODES AND REGULATIONS INCLUDING BUT NOTLIMITED TO THE CURRENT NATIONAL ELECTRIC CODE (NEC). BECOME FAMILIAR WITH THE COMPLETE SET OF CONTRACT DOCUMENTS, AS ALL OTHER SPECIFICATION SECTIONS AND DRAWINGS ARE APPLICABLE TO THE WORK OF THIS DRAWING.FOLLOW THE JOB-SITE INSTRUCTIONS OUTLINED IN THE GENERAL CONDITIONS. ALL LOW VOLTAGE WIRING TO BE RUN WITH A MINIMUM OF 12" CLEARANCE FROM FLUORESCENT LIGHTING IN ALL DIRECTIONS. FIRE RATING OF ALL WALLS AND CEILINGS SHALL BE MAINTAINED. ANY FIRE BARRIERS THAT MUST BE PENETRATED SHALL MAINTAIN FIRE RATINGS THAT COMPLY WITH BOTH THENATIONAL FIRE PROTECTION ASSOCIATION AND UNDERWRITER LABORATORY'S STANDARDS AND SPECIFICATIONS. EMT CONDUIT SHALL BE USED FOR CONCEALED WALL & CEILING PENETRATIONS, RISERS AND MAY BE USED IN EQUIPMENT CLOSETS. ALL WIRING TO BE CONCEALED WHEREVER POSSIBLE. IF BUILDING STRUCTURE PREVENTS WIRE OR CABLE FROM BEING RUN INSIDE WALLS AND CEILINGS, ALL EXPOSED WIRING TOBE RUN IN METALLIC RACEWAY. IF ANY ASBESTOS OR MATERIALS CONTAINING ASBESTOS ARE ENCOUNTERED DURING EXECUTION OF THE PROJECT WORK IS TO BE HALTED. IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY THE OWNER AND PROPER AUTHORITIES IF THEY HAVE DISCOVERED ASBESTOS. PROVIDE THE OWNER WITH ALL MANUFACTURERS WARRANTIES FOR EQUIPMENT AND MATERIAL FURNISHED. ANY HAZARDOUS MATERIALS ENCOUNTERED (SUCH AS PCB BALLASTS) SHALL BE DISPOSED OF PROPERLY. ALL PAPERWORK RELATING TO DISPOSAL SHALL BE MAINTAINED ON FILEFOR ONE YEAR FROM COMPLETION OF JOB. UNLESS OTHERWISE INDICATED PROVIDE COMMERCIAL GRADE, 20 AMPERE RECEPTACLES. UNLESS OTHERWISE INDICATED, INTERIOR BRANCH CIRCUIT WIRING USING 6 AWG AND SMALLER CONDUCTORS MAY BE ARMORED CABLE (TYPE AC) WHERE ACCEPTABLE TO LOCALCODES. UNLESS OTHERWISE INDICATED ALL ENCLOSURES FOR EQUIPMENT SHALL BE NEMA TYPE 1. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL FIELD CONDITIONS OR INTERFERENCES THAT MAY EXIST. CONTRACTOR SHALL VISIT THE JOB SITE, BECOME FAMILIAR WITHFIELD CONDITIONS AND ASSUME RESPONSIBILITY FOR THEM THEREOF, BEFORE BIDDING AND DURING EXECUTION OF WORK. 21. 20. 19. 18. 17. 16. 15. 14. 13. 12. 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. GENERAL ELECTRICAL NOTES DATA OUTLET MOTOR PC PHOTO CELL SMOKE DETECTOR ALL CONDUCTORS SHALL BE COPPER W/ THHN/THWN INSULATION. ALUMINUM CONDUCTOR WILL NOT BE ACCEPTED.22. UNLESS OTHERWISE NOTED ALL CIRCUITS SHALL BE 2#12 AWG & 1#12 GND IN 1/2"C23. ALL WIRING SHALL BE IN METAL CLAD CABLE OR (BX) OR IN FLEXIBLE METAL CONDUIT UNLESS OTHERWISE INDICATED ABOVE. PROVIDE A DEDUCT PRICE TO BE NON-METALLIC CABLE (ROMEX) WHERE CONCEALED.24. FLOOR OR COUNTERTOP MOUNTED DUPLEX RECEPTACLE OUTLET 240 VOLT OUTLET SPECIAL PURPOSE SINGLE RECEPTACLE OUTLET EXTERNALLY OPERATED DISCONNECT SWITCH SWITCH LEG WIRING AIR HANDLING UNITAH-# SMOKE AND CARBON MONOXIDE DETECTOR SURFACE CEILING MOUNTED LIGHT FIXTURE EXHAUST FAN/ LIGHT CONDENSING UNITCU-# WI-FI HOT SPOT TV CABLE OUTLET DIMMER SWITCH TIMER SWITCH MANUFACTURERS ASSOCIATION ADA COMPLIANT STROBE WITH REQUIRED CANDELA (cd) RATING - WALL FIRE ALARM CONTROL PANEL INDIVIDUAL ADDRESSABLE INPUT MODULE SPRINKLER TAMPER SWITCH TO BE MONITORED SPRINKLER FLOW SWITCH TO BE MONITORED ADA COMPLIANT STROBE WITH REQUIRED CANDELA (cd) RATING - CEILING SMOKE DETECTOR MANUAL PULL STATION FIRE ALARM SYMBOL LIST SYMBOL DESCRIPTION FIRE ALARM ANNUNCIATOR PANEL SMOKE DETECTOR CONNECTED TO ELEVATOR RECALL SYSTEM. LIGHT FIXTURE SCHEDULE MOTOR SWITCH COMBINATION SMOKE/CARBON MONOXIDE DETECTOR Scale Date Drawn By Checked By Project Number UNCASVILLE, 1 CONST DOCS 11/1/16 2 CONST DOCS 10/31/17 3 CONST DOCS 05/01/18 4 FINAL CONST DOCS 10/12/18 1/4" = 1'-0" E3.3 ELECTRICAL SCHEDULES Dakota Partners, Inc. OXOBOXO LOFTS DA RS 11/01/2016 16066.01 No.Description Date PHONE OUTLET SM